CN108098979A - A kind of PK sections concrete box girder precast segment template - Google Patents

A kind of PK sections concrete box girder precast segment template Download PDF

Info

Publication number
CN108098979A
CN108098979A CN201711326085.2A CN201711326085A CN108098979A CN 108098979 A CN108098979 A CN 108098979A CN 201711326085 A CN201711326085 A CN 201711326085A CN 108098979 A CN108098979 A CN 108098979A
Authority
CN
China
Prior art keywords
formwork
support
box girder
movable
concrete box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711326085.2A
Other languages
Chinese (zh)
Inventor
宋伟俊
赵健
龚国锋
陈宁贤
朱永盛
田亮
李春江
于浩业
杨占伟
孙百锋
刘春城
姜延开
岳超杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Provincial Communications Investment Group Co Ltd
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Bridge Engineering Bureau Group Co Ltd filed Critical China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority to CN201711326085.2A priority Critical patent/CN108098979A/en
Publication of CN108098979A publication Critical patent/CN108098979A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0002Auxiliary parts or elements of the mould
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0029Moulds or moulding surfaces not covered by B28B7/0058 - B28B7/36 and B28B7/40 - B28B7/465, e.g. moulds assembled from several parts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0029Moulds or moulding surfaces not covered by B28B7/0058 - B28B7/36 and B28B7/40 - B28B7/465, e.g. moulds assembled from several parts
    • B28B7/0055Mould pallets; Mould panels

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明创造提供了一种PK断面混凝土箱梁节段预制模板,包括侧模组件、底模组件、端模组件以及滑移组件;其中,侧模组件包括侧模支架以及由侧模支架支撑的侧模板;在侧模支架上设有活动模,同时在侧模支架下端还设有用于撑地的液压顶撑杆;底模组件包括底模支撑梁,在底模支撑梁上端设有底模板,下端设有底模支撑杆;端模组件包括对应箱梁节段两端设置的固定端模板和活动端模板;滑移组件包括设置在底模板下端的行走支架,在行走支架下端设有滑靴。本发明创造中设置了滑移组件,能够大大提升移梁速度,适用于大吨位PK断面混凝土箱梁节段“短线法”预制施工,提高了混合梁斜拉桥的生产效率,缩短了工期,同时还有助于节约建造成本。

The invention provides a prefabricated formwork for a PK section concrete box girder segment, including a side form assembly, a bottom form assembly, an end form assembly and a sliding assembly; wherein, the side form assembly includes a side form support and a The side formwork supported by the formwork support; the movable formwork is arranged on the side formwork support, and the hydraulic jacking rod for supporting the ground is also provided at the lower end of the side formwork support; the bottom formwork assembly includes the bottom formwork support beam, and the bottom formwork support beam The bottom formwork is provided at the upper end, and the bottom formwork support rod is provided at the lower end; the end formwork assembly includes a fixed end formwork and a movable end formwork provided at both ends of the corresponding box girder segment; the sliding assembly includes a walking bracket arranged at the lower end of the bottom formwork, The lower end of the walking bracket is provided with a sliding shoe. The invention is provided with sliding components, which can greatly increase the beam moving speed, and is suitable for the "short-line method" prefabrication construction of large-tonnage PK section concrete box girder segments, which improves the production efficiency of mixed girder cable-stayed bridges and shortens the construction period. It also helps to save construction costs.

Description

一种PK断面混凝土箱梁节段预制模板A Prefabricated Formwork for PK Section Concrete Box Girder Segments

技术领域technical field

本发明创造属于混凝土梁预制施工技术领域,尤其是涉及一种PK断面混凝土箱梁节段预制模板。The invention belongs to the technical field of concrete beam prefabrication construction, and in particular relates to a segmental prefabricated template of a PK section concrete box girder.

背景技术Background technique

传统的斜拉桥PK断面混凝土箱梁大多数采用的是支架现浇法,所以对模板工艺要求相对简单。然而,由于PK断面混凝土箱梁结构构造的特点,在采用地面“短线法”预制施工的过程中,模板的拼装、拆卸、移梁效率都较低,目前我国该技术尚未成熟。如何在保证工程质量的前提下,既能够适应“短线法”施工工艺,节约建造成本,同时还显著提高混合梁斜拉桥的生产效率,是个亟需解决的问题。Most of the traditional PK section concrete box girders of cable-stayed bridges adopt the cast-in-place method of brackets, so the requirements for formwork technology are relatively simple. However, due to the characteristics of the PK section concrete box girder structure, the efficiency of formwork assembly, disassembly, and beam removal is low during the prefabrication process using the "short-line method" on the ground. At present, this technology is not yet mature in my country. How to adapt to the "short-line method" construction technology, save construction costs, and significantly improve the production efficiency of composite girder cable-stayed bridges on the premise of ensuring project quality is an urgent problem to be solved.

发明内容Contents of the invention

有鉴于此,本发明创造旨在克服上述现有技术中存在的缺陷,提出一种PK断面混凝土箱梁节段预制模板。In view of this, the present invention aims to overcome the above-mentioned defects in the prior art, and proposes a prefabricated formwork for the PK section concrete box girder segment.

为达到上述目的,本发明创造的技术方案是这样实现的:In order to achieve the above object, the technical solution created by the present invention is achieved in this way:

一种PK断面混凝土箱梁节段预制模板,包括侧模组件、底模组件、端模组件以及滑移组件;A PK section concrete box girder section prefabricated formwork, including side formwork components, bottom formwork components, end formwork components and sliding components;

侧模组件,包括侧模支架以及由侧模支架支撑的侧模板;在侧模支架上设有活动模,同时在侧模支架下端还设有用于撑地的液压顶撑杆;The side form assembly includes a side form support and a side form supported by the side form support; a movable form is provided on the side form support, and a hydraulic top brace for ground support is also provided at the lower end of the side form support;

底模组件,包括底模支撑梁,在底模支撑梁上端设有底模板,下端设有底模支撑杆;The bottom form assembly includes a bottom form support beam, a bottom formwork is provided at the upper end of the bottom form support beam, and a bottom form support bar is provided at the lower end;

端模组件,包括对应箱梁节段两端设置的固定端模板和活动端模板,所述活动端模板通过螺栓固定连接在底模板上,固定端模板安装在固定支架上;所述活动端模板的上部与固定端模板的上部通过上对拉钢杆连接;The end formwork assembly includes a fixed end formwork and a movable end formwork provided at both ends of the corresponding box girder section, the movable end formwork is fixedly connected to the bottom formwork by bolts, and the fixed end formwork is installed on the fixed bracket; the movable end formwork The upper part of the formwork is connected with the upper part of the fixed end formwork through the upper pair of tension steel rods;

滑移组件,包括设置在底模板下端的行走支架,行走支架下端设有滑靴。The sliding component includes a walking bracket arranged at the lower end of the bottom template, and a sliding shoe is arranged at the lower end of the walking bracket.

进一步,所述固定支架上设有与用于与固定模板连接的加固法兰盘。Further, the fixing bracket is provided with a reinforcing flange for connecting with the fixing template.

进一步,所述固定支架下端设有伸入地面以下的锚固钢筋。Further, the lower end of the fixed bracket is provided with anchoring steel bars extending below the ground.

进一步,所述活动模为侧模支架上通过可调式支撑杆安装的活动角模板,或是在侧模支架上直接安装的活动翻口板。Further, the movable form is a movable angle formwork installed on the side form support through an adjustable support rod, or a movable opening plate directly installed on the side form support.

进一步,所述行走支架上设有能调整底模板高度的千斤顶。Further, a jack capable of adjusting the height of the bottom template is provided on the walking support.

进一步,所述滑靴中部设有限位钢轨。Further, a limit rail is provided in the middle of the sliding shoe.

进一步,所述底模板与侧模支架之间设有下对拉钢杆。Further, a lower pair of tension steel rods is provided between the bottom formwork and the side formwork support.

相对于现有技术,本发明创造具有以下优势:Compared with the prior art, the present invention has the following advantages:

本发明提供的预制模板安装简单,拆卸方便,由于设置了滑移组件,因此,大大提升了移梁速度,特别适用于大吨位PK断面混凝土箱梁节段“短线法”预制施工,本预制模板可以保障PK断面箱梁的浇筑线型,保障了结构质量,并提高了混合梁斜拉桥的生产效率,间接的缩短了工期,同时还有助于节约建造成本。The prefabricated formwork provided by the invention is easy to install and easy to disassemble. Since the sliding assembly is provided, the beam moving speed is greatly improved, and it is especially suitable for the "short-line method" prefabricated construction of large-tonnage PK section concrete box girder segments. This prefabricated formwork It can ensure the pouring line of the PK section box girder, guarantee the structural quality, improve the production efficiency of the mixed girder cable-stayed bridge, indirectly shorten the construction period, and help save construction costs at the same time.

附图说明Description of drawings

构成本发明创造的一部分的附图用来提供对本发明创造的进一步理解,本发明创造的示意性实施例及其说明用于解释本发明创造,并不构成对本发明创造的不当限定。在附图中:The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention, and the schematic embodiments and descriptions of the present invention are used to explain the present invention, and do not constitute improper limitations to the present invention. In the attached picture:

图1为本发明创造的结构示意图;Fig. 1 is the structural representation that the present invention creates;

图2为本发明创造采用活动翻口板时的结构示意图;Fig. 2 is the structural representation when the present invention creates and adopts movable opening plate;

图3为图1的右视图。Fig. 3 is a right side view of Fig. 1 .

附图标记说明:Explanation of reference signs:

1-侧模组件;2-底模组件;3-端模组件;4-滑移组件;5-侧模支架;6-侧模板;7-液压顶撑杆;8-底模支撑梁;9-底模板;10-底模支撑杆;11-固定端模板;12-活动端模板;13-固定支架;14-上对拉钢杆;15-行走支架;16-滑靴;17-加固法兰盘;18-下对拉钢杆;19-活动角模板;20-活动翻口板;21-锚固钢筋;22-千斤顶;23-可调式支撑杆。1-side mold assembly; 2-bottom mold assembly; 3-end mold assembly; 4-sliding assembly; 5-side mold bracket; 6-side formwork; Beam; 9-bottom formwork; 10-bottom formwork support rod; 11-fixed end formwork; 12-movable end formwork; 13-fixed bracket; -Reinforced flange; 18-Double pull steel rod; 19-Active angle formwork; 20-Active flap plate; 21-Anchor steel bar; 22-Jack; 23-Adjustable support rod.

具体实施方式Detailed ways

需要说明的是,在不冲突的情况下,本发明创造中的实施例及实施例中的特征可以相互组合。It should be noted that, in the case of no conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other.

在本发明创造的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明创造和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明创造的限制。此外,术语“第一”、“第二”等仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”等的特征可以明示或者隐含地包括一个或者更多个该特征。在本发明创造的描述中,除非另有说明,“多个”的含义是两个或两个以上。In describing the present invention, it should be understood that the terms "center", "longitudinal", "transverse", "upper", "lower", "front", "rear", "left", "right", The orientations or positional relationships indicated by "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. are based on the orientation or positional relationships shown in the drawings, and are only for the convenience of describing the present invention Creation and simplification of description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore should not be construed as limiting the invention. In addition, the terms "first", "second", etc. are used for descriptive purposes only, and should not be understood as indicating or implying relative importance or implicitly specifying the quantity of the indicated technical features. Thus, a feature defined as "first", "second", etc. may expressly or implicitly include one or more of that feature. In the description of the present invention, unless otherwise specified, "plurality" means two or more.

在本发明创造的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以通过具体情况理解上述术语在本发明创造中的具体含义。In the description of the present invention, it should be noted that unless otherwise specified and limited, the terms "installation", "connection" and "connection" should be interpreted in a broad sense, for example, it can be a fixed connection or a flexible connection. Detachable connection, or integral connection; it can be mechanical connection or electrical connection; it can be direct connection or indirect connection through an intermediary, and it can be the internal communication of two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present invention based on specific situations.

下面将参考附图并结合实施例来详细说明本发明创造。The invention will be described in detail below with reference to the accompanying drawings and examples.

一种PK断面混凝土箱梁节段预制模板,如图1至3所示,包括侧模组件1、底模组件2、端模组件3以及滑移组件4;A PK section concrete box girder section prefabricated formwork, as shown in Figures 1 to 3, includes a side formwork assembly 1, a bottom formwork assembly 2, an end formwork assembly 3 and a sliding assembly 4;

侧模组件1,包括侧模支架5以及由侧模支架支撑住的侧模板6,在侧模支架上设有活动模,同时,为了提高侧模支架的稳定性,在侧模支架下端还设有用于撑地的数个液压顶撑杆7,通过液压顶撑杆形成多点支撑,具体的,液压顶撑杆可以采用液压缸,利用液压的压力支撑住侧模支架;Side form assembly 1, comprises side form support 5 and the side template 6 that is supported by side form support, is provided with movable mold on side form support, simultaneously, in order to improve the stability of side form support, in side form support lower end also There are several hydraulic top struts 7 for supporting the ground, which form multi-point support through the hydraulic top struts. Specifically, the hydraulic top struts can use hydraulic cylinders to support the side form brackets with hydraulic pressure;

底模组件2,包括底模支撑梁8,在底模支撑梁8上端设有底模板9,下端设有底模支撑杆10;The bottom mold assembly 2 includes a bottom mold support beam 8, a bottom formwork 9 is provided at the upper end of the bottom mold support beam 8, and a bottom mold support rod 10 is provided at the lower end;

端模组件3,包括对应箱梁节段两端设置的固定端模板11和活动端模板12,所述活动端模板12通过螺栓固定连接在底模板9上,固定端模板11安装在固定支架13上;所述活动端模板的上部与固定端模板的上部通过上对拉钢杆14连接;The end formwork assembly 3 includes a fixed end formwork 11 and a movable end formwork 12 arranged at both ends of the corresponding box girder section, the movable end formwork 12 is fixedly connected to the bottom formwork 9 by bolts, and the fixed end formwork 11 is installed on the fixed bracket 13; the upper part of the movable end formwork is connected with the upper part of the fixed end formwork through the upper pair of tension steel rods 14;

滑移组件4,包括设置在底模板9下端的行走支架15,在行走支架下端设有滑靴16。侧模板、底模板和活动端模板拆除后,可利用滑靴实现牵引移梁,省时省力,提高了工作效率。The sliding assembly 4 includes a walking bracket 15 arranged at the lower end of the bottom template 9, and a sliding shoe 16 is arranged at the lower end of the walking bracket. After the side formwork, bottom formwork and movable end formwork are removed, the sliding shoe can be used to pull and move the beam, which saves time and effort and improves work efficiency.

活动端模板的上部与固定端模板的上部通过上对拉钢杆14连接,可以方便的连接和解除固定,活动端模板装拆方便。The upper part of the movable end formwork is connected with the upper part of the fixed end formwork by the upper pair of pull steel rods 14, which can be easily connected and unfixed, and the movable end formwork is easy to assemble and disassemble.

具体的,侧模板可以倾斜的安装在侧面支架上,其倾斜度与所要预制生产的梁节段匹配;在侧模支架上设有活动模,可以根据梁节段具体的结构形式,匹配相应的可活动调节的模板,保证预制生产的构件达到设计要求。Specifically, the side formwork can be obliquely installed on the side support, and its inclination matches the beam segment to be prefabricated; there is a movable mold on the side formwork support, which can match the corresponding beam segment according to the specific structural form of the beam segment. The movable and adjustable formwork ensures that the prefabricated components meet the design requirements.

上述固定支架上设有与用于与所述固定模板连接的加固法兰盘17,通过加固法兰盘,可以将固定模板牢靠的安装在固定支架上。The above-mentioned fixing bracket is provided with a reinforcing flange 17 for connecting with the fixing template, and the fixing template can be firmly installed on the fixing bracket through the reinforcing flange.

上述固定支架下端设有伸入地面以下的锚固钢筋21,有效的保证了固定支架结构的稳定性,不容易受载倾翻。固定支架可以采用桁架结构。The lower end of the fixed bracket is provided with an anchoring steel bar 21 extending below the ground, which effectively ensures the stability of the fixed bracket structure and is not prone to overturning under load. The fixed bracket can adopt a truss structure.

上述的活动模可以是侧模支架上通过可调式支撑杆23安装的活动角模板19,或是在侧模支架上直接安装的活动翻口板20。可调式支撑杆可以根据需要调整长度以及转动方向,保证能够将活动模调整到设计位置。The above-mentioned movable form can be a movable angle template 19 installed by an adjustable support rod 23 on the side form support, or a movable opening plate 20 directly installed on the side form support. The adjustable support rod can adjust the length and rotation direction according to the needs, so as to ensure that the movable mold can be adjusted to the designed position.

活动角模板一般为斜向下结构设置,活动翻口板一般为斜向上结构设置,辅助定位和成型梁节段的边角位置的结构。活动角模板以及活动翻口板均是针对梁阶段两侧结构设计的,板具体结构可以根据实际工况需要而定,这里不做具体限定。The movable corner formwork is generally arranged with an obliquely downward structure, and the movable opening plate is generally arranged with an obliquely upward structure, which assists in positioning and forming the corner position of the beam segment. Both the movable corner formwork and the movable flap are designed for the structures on both sides of the beam stage. The specific structure of the slab can be determined according to the actual working conditions, and there is no specific limitation here.

上述行走支架上设有能调整底模板高度的千斤顶22,可以根据需要,适当的调整底模板高度,或是用于底模板的调平操作,便于操作,非常实用。也可以用于顶升在滑靴上滑动的箱梁节段。The above-mentioned walking support is provided with a jack 22 capable of adjusting the height of the bottom formwork, which can properly adjust the height of the bottom formwork according to needs, or be used for leveling operations of the bottom formwork, which is easy to operate and very practical. It can also be used to lift box girder sections that slide on skid shoes.

上述滑靴中部设有限位钢轨,可以避免梁在滑靴上滑动时跑偏的情况发生。上述底模板与侧模支架之间设有下对拉钢杆18,最大限度的保证了本发明创造所提出的预制模板整体结构的稳定性。The middle part of the above-mentioned sliding shoe is provided with a limit rail, which can avoid the deviation of the beam when sliding on the sliding shoe. Between the above-mentioned bottom formwork and the side formwork support, there are lower paired steel rods 18, which ensure the stability of the overall structure of the prefabricated formwork proposed by the present invention to the greatest extent.

通常,侧模支架与侧模板采用螺栓连接。液压顶撑杆与侧模支架、以及可调式支撑杆与侧模支架均焊接固定。Usually, the side form bracket and the side form are connected by bolts. The hydraulic top support bar and the side form support, as well as the adjustable support bar and the side form support are all welded and fixed.

本发明提供的预制模板安装简单,拆卸方便,由于设置了滑移组件,因此,大大提升了移梁速度,特别适用于大吨位PK断面混凝土箱梁节段“短线法”预制施工,本预制模板可以保障PK断面箱梁的浇筑线型,保障了结构质量,并提高了混合梁斜拉桥的生产效率,间接的缩短了工期,同时还有助于节约建造成本。The prefabricated formwork provided by the invention is easy to install and easy to disassemble. Since the sliding assembly is provided, the beam moving speed is greatly improved, and it is especially suitable for the "short-line method" prefabricated construction of large-tonnage PK section concrete box girder segments. This prefabricated formwork It can ensure the pouring line of the PK section box girder, guarantee the structural quality, improve the production efficiency of the mixed girder cable-stayed bridge, indirectly shorten the construction period, and help save construction costs at the same time.

以上所述仅为本发明创造的较佳实施例而已,并不用以限制本发明创造,凡在本发明创造的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明创造的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included in the Within the scope of protection of the present invention.

Claims (7)

1.一种PK断面混凝土箱梁节段预制模板,其特征在于:包括侧模组件、底模组件、端模组件以及滑移组件;1. A PK section concrete box girder section prefabricated formwork, is characterized in that: comprise side form assembly, bottom form assembly, end form assembly and slip assembly; 侧模组件,包括侧模支架以及由侧模支架支撑的侧模板;在侧模支架上设有活动模,同时在侧模支架下端还设有用于撑地的液压顶撑杆;The side form assembly includes a side form support and a side form supported by the side form support; a movable form is provided on the side form support, and a hydraulic top brace for ground support is also provided at the lower end of the side form support; 底模组件,包括底模支撑梁,在底模支撑梁上端设有底模板,下端设有底模支撑杆;The bottom form assembly includes a bottom form support beam, a bottom formwork is provided at the upper end of the bottom form support beam, and a bottom form support bar is provided at the lower end; 端模组件,包括对应箱梁节段两端设置的固定端模板和活动端模板,所述活动端模板通过螺栓固定连接在底模板上,固定端模板安装在固定支架上;所述活动端模板的上部与固定端模板的上部通过上对拉钢杆连接;The end formwork assembly includes a fixed end formwork and a movable end formwork provided at both ends of the corresponding box girder section, the movable end formwork is fixedly connected to the bottom formwork by bolts, and the fixed end formwork is installed on the fixed bracket; the movable end formwork The upper part of the formwork is connected with the upper part of the fixed end formwork through the upper pair of tension steel rods; 滑移组件,包括设置在底模板下端的行走支架,在行走支架下端设有滑靴。The sliding assembly includes a walking bracket arranged at the lower end of the bottom template, and a sliding shoe is arranged at the lower end of the walking bracket. 2.根据权利要求1所述的一种PK断面混凝土箱梁节段预制模板,其特征在于:所述固定支架上设有与用于与所述固定模板连接的加固法兰盘。2. A PK section concrete box girder segment prefabricated formwork according to claim 1, characterized in that: said fixing bracket is provided with a reinforcement flange for connecting with said fixed formwork. 3.根据权利要求1所述的一种PK断面混凝土箱梁节段预制模板,其特征在于:所述固定支架下端设有伸入地面以下的锚固钢筋。3. A PK section concrete box girder segmental prefabricated formwork according to claim 1, characterized in that: the lower end of the fixed bracket is provided with an anchoring steel bar extending below the ground. 4.根据权利要求1所述的一种PK断面混凝土箱梁节段预制模板,其特征在于:所述活动模为侧模支架上通过可调式支撑杆安装的活动角模板,或是在侧模支架上直接安装的活动翻口板。4. A kind of PK cross-section concrete box girder section prefabricated formwork according to claim 1, it is characterized in that: described movable formwork is the movable angle formwork installed by adjustable support bar on the sideform support, or on the sideform The movable opening panel installed directly on the bracket. 5.根据权利要求1所述的一种PK断面混凝土箱梁节段预制模板,其特征在于:所述行走支架上设有能调整底模板高度的千斤顶。5. A PK section concrete box girder section prefabricated formwork according to claim 1, characterized in that: the walking support is provided with a jack capable of adjusting the height of the bottom formwork. 6.根据权利要求1所述的一种PK断面混凝土箱梁节段预制模板,其特征在于:所述滑靴中部设有限位钢轨。6. A PK section concrete box girder segment prefabricated formwork according to claim 1, characterized in that: the middle part of the sliding shoe is provided with a limit rail. 7.根据权利要求1所述的一种PK断面混凝土箱梁节段预制模板,其特征在于:所述底模板与侧模支架之间设有下对拉钢杆。7. A PK cross-section concrete box girder segment prefabricated formwork according to claim 1, characterized in that: the bottom formwork and the side formwork support are provided with lower tension steel rods.
CN201711326085.2A 2017-12-13 2017-12-13 A kind of PK sections concrete box girder precast segment template Pending CN108098979A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711326085.2A CN108098979A (en) 2017-12-13 2017-12-13 A kind of PK sections concrete box girder precast segment template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711326085.2A CN108098979A (en) 2017-12-13 2017-12-13 A kind of PK sections concrete box girder precast segment template

Publications (1)

Publication Number Publication Date
CN108098979A true CN108098979A (en) 2018-06-01

Family

ID=62215712

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711326085.2A Pending CN108098979A (en) 2017-12-13 2017-12-13 A kind of PK sections concrete box girder precast segment template

Country Status (1)

Country Link
CN (1) CN108098979A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842592A (en) * 2018-06-09 2018-11-20 中交航局第工程有限公司 200 metre hole road box beams of one kind and its segmentation casting method
CN110016865A (en) * 2019-04-08 2019-07-16 中国铁建大桥工程局集团有限公司 A construction method of prestressed concrete box girder with PK section
CN112936524A (en) * 2021-04-10 2021-06-11 山东博远重工有限公司 Novel movable end die fixing structure
CN113246272A (en) * 2021-06-18 2021-08-13 中交第二航务工程局有限公司 Section beam prefabricating template system based on non-matching beam and prefabricating method
CN113981831A (en) * 2021-11-12 2022-01-28 中铁大桥局集团有限公司 Integral sliding device for cast-in-place beam side formwork system and construction method thereof
CN115595893A (en) * 2022-11-09 2023-01-13 中铁大桥局集团有限公司(Cn) A construction method of short-line high-altitude precast concrete PK section beam

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000296516A (en) * 1999-04-15 2000-10-24 Nippon Ps:Kk Production of prestress-introduced precast concrete segment
CN101028726A (en) * 2006-09-21 2007-09-05 中铁大桥局股份有限公司 Precast PC case beam process by short-line method
CN101713169A (en) * 2008-10-06 2010-05-26 中交第三航务工程局有限公司 Method for manufacturing segmental box girder
CN103770218A (en) * 2013-11-29 2014-05-07 中交第二航务工程局有限公司 Segment matching and prefabricating method for large-scale standardized structural element
CN103924525A (en) * 2014-04-25 2014-07-16 成张佳宁 Urban overpass industrial short-line prefabricating and splicing construction method
CN105269664A (en) * 2014-07-24 2016-01-27 青岛百键城环保科技有限公司 Installation technique for segment box beam manufacturing formwork
CN105365036A (en) * 2014-08-12 2016-03-02 青岛百键城环保科技有限公司 Process for mounting template for manufacturing sectional box girders
CN105848839A (en) * 2016-03-31 2016-08-10 中交第二航务工程局有限公司 Stub matching prefabricated form system used for corrugated steel web composite structure girder bridge

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000296516A (en) * 1999-04-15 2000-10-24 Nippon Ps:Kk Production of prestress-introduced precast concrete segment
CN101028726A (en) * 2006-09-21 2007-09-05 中铁大桥局股份有限公司 Precast PC case beam process by short-line method
CN101713169A (en) * 2008-10-06 2010-05-26 中交第三航务工程局有限公司 Method for manufacturing segmental box girder
CN103770218A (en) * 2013-11-29 2014-05-07 中交第二航务工程局有限公司 Segment matching and prefabricating method for large-scale standardized structural element
CN103924525A (en) * 2014-04-25 2014-07-16 成张佳宁 Urban overpass industrial short-line prefabricating and splicing construction method
CN105269664A (en) * 2014-07-24 2016-01-27 青岛百键城环保科技有限公司 Installation technique for segment box beam manufacturing formwork
CN105365036A (en) * 2014-08-12 2016-03-02 青岛百键城环保科技有限公司 Process for mounting template for manufacturing sectional box girders
CN105848839A (en) * 2016-03-31 2016-08-10 中交第二航务工程局有限公司 Stub matching prefabricated form system used for corrugated steel web composite structure girder bridge

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842592A (en) * 2018-06-09 2018-11-20 中交航局第工程有限公司 200 metre hole road box beams of one kind and its segmentation casting method
CN110016865A (en) * 2019-04-08 2019-07-16 中国铁建大桥工程局集团有限公司 A construction method of prestressed concrete box girder with PK section
CN112936524A (en) * 2021-04-10 2021-06-11 山东博远重工有限公司 Novel movable end die fixing structure
CN113246272A (en) * 2021-06-18 2021-08-13 中交第二航务工程局有限公司 Section beam prefabricating template system based on non-matching beam and prefabricating method
CN113981831A (en) * 2021-11-12 2022-01-28 中铁大桥局集团有限公司 Integral sliding device for cast-in-place beam side formwork system and construction method thereof
CN115595893A (en) * 2022-11-09 2023-01-13 中铁大桥局集团有限公司(Cn) A construction method of short-line high-altitude precast concrete PK section beam

Similar Documents

Publication Publication Date Title
CN108098979A (en) A kind of PK sections concrete box girder precast segment template
CN102493362B (en) Construction method for midspan closure segment of longspan continuous rigid frame bridge
CN105386778B (en) Tunnel excavation lining construction chassis and tunnel excavation lining construction method
CN101713168B (en) Process for mounting template for manufacturing sectional box girders
CN110700105A (en) Synchronous construction method for high pier column and tie beam and template used in same
CN101210419A (en) Small radius curved concrete box girder construction machine with internal and external girder system and its construction method
CN107044090A (en) A kind of construction method of dual deck bridge
CN105365036A (en) Process for mounting template for manufacturing sectional box girders
CN106638265A (en) Steel reinforced concrete beam rigid framework bridge
CN105269664A (en) Installation technique for segment box beam manufacturing formwork
CN108103945A (en) A kind of whole landing mould bases of cast-in-situ box girder
CN104131515A (en) Method for constructing cast-in-place box beam by means of movable formwork
CN107791368A (en) Fixed integral prefabricated box girder formwork structure and its construction method
CN103469735B (en) The installation method of the formwork of the solid section of the pier top of the hollow column and slab pier with curved superelevation
CN204386615U (en) A self-propelled tunnel inverted arch construction trolley
CN103266567B (en) Steel truss cantilever supporting frame and its implementation
CN205112085U (en) Hydraulic pressure centre form construction system
CN205116025U (en) Hanger device is pour to self -balancing concrete case roof beam and T beam bridge cantilever edge of a wing secondary
CN203200664U (en) Slip-form construction device for variable cross-section hollow high pier
CN208122869U (en) Template trolley for pipe gallery construction
CN104405417A (en) Inverted arch construction trolley for self-propelled tunnel
CN113322787B (en) Construction process of bridge deck runoff collecting device and formwork supporting device thereof
CN116219905A (en) Multifunctional hanging all-in-one machine and its construction method
CN115506247A (en) Combined steel plate girder bridge deck sliding formwork construction device
CN203174511U (en) Steel truss overhanging bracket

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190718

Address after: Binhai New Area 300300 Tianjin FTA test area (Airport Economic Zone, Central Road No. 32)

Applicant after: CHINA RAILWAY CONSTRUCTION BRIDGE ENGINEERING BUREAU GROUP CO., LTD.

Applicant after: HUBEI PROVINCIAL COMMUNICATIONS INVESTMENT GROUP CO., LTD.

Address before: 300300 No. 32 Central West Road, Airport Economic Zone, Binhai New Area, Tianjin

Applicant before: CHINA RAILWAY CONSTRUCTION BRIDGE ENGINEERING BUREAU GROUP CO., LTD.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180601