CN110016865A - A kind of PK section prestressed concrete box girder construction method - Google Patents

A kind of PK section prestressed concrete box girder construction method Download PDF

Info

Publication number
CN110016865A
CN110016865A CN201910277384.4A CN201910277384A CN110016865A CN 110016865 A CN110016865 A CN 110016865A CN 201910277384 A CN201910277384 A CN 201910277384A CN 110016865 A CN110016865 A CN 110016865A
Authority
CN
China
Prior art keywords
prefabricated
section
construction method
prestressed concrete
box girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910277384.4A
Other languages
Chinese (zh)
Inventor
宋伟俊
朱永盛
龚国锋
陈宁贤
曲江峰
李春江
朱林达
刘春成
岳超杰
郭万良
刘路通
张培炎
张斌
蔡文涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Bridge Engineering Bureau Group Co Ltd
China Railway Construction Corp Ltd CRCC
Original Assignee
China Railway Construction Bridge Engineering Bureau Group Co Ltd
China Railway Construction Corp Ltd CRCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Bridge Engineering Bureau Group Co Ltd, China Railway Construction Corp Ltd CRCC filed Critical China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority to CN201910277384.4A priority Critical patent/CN110016865A/en
Publication of CN110016865A publication Critical patent/CN110016865A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete

Abstract

The invention provides a kind of PK section prestressed concrete box girder construction method, first carries out in the prefabricated place in ground prefabricated;Then prefabricated beam section is promoted to slippage bracket;Prefabricated beam section is moved to design position on slippage bracket, realizes long-term storage;Splicing is completed after splicing period to be achieved.Short-line prefabrication is used when ground is prefabricated.Construction method principle provided by the invention is simple, operation is convenient, economical rationality, can be widely applied in all types of element precast concatenation constructions, can effectively save manually, and it is uncertain to have can avoid manual operation bring.

Description

A kind of PK section prestressed concrete box girder construction method
Technical field
The invention belongs to technical field of bridge construction, applies more particularly, to a kind of PK section prestressed concrete box girder Work method.
Background technique
Domestic and international project construction field is general to use using the prestressed concrete box-beam bridge beam negligible amounts of PK section The construction of support cast-in-place method.But when being constructed due to this kind of ultra-wide, the beam type that overweight, direction across bridge torsional rigidity is weak using cast-in-place method always It has the following deficiencies:
1. cast-in-place method is inconsistent to beam body all directions constraint rigidity, cause easily to generate a large amount of receive in course of hardening Draw line, even crack;
2. needing the support system and template system of the big scale of construction, and do not have generally and repeatedly arrive the condition of using, economy is very poor;
3. the linear rigidity for fully relying on strutting system and template system of support cast-in-place method, and Practical Project middle or long line Matter condition and supporting condition difference are very big, and the stiffness variation of entire bracket and template system is huge, according to cast-in-place both at home and abroad at present The case of construction, alignment control are very poor;
4. there have above-mentioned 3rd article of Linear Error to lead to bridge entirety stress system to be inconsistent with designing, and has a large amount of crackles to split The presence of seam then makes the Years Of Service of bridge have a greatly reduced quality, and operation stage in later period generates a large amount of reconditions.
Rare precast segment method construction exists also due to analysis and processing to critical issue are not in place in the prior art Many deficiencies need to improve.
Summary of the invention
The invention will solve the problems, such as to be intended to overcome above-mentioned defect existing in the prior art, propose that a kind of PK is disconnected Face prestressed concrete box girder construction method.
In order to solve the above technical problems, the technical solution of the invention is achieved in that
A kind of PK section prestressed concrete box girder construction method, steps are as follows:
S1 is carried out prefabricated in the prefabricated place in ground;
Prefabricated beam section is promoted to slippage bracket by S2;
Prefabricated beam section is moved to design position on slippage bracket by S3, realizes long-term storage;
S4 completes splicing after splicing period to be achieved.
Further, short-line prefabrication is used when ground is prefabricated.
Further, prefabricated place use rigid foundation, on the basis of arrangement precast pedestal area, matching beam section area and eventually Area is starched in tension and compression.
Further, when matching the prefabricated beam section progress pose adjustment in beam section area, using 4 points of three point balance methods of adjustment.
Further, lifting process uses 4 points of three point balance methods of promotion.
Further, slipping uses three point balance method of four-point supporting.
Further, it is applied to hoisting hanger in lifting process and is equipped with displacement and pressure sensor.
The invention has the advantages and positive effects of:
The construction method that the invention provides effectively controls beams of concrete from the prefabricated cracking at bridge operation stage Situation improves into bridge line style and designs the goodness of fit of line style, and very big limit, which weakens the construction of box beam internal cause, causes secondary stress to increase The case where adding, improves work efficiency, and reduces difficulty of construction, shortens the duration, improves economic benefit.
Detailed description of the invention
Fig. 1 is the structural representation of the single prefabricated beam section of PK section prestressed concrete box girder in the invention embodiment Figure;
Fig. 2 is the schematic diagram for the construction method that the invention provides;
Fig. 3 is schematic diagram when the invention ground is prefabricated;
Schematic diagram when Fig. 4 is 4 points of adjustment in the invention;
Fig. 5 is the schematic diagram of slide device applied in the invention;
Fig. 6 is the schematic diagram of support system applied in the invention embodiment.
In figure: the prefabricated beam section of 1-;The ground 2- predefined region;3- lifting means;4- slippage bracket;5- slides beam section;6- is long-term Store beam section;7- splicing beam section;The fixed steel form of the big rigidity of 8-;9- pours beam section;10- matches beam section;11- beam to be hoisted Section;12- end template;13- vertical supporting piston shoes;14- horizontally tracting system.
Specific embodiment
It should be noted that the feature in embodiment and embodiment in the case where not colliding, in the invention It can be combined with each other.
Detailed description of specific embodiments of the invention is provided below.
A kind of PK section prestressed concrete box girder construction method, as shown in Figures 1 to 6, steps are as follows:
S1 carries out the prefabricated of beam section in ground predefined region 2;
Prefabricated beam section 1 is promoted to slippage bracket 4 by S2;Slippage bracket generally uses pier beam type steel construction, has each position Vertical rigidity difference is big, the big feature of amount of deflection;
Sliding beam section 5 (i.e. previous prefabricated beam section) is moved to design position on slippage bracket, after movement in place by S3 Guarantee that beam body is static using mechanical damping not shake, long-term storage beam section 6 to be assembled is stored in this region;
S4 completes splicing after splicing period to be achieved, form splicing beam section 7, until place is at bridge.
It is dropped down on slippage bracket after prefabricated beam section is promoted using lifting means 3, it in an alternative embodiment, can be Hydraulic support system is arranged in top of support, falls beam mode using actively connecing beam mode and substituting conventional rigid, reaches good support and subtracts Shake effect.It can be with reference to a kind of hanging method of big cross section prefabricated components disclosed in 108147283 A of CN, it is of course also possible to be Other hanging methods.
For generally including the vertical branch for being used to support beam section in the slide device of the mobile prefabricated beam section in slippage bracket top The horizontally tracting system 14 that support piston shoes 13 and traction piston shoes slide on sliding rail 15.
Short-line prefabrication is used when ground is prefabricated.Prefabricated place use rigid foundation, on the basis of arrangement precast pedestal area, Beam section area and whole tensioning mud jacking area are matched, it is corresponding to pour beam section 9, matching beam section 10, beam section to be hoisted 11.Generally adopt With intensive clump of piles rigid foundation.Template system when prefabricated can be torn open certainly by the fixed steel form 8 of the big rigidity in end, side hydraulic Unload removable 12 system of the end template composition that can be fallen of steel form, drive and leveling facility.
It will appear the process moved horizontally during becoming matching beam due to beam section, during being somebody's turn to do under normal circumstances Beam body concrete strength and elasticity modulus and not up to design strength;Beam body pre-stressed state is not also stretched to bridge completion state; And beam body temporary support state at bridge design point, there are larger differences;However under common four-point supporting mode, wherein one A fulcrum is minimum relative to the permission deflection of other formed planes of three fulcrums;So moving horizontally process often in beam section Cracked or crack.
For problem not in place to the safeguard measure of beam body during above-mentioned matching in the prior art beam processed, in matching beam When prefabricated beam section in section area carries out pose adjustment, using 4 points of three point balance methods of adjustment.In addition, lifting process is mentioned using 4 points Rise three point balance methods;Slipping uses three point balance method of four-point supporting.
Above-mentioned 4 points of three point balance methods of adjustment, 4 points of three point balance methods of promotion, 4 points of three point balance methods of sliding constructions are real Border is same principle, by taking 4 points of three point balance methods of adjustment as an example, as shown in figure 4, prefabricated beam section to be adjusted be all made of a, b, C, d four-point supporting, wherein the c point and d point of side beam bottom support when using hydraulic pressure support structure characteristic, by the liquid of point-to-point transmission Pressure oil road is in parallel, forms theoretical point e support (in general, e point is fallen between c point and d point);It is then to pass through machine when promotion C point, d point are connected by a pin shaft or other structures part, form theoretic e point by tool principle.
It is not in place to the Linear Control understanding of prefabrication of beam segment, also stop the prefabricated required precision base of traditional beams of concrete On plinth;And then cause next precast beam linear very since the beam body fulcrum after movement is displaced according to above content Be difficult to guarantee it is accurate, the deviation accumulation of the prefabricated generation of multi-segmental can be embodied in whole empty beam it is assembled it is linear on;This is resulted in assembled mistake In order to linearly add gasket in matching face at bridge, add the appearance of the measures such as wet seam after the splicing of part beam section in journey;First is that At the bad of bridge Linear Control, second is that Mosaic face is since the presence of gasket causes beam body stress that greatly variation occurs, third is that Wet seam becomes a stress and Crack Control weak part due to concrete shrinkage and creep etc..
Since the beam body of this type, to having the characteristics that torsional rigidity weakness, is balanced along bridge due to being difficult to solve to lift Property and problem of Cracking, therefore it is also to carry out equal beam highly processed in top of support and slide that the type bridge subsection few in number is prefabricated Construction, but since the support of prefab-form is in elastic support system, leading to beam process processed is in high altitude operation, and elastic support The prefabricated beam body of system cannot reach grade control at all.Beam section generally has relatively long distance at design bridge location from prefabricated Sliding, it is few then tens meters, more then several hundred upper kms;Longer horizontal or light grade movement is enterprising in the elastic support of variation rigidity Row, therefore, the safety of beam body is generally all difficult to be guaranteed, the sustainable development at this stage in crackle crack.
Usual prefabricated beam section needs to stand before being assembled into bridge several months, to complete exhausted big portion before assembly to beam section Divide contraction distortion, within this period that top of support is stood, beam body generates differential settlement as long duration load, bracket basis, It is passing to be adjusted one by one after personal monitoring during a large amount of beam sections are stood, or bracket sedimentation and deformation of leaving passes through elasticity The compatibility of deformation of bracket itself come yield to beam section fulcrum displacement and counter-force, cause many beam sections to generate in this process largely Crackle crack, is even destroyed.
It is applied to hoisting hanger in lifting process and is equipped with displacement and pressure sensor, sensor is connect with control host, Once promoting suspension centre can adjust automatically more than warning value.Equipment used by being promoted can be hoist engine, be arranged on hoist engine Rope stretching quantity sensor, wirerope can control list suspension centre adjustment of displacement value in demand precision, generally exist after high power pulley blocks In 1mm.
In the invention, prefabricated beam section when slippage bracket top is stored for a long time, can by dedicated storage equipment, A kind of prefabricated components splicing special equipment as disclosed in using 207004057 U of our company's patent CN, using with pressure and position The hydraulic device of displacement sensor is as fulcrum support structure;Sensor has wireless signal transmitting and ability to accept, in middle control electricity After brain receives signal, according to the transmittable digital model of the warning value of setting, by hydraulic device automatically adjust each fulcrum of beam body by Power and displacement guarantee the beam section safety under long-term storage, and complete wholly computer controlled, save artificial.
Splice special equipment using above-mentioned prefabricated components, is not used between beam section matching face during splicing any type of Gasket and wet seam;In addition, the support construction with electrodeless adjustment mode can guarantee splicing beam section not to preceding after the completion of splicing Sequence beam section causes the reaction of supports and change in displacement, to guarantee zero degree stress splicing Cheng Qiao.
Construction method principle provided by the invention is simple, operation is convenient, economical rationality, can be widely applied to all types of components It in precast spliced construction, can effectively save manually, and it is uncertain to have can avoid manual operation bring.Prefabricated beam section is in glue During spelling, do not use any type of wet seam that can reach high-precision linear requirements;Largely reduce biography Because of not eliminable additional secondary stress, integrated stress state and local stress in construction bring beam body in splicing construction method of uniting State is consistent with design theory state height.
It is obvious to a person skilled in the art that the invention is not limited to the details of above-mentioned exemplary embodiment, and And without departing substantially from the spirit or essential attributes of the invention, wound that the present invention can be realized in other specific forms It makes.
Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this The range of innovation and creation is indicated by the appended claims rather than the foregoing description, it is intended that equally wanting for claim will be fallen in All changes in the meaning and scope of part are included in the invention.Any appended drawing reference in claim should not be regarded To limit the claims involved.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (7)

1. a kind of PK section prestressed concrete box girder construction method, which is characterized in that steps are as follows:
S1 is carried out prefabricated in the prefabricated place in ground;
Prefabricated beam section is promoted to slippage bracket by S2;
Prefabricated beam section is moved to design position on slippage bracket by S3, realizes long-term storage;
S4 completes splicing after splicing period to be achieved.
2. a kind of PK section prestressed concrete box girder construction method according to claim 1, it is characterised in that: ground is pre- Short-line prefabrication is used when processed.
3. a kind of PK section prestressed concrete box girder construction method according to claim 2, it is characterised in that: precasting yard Ground uses rigid foundation, on the basis of arrangement precast pedestal area, matching beam section area and whole tensioning mud jacking area.
4. a kind of PK section prestressed concrete box girder construction method according to claim 2, it is characterised in that: matching When prefabricated beam section in beam section area carries out pose adjustment, using 4 points of three point balance methods of adjustment.
5. a kind of PK section prestressed concrete box girder construction method according to claim 1, it is characterised in that: promoted 4 points of Cheng Caiyong three point balance methods of promotion.
6. a kind of PK section prestressed concrete box girder construction method according to claim 1, it is characterised in that: slid Three point balance method of Cheng Caiyong four-point supporting.
7. a kind of PK section prestressed concrete box girder construction method according to claim 1, it is characterised in that: promoted It is applied to hoisting hanger in journey and is equipped with displacement and pressure sensor.
CN201910277384.4A 2019-04-08 2019-04-08 A kind of PK section prestressed concrete box girder construction method Pending CN110016865A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910277384.4A CN110016865A (en) 2019-04-08 2019-04-08 A kind of PK section prestressed concrete box girder construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910277384.4A CN110016865A (en) 2019-04-08 2019-04-08 A kind of PK section prestressed concrete box girder construction method

Publications (1)

Publication Number Publication Date
CN110016865A true CN110016865A (en) 2019-07-16

Family

ID=67190768

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910277384.4A Pending CN110016865A (en) 2019-04-08 2019-04-08 A kind of PK section prestressed concrete box girder construction method

Country Status (1)

Country Link
CN (1) CN110016865A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112726407A (en) * 2020-12-27 2021-04-30 安徽省交通控股集团有限公司 Prefabricated linear control method and storage medium for matching prefabricated bridge deck

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203755169U (en) * 2014-02-17 2014-08-06 中铁重工有限公司 Adjustable steel box girder storage jig frame with four-fulcrum supporting and three-fulcrum balancing function
CN204368856U (en) * 2014-12-24 2015-06-03 中铁十六局集团第三工程有限公司 Balanced support mechanism during a kind of U-shaped beam transport
CN107090773A (en) * 2017-05-22 2017-08-25 中国铁建大桥工程局集团有限公司 A kind of concrete prefabricated beam section crack resistence sliding system of kiloton
CN108098979A (en) * 2017-12-13 2018-06-01 中国铁建大桥工程局集团有限公司 A kind of PK sections concrete box girder precast segment template
CN108762059A (en) * 2018-08-12 2018-11-06 广州瀚阳工程咨询有限公司 A kind of automatic control system applied to short-line prefabrication bridge subsection

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203755169U (en) * 2014-02-17 2014-08-06 中铁重工有限公司 Adjustable steel box girder storage jig frame with four-fulcrum supporting and three-fulcrum balancing function
CN204368856U (en) * 2014-12-24 2015-06-03 中铁十六局集团第三工程有限公司 Balanced support mechanism during a kind of U-shaped beam transport
CN107090773A (en) * 2017-05-22 2017-08-25 中国铁建大桥工程局集团有限公司 A kind of concrete prefabricated beam section crack resistence sliding system of kiloton
CN108098979A (en) * 2017-12-13 2018-06-01 中国铁建大桥工程局集团有限公司 A kind of PK sections concrete box girder precast segment template
CN108762059A (en) * 2018-08-12 2018-11-06 广州瀚阳工程咨询有限公司 A kind of automatic control system applied to short-line prefabrication bridge subsection

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
吴红强: "合武客运专线大吨位箱梁提运架施工方法", 《铁道建筑》 *
赵健等: "石首长江公路大桥北边跨主梁施工关键技术", 《桥梁建设》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112726407A (en) * 2020-12-27 2021-04-30 安徽省交通控股集团有限公司 Prefabricated linear control method and storage medium for matching prefabricated bridge deck

Similar Documents

Publication Publication Date Title
CN204589787U (en) The prefabricated bent cap of the T-shaped pier of Bridges on Urban Rail Transit
CN104746437B (en) A kind of self-anchored suspension bridge installation method
CN208702197U (en) A kind of big displacement integral jacking Compact Mounts
CN103410094B (en) Installation construction method for bridge rigid hinge
CN104790301B (en) A kind of cable-styled bridge system transform hoist cable tensioning one-time-reach-place construction method
CN107060105A (en) A kind of lifting construction method of multiple steel vestibules between high building
CN108103949A (en) A kind of Cable stayed Bridge Main Tower composite steel anchor beam integral assembling process
CN110629675A (en) Cast-in-place pier top rotating and cantilever pouring combined construction method for continuous beam support
CN110644381A (en) Bridge jacking method
CN110016865A (en) A kind of PK section prestressed concrete box girder construction method
CN113106872A (en) Mid-span closure method for steel box girder of cable-stayed bridge
CN208932821U (en) A kind of erecting beam construction height leg gantry crane
CN105088961A (en) Side-span closure section and cast-in-place section combining construction method
CN107524093A (en) A kind of bridge jacking method
CN102493363B (en) Quick construction method for segment No.0 of continuous beam
CN110886184A (en) Device and method for reducing accurate matching additional stress of wide steel box girder of cable-stayed bridge
CN111188283A (en) Method for integrally and synchronously jacking and falling steel bridge
CN105274940B (en) A kind of bridge arch rib integral installation method
CN106869319A (en) Large span steel truss installation method
CN103147402A (en) Support device for constructing continuous box girder bridge and elevation adjusting method
CN111877186A (en) Balanced cast-in-place construction method for beam section bracket of side pier of continuous beam
CN211172120U (en) Concrete pile bending test device
CN110593085B (en) Method for mounting steel pipes of lattice pier of bridge steel pipe
CN204530506U (en) End bay closing device
CN201843083U (en) V-shaped support frame

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190716

RJ01 Rejection of invention patent application after publication