CN208602474U - The traffic system laterally climbed - Google Patents

The traffic system laterally climbed Download PDF

Info

Publication number
CN208602474U
CN208602474U CN201820768557.3U CN201820768557U CN208602474U CN 208602474 U CN208602474 U CN 208602474U CN 201820768557 U CN201820768557 U CN 201820768557U CN 208602474 U CN208602474 U CN 208602474U
Authority
CN
China
Prior art keywords
track
traffic system
climbs
high aititude
low altitude
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820768557.3U
Other languages
Chinese (zh)
Inventor
王鑫敏
张敏
武长虹
司小伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Air Beijing Technology Co Ltd
Original Assignee
China Construction Air Beijing Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Air Beijing Technology Co Ltd filed Critical China Construction Air Beijing Technology Co Ltd
Priority to CN201820768557.3U priority Critical patent/CN208602474U/en
Application granted granted Critical
Publication of CN208602474U publication Critical patent/CN208602474U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model belongs to transit equipment technical field, specifically provides a kind of traffic system laterally climbed.The utility model aims to solve the problem that the problem of a large amount of construction of cutting, embankment, tunnel can seriously destroy pre-existing topography landforms.The utility model provides a kind of traffic system laterally climbed, including High aititude track, low altitude area track, the track that climbs, track element, transfer device and energy storage equipment.Wherein, the first end of track of climbing leads to High aititude track, and second end leads to low altitude area track.Transfer device setting is climbing on track, for track element to be transported to the first end or second end of the track that climbs, with High aititude orbital docking or with low altitude area orbital docking.Energy storage equipment and transfer device are drivingly connected.Therefore, the utility model reduces the length for the track that climbs, to reduce cutting, embankment, tunnel construction, maximumlly maintains original topography and geomorphology by rising or falling track element laterally along the track that climbs.

Description

The traffic system laterally climbed
Technical field
The utility model belongs to transit equipment technical field, specifically provides a kind of traffic system laterally climbed.
Background technique
Rail Transit System (such as rail of train) generallys use excavating cut slope, railway embankment, the mode for digging tunnel Pass through mountainous region or the biggish location of surface relief.
Location biggish for height fall needs excavating cut slope, railway embankment, cutting tunnel on a large scale, to prolong Long track circuit length, reduces the gradient of track routes.A large amount of construction not only higher costs, but also gesture of cutting, embankment, tunnel Original topography and geomorphology must be seriously destroyed, the perception of people is influenced, for scenic spot.
Correspondingly, this field needs the traffic system laterally climbed of one kind newly to solve the above problems.
Utility model content
In order to solve the above problem in the prior art, understand seriously in order to solve a large amount of construction of cutting, embankment, tunnel The problem of destroying pre-existing topography landforms, the utility model provide a kind of traffic system laterally climbed, the traffic system packet It includes:
High aititude track, setting is in High aititude position, for carrying train walking;
Low altitude area track, setting is in low altitude area position, for carrying train walking;
Climb track, and first end leads to the High aititude track, and second end leads to the low altitude area track;
Track element, can carry train and selectively with the High aititude track or low altitude area orbital docking;
Transfer device, setting are climbed on track described, for the track element to be transported to the track that climbs First end at be transported at the second end of the track that climbs with the High aititude orbital docking and by the track element With the low altitude area orbital docking;
Energy storage equipment is drivingly connected with the transfer device, mobile to the low altitude area track in the transfer device When store potential energy, discharge potential energy when the transfer device is mobile to the High aititude track.
In the optimal technical scheme of above-mentioned traffic system, the transfer device includes:
Ontology;
Traveling wheel, setting are in rolling contact on the body and with the track that climbs;
Clamping device is arranged on the body, for clamping the track element;
Power device is arranged on the body, for driving the clamping device to act and drive the traveling wheel Rotation.
In the optimal technical scheme of above-mentioned traffic system, the clamping device includes being symmetrically disposed on the ontology Multiple L shape mechanical arms, the transfer device catches on the track element by the L shape mechanical arm.
In the optimal technical scheme of above-mentioned traffic system, the traveling wheel is gear, and the track that climbs extends along Direction is provided with the rack gear being meshed with the gear.
In the optimal technical scheme of above-mentioned traffic system, the energy storage equipment includes fixing base, counter weight device and leads Straw line;One end is fixedly connected with the counter weight device after the hauling rope bypasses the fixing base, the other end and described Body connection, and therefore the counter weight device is suspended on the fixing base.
In the optimal technical scheme of above-mentioned traffic system, the energy storage equipment further includes being arranged on the fixing base Multiple fixed pulleys and multiple movable pulleys for being arranged on the counter weight device, the hauling rope, which successively bypasses, the multiple determines cunning Wheel and the multiple movable pulley.
In the optimal technical scheme of above-mentioned traffic system, the appearance that can hold liquid is provided in the counter weight device Chamber.
In the optimal technical scheme of above-mentioned traffic system, the energy storage equipment further includes water pump, the water pump be used for Water is pumped in the cavity, and the water in the cavity is extracted out.
In the optimal technical scheme of above-mentioned traffic system, the train is suspension type sky iron.
In the optimal technical scheme of above-mentioned traffic system, the High aititude track, the low altitude area track and described climb Rail lift road passes through more root posts fixed on ground respectively.
It will be appreciated to those of skill in the art that in the optimal technical scheme of the utility model, by High aititude The track that climbs is set between track and low altitude area track, enables the track element that carry train in transfer device and accumulation of energy Along the extending direction transverse shifting of track of climbing under the action of device, so selectively with High aititude track or low altitude area track pair It connects, train is transported to low altitude area track from High aititude track, or be transported to High aititude track from low altitude area track.Therefore, The utility model is by rising or falling track element laterally along the track that climbs, under the premise of guaranteeing that train operation is stable, Reduce the length for the track that climbs, to reduce cutting, embankment, tunnel construction, with maximumlly maintaining original landform Looks.
When climbing, track element and low altitude area orbital docking.Train is first from low altitude area rail running to track element.Rail Road unit drives the lower edge track that climbs to rise to position with High aititude orbital docking, train transfer device and energy storage equipment It travels from track element to High aititude track.
When decline, track element and High aititude orbital docking.Train is first from High aititude rail running to track element.Rail Road unit drives the lower edge track that climbs to drop to position with low altitude area orbital docking, train transfer device and energy storage equipment It travels from track element to low altitude area track.
Detailed description of the invention
Preferred embodiments of the present invention are described with reference to the accompanying drawings and in conjunction with suspension type sky iron, in attached drawing:
Fig. 1 is the schematic illustration of the traffic system laterally climbed of the utility model;
Fig. 2 is the effect diagram of the traffic system laterally climbed of the utility model;
Effect diagram when Fig. 3 is the track element carrying suspension type sky iron of the utility model;
Fig. 4 is the first state schematic diagram of the bale handle vehicle of the utility model;
Fig. 5 is the second status diagram of the bale handle vehicle of the utility model;
Fig. 6 is the effect diagram of the energy storage equipment of the utility model.
Reference signs list:
1, High aititude track;11, the first docking position;2, low altitude area track;21, the second docking position;3, climb track;31, Rack gear;4, track element;5, column;6, bale handle vehicle;61, ontology;62, gear;63, L shape mechanical arm;64, limit sensors;7, Energy storage equipment;71, fixing base;711, fixed pulley;72, counter weight device;721, movable pulley;73, the first hauling rope;74, sculpture; 75, water pump;8, speed limit reel;81, the second hauling rope;9, suspension type sky iron.
Specific embodiment
It will be apparent to a skilled person that this section embodiment is used only for explaining that the technology of the utility model is former Reason, is not intended to limit the protection scope of the utility model.Although for example, being to close by a certain percentage between each component in attached drawing What system drew, but this proportionate relationship is not unalterable, those skilled in the art, which can according to need, makes adjustment to it, To adapt to specific application, technical solution adjusted will fall into the protection scope of the utility model.
It should be noted that term " center ", "upper", "lower", "left", "right", " perpendicular in the description of the present invention, Directly ", the term of the instruction direction such as "horizontal", "inner", "outside" or positional relationship is direction based on the figure or positional relationship, This is intended merely to facilitate description, rather than indication or suggestion described device or element must have a particular orientation, with specific Orientation construction and operation, therefore should not be understood as limiting the present invention.In addition, term " first ", " second ", " Three " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In addition it is also necessary to explanation, in the description of the present invention, unless otherwise clearly defined and limited, art Language " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or It is integrally connected;It can be directly connected, the company inside two elements can also be can be indirectly connected through an intermediary It is logical.To those skilled in the art, the concrete meaning of above-mentioned term in the present invention can be understood as the case may be.
As depicted in figs. 1 and 2, the traffic system laterally climbed of the utility model mainly includes High aititude track 1, low sea Pull out track 2, the track 3 that climbs, track element 4, column 5, bale handle vehicle 6 and energy storage equipment 7 as transfer device.Wherein, Gao Hai It pulls out track 1 and is located at the higher position of height above sea level, be provided with the first docking position 11;Low altitude area track 2 is located at the lower position of height above sea level It sets, is provided with the second docking position 21.The track 3 that climbs is obliquely installed, and has angle with horizontal plane, which is 0 ° to 90 ° Between arbitrary value.The first end of track 3 of climbing leads to High aititude track 1, is aligned with the first docking position 11;Climb track 3 Second end leads to low altitude area track 2, is aligned with the second docking position 21.Track element 4 can be along the extending direction cross for the track 3 that climbs To movement, and selectively, insertion first is docked in position 11 or the second docking position 21, right with High aititude track 1 or low altitude area track 2 It connects.After track element 4 is docked with High aititude track 1 or low altitude area track 2, suspension type sky iron 9 can along High aititude track 1 or The extending direction of low altitude area track 2 travels.
Vertical relation one is not limited only between track 3 and track element 4 it will be appreciated to those of skill in the art that climbing Kind, angle between the two can also be the arbitrary value between 0 ° to 90 °.
In addition, those skilled in the art can according to need, make track element 4 selectively with High aititude track 1 or low The both ends of height above sea level track 2 are docked, to save the first docking position 11 shown in Fig. 1 and the second docking position 21.
It will be appreciated to those of skill in the art that track element 4 can be using any feasible mode and High aititude rail Road 1 or low altitude area track 2 dock.Illustratively, two individual columns 5 are set, and the distance between the two root posts 5 are just etc. It is provided with the sliding rail for allowing track element 4 to slide, in the top of the length of track element 4, and two root posts 5 so as to track list The both ends of member 4 can be supported by two root posts 5.When track element 4 is moved in two root posts 5 along the track 3 that climbs, track The two of unit 4 correct docks with High aititude track 1 or low altitude area track 2 respectively.Further, it is additionally provided on column 5 electronic Locking system (such as hydraulic push rod) prevents track element 4 and High aititude track 1 or low altitude area rail for locking track element 4 It shakes, be displaced after the docking of road 2.
Further, it will be appreciated to those of skill in the art that the quantity for the track 3 that climbs is not limited to two shown in Fig. 1 Root can also be three, four, five etc..
As shown in Fig. 2, High aititude track 1, low altitude area track 2 and the track 3 that climbs are fixed to ground by column 5 respectively On.Specifically, High aititude track 1 is fixed to mountain top by column 5 or the higher position of other height above sea level, low altitude area track 2 pass through Column 5 is fixed to the foot of the hill or the lower position of other height above sea level, and the track 3 that climbs is fixed on the slope of massif by column 5.Bale handle Vehicle 6, which is arranged on, to climb on track 3, for clamping and transporting track element 4.Energy storage equipment 7 is arranged in mountain top or other height above sea level Higher position, and be connected with bale handle vehicle 6.Energy storage equipment 7 can be stored when bale handle vehicle 6 is mobile to low altitude area track 2 Gravitional force discharges gravitional force when mobile to High aititude track 1.
In addition, those skilled in the art can according to need, energy storage equipment 7 is arranged in any other feasible position, Such as the foot of the hill or the lower position of other height above sea level.Further, those skilled in the art can also be as needed, makes energy storage equipment 7 Directly it is connected with track element 4.
As shown in figure 3, the High aititude track 1 of the utility model, low altitude area track 2 and track element 4 are all to be suitable for hanging The box track girder of hanging sky iron 9, and the length of track element 4 is greater than the overall length of suspension type sky iron 9, so as to track element 4 When transverse shifting, suspension type sky iron 9 can be suspended in the lower section of track element 4 completely.
In addition, those skilled in the art can according to need, by High aititude track 1, low altitude area track 2 and track element 4 It is arranged to any other feasible track, as long as the track can carry suspension type sky iron 9.Further, art technology Personnel can also be as needed, and suspension type sky iron 9 is substituted for the train of any other form, such as train, and appropriate adjustment The form of High aititude track 1, low altitude area track 2 and track element 4.It will be apparent to a skilled person that suspension type is empty For iron 9 is compared with the traveling wheels such as train train arranged at the bottom, the fixation between track element 4 in transverse direction is more firm It leans on.
As shown in Figures 3 to 5, bale handle vehicle 6 is for driving track element 4 along the extending direction transverse shifting for the track 3 that climbs, It mainly includes ontology 61, power device (not shown), the gear 62 as traveling wheel, the L shape machine as clamping device Tool arm 63.Wherein, ontology 61 is in " n " shape, straddles and climbs on track 3, to improve the stability of its left and right directions.Gear 62 are pivotally arranged on ontology 61, and can be in rolling contact with the track 3 that climbs.With gear 62 correspondingly, climb track The rack gear 31 engaged with gear 62 is provided on 3 faces being in contact with gear 62.Pass through the engagement between gear 62 and rack gear 31 Effect, can be improved the frictional force of gear 62 and rack gear 31, prevent gear 62 from occurring to skid now when climbing and walking on track 3 As.Further, in the preferred embodiment of the utility model, the both ends for the track 3 that climbs are respectively arranged with stop dog component (in figure Do not indicate), for preventing gear 62 from slipping the track 3 that climbs.Preferably, being additionally provided on stop dog component can contact with ontology 61 Elastic component, for slowing down impact of the bale handle vehicle 6 to stop dog component.
With continued reference to Fig. 3 to Fig. 5, four L shape mechanical arms 63 symmetrically, be pivotally arranged at the two sides of ontology 61, be used for Catch on track element 4.Preferably, each L shape mechanical arm 63 is additionally provided with limit sensors 64, for determining L shape mechanical arm 63 have caught on track element 4.It is further preferred that two opposite L shape mechanical arms 63 be provided with anti-falling safety device (such as Rope), for preventing track element 4 from slipped under pendant from L shape mechanical arm 63.
Although not showing that in figure, power device is fixedly provided on ontology 1, for driving gear 62 to rotate, L shape mechanical arm 63 is driven to swing.Preferably, power device includes motor and gear transmission structure.Motor and gear transmission structure All be fixedly provided on ontology 1, the input terminal of gear transmission structure and the output axis connection of motor, gear transmission structure it is defeated Outlet is connect with gear 62 and/or L shape mechanical arm 63, and the torque of motor output is by passing to gear after gear transmission structure 62 and/or L shape mechanical arm 63.It will be appreciated to those of skill in the art that gear 62 and L shape mechanical arm 63 can be by an electricity Machine and a gear transmission structure drive jointly, can also be driven jointly or respectively by multiple electric motors and multiple gear transmission structures It is dynamic.
It will be appreciated to those of skill in the art that the quantity of bale handle vehicle 6 is not limited only to two shown in Fig. 2, also It can be any other feasible quantity, such as one, three, four etc..Those skilled in the art are also understood that, L Shape mechanical arm 63 can also be any other feasible mechanical arm, such as the rod-shaped mechanical arm with hook.L shape mechanical arm 63 Quantity is also not limited to above-mentioned four, still can be any number of, such as two, three, six, eight etc..
In addition, those skilled in the art can also be as needed, L shape mechanical arm 63 is saved, ontology 61 and track element are made 4 are fixedly attached together or are made into integration.
As shown in fig. 6, the energy storage equipment 7 of the utility model is mainly wrapped for assisting bale handle vehicle 6 to drive track element 4 Include fixing base 71, counter weight device 72 and the first hauling rope 73.Wherein, after the first hauling rope 73 bypasses fixing base 71, two End is connect with ontology 61 and counter weight device 72 respectively, and therefore suspends counter weight device 72 in midair.Wherein, fixing base 71 can be with It is cement works object, steel construction, wooden structures etc..
With continued reference to Fig. 6, it is provided with multiple fixed pulleys 711 on fixing base 71, is provided on counter weight device 72 multiple dynamic Pulley 721.First hauling rope 73 successively bypasses all fixed pulleys 711 and all movable pulleys 721, matches refitting to reduce Set 72 stroke.In other words, when bale handle vehicle 6 is 100 meters mobile, 72 more than ten meters of movements of counter weight device, several meters even several lis Rice.
With continued reference to Fig. 6, the energy storage equipment 7 of the utility model further includes sculpture 74.Although being not specifically shown in figure, It is that sculpture 74 is fixedly connected with counter weight device 72, to go up and down sculpture 74 with the lifting of counter weight device 72, improves spectators' Ornamental sense.Illustratively, the top of fixing base 71 is provided with through-hole, and connecting rod or support column pass through the through-hole later for sculpture 74 and counter weight device 72 be fixedly attached together.Or those skilled in the art also can according to need, in fixing base 71 A biggish window structure is arranged in top, sculpture 74 is arranged on counter weight device 72, or make sculpture 74 and counter weight device 72 are made into integration.
It will be appreciated to those of skill in the art that sculpture 74 is not limited only to artificial hillock shown in Fig. 6, it can also be Stone carving, woodcarving, copper carving of his arbitrary shape etc..For example, Landscape stone, lamp group, fountain, green plant etc..
Although being not specifically shown in figure, the cavity that can hold liquid is provided in counter weight device 72, to lead to Overregulate hold intracavity liquid number adjust the weight of counter weight device 72.
With continued reference to Fig. 6, the energy storage equipment 7 of the utility model further includes water pump 75, and water source (example is led in one end of water pump 75 Such as water tank), the other end of water pump 75 leads to the cavity in counter weight device 72.To be pumped in the cavity into counter weight device 72 Water, or the water in the cavity in counter weight device 72 is extracted out.It should be noted that the water pump 75 is two-way pump or this field Technical staff can according to need, and configure two pumps for energy storage equipment 7, one is used to pump water into cavity, and another is used for Water is extracted from cavity.
As shown in Figure 1, drop excessive velocities at present in order to avoid bale handle vehicle 6 transports track element 4, the utility model it is lateral The traffic system climbed further includes speed limit reel 8, and speed limit reel 8 is connected by the second hauling rope 81 with ontology 61.Speed limit volume Disk 8 can be rotated with the movement of bale handle vehicle 6, and when it is more than certain revolving speed, rotary resistance increases.It should due to realizing The speed limit reel 8 of function is that skilled person can directly obtain from the market, so no longer doing excessive explanation herein.
The process of the traffic system transfer suspension type sky iron 9 laterally to climb is carried out specifically below with reference to Fig. 1 and Fig. 2 It is bright.
When suspension type sky iron 9 is transported to High aititude track 1 from low altitude area track 2, pass through bale handle vehicle 6 and energy storage equipment 7 Track element 4 is transported to the second docking position 21, is docked with low altitude area track 2.Suspension type sky iron 9 is complete from low altitude area track 2 Portion is driven on track element 4.6 gripper rail unit 4 of bale handle vehicle is moved along track 3 is climbed to High aititude track 1.In bale handle vehicle 6 While rising, counter weight device 72 declines, and discharges gravitional force, provides auxiliary power for bale handle vehicle 6.When bale handle vehicle 6 slides into Climb track 3 first end when, track element 4 is moved to the first docking position 11, docks with High aititude track 1.At this point, suspension type Empty iron 9 can be travelled from track element 4 to High aititude track 1.
When suspension type sky iron 9 is transported to low altitude area track 2 from High aititude track 1, suspension type sky iron 9 is from High aititude track It is all driven on track element 4 on 1.6 gripper rail unit 4 of bale handle vehicle is moved along track 3 is climbed to low altitude area track 2.It is mentioning While beam vehicle 6 declines, counter weight device 72 rises, and stores gravitional force, prevents 6 decrease speed of bale handle vehicle too fast.When bale handle vehicle 6 When sliding into the second end for the track 3 that climbs, track element 4 is moved to the second docking position 21, docks with low altitude area track 2.At this point, Suspension type sky iron 9 can be travelled from track element 4 to low altitude area track 2.
In conclusion in the optimal technical scheme of the utility model, by High aititude track 1 and low altitude area track 2 Between setting climb track 3, enable work of the track element 4 in bale handle vehicle 6 and energy storage equipment 7 that carry suspension type sky iron 9 It is climbed the extending direction transverse shifting of track 3 with lower edge, and then is selectively docked with High aititude track 1 or low altitude area track 2, it will Suspension type sky iron 9 is transported to low altitude area track 2 from High aititude track 1, or is transported to High aititude track 1 from low altitude area track 2. Therefore, the utility model is guaranteeing the operation of suspension type sky iron 9 by rising or falling track element 4 laterally along the track 3 that climbs Under the premise of smoothly, the length for reducing the track 3 that climbs maximumlly is kept to reduce cutting, embankment, tunnel construction Original topography and geomorphology.
In addition, the utility model other than above-mentioned preferred embodiment, additionally provides embodiment one, embodiment two and reality Apply example three.It is specific as follows:
Embodiment one, unlike above preferred embodiment, in the present embodiment, the traffic system laterally climbed only is wrapped High aititude track 1, low altitude area track 2, the track 3 that climbs, track element 4 and column 5 are included, without the driving device of peripheral hardware. Wherein, the top of track element 4 is provided with driving device.The driving device includes the power unit and traveling wheel being drivingly connected, The power unit can drive the traveling wheel to be walked on track 3 climbing, and therefore driving track element 4 is mobile.It is preferred that Ground, power unit include motor and speed reducer, and the input terminal of speed reducer is fixedly connected with the shaft of motor, the output end of speed reducer It is fixedly connected with traveling wheel.With the rack gear 31 that climbs on track 3 correspondingly, traveling wheel is for gear.Alternatively, this field skill Art personnel also can according to need, and power unit is arranged to any other feasible form, for example, each traveling wheel is matched Set an individual motor.
It will be appreciated to those of skill in the art that in example 1, by High aititude track 1 and low altitude area track The track 3 that climbs is set between 2, keeps the track element 4 that carry suspension type sky iron 9 horizontal along the extending direction for the track 3 that climbs It is docked to movement, and then selectively with High aititude track 1 or low altitude area track 2, suspension type sky iron 9 is transported from High aititude track 1 It is sent to low altitude area track 2, or is transported to High aititude track 1 from low altitude area track 2.Therefore, embodiment one is by making track list Member 4 laterally rises or falls along the track 3 that climbs, and under the premise of guaranteeing that suspension type sky iron 9 runs smoothly, reduces the rail that climbs The length in road 3 maximumlly maintains original topography and geomorphology to reduce cutting, embankment, tunnel construction.
Embodiment two, unlike above preferred embodiment, in the present embodiment, the traffic system laterally climbed only is wrapped High aititude track 1, low altitude area track 2, the track 3 that climbs, track element 4, column 5 and the bale handle vehicle 6 as transfer device are included, and Without energy storage equipment 7 and speed limit reel 8.
It will be appreciated to those of skill in the art that in example 2, by High aititude track 1 and low altitude area track The track 3 that climbs is set between 2, the track element 4 that carry suspension type sky iron 9 edge under the action of bale handle vehicle 6 is enable to climb The extending direction transverse shifting of track 3, and then selectively docked with High aititude track 1 or low altitude area track 2, by suspension type sky iron 9 are transported to low altitude area track 2 from High aititude track 1, or are transported to High aititude track 1 from low altitude area track 2.Therefore, this reality With novel by rising or falling track element 4 laterally along the track 3 that climbs, before guaranteeing that suspension type sky iron 9 runs smoothly It puts, reduces the length for the track 3 that climbs, to reduce cutting, embankment, tunnel construction, maximumlly maintain original Topography and geomorphology.
Embodiment three, unlike above preferred embodiment, in the present embodiment, the traffic system laterally climbed only is wrapped High aititude track 1, low altitude area track 2, the track 3 that climbs, track element 4, column 5 and energy storage equipment 7 are included, without including bale handle vehicle 6.Wherein, the first hauling rope 71 is directly connect with track element 4.The top of track element 4 is provided with corresponding with the track 3 that climbs Traveling wheel, be used to support track element 4 and walked on track 3 climbing.Or those skilled in the art can according to need, and make Track element 4 is slidably connected with the track 3 that climbs.In addition, the traffic system laterally climbed further includes power assisting device, the power assisting device When energy storage equipment 7 is not enough to drive track element 4 mobile, the power assisting device is used to provide the dynamic of auxiliary for track element 4 Power.Preferably, power assisting device includes hoist engine and hauling rope, wherein hoist engine setting climb track 3 or ground (massif or Ground) on, one end of hauling rope is connected with hoist engine, and the other end of hauling rope is connected with track element 4.
It will be appreciated to those of skill in the art that in the third embodiment, by High aititude track 1 and low altitude area track The track 3 that climbs is set between 2, enables the track element 4 that carry suspension type sky iron 9 in energy storage equipment 7 and power assisting device Under the action of along the extending direction transverse shifting of track 3 of climbing, and then it is selectively right with High aititude track 1 or low altitude area track 2 It connects, suspension type sky iron 9 is transported to low altitude area track 2 from High aititude track 1, or be transported to High aititude from low altitude area track 2 Track 1.Therefore, the utility model is guaranteeing that suspension type is empty by rising or falling track element 4 laterally along the track 3 that climbs Under the premise of iron 9 runs smoothly, reduce the length for the track 3 that climbs, to reduce cutting, embankment, tunnel construction, maximizes Ground maintains original topography and geomorphology.
In addition, being different from any of the above embodiments, the utility model additionally provides a kind of traffic system laterally climbed System, the traffic system are only used for passenger being transported to low altitude area from High aititude, are transported to High aititude from low altitude area.Specifically, it asks Referring to example IV, embodiment five and embodiment six.
Example IV, the traffic system laterally climbed of the present embodiment include train, driving device and described above climb Rail lift road 3.Wherein, the top of train is arranged in driving device, and is fixedly connected with train.Driving device includes being drivingly connected Power unit and traveling wheel, the power unit can drive the traveling wheel to be walked on track 3 climbing, and therefore driving column Vehicle transverse shifting.Preferably, power unit includes motor and speed reducer, the input terminal of speed reducer and the fixed company of the shaft of motor It connects, the output end of speed reducer is fixedly connected with traveling wheel.With the rack gear 31 that climbs on track 3 correspondingly, traveling wheel is for tooth Wheel.Alternatively, those skilled in the art also can according to need, power unit is arranged to any other feasible form, such as An individual motor is configured for each traveling wheel.
Further, the traffic system laterally climbed of the present embodiment further includes that the station at 3 both ends of track of climbing is arranged in, should Station is used to stop train, and for the upper Train of passenger.
Embodiment five, the traffic system laterally climbed of the present embodiment include train, it is described above climb track 3 and Energy storage equipment 7 and power assisting device described in embodiment three.Wherein, the first hauling rope 73 of energy storage equipment 7 is connected with train, For pulling train.The top at the both ends on train length direction has been fixedly disposed the cogged running gear of tool respectively.It should The gear of running gear is in rolling contact with the rack gear to climb on track 3.Or those skilled in the art also can according to need, it will Running gear at the top of train replaces with carriage, and sliding rail is arranged on track 3 climbing, makes train by carriage and cunning Rail is slidably connected with the track 3 that climbs.Wherein, power assisting device is provided when energy storage equipment 7 is not enough to drive train mobile for train The power of auxiliary.Preferably, power assisting device includes hoist engine and hauling rope, and wherein hoist engine is arranged in track 3 or the ground of climbing On (massif or ground), one end of hauling rope is connected with hoist engine, and the other end of hauling rope is connected with train.
Further, the traffic system laterally climbed of the present embodiment further includes that the station at 3 both ends of track of climbing is arranged in, should Station is used to stop train, and for the upper Train of passenger.
Embodiment six, unlike embodiment five, the traffic system laterally climbed further includes described in example IV Driving device.
It will be appreciated to those of skill in the art that in example IV, embodiment five and embodiment six, by making train Both ends on the length direction track 3 that climbs respectively with one is slidably connected, and enables train along the extending direction for the track 3 that climbs Transverse shifting, so that the length of train can be as big as possible, so as to increase the single passenger capacity of train.
In addition to this, the utility model additionally provides a kind of energy storage equipment, which includes accumulation of energy described above All technical characteristics of device 7.
So far, it has been combined preferred embodiment shown in the drawings and describes the technical solution of the utility model, still, this Field technical staff is it is easily understood that the protection scope of the utility model is expressly not limited to these specific embodiments.? Under the premise of the principles of the present invention, those skilled in the art can make equivalent change to the relevant technologies feature Or replacement, the technical solution after these changes or replacement are fallen within the protection scope of the utility model.

Claims (10)

1. the traffic system laterally climbed of one kind, which is characterized in that the traffic system includes:
High aititude track, setting is in High aititude position, for carrying train walking;
Low altitude area track, setting is in low altitude area position, for carrying train walking;
Climb track, and first end leads to the High aititude track, and second end leads to the low altitude area track;
Track element, can carry train and selectively with the High aititude track or low altitude area orbital docking;
Transfer device, setting are climbed on track described, for the track element to be transported to the of the track that climbs It is transported at the second end of the track that climbs and institute at one end with the High aititude orbital docking and by the track element State low altitude area orbital docking;
Energy storage equipment is drivingly connected with the transfer device, is stored up when the transfer device is mobile to the low altitude area track Potential energy is deposited, discharges potential energy when the transfer device is mobile to the High aititude track.
2. the traffic system according to claim 1 laterally climbed, which is characterized in that the transfer device includes:
Ontology;
Traveling wheel, setting are in rolling contact on the body and with the track that climbs;
Clamping device is arranged on the body, for clamping the track element;
Power device is arranged on the body, for driving the clamping device to act and drive the traveling wheel to rotate.
3. the traffic system according to claim 2 laterally climbed, which is characterized in that the clamping device includes symmetrically Multiple L shape mechanical arms on the body are set, and the transfer device catches on the track list by the L shape mechanical arm Member.
4. the traffic system according to claim 2 laterally climbed, which is characterized in that the traveling wheel is gear, described The track that climbs extends along direction and is provided with the rack gear being meshed with the gear.
5. the traffic system according to claim 2 laterally climbed, which is characterized in that the energy storage equipment includes fixed base Body, counter weight device and hauling rope;
One end is fixedly connected with the counter weight device after the hauling rope bypasses the fixing base, the other end and the ontology Connection, and therefore the counter weight device is suspended on the fixing base.
6. the traffic system according to claim 5 laterally climbed, which is characterized in that the energy storage equipment further includes setting Multiple fixed pulleys on the fixing base and the multiple movable pulleys being arranged on the counter weight device, the hauling rope is successively Around the multiple fixed pulley and the multiple movable pulley.
7. the traffic system according to claim 5 laterally climbed, which is characterized in that be provided with energy in the counter weight device Enough hold the cavity of liquid.
8. the traffic system according to claim 7 laterally climbed, which is characterized in that the energy storage equipment further includes water Pump, the water pump are extracted out for pumping water into the cavity, and by the water in the cavity.
9. the traffic system according to any one of claim 1 to 8 laterally climbed, which is characterized in that the train is Suspension type sky iron.
10. the traffic system according to claim 9 laterally climbed, which is characterized in that the High aititude track, described low Height above sea level track and the track that climbs pass through more root posts fixed on ground respectively.
CN201820768557.3U 2018-05-22 2018-05-22 The traffic system laterally climbed Active CN208602474U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820768557.3U CN208602474U (en) 2018-05-22 2018-05-22 The traffic system laterally climbed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820768557.3U CN208602474U (en) 2018-05-22 2018-05-22 The traffic system laterally climbed

Publications (1)

Publication Number Publication Date
CN208602474U true CN208602474U (en) 2019-03-15

Family

ID=65661753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820768557.3U Active CN208602474U (en) 2018-05-22 2018-05-22 The traffic system laterally climbed

Country Status (1)

Country Link
CN (1) CN208602474U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108423014A (en) * 2018-05-22 2018-08-21 中建空列(北京)科技有限公司 The traffic system laterally climbed

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108423014A (en) * 2018-05-22 2018-08-21 中建空列(北京)科技有限公司 The traffic system laterally climbed
CN108423014B (en) * 2018-05-22 2024-06-21 中建空列(北京)科技有限公司 Traffic system capable of climbing sideways

Similar Documents

Publication Publication Date Title
CN208602475U (en) The traffic system laterally climbed
CN201485185U (en) Segment crane
CN104019995B (en) Miniature wheel-type transporter climbing testboard
CN208602474U (en) The traffic system laterally climbed
CN108708275A (en) A kind of bridge bottom safety apparatus for examination and repair
CN208602478U (en) The traffic system laterally climbed
CN108423017A (en) The traffic system laterally climbed
CN208602477U (en) The traffic system laterally climbed
CN207903864U (en) A kind of side slope protection material lifting device
CN208602473U (en) The traffic system laterally climbed
CN208469800U (en) The traffic system laterally climbed
CN208602479U (en) The traffic system laterally climbed
CN107190667A (en) A kind of road and bridge construction special efficient alarm set
CN108423014A (en) The traffic system laterally climbed
CN211171565U (en) Liftable building bridge
CN208602476U (en) Energy storage equipment
CN108583587A (en) The traffic system laterally climbed
CN108423016A (en) The traffic system laterally climbed
CN204435221U (en) A kind of high-speed railway bridge inspection vehicle
CN108860172A (en) The traffic system laterally climbed
CN207225181U (en) Box culvert transport vehicle
CN108423015A (en) The traffic system laterally climbed
CN108423013A (en) The traffic system laterally climbed
CN205646631U (en) Cable fly line machine