CN208593973U - A kind of miniature movable type hoisting apparatus - Google Patents
A kind of miniature movable type hoisting apparatus Download PDFInfo
- Publication number
- CN208593973U CN208593973U CN201821222298.0U CN201821222298U CN208593973U CN 208593973 U CN208593973 U CN 208593973U CN 201821222298 U CN201821222298 U CN 201821222298U CN 208593973 U CN208593973 U CN 208593973U
- Authority
- CN
- China
- Prior art keywords
- lower beam
- pulley
- pulley blocks
- spool
- upper beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model discloses a kind of miniature movable type hoisting apparatus, including two upright bars, the top of two upright bars is connected by upper beam, each self installation lower beam in the bottom of two upright bars, and the bottom of upright bar and the middle part of lower beam are fixed;The end of lower beam passes through diagonal brace and is connected to upright bar;The upper beam is i-beam structure, I-steel upper beam is as sliding rail, two groups of pulley blocks being adapted to therewith are installed thereon, every group of pulley blocks include the pulley that two pulleys are axially arranged along crossbeam, the both ends of the upper beam are additionally provided with spool, spool is also connected with band handle knob, and on spool, the other end is connect steel wire one ends wound with the pulley close to the end;The device further includes the electric hoist below pulley blocks, and two groups of pulley blocks and electric hoist are connected as one by clamping plate.The utility model simple structure, low in cost, operating efficiency is high, time saving and energy saving.
Description
Technical field
The utility model relates to lifting field, specially a kind of hoisting apparatus is particularly suitable in lifting and mobile city
The concrete structures such as high pressure well lid.
Background technique
Underground pipe line Information Management System Construction is just like a raging fire to be carried out in China, by building underground pipe line
Information management system is able to satisfy the needs of work such as urban planning, construction, operation and emergency.One major tasks of system Construction
It is exactly the bases such as the scale for grasping and acquiring in time underground utilities, positional relationship, functional attributes, property ownership, the operation time limit
This information data.The a part of power high voltage pipeline as Underground Pipeline General Survey, cable are all placed in high-pressure well, and well lid is basic
It is concrete material entirely, shape is mostly rectangle, and width about 0.5m, length is in 1.0m ~ 2m range, and thickness is in 0.08m ~ 0.25m model
Enclose, quality is all heavier, high-pressure well it is densely distributed in city and extend range it is big, pipeline surveying work range it is wide, people
The industry that works is very laborious time-consuming, even can not manually open sometimes.A kind of small-sized hoisting device is now designed, keeps operation time saving and energy saving fast
Speed is convenient, while installation weight, within 50kg, universal wheel is arranged at bottom, and movement is got up easily fast, and manpower is greatly reduced
Consumption, improve operating efficiency.The device can carry movement at any time, can be recycled.
Summary of the invention
In order to solve the above-mentioned technical problem, the utility model provides a kind of hoisting apparatus, and simple structure is low in cost, makees
Industry is high-efficient, time saving and energy saving.
Technical solution adopted in the utility model is a kind of hoisting apparatus, including two upright bars, the top of two upright bars
It is connected by upper beam, each self installation lower beam in the bottom of two upright bars, and the bottom of upright bar and the middle part of lower beam are fixed;Under
The end of crossbeam passes through diagonal brace and is connected to upright bar;The upper beam is i-beam structure, I-steel upper beam as sliding rail,
On two groups of pulley blocks being adapted to therewith are installed, every group of pulley blocks include the pulley that two pulleys are axially arranged along crossbeam, described
The both ends of upper beam are additionally provided with spool, and spool is also connected with band handle knob, and steel wire one ends wound is another on spool
It holds and is connect with the pulley close to the end;The device further includes the electric hoist below the pulley blocks, clamping plate by two groups of pulley blocks and
Electric hoist is connected as one.
Further, there are two the universal wheels of strap brake for the bottom installation of each lower beam.
Further, which further includes snap ring and the wirerope for fixing weight to be lifted.
Further, the lower beam is perpendicular to upper beam and vertical rod designs.
Further, the upright bar and lower beam are channel steel, and diagonal brace is rectangle steel.
The utility model has the following beneficial effects:
1, small-sized weight is lifted by crane and is moved using device provided by the utility model, especially worked in Underground Pipeline General Survey
In, high pressure well lid easily can be quickly opened, checks well gut line situation, work operations efficiency can be effectively improved, is ensured
Safety reduces human input, and 3 ~ 4 number of every group that high pressure line can be made to generally investigate is significantly reduced to 1 ~ 2 people, there is certain economic effect
Benefit.
2, more time saving and energy saving relative to pure manual work, more saved relative to mobile automobile crane artificial and equipment at
This, operating efficiency is higher.And this device simple structure, it is low in cost, there is very big utility value in actual operation, over the ground
High pressure well lid unlatching in underground pipelines generaI investigation has a clear superiority.
Detailed description of the invention
Fig. 1 is the structural front view of the utility model.
Fig. 2 is the structure top view of the utility model.
Fig. 3 is the structural side view of the utility model.
Specific embodiment
The utility model, but the range of the requires of the utility model protection are further illustrated below with reference to examples and drawings
It is not limited to the scope of the embodiments.
As shown in Figure 1-Figure 3, the top of a kind of hoisting apparatus, including two upright bars 1, two upright bars is connected by upper beam 2
It connects, each self installation lower beam 3 in the bottom of two upright bars 1, and the bottom of upright bar 1 and the middle part of lower beam are fixed;The end of lower beam 3
Portion passes through diagonal brace 10 and is connected to upright bar;The upper beam 2 is i-beam structure, and I-steel upper beam is pacified thereon as sliding rail
Equipped with two groups of pulley blocks 4 being adapted to therewith, every group of pulley blocks include the pulley that two pulleys are axially arranged along crossbeam, the upper cross
The both ends of beam 2 are additionally provided with spool 5, and spool 5 is also connected with band handle knob 6, and steel wire one ends wound is another on spool
It holds and is connect with the pulley close to the end;The device further includes the electric hoist 7 below the pulley blocks, and clamping plate 8 is by two groups of pulley blocks
It is connected as one with electric hoist.
Preferably in scheme, there are two the universal wheels 9 of strap brake for the bottom installation of each lower beam 3.It being capable of basis
It needs arbitrarily to advance and can be braked.
Preferably, which further includes snap ring and the wirerope for fixing weight to be lifted.Facilitate hoisting heavy.
Preferably, the lower beam is perpendicular to upper beam and vertical rod designs.
Preferably, the upright bar and lower beam are channel steel, and diagonal brace is rectangle steel.
When assembly, welding manner being all made of between column and upper beam, lower beam and diagonal brace and is fixed, connection is more
Fastening.In use, the width direction along high-pressure well sheet block places hoisting apparatus, so that universal wheel is in braking state, use steel wire
Rope is fixed wirerope with snap ring and is hung on electric block across the hoisting ring for being hung well lid, checks that each position connection is good
Afterwards, it slowly opens electric block power supply and lifts by crane well lid, until stopping lifting after certain altitude, pulley row is controlled by band handle knob
Into keeping the well lid sling mobile to predetermined direction, is braked after being moved to predetermined position, slowly open electric block power supply and put down well
Lid is to settling position, so far high pressure well lid smooth safe opening, and operating personnel, which can enter in well, checks situation in well, measures
Related data is surveyed and recorded, is measured after completing personnel safety out, closes well lid according to the reverse step for opening well lid.
Claims (5)
1. a kind of miniature movable type hoisting apparatus, it is characterised in that: including two upright bars (1), the top of two upright bars passes through upper
Crossbeam (2) connection, each self installation lower beam (3) in the bottom of two upright bars (1), and the middle part of the bottom of upright bar (1) and lower beam
It is fixed;The end of lower beam (3) passes through diagonal brace (10) and is connected to upright bar;The upper beam (2) is i-beam structure, I-steel
Upper beam is equipped with two groups of pulley blocks (4) being adapted to therewith as sliding rail thereon, and every group of pulley blocks include two pulleys along crossbeam
The both ends of the pulley being axially arranged, the upper beam (2) are additionally provided with spool (5), and spool (5) is also connected with band handle knob
(6) movements of clamping plate (8) is controlled, on spool, the other end is connect steel wire one ends wound with the pulley close to the end;The dress
Setting further includes the electric hoist (7) being located at below pulley blocks, and two groups of pulley blocks and electric hoist are connected as one by clamping plate (8).
2. the apparatus according to claim 1, it is characterised in that: there are two bands for the bottom installation of each lower beam (3)
The universal wheel (9) of brake.
3. the apparatus according to claim 1, it is characterised in that: the device further includes snap ring and for fixing weight to be lifted
Wirerope.
4. the apparatus according to claim 1, it is characterised in that: the lower beam is perpendicular to upper beam and vertical rod designs.
5. the apparatus according to claim 1, it is characterised in that: the upright bar and lower beam are channel steel, and diagonal brace is rectangle
Steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821222298.0U CN208593973U (en) | 2018-07-31 | 2018-07-31 | A kind of miniature movable type hoisting apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821222298.0U CN208593973U (en) | 2018-07-31 | 2018-07-31 | A kind of miniature movable type hoisting apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208593973U true CN208593973U (en) | 2019-03-12 |
Family
ID=65604050
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821222298.0U Active CN208593973U (en) | 2018-07-31 | 2018-07-31 | A kind of miniature movable type hoisting apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208593973U (en) |
-
2018
- 2018-07-31 CN CN201821222298.0U patent/CN208593973U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202186848U (en) | Universal movable maintenance gantry crane | |
CN201154877Y (en) | Simple dismounting type cantilever sliding small crane | |
CN110240048A (en) | A kind of external attached type skyscraper goods jack system | |
CN203794533U (en) | Light portable mobile lifting equipment | |
CN209468056U (en) | A kind of subway is laid a railway track gantry crane | |
CN208593973U (en) | A kind of miniature movable type hoisting apparatus | |
CN113335475A (en) | Deck bottom fixed pulley sliding platform dismantling process | |
CN201250058Y (en) | Improved lifting trolley | |
CN201325826Y (en) | Rock anchor beam hoisting device for underground power house | |
CN204873574U (en) | Hoist girder construction of stretching out and drawing back | |
CN104150373A (en) | Movable mast crane | |
CN103663236A (en) | Heavy-type cover plate lifting device | |
CN207017153U (en) | Main push-towing rope inspection trolley lifting device | |
CN209872197U (en) | Hoisting accessory for building | |
CN205114887U (en) | Hand propelled removes portal frame | |
JP2003180009A (en) | Method of transferring power line | |
CN209959289U (en) | Mining hydraulic hoisting-free loading platform | |
CN112758803A (en) | Overhead hook replacement technology for hoisting prefabricated box girder | |
CN202658521U (en) | Overhauling system of stayed cable of single plane cable stayed bridge | |
CN204138213U (en) | Track gun carriage is used in a kind of cell cube curtain wall lifting | |
CN205529939U (en) | Bridge testing and maintenance platform of rope type | |
CN206256382U (en) | It is a kind of to suspend purlin car in midair for the triangle that Wavelike steel webplate is installed | |
CN206110628U (en) | Portable lift | |
CN205662284U (en) | Two poles become platform ground jack | |
CN205772931U (en) | A kind of gantry crane being prone to remote transverse shifting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |