CN208563281U - A kind of hydraulic engineering is removed contamination fence - Google Patents
A kind of hydraulic engineering is removed contamination fence Download PDFInfo
- Publication number
- CN208563281U CN208563281U CN201820821634.7U CN201820821634U CN208563281U CN 208563281 U CN208563281 U CN 208563281U CN 201820821634 U CN201820821634 U CN 201820821634U CN 208563281 U CN208563281 U CN 208563281U
- Authority
- CN
- China
- Prior art keywords
- floating body
- fence
- pulley
- shaft
- hydraulic engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Fencing (AREA)
Abstract
It removes contamination fence the utility model discloses a kind of hydraulic engineering, including column, fence is installed between the column, the column is equipped with T-shaped first sliding groove, it is rolled in the first sliding groove and is connected with first pulley, the base side of the first pulley is equipped with first connecting rod, the first connecting rod is fixedly connected with the first floating body, motor is installed on first floating body, first gear is installed on the motor output shaft, the first gear is connect by chain with second gear, the second gear is fixedly connected in shaft, the shaft is fixedly connected with spoke, wire netting is connected between the spoke.The utility model can effectively intercept and salvage different size of floating refuse, and the wire netting and collecting box of salvaging can be easy to operate according to water auto-regulation, remove contamination high-efficient.
Description
Technical field
The utility model relates to hydraulic engineering technical field, specially a kind of hydraulic engineering is removed contamination fence.
Background technique
Currently, often have house refuse drift on the water surface in river, it is aquatic when especially river is intensive, water plant grows thickly
Plant spreads unchecked growth, often has various floating refuses, including house refuse, water plant or other floating materials on trunk river, seriously
River channel ecology environment is influenced, and is easy polluted source, so these pollution sources must be intercepted.Currently, generally using fence of removing contamination
It is intercepted, the structure for fence of removing contamination includes two pedestals and the left side column and right side uprights that are set on the base,
Upper and lower between the left side column and right side uprights is equipped with cross bar, in the space that the cross bar and two root posts surround
Equipped with boom net, the floating refuse in river is intercepted by boom net, this fence deficiency of removing contamination is that rubbish is easy
It being blocked in fence mesh, causes water flow unsmooth, resistance to water-flow increases, and it is easy to overthrow on fence, does not have and block dirty effect, and
It is not easily cleaned after interception, increases the burden of staff.For this purpose, being used we have proposed a kind of hydraulic engineering fence of removing contamination
To solve the above problems.
Application No. is the Chinese patents of CN201721125025.X, disclose a kind of hydraulic engineering grid of removing contamination
Column, including side pillar are fixedly connected with connection cross bar between the side pillar, are fixedly connected on the outside of the connection cross bar
Several trash racks, the trash rack side wall are provided with sliding groove, and activity is plugged with sliding fixture block, the sliding card in the sliding groove
Block end is fixedly connected with cross bar of removing contamination, and the cross bar leading flank of removing contamination is fixedly connected with several pawls of removing contamination, the side pillar
For rectangular frame, and middle part is provided with through cavities, and through cavities upper end activity is plugged with drive sprocket axle, the through cavities
Lower end activity is plugged with follower shaft, and crawler belt, the crawler belt and cross bar of removing contamination are socketed on the drive sprocket axle and follower shaft
It is fixedly connected, is fixedly connected to waterproof machine on the outside of the side pillar, the waterproof machine upper end is fixedly connected to behaviour
Make platform, the drive shaft of the waterproof machine is fixedly connected with drive sprocket axle.But there is also following shortcomings for above scheme:
1, the pawl of removing contamination of Disjunct distribution can only remove large stretch of solid refuse, can not be clear for the fritter rubbish of floating
It removes.
2, the rubbish pawl of being removed contamination floated is picked up from water, is needed people the garbage collection removed contamination on pawl, is then put
Under pawl of removing contamination salvage again, efficiency is lower.
Utility model content
It removes contamination fence the purpose of this utility model is to provide a kind of hydraulic engineering, to solve to propose in above-mentioned background technique
The problem of.
To achieve the above object, the utility model provides the following technical solutions: a kind of hydraulic engineering is removed contamination fence, including vertical
Column, fence is equipped between the column, and the column is equipped with T-shaped first sliding groove, the company of rolling in the first sliding groove
It is connected to first pulley, the base side of the first pulley is equipped with first connecting rod, and the first connecting rod is fixed with the first floating body
It connects, motor is installed on first floating body, first gear is installed, the first gear passes through on the motor output shaft
Chain is connect with second gear, and the second gear is fixedly connected in shaft, and the shaft is fixedly connected with spoke, the spoke
Wire netting is connected between item, the column is equipped with T-shaped second sliding slot, and it is sliding to be connected with second for rolling in the second sliding slot
Wheel, the base side of the second pulley is equipped with second connecting rod, and the second connecting rod is fixedly connected with third floating body, and described the
Collecting box is installed between three floating bodies.
Preferably, the left end of the shaft and the first floating body are rotatablely connected, and the right end of the shaft and the second floating body rotate
Connection.
Preferably, second floating body is identical as the dimensional structure of the first floating body, and second floating body passes through first connecting rod
It is connect with the base side of first pulley, clump weight is installed on second floating body.
Preferably, the front end of the spoke is bent and curved direction is consistent with the rotation direction of shaft.
Preferably, the first sliding groove and first pulley are identical as the structure of second sliding slot and second pulley.
Preferably, the back side panel of the collecting box is higher than front side board, and several circular holes are offered on the bottom plate of collecting box.
Compared with prior art, the utility model has the beneficial effects that the utility model drives spoke and iron by motor
Silk screen rotation, the floating refuse before being gathered in fence is caught by wire netting to be picked up, when wire netting is rotated top, in wire netting
Rubbish is entered in collecting box by centrifugal drying, and the mesh of wire netting is smaller while can salvage bulk rubbish and fritter rubbish, rubbish quilt
Centrifugal drying enters in collecting box to be gone to clear up by personnel's timing, and rubbish is salvaged in the cleaning of wire netting continuous rotation, and work efficiency is high.Iron wire
Net and collecting box can move back automatic controlled height with the length of dampening, easy for operation.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the connection schematic diagram of the utility model collecting box;
Fig. 3 is that structural schematic diagram is cutd open in the utility model side;
Fig. 4 is the utility model local overlooking schematic diagram.
In figure: 1 column, 2 fence, 3 shafts, 4 first floating bodies, 5 motors, 6 first gears, 7 second gears, 8 second floating bodies,
9 first connecting rods, 10 collecting boxs, 11 second connecting rods, 12 third floating bodies, 13 spokes, 14 wire nettings, 15 first sliding grooves, 16 first are slided
Wheel, 17 second sliding slots, 18 second pulleys, 19 clump weights.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Please refer to Fig. 1-4, the utility model provides a kind of technical solution: a kind of hydraulic engineering is removed contamination fence, including column
1, fence 2 is installed, the column 1 is equipped with T-shaped first sliding groove 15, in the first sliding groove 15 between the column 1
Rolling is connected with first pulley 16, and the base side of the first pulley 16 is equipped with first connecting rod 9, the first connecting rod 9 with
First floating body 4 is fixedly connected, and motor 5 is equipped on first floating body 4, is equipped with first gear on 5 output shaft of motor
6, the first gear 6 is connect by chain with second gear 7, and the second gear 7 is fixedly connected in shaft 3, and described turn
Axis 3 is fixedly connected with spoke 13, and wire netting 14 is connected between the spoke 13, and the column 1 is equipped with T-shaped second sliding slot
17, it rolls in the second sliding slot 17 and is connected with second pulley 18, the base side of the second pulley 18 is equipped with the second company
Bar 11, the second connecting rod 11 are fixedly connected with third floating body 12, are equipped with collecting box 10 between the third floating body 12.
Specifically, the left end of the shaft 3 and the first floating body 4 are rotatablely connected, the right end of the shaft 3 and the second floating body 8
Rotation connection.
Specifically, second floating body 8 is identical as the dimensional structure of the first floating body 4, second floating body 8 connects by first
Bar 9 is connect with the base side of first pulley 16, is equipped with clump weight 19 on second floating body 8, why plus clump weight 19 ensure
First floating body 4 is identical with 8 draft of the second floating body.
Specifically, the front end of the spoke 13 is bent and curved direction is consistent with the rotation direction of shaft 3.Ensure iron wire
When net 14 picks up floating refuse from the water surface, it will not fall off.
Specifically, the first sliding groove 15 and first pulley 16 are identical as the structure of second sliding slot 17 and second pulley 18.
Specifically, the back side panel of the collecting box 10 is higher than front side board, and several circles are offered on the bottom plate of collecting box 10
Hole, the water in rubbish can be leaked out from circular hole.
Working principle: column 1 is fixed on when use the both sides in river, and positional symmetry, grid is installed between column 1
The first floating body 4 and the second floating body 8 are installed in the front of the influent side of fence 2, between the first floating body 4 and the second floating body 8 in column 2
Shaft 3 is installed, passes through spoke 13 in shaft 3 and wire netting 14 is installed, third is installed in the front of the first floating body 4 and the second floating body 8
Floating body 12 installs collecting box 10 between third floating body 12, and fence 2 keeps off the rubbish of floating in influent side, starts motor 5, electricity
Machine 5 drive shaft 3 rotate, shaft 3 by spoke 13 drive wire netting 14 rotate, wire netting 14 rubbish from underwater pocket, iron
When silk screen 14 is rotated top, the rubbish in wire netting 14 is entered in collecting box 10 by centrifugal drying, and the mesh of wire netting 14 is smaller same
When can salvage bulk rubbish and fritter rubbish.Shaft 3 is installed between the first floating body 4 and the second floating body 8, the first floating body 4
It can be moved up and down in first sliding groove 15 with the first pulley 16 of 8 side of the second floating body installation, the length of river water moves back driving first
The rise and fall of floating body 4 and the second floating body 8, therefore shaft 3 can move back automatic controlled height according to the length of river water, collecting box 10
Height adjustment principle is identical as shaft 3.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (6)
- The fence 1. a kind of hydraulic engineering is removed contamination, including column (1), it is characterised in that: fence is installed between the column (1) (2), the column (1) is equipped with T-shaped first sliding groove (15), rolls in the first sliding groove (15) and is connected with first pulley (16), the base side of the first pulley (16) is equipped with first connecting rod (9), the first connecting rod (9) and the first floating body (4) It is fixedly connected, is equipped with motor (5) on first floating body (4), first gear (6) are installed on motor (5) output shaft, The first gear (6) is connect by chain with second gear (7), and the second gear (7) is fixedly connected on shaft (3), The shaft (3) is fixedly connected with spoke (13), is connected with wire netting (14) between the spoke (13), and the column (1) sets Have T-shaped second sliding slot (17), is rolled in the second sliding slot (17) and be connected with second pulley (18), the second pulley (18) base side is equipped with second connecting rod (11), and the second connecting rod (11) is fixedly connected with third floating body (12), described Collecting box (10) are installed between third floating body (12).
- The fence 2. a kind of hydraulic engineering according to claim 1 is removed contamination, it is characterised in that: the left end of the shaft (3) with First floating body (4) rotation connection, right end and the second floating body (8) rotation connection of the shaft (3).
- The fence 3. a kind of hydraulic engineering according to claim 2 is removed contamination, it is characterised in that: second floating body (8) and the The dimensional structure of one floating body (4) is identical, and second floating body (8) passes through the base side of first connecting rod (9) and first pulley (16) Face connects, and is equipped with clump weight (19) on second floating body (8).
- The fence 4. a kind of hydraulic engineering according to claim 1 is removed contamination, it is characterised in that: the front end of the spoke (13) is curved Bent and curved direction is consistent with the rotation direction of shaft (3).
- The fence 5. a kind of hydraulic engineering according to claim 1 is removed contamination, it is characterised in that: the first sliding groove (15) and One pulley (16) is identical as the structure of second sliding slot (17) and second pulley (18).
- The fence 6. a kind of hydraulic engineering according to claim 1 is removed contamination, it is characterised in that: the rear side of the collecting box (10) Plate is higher than front side board, and offers several circular holes on the bottom plate of collecting box (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820821634.7U CN208563281U (en) | 2018-05-30 | 2018-05-30 | A kind of hydraulic engineering is removed contamination fence |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820821634.7U CN208563281U (en) | 2018-05-30 | 2018-05-30 | A kind of hydraulic engineering is removed contamination fence |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208563281U true CN208563281U (en) | 2019-03-01 |
Family
ID=65483036
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820821634.7U Expired - Fee Related CN208563281U (en) | 2018-05-30 | 2018-05-30 | A kind of hydraulic engineering is removed contamination fence |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208563281U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110302891A (en) * | 2019-05-10 | 2019-10-08 | 安徽乐川食品有限公司 | A kind of beans congee production bean material screening plant |
-
2018
- 2018-05-30 CN CN201820821634.7U patent/CN208563281U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110302891A (en) * | 2019-05-10 | 2019-10-08 | 安徽乐川食品有限公司 | A kind of beans congee production bean material screening plant |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110803727A (en) | Grid for sewage treatment convenient to installation clearance | |
CN211080179U (en) | Sewage treatment plant river course floater fishing device | |
CN108824057B (en) | Slurry and slag treatment and recycling device | |
CN207244596U (en) | A kind of hydroenergy storage station suspension garbage cleaning device | |
CN208563281U (en) | A kind of hydraulic engineering is removed contamination fence | |
CN215669376U (en) | Can collect power station trash rack mechanism of clearance debris | |
CN113426172A (en) | Energy-concerving and environment-protective waste water recovery processing apparatus that uses | |
CN208346764U (en) | A kind of riverway waste cleaning machine | |
CN211676684U (en) | Sewage recycling device for municipal construction | |
CN107916652A (en) | A kind of integral type pumping plant gate trash rack | |
CN210827800U (en) | Riverway water drainage mouth treatment facility | |
CN108101128B (en) | Garbage lifting device for water treatment | |
CN208346765U (en) | A kind of river multistage trash | |
CN113404018B (en) | Sluice rubbish interception anti-clogging device for hydraulic engineering | |
CN214783767U (en) | Floater blocking and collecting device for large water gate | |
CN211963223U (en) | Portable landfill leachate processing apparatus | |
CN213350106U (en) | Novel cleaning table for building environmental protection engineering | |
CN212835314U (en) | River water pollution treatment device | |
CN114673126A (en) | A refuse treatment device for hydraulic engineering uses | |
CN2289828Y (en) | Dirt removing machine for dirt screen | |
CN2295794Y (en) | Apparatus for cleaning waste barrier | |
CN113494069A (en) | A garbage collection device for river course clearance | |
CN207130707U (en) | A kind of hydraulic engineering fence of removing contamination | |
CN214360337U (en) | Suspension type water prosthetic devices | |
CN220318729U (en) | Equipment pump house ground drainage dirt intercepting well based on comprehensive utilization of waste water of thermal power plant |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20191219 Address after: Room 325, complex building, No. 76-2, Shenbei Road, Shenbei New District, Shenyang City, Liaoning Province Patentee after: Shenyang Xintong Construction Engineering Co.,Ltd. Address before: 450000 2903 West Chamber street, Jinshui District, Zhengzhou, Henan Patentee before: HENAN BAINIAN RONGTENG INDUSTRIAL Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190301 |