CN208533523U - Embedded slope prestressed anchorage cable anchor pier structure - Google Patents
Embedded slope prestressed anchorage cable anchor pier structure Download PDFInfo
- Publication number
- CN208533523U CN208533523U CN201821102980.6U CN201821102980U CN208533523U CN 208533523 U CN208533523 U CN 208533523U CN 201821102980 U CN201821102980 U CN 201821102980U CN 208533523 U CN208533523 U CN 208533523U
- Authority
- CN
- China
- Prior art keywords
- anchor
- pier
- cable
- anchor pier
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004567 concrete Substances 0.000 claims abstract description 19
- 239000011435 rock Substances 0.000 claims abstract description 11
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 5
- 230000000295 complement effect Effects 0.000 claims description 2
- 230000015271 coagulation Effects 0.000 claims 2
- 238000005345 coagulation Methods 0.000 claims 2
- 238000009412 basement excavation Methods 0.000 abstract description 11
- 230000015572 biosynthetic process Effects 0.000 abstract description 2
- 238000004873 anchoring Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses an embedded slope prestressed anchorage cable anchor pier structure, which comprises an anchor pier groove (2) embedded and formed in a rock at a slope excavation surface (1), wherein anchor pier concrete (3) with a reinforced concrete structure is arranged in the anchor pier groove (2), a reserved anchorage cable hole (4) is drilled in the anchor pier concrete (3), and the reserved anchorage cable hole (4) extends into the rock; an anchor cable component (5) is arranged in the reserved anchor cable hole (4); an anchor cable protection pier (6) formed by pouring concrete is arranged at the exposed end of the anchor cable component (5). Through the utility model discloses make the anchor pier of prestressed anchorage cable do not stand out the excavation face, the face and the excavation face of final formation flush, the structural arrangement in the later stage of being convenient for more.
Description
Technical field
The utility model belongs to slope retaining field, more particularly to the anchor cable pier structure of side slope.
Background technique
Anchor cable is a kind of common slope retaining means in earthwork evacuation engineering, and the anchor pier of general anchor cable is all to excavate
Based on face, the armored concrete platform body structure of prominent excavation face, pier outside places the locking device of anchor cable, and anchor cable is from pier
It is passed through among body, compression can be generated on anchor pier after anchorage cable stretching, the effect of anchor pier is exactly to be homogenized prestressd anchor cable in side slope
Distribution in excavation face, the deformation for avoiding side slope face excessive since compressive pre-stress generates even destroy.
Existing prestress anchorage cable anchor pier is all prominent excavation slope face, if you need to abut excavation face arragement construction, anchor pier
Structure space will be occupied, structure arrangement is influenced.
Utility model content
The purpose of the utility model is to provide a kind of embedded side slope prestress anchorage cable anchor pier structures, make prestress anchorage cable
Anchor pier does not protrude excavation face, does not influence structure arrangement.
The utility model is realized in this way:
A kind of embedded side slope prestress anchorage cable anchor pier structure, including being formed in slope excavating towards rock interior is embedded
Anchor pier slot is equipped with the anchor pier concrete of reinforced concrete structure in the anchor pier slot, is drilled in the anchor pier concrete reserved
Anchor cable hole, the reserved anchor cable hole extend into rock interior;Anchor rope component is equipped in reserved anchor cable hole;In the exposed of anchor rope component
End is equipped with anchor cable made of concreting and protects pier.
Further, the lateral surface slope excavating face of the anchor cable protection pier flushes.
Further, the anchor pier concrete and anchor cable protection pier are fully populated with the space in anchor pier slot.
Further, anchor cable protection pier blocks anchor pier concrete from outside completely.
Further, the space that the anchor pier concrete occupies in anchor pier slot is the 2/5-3/5 of anchor pier slot gross space,
Complementary space is that anchor cable protects pier.
The construction method of this embedded side slope prestress anchorage cable anchor pier structure of the utility model, includes the following steps:
Slope excavating face is formed after the completion of slope excavating, excavates out an anchor pier slot to rock interior on the basis of slope excavating face;It pours
Anchor pier concrete is built, and in internal reservation anchor cable hole, after anchor pier concrete strength is met the requirements, then carries out the peace of anchor rope component
Dress, interior anchoring, tensioning and locking finally implement anchor cable and protect pier, play the role of protecting anchor cable.
The anchor pier of prestress anchorage cable is set not protrude excavation face by the utility model, finally formed face and excavation face are neat
It is flat, easily facilitate the structure arrangement in later period.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is one embodiment schematic diagram of the utility model.
Description of symbols: 1- slope excavating face, 2- anchor pier slot, 3- anchor pier concrete, 4- reserve anchor cable hole, 5- anchor cable group
Part, 6- anchor cable protect pier.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawings and examples, but appoints not as to the utility model
What is limited.
The embedded side slope prestress anchorage cable anchor pier structure of the utility model is as shown in Figure 1, the structure is included in side slope opens
Digging face 1 is equipped with the anchor pier concrete of reinforced concrete structure to the embedded anchor pier slot 2 formed of rock interior in the anchor pier slot 2
3, reserved anchor cable hole 4 is drilled in the anchor pier concrete 3, which extends into rock interior;In reserved anchor cable hole
Anchor rope component 5 is equipped in 4;Anchor cable made of concreting, which is equipped with, in the exposed junction of anchor rope component 5 protects pier 6.Anchor rope component 5
Including anchor cable and its attachment.The lateral surface slope excavating face 1 of anchor cable protection pier 6 flushes.
For the one embodiment of the utility model in some hydropower station arch dam excavation as shown in Fig. 2, when implementing, slope excavating is complete
At rear formation slope excavating face 1, an anchor pier slot 2 is excavated out to rock interior on the basis of slope excavating face 1, anchor pier slot 2
Structure size need to meet the requirement of arrangement anchor rope component 5, and meet rock strength requirement, pour anchor pier concrete 3, generally steel
Reinforced concrete, and require in internal reservation anchor cable hole 4, after 3 intensity of anchor pier concrete is met the requirements, carrying out anchor rope component 5
Installation, interior anchoring, tensioning and locking, finally implement anchor cable and protect pier 6, play the role of protecting anchor cable.As can be seen that implementing
After, the anchor cable of prestress anchorage cable protects pier 6 not protrude slope excavating face 1, the lateral surface of finally formed anchor cable protection pier 6
It is flushed with slope excavating face 1, easily facilitates the structure arrangement in later period.
Certainly, the specific application example of above only the utility model, the utility model are all there are also other embodiments
The technical solution formed using equivalent substitution or equivalent transformation, is all fallen within protection scope required by the utility model.
Claims (5)
1. a kind of embedded side slope prestress anchorage cable anchor pier structure, it is characterised in that: be included in slope excavating face (1) into rock
The embedded anchor pier slot (2) formed in portion, is equipped with the anchor pier concrete (3) of reinforced concrete structure, in the anchor in the anchor pier slot (2)
Reserved anchor cable hole (4) are drilled in pier concrete (3), which extends into rock interior;In reserved anchor cable hole
(4) anchor rope component (5) are equipped in;The protection of anchor cable made of concreting pier (6) is equipped in the exposed junction of anchor rope component (5).
2. embedded side slope prestress anchorage cable anchor pier structure according to claim 1, it is characterised in that: the anchor cable protection
The lateral surface slope excavating face (1) of pier (6) flushes.
3. embedded side slope prestress anchorage cable anchor pier structure according to claim 1, it is characterised in that: the anchor pier coagulation
Native (3) and anchor cable protection pier (6) are fully populated with the space in anchor pier slot (2).
4. embedded side slope prestress anchorage cable anchor pier structure according to claim 3, it is characterised in that: anchor cable protects pier
(6) it is blocked completely from outside by anchor pier concrete (3).
5. embedded side slope prestress anchorage cable anchor pier structure according to claim 3, it is characterised in that: the anchor pier coagulation
The space that native (3) occupy in anchor pier slot (2) is the 2/5-3/5 of anchor pier slot (2) gross space, and complementary space is that anchor cable protects pier
(6)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821102980.6U CN208533523U (en) | 2018-07-12 | 2018-07-12 | Embedded slope prestressed anchorage cable anchor pier structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821102980.6U CN208533523U (en) | 2018-07-12 | 2018-07-12 | Embedded slope prestressed anchorage cable anchor pier structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208533523U true CN208533523U (en) | 2019-02-22 |
Family
ID=65387205
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821102980.6U Active CN208533523U (en) | 2018-07-12 | 2018-07-12 | Embedded slope prestressed anchorage cable anchor pier structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208533523U (en) |
-
2018
- 2018-07-12 CN CN201821102980.6U patent/CN208533523U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106761778B (en) | A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground | |
CN101509261B (en) | Method for pile plate base for ultra-high voltage electric power line steel tower on soft foundation | |
CN101260806A (en) | Preposition type opening construction method | |
CN101270579B (en) | Foundation pit guard method for expansion construction from deep foundation pit to shallow foundation pit | |
CN104329095B (en) | A kind of existing tunnel Widening Construction method | |
CN201334669Y (en) | Anchoring structure of tailings reservoir preliminary dam top leakproof geomembrane | |
CN105696602A (en) | Composite pile-anchor supporting method and structure for deepening excavation | |
CN102606168B (en) | Construction method for preventing settlement and deformation of shallow-buried-excavation tunnel in excavation | |
CN107965325B (en) | A kind of small interval shallow tunnel just branch arch replacement construction method | |
CN103628886A (en) | Method for excavating weak surrounding rock tunnel under water-rich high-ground-stress conditions | |
CN102011597A (en) | Method and structure for supporting weak surrounding rocks of tunnel | |
CN108797641A (en) | A kind of structure and its construction method of Underground Subway Station construction period full station sealing | |
CN104533451A (en) | Tunnel advance pre-supporting technology used in discrete gravelly soil and broken surrounding rock | |
EA031926B1 (en) | Method for forming a pillar part and reinforcing adjacently constructed parallel tunnels with reinforcing rods | |
CN109812270A (en) | A kind of supporting construction and its construction method of Tunnel Passing rich water filled-type solution cavity | |
CN109457709A (en) | A kind of supporting construction and construction method of double-row pile combination wide-angle anchor cable | |
CN207111103U (en) | A kind of benching tunnelling method excavation supporting structure of weak surrounding rock large cross-section tunnel double -side approach three | |
CN207348879U (en) | Tailwater tunnel structure | |
CN106088115A (en) | The method increasing Stability of Soil of High Side Slopes | |
CN101949293B (en) | Periphery water stop structure of tunnel plug and setting method thereof | |
CN106120820B (en) | Anchoring method and structure of rock slope | |
CN205934940U (en) | Anchoring structure of rock slope | |
CN107012874A (en) | A kind of upper-soft lower-hard ground subway station building enclosure | |
CN208533523U (en) | Embedded slope prestressed anchorage cable anchor pier structure | |
CN109538236A (en) | A kind of tunnel structure and tunnel construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |