CN208516221U - High-rise building waste vertical transit system - Google Patents

High-rise building waste vertical transit system Download PDF

Info

Publication number
CN208516221U
CN208516221U CN201820876018.1U CN201820876018U CN208516221U CN 208516221 U CN208516221 U CN 208516221U CN 201820876018 U CN201820876018 U CN 201820876018U CN 208516221 U CN208516221 U CN 208516221U
Authority
CN
China
Prior art keywords
standard knot
floor
rise building
transit system
building waste
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820876018.1U
Other languages
Chinese (zh)
Inventor
来交交
张明
王鸿章
贺茂军
王克魁
赵鹏
赵娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
China Construction First Division Steel Structure Engineering Co Ltd
Original Assignee
China Construction First Group Corp Ltd
China Construction First Division Steel Structure Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, China Construction First Division Steel Structure Engineering Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201820876018.1U priority Critical patent/CN208516221U/en
Application granted granted Critical
Publication of CN208516221U publication Critical patent/CN208516221U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to construction building technical field of waste treatment, disclose a kind of high-rise building waste vertical transit system.The utility model transport channel is arranged in the reserved space on the inside of building up and down, and the surrounding of transport channel is arranged in supporting frame, and the transport channel in each floor is connected with several standard knots by a platform starting section and formed;Platform starting section is arranged in the reserved opening of upper layer floor, for the bottomless truncated cone-shaped cylinder of up big and down small, uncovered, and the side of truncated cone-shaped cylinder top is equipped with a feeding inlet, standard knot is the truncated cone-shaped cylinder up big and down small, uncovered is bottomless, several standard knots, which are taken, to be placed on supporting frame, supporting frame includes frame structure and horizontal support bar and Horizontal limiting bar, and the top and bottom end of frame structure are fixedly connected with the upper surface of the lower surface of upper layer floor and lower layer's floor respectively.The utility model structure is simple, at low cost, easy to use, applied widely.

Description

High-rise building waste vertical transit system
Technical field
The utility model relates to construction building technical field of waste treatment, more particularly to a kind of high-rise building waste Vertical transit system.
Background technique
In the work progress of super high-rise building, the electromechanics in a large amount of building waste, especially later period can be generated, finishing is applied Work stage, each floor all have that building waste yield is big, generate period length, and current high-rise rubbish has bad luck mode, main There are following three kinds:
First is that collect into bucket, transported to ground with building hoist or tower crane, without setting up auxiliary equipment, but this fortune Defeated mode low efficiency occupies the vertical transferring apparatus such as building hoist, tower crane, increases the pressure of vertical transport, and transportation cost is high;
Second is that setting up suspension type garbage shaft along vertical wall, curtain rubbish is set in the position of corresponding door and window reserved opening Rubbish input port, it is easy to use, but the general subregion investment of rubbish, high area's rubbish can be deposited on grade curtain, put into low area's rubbish After, shelves curtain is opened, easily causes the damage of grade curtain, and this garbage shaft needs the pre-buried embedded part on vertical wall, It is fixed using fashioned iron, construction cost is high, complex procedures;
Third is that build closed channel in stair side using masonry, each floor opens up moving collection mouth to collect rubbish, This mode construction cost is high, is fixed structure, can not be used in turn, and in the design of the structure of super high-rise building, due to The requirement of refuge story is evacuated, stair, which need to be spaced certain number of plies, to be converted, and cause the vertical transport of rubbish that can not be formed continuously, To need to build closed channel in many places, construction cost is further increased, meanwhile, when collection port or garbage shaft are damaged When, renewal expense is high, and the repairing period is long.
Utility model content
The utility model provides that a kind of structure is simple, at low cost, convenient to assemble and disassemble, applied widely, live is used in turn Flexible high-rise building waste vertical transit system.
The technical issues of solution is: structure is complicated for the transport channel of existing skyscraper rubbish, and working procedure is complicated, fortune Defeated low efficiency, is limited larger by architectural design structure, and design and application have certain specificity, and construction cost is high, Ge Bieshe It is calculated as fixed structure, utilization rate is limited, can not be used in turn.
In order to solve the above technical problems, the utility model adopts the following technical solution:
The high-rise building waste vertical transit system of the utility model, including transport channel and supporting frame, transport are logical Road is arranged in the reserved space on the inside of building up and down, and the surrounding of transport channel is arranged in supporting frame, for going along with sb. to guard him fortune Defeated channel;
Transport channel in each floor, which is connected by a platform starting section with several standard knots, to be formed;
The platform starting section is arranged in the reserved opening of upper layer floor, for the truncated cone-shaped up big and down small, uncovered is bottomless Cylinder, and the side of truncated cone-shaped cylinder top is equipped with a feeding inlet, and the platform starting section, which is taken, to be placed on supporting frame, and Lower part passes through the reserved opening of upper layer floor to the lower section of upper floor plate, and the upper of standard knot is arranged in the lower end of platform starting section In port;
The standard knot is the truncated cone-shaped cylinder up big and down small, uncovered is bottomless, several standard knots, which are taken, is placed on support frame On body, and between neighbouring two standard knot, the lower end for the standard knot being located above is arranged in the standard knot of lower section Upper port in, close to lower layer's floor standard knot lower end be arranged in the platform on lower layer's floor starting section upper end In mouthful;
Support frame as described above body include frame structure and horizontal support bar made of being enclosed as cross bar, vertical pole and upright bar and Horizontal limiting bar, the top and bottom end of the frame structure are solid with the lower surface of upper layer floor and the upper surface of lower layer's floor respectively Fixed connection;The bottom end of supporting frame is arranged in the horizontal support bar, and the surrounding of platform starting section is arranged in groined type;It is described Horizontal limiting bar along the vertical direction, be arranged at intervals on supporting frame, the surrounding of standard knot is set in groined type.
The high-rise building waste vertical transit system of the utility model, further, the feeding inlet are platform starting The side arc segment on section top extends horizontally outward, is gradually reduced to be formed, the smooth transition of feeding inlet lower sidewalls.
The high-rise building waste vertical transit system of the utility model, further, the top of the platform starting section Cross section is close-shaped made of being enclosed as two opposite arc segments and two symmetrical line segments.
The high-rise building waste vertical transit system of the utility model, further, circle where two arc segments The ratio between radius be 7:5.
The high-rise building waste vertical transit system of the utility model, further, the rotary table of the platform starting section The bus of shape cylinder and high angle are 5-12 °.
The high-rise building waste vertical transit system of the utility model, further, the outside of the platform starting section Connection hanging piece is equipped on wall and on the lateral wall of standard knot, between neighbouring platform starting section and standard knot, standard knot It is articulated on platform starting section by connection hanging piece and steel chain;It is underlying between neighbouring standard knot and standard knot Standard knot is articulated on the standard knot being located above by connection hanging piece and steel chain.
The high-rise building waste vertical transit system of the utility model, further, the truncated cone-shaped cylinder of the standard knot The bus of body and high angle are 5-8 °, and the opening diameter on standard knot top is 1.25-1.4 times of lower openings diameter.
The high-rise building waste vertical transit system of the utility model, further, the platform starting section and standard Section is all made of polyvinyl chloride and is made.
The high-rise building waste vertical transit system of the utility model compared with prior art, has following beneficial to effect Fruit:
The high-rise building waste vertical transit system of the utility model originates section and standard knot section by section sequentially using platform Connection forms transport channel up and down, platform starting section is fixed on horizontal floor, without relying on vertical wall, layout Flexibly, it is not limited by vertical wall, the construction of Core Walls Structure elevator cup and all kinds of computer rooms is not had an impact, it is applied widely It is general, it is suitable for each construction stages such as each main structure body of Super High, electromechanics and finishing.
Standard knot between the utility model adjacent floor deck is connected to platform starting section lower section by the way of suspension, is not necessarily to Other support constructions in space, structure is simple, convenient for construction, substantially increases construction efficiency, shortens the construction period.
The upper opening of the utility model platform starting section is provided with the feeding inlet of local elongation formation, convenient for every layer of building Dispensing, the transport of rubbish, while ensuring the continuity of transport channel, construction safety is easy to use, simultaneously because upper opening office Portion expands, and conducive to its fixation at floor slab preformed hole mouth, stress form safety and stability is efficiently convenient, substantially increases system Stability and safety, be also convenient for the replacement and disassembly in later period.
The utility model has set up supporting frame in the surrounding of transport channel, and the horizontal support bar of supporting frame bottom end mentions The high stability of platform starting section;Horizontal limiting bar limits the position of the standard knot of suspension, avoids and throws in building waste Enter transport pipeline, because of the shaking of standard knot caused by impact force, improves the safety in utilization of system, while extending standard knot Service life reduces construction noise and dust pollution.
The high-rise building waste vertical transit system structure of the utility model is simple, and construction cost is low, can ensure that construction Rubbish is with producing with clear, using flexible, and easy to demolition, reusable, scene turnover utilization rate is high.
The high-rise building waste vertical transit system of the utility model is described further with reference to the accompanying drawing.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the high-rise building waste vertical transit system of the utility model;
Fig. 2 is the detailed structure schematic diagram at the position A in Fig. 1;
Fig. 3 is section B-B schematic diagram in Fig. 1;
Fig. 4 is C-C schematic cross-section in Fig. 1;
Fig. 5 is the main view of platform starting section;
Fig. 6 is the top view of platform starting section.
Appended drawing reference:
1- platform starting section;11- feeding inlet;2- standard knot;3- supporting frame;31- cross bar;32- vertical pole;33- upright bar; 34- horizontal support bar;35- Horizontal limiting bar;4- connection hanging piece;5- steel chain;6- reserved opening;The upper layer 71- floor;72- lower layer Floor.
Specific embodiment
As shown in Figure 1, the high-rise building waste vertical transit system of the utility model includes transport channel and support frame Body 3, transport channel are arranged in the reserved space on the inside of building up and down, and the surrounding of transport channel is arranged in supporting frame 3, For going along with sb. to guard him transport channel;
Transport channel in each floor is made of a platform starting section 1 and the connection of several standard knots 2;
Platform starting section 1 is arranged in the reserved opening 6 of upper layer floor 71, for the truncated cone-shaped up big and down small, uncovered is bottomless Cylinder, as shown in Figure 5 and Figure 6, the side of truncated cone-shaped cylinder top are equipped with a feeding inlet 11, and feeding inlet 11 is platform starting section 1 The side arc segment on top extends horizontally outward, is gradually reduced to be formed, the smooth transition of 11 lower sidewalls of feeding inlet, platform starting The top cross section of section 1 is close-shaped, two camber lines made of being enclosed as two opposite arc segments and two symmetrical line segments The ratio between radius of circle where section is 7:5, and the bus and high angle of the truncated cone-shaped cylinder of platform starting section 1 are 5-12 °, and platform rises Beginning section 1, which is taken, to be placed on supporting frame 3, and lower part passes through the reserved opening 6 of upper layer floor 71 to the lower section of upper floor plate 71, makes The lateral wall of platform starting section 1 fixes at 6 edge of reserved opening, and the upper end of standard knot 2 is arranged in the lower end of platform starting section 1 In mouthful;On the lateral wall of platform starting section 1, it is symmetrically arranged with connection hanging piece 4, connection hanging piece 4 is adjacent with lower section by steel chain 5 Standard knot 2 connects;
Standard knot 2 is the truncated cone-shaped cylinder up big and down small, uncovered is bottomless, and the bus of truncated cone-shaped cylinder and high angle are 5- 8 °, the opening diameter on 2 top of standard knot is 1.25-1.4 times of lower openings diameter;On the lateral wall of standard knot 2, it is symmetrical arranged There is connection hanging piece 4, between neighbouring standard knot 2 and standard knot 2, underlying standard knot 2 passes through connection hanging piece 4 and steel Chain 5 is articulated on the standard knot 2 being located above;Between neighbouring platform starting section 1 and standard knot 2, standard knot 2 passes through company It connects pendant 4 and steel chain 5 is articulated on platform starting section 1;Several standard knots 2, which are taken, to be placed on supporting frame 3, in supporting frame Under 3 limitation, standard knot 2 is avoided to shake, and between neighbouring two standard knot 2, the lower end for the standard knot 2 being located above It is arranged in the upper port of the standard knot 2 of lower section, the lower end close to the standard knot 2 of lower layer's floor 72 is arranged in down In the upper port of platform starting section 1 on floor plate 72;Platform starting section 1 and standard knot 2 are all made of polyvinyl chloride and are made;
Supporting frame 3 includes frame structure and horizontal support bar made of being enclosed as cross bar 31, vertical pole 32 and upright bar 33 34 and Horizontal limiting bar 35, the top and bottom end of frame structure are upper with the lower surface of upper layer floor 71 and lower layer's floor 72 respectively Surface is fixedly connected, as shown in figure 3, the bottom end of supporting frame 3 is arranged in horizontal support bar 34, is risen in groined type setting in platform The surrounding of beginning section 1;As shown in Figure 2 and Figure 4, Horizontal limiting bar 35 along the vertical direction, be arranged at intervals on supporting frame 3, be in well The surrounding of standard knot 2 is arranged in font;Horizontal limiting bar 35 is bonded setting with the lateral wall of standard knot 2;3 four side of supporting frame Face is provided with Dense mesh screen.
The construction method of the high-rise building waste vertical transit system of the utility model, specifically includes the following steps:
Step 1: prefabricated components: it is required according to detail design, the platform that is prefabricated in the factory starting section 1 and standard knot 2, and Platform starting section 1 and 2 two sides of standard knot are symmetrical arranged connection hanging piece 4;
Step 2: setting up supporting frame: setting up supporting frame 3 using coating steel pipe, supporting frame 3 is disposed around up and down Reserved space surrounding;
Step 3: setting platform originates section: according to the size of 71 reserved opening 6 of upper layer floor, horizontal support bar 34 is set, Platform starting section 1 is fixed on horizontal support bar 34, the lower part of platform starting section 1 passes through reserved opening 6, extends downwardly, and makes The lateral wall of platform starting section 1 fixes at 6 edge of reserved opening;
Step 4: setting standard knot: standard knot 2 being successively hung below platform starting section 1 by steel chain 5, in formation The transport channel of lower perforation.
The building waste of each floor can save the feeding inlet 11 on 1 by the platform starting being located on this floor plate and throw Enter in transport channel the rubbish original place vertical transport, it can be achieved that each floor, form an integral passage up and down, when applying After work, supporting frame 3 and transport channel are detachable, are transferred to the use of other construction sites.
Embodiment described above is only that preferred embodiments of the present invention are described, not practical to this Novel range is defined, and under the premise of not departing from the spirit of the design of the utility model, those of ordinary skill in the art are to this The various changes and improvements that the technical solution of utility model is made should all fall into the protection that the utility model claims book determines In range.

Claims (8)

1. high-rise building waste vertical transit system, it is characterised in that: including transport channel and supporting frame (3), transport Channel is arranged in the reserved space on the inside of building up and down, and the surrounding of transport channel is arranged in supporting frame (3), for enclosing Protect transport channel;
Transport channel in each floor is made of a platform starting section (1) and the connection of several standard knots (2);
The platform starting section (1) is arranged in the reserved opening (6) of upper layer floor (71), for up big and down small, uncovered is bottomless Truncated cone-shaped cylinder, and the side of truncated cone-shaped cylinder top is equipped with a feeding inlet (11), and the platform starting section (1), which is taken, is placed on branch On support body (3), and lower part passes through the reserved opening (6) of upper layer floor (71) to the lower section of upper floor plate (71), and platform rises The lower end for beginning to save (1) is arranged in the upper port of standard knot (2);
The standard knot (2) is the truncated cone-shaped cylinder up big and down small, uncovered is bottomless, several standard knots (2), which are taken, is placed on support On frame body (3), and between neighbouring two standard knot (2), the lower end for the standard knot (2) being located above is arranged in down In the upper port of the standard knot (2) of side, the lower end close to the standard knot (2) of lower layer's floor (72) is arranged in lower layer's floor (72) in the upper port of the platform starting section (1) on;
Support frame as described above body (3) includes frame structure made of being enclosed as cross bar (31), vertical pole (32) and upright bar (33), Yi Jishui Flat support rod (34) and Horizontal limiting bar (35), the top and bottom end of the frame structure following table with upper layer floor (71) respectively Face is fixedly connected with the upper surface of lower layer's floor (72);The horizontal support bar (34) is arranged in the bottom end of supporting frame (3), is in Groined type setting originates the surrounding of section (1) in platform;The Horizontal limiting bar (35) along the vertical direction, be arranged at intervals on support frame Surrounding on body (3), in groined type setting in standard knot (2).
2. high-rise building waste vertical transit system according to claim 1, it is characterised in that: the feeding inlet (11) the side arc segment for platform starting section (1) top extends horizontally outward, is gradually reduced to be formed, below feeding inlet (11) Smooth-sided transition.
3. high-rise building waste vertical transit system according to claim 2, it is characterised in that: the platform starting The top cross section for saving (1) is close-shaped made of being enclosed as two opposite arc segments and two symmetrical line segments.
4. high-rise building waste vertical transit system according to claim 3, it is characterised in that: two camber lines The ratio between radius of circle where section is 7:5.
5. high-rise building waste vertical transit system according to claim 4, it is characterised in that: the platform starting The bus and high angle for saving the truncated cone-shaped cylinder of (1) are 5-12 °.
6. high-rise building waste vertical transit system according to claim 1, it is characterised in that: the platform starting It saves on the lateral wall of (1) and is equipped with connection hanging piece (4) on the lateral wall of standard knot (2), neighbouring platform starting section (1) Between standard knot (2), standard knot (2) is articulated on platform starting section (1) by connection hanging piece (4) and steel chain (5);Phase up and down Between adjacent standard knot (2) and standard knot (2), underlying standard knot (2) is mounted by connection hanging piece (4) and steel chain (5) On the standard knot (2) being located above.
7. high-rise building waste vertical transit system according to claim 1, it is characterised in that: the standard knot (2) bus of truncated cone-shaped cylinder and high angle are 5-8 °, and the opening diameter on standard knot (2) top is lower openings diameter 1.25-1.4 again.
8. high-rise building waste vertical transit system according to claim 1, it is characterised in that: the platform starting Section (1) and standard knot (2) are all made of polyvinyl chloride and are made.
CN201820876018.1U 2018-06-07 2018-06-07 High-rise building waste vertical transit system Expired - Fee Related CN208516221U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820876018.1U CN208516221U (en) 2018-06-07 2018-06-07 High-rise building waste vertical transit system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820876018.1U CN208516221U (en) 2018-06-07 2018-06-07 High-rise building waste vertical transit system

Publications (1)

Publication Number Publication Date
CN208516221U true CN208516221U (en) 2019-02-19

Family

ID=65326044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820876018.1U Expired - Fee Related CN208516221U (en) 2018-06-07 2018-06-07 High-rise building waste vertical transit system

Country Status (1)

Country Link
CN (1) CN208516221U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108750500A (en) * 2018-06-07 2018-11-06 中建局集团建设发展有限公司 High-rise building waste vertical transit system and its construction method
CN112922270A (en) * 2019-12-06 2021-06-08 中建四局第五建筑工程有限公司 Floor garbage transportation method and device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108750500A (en) * 2018-06-07 2018-11-06 中建局集团建设发展有限公司 High-rise building waste vertical transit system and its construction method
CN112922270A (en) * 2019-12-06 2021-06-08 中建四局第五建筑工程有限公司 Floor garbage transportation method and device

Similar Documents

Publication Publication Date Title
CN108750500A (en) High-rise building waste vertical transit system and its construction method
CN101514586B (en) Hanger rail type electric hanging boat and construction method thereof
CN105648924B (en) The construction method of multispan freely-supported steel truss girder bridge
CN107100358A (en) Without the special bracket of encorbelmenting of off-load industrialization security protection, support body and its construction method
CN208516221U (en) High-rise building waste vertical transit system
CN107938520B (en) Using the method for vertical drag-line construction steel reinforced concrete combination beam
CN107090974A (en) A kind of top plate Quick Release support system and its construction method
CN110080526A (en) A kind of basement reversed construction method by stages
CN110258352A (en) The steel reinforced concrete combined bridge construction method that two bridgings are done
CN102733608B (en) Construction method for spray head layer of granulation tower
CN206942109U (en) One kind is without special bracket and the protection support body of encorbelmenting of off-load industrialization security protection
CN206942245U (en) Prefabricated case beam tie with reinforcing bar construction frame
CN205367454U (en) Large -size formwork hoisting machine constructs
CN205224050U (en) Steel reinforcement cage is hung and is put device
CN109132843A (en) The installation method of super-section metal bellows in a kind of vertical shaft
CN108374351A (en) A kind of simple hoisting apparatus and method for removing box beam beret slice
CN205330690U (en) Cloth welding platform truck is hung to tunnel water proofing board
CN110453689A (en) A kind of physa hole inwall template construction system and construction method
CN105776092A (en) Stretching type basket device and construction method thereof
CN207048309U (en) A kind of top plate Quick Release support system
CN110344334A (en) Steel reinforced concrete combined bridge construction method is done using two bridgings of dorsal funciculus formula Bridge Erector
CN109279522A (en) Movable units body glass curtain wall cantilevered hanging device
CN107675892A (en) A kind of glass curtain wall monorail hoisting structure
CN208981742U (en) A kind of builder's jack for housing construction
CN207073274U (en) A kind of super high rise building it is dual from hoisting type outer climbing frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190219