CN208502659U - A kind of prefabricated tubular pile borehole cleaning structure - Google Patents

A kind of prefabricated tubular pile borehole cleaning structure Download PDF

Info

Publication number
CN208502659U
CN208502659U CN201821144166.0U CN201821144166U CN208502659U CN 208502659 U CN208502659 U CN 208502659U CN 201821144166 U CN201821144166 U CN 201821144166U CN 208502659 U CN208502659 U CN 208502659U
Authority
CN
China
Prior art keywords
fixedly connected
inner cavity
riser
seal box
cabinet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821144166.0U
Other languages
Chinese (zh)
Inventor
邓松柏
冷凯
廖健平
李喻
陈仕凯
关美云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuhai Jianan Group Co Ltd
Original Assignee
Zhuhai Jianan Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuhai Jianan Group Co Ltd filed Critical Zhuhai Jianan Group Co Ltd
Priority to CN201821144166.0U priority Critical patent/CN208502659U/en
Application granted granted Critical
Publication of CN208502659U publication Critical patent/CN208502659U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of prefabricated tubular pile borehole cleaning structures, including cabinet, the two sides of the bottom of box are fixedly connected to riser, the front-end and back-end of the bottom of the riser pass through bracket and are flexibly connected idler wheel, first motor is fixedly connected at the top of the cabinet, the shaft of the first motor is through to the inner cavity of cabinet and is fixedly connected with the first belt pulley, two sides at the top of the cabinets cavity are connected with threaded rod, and the inner cavity that the bottom of the threaded rod is through to riser is flexibly connected with the bottom of riser inner cavity.The utility model is cooperated by cabinet, riser, first motor, the first belt pulley, threaded rod, the second belt pulley, long hole, thread bush, connecting rod, support plate, seal box, the second motor, first bevel gear, drilling pipe and second bevel gear, facilitate the height for adjusting drilling pipe, carry out bore operation that can be more convenient, it is operated convenient for operator, it improves work efficiency, convenient for the use of people.

Description

A kind of prefabricated tubular pile borehole cleaning structure
Technical field
The utility model relates to prefabricated tubular pile technical field, specially a kind of prefabricated tubular pile borehole cleaning structure.
Background technique
Prestressed concrete pipe pile can be divided into post-tensioned prestressing stake and pretensioned-prestressed tube pile, pretensioned prestressing Tubular pole is using a kind of hollow cylinder elongate concrete prefabricated components made of pretensioned prestressing technique and centrifugal casting, master It to be made of cylinder-shaped pile body, end plate and steel hoop etc., prefabricated tubular pile needs to punch in advance before the mounting, existing prefabricated Tubular pole borehole cleaning structure applicability is not high, and the height of drilling rod is inconvenient to adjust, and punching is ineffective, influences the work effect of operator Rate is not easy to the use of people.
Utility model content
The purpose of this utility model is to provide a kind of prefabricated tubular pile borehole cleaning structure, have the height for facilitating and adjusting drilling rod, Advantage easy to use, solves that existing prefabricated tubular pile borehole cleaning structure applicability is not high, and the height of drilling rod is inconvenient to adjust, and beats The problem of hole is ineffective, influences operator's working efficiency.
To achieve the above object, the utility model provides the following technical solutions: a kind of prefabricated tubular pile borehole cleaning structure, including case Body, the two sides of the bottom of box are fixedly connected to riser, and the front-end and back-end of the bottom of the riser pass through bracket activity Idler wheel is connected, is fixedly connected with first motor at the top of the cabinet, the shaft of the first motor is through to the inner cavity of cabinet And it is fixedly connected with the first belt pulley, the two sides at the top of the cabinets cavity are connected with threaded rod, the threaded rod The inner cavity that bottom is through to riser is flexibly connected with the bottom of riser inner cavity, and one end that the threaded rod is located in the box body chamber is arranged There is the second belt pulley, first belt pulley is sequentially connected by belt and the second belt pulley, and the opposite side of the riser is opened Equipped with long hole, the threaded one end that the threaded rod is located at riser inner cavity is connected with thread bush, the thread bush close to long hole one Side is fixedly connected with connecting rod, and the one end of the connecting rod far from thread bush is through long hole and is fixedly connected with support plate, described It is fixedly connected with seal box at the top of support plate, the second motor is fixedly connected on the right side of the seal box inner cavity top, it is described The shaft of second motor is fixedly connected with first bevel gear, and the top movable of the sealing box cavity is connected with drilling pipe, the brill Support plate is run through in the bottom of pipe, and one end that the drilling pipe is located at sealing box cavity is arranged with second bevel gear, the first cone tooth Wheel is engaged with second bevel gear.
Preferably, partition, the bottom of the partition and support plate are fixedly connected on the left of the seal box inner cavity top It being fixedly connected, the top on the left of the seal box is communicated with water inlet pipe, and the left side at the top of the support plate is fixedly connected with water pump, Connecting tube is communicated at the top of the water pump, the one end of the connecting tube far from water pump is through seal box and extends in drilling pipe The bottom of chamber, the drilling pipe two sides offers through-hole.
Preferably, fixed plate is fixedly connected on the right side of second motor, in the top and seal box of the fixed plate It is fixedly connected at the top of chamber, the bottom of the fixed plate is fixedly connected with support plate.
Preferably, the front of the seal box is connected with chamber door by articulate, and the positive right side of chamber door is fixed It is connected with handle.
Preferably, the bottom of the riser is fixedly connected with electric telescopic rod, and the bottom of the electric telescopic rod is fixed to be connected It is connected to friction block.
Compared with prior art, the beneficial effects of the utility model are as follows:
1, the utility model by cabinet, riser, first motor, the first belt pulley, threaded rod, the second belt pulley, long hole, Thread bush, connecting rod, support plate, seal box, the second motor, first bevel gear, drilling pipe and second bevel gear are cooperated, convenient The height of drilling pipe is adjusted, carry out bore operation that can be more convenient is operated convenient for operator, is improved work efficiency, Convenient for the use of people.
2, the utility model is cooperated by partition, water inlet pipe, water pump, connecting tube and through-hole, can be in drilling pipe Chamber conveys water source, and the water of drilling pipe inner cavity is flowed out by through-hole, can be moistened to soil, and more convenient drilling pipe drills, By the way that partition is arranged, the water that can be avoided sealing box cavity flow to the right side of partition, can be to the second electricity by the way that fixed plate is arranged Machine is reinforced, and the stability of the second motor is improved, and by the way that chamber door is arranged, is repaired convenient for the component to sealing box cavity And maintenance, it is moved down by electric telescopic rod elongated dynamic friction block, is in close contact friction block and idler wheel, it can be to idler wheel Locking is carried out, the stability of borehole cleaning structure is improved.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model structure schematic elevation view.
In figure: 1 cabinet, 2 risers, 3 idler wheels, 4 first motors, 5 first belt pulleys, 6 threaded rods, 7 second belt pulleys, 8 length Hole, 9 thread bush, 10 connecting rods, 11 support plates, 12 seal boxs, 13 second motors, 14 first bevel gears, 15 drilling pipes, 16 second cones Gear, 17 partitions, 18 water inlet pipes, 19 water pumps, 20 connecting tubes, 21 through-holes, 22 fixed plates, 23 chamber doors, 24 electric telescopic rods.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
The two sides of a kind of prefabricated tubular pile borehole cleaning structure referring to FIG. 1-2, including cabinet 1,1 bottom of cabinet are fixedly connected with There is riser 2, the front-end and back-end of 2 bottom of riser are flexibly connected idler wheel 3 by bracket, and the bottom of riser 2 is fixedly connected with electricity Dynamic telescopic rod 24, the bottom of electric telescopic rod 24 is fixedly connected with friction block, passes through 24 elongated dynamic friction block of electric telescopic rod It moves down, is in close contact friction block and idler wheel 3, locking can be carried out to idler wheel 3, improve the stability of borehole cleaning structure, The top of cabinet 1 is fixedly connected with first motor 4, and the shaft of first motor 4 is through to the inner cavity of cabinet 1 and is fixedly connected with One belt pulley 5, the two sides of 1 inner cavity top of cabinet are connected with threaded rod 6, and the bottom of threaded rod 6 is through to the interior of riser 2 Chamber is flexibly connected with the bottom of 2 inner cavity of riser, and one end that threaded rod 6 is located at 1 inner cavity of cabinet is arranged with the second belt pulley 7, and first Belt pulley 5 is sequentially connected by belt and the second belt pulley 7, and the opposite side of riser 2 offers long hole 8, and threaded rod 6 is located at perpendicular The threaded one end of 2 inner cavity of plate is connected with thread bush 9, and thread bush 9 is fixedly connected with connecting rod 10 close to the side of long hole 8, connection The one end of bar 10 far from thread bush 9 is through long hole 8 and is fixedly connected with support plate 11, and the top of support plate 11 is fixedly connected with close Joint sealing 12 is fixedly connected with the second motor 13 on the right side of 12 inner cavity top of seal box, and the right side of the second motor 13 is fixedly connected with Fixed plate 22 is fixedly connected at the top of the top and 12 inner cavity of seal box of fixed plate 22, the bottom of fixed plate 22 and support plate 11 It is fixedly connected, by setting fixed plate 22, the second motor 13 can be reinforced, improve the stability of the second motor 13, The shaft of second motor 13 is fixedly connected with first bevel gear 14, and the top movable of 12 inner cavity of seal box is connected with drilling pipe 15, bores Support plate 11 is run through in the bottom of pipe 15, and one end that drilling pipe 15 is located at 12 inner cavity of seal box is arranged with second bevel gear 16, the first cone Gear 14 is engaged with second bevel gear 16, and partition 17, the bottom of partition 17 are fixedly connected on the left of 12 inner cavity top of seal box It is fixedly connected with support plate 11, the top in 12 left side of seal box is communicated with water inlet pipe 18, and the left side at 11 top of support plate is fixed to be connected It is connected to water pump 19, the top of water pump 19 is communicated with connecting tube 20, and connecting tube 20 runs through seal box 12 simultaneously far from one end of water pump 19 The inner cavity of drilling pipe 15 is extended to, the bottom of 15 two sides of drilling pipe offers through-hole 21, and the front of seal box 12 passes through articulate It is connected with chamber door 23, the positive right side of chamber door 23 is fixedly connected with handle, by the way that chamber door 23 is arranged, convenient for 12 inner cavity of seal box Component repair and safeguard, cooperated by partition 17, water inlet pipe 18, water pump 19, connecting tube 20 and through-hole 21, can Water source is conveyed to the inner cavity of drilling pipe 15, the water of 15 inner cavity of drilling pipe is flowed out by through-hole 21, can be moistened to soil, more just Just drilling pipe 15 drills, and by the way that partition 17 is arranged, the water that can be avoided 12 inner cavity of seal box flow to the right side of partition 17, passes through Cabinet 1, riser 2, first motor 4, the first belt pulley 5, threaded rod 6, the second belt pulley 7, long hole 8, thread bush 9, connecting rod 10, Support plate 11, seal box 12, the second motor 13, first bevel gear 14, drilling pipe 15 and second bevel gear 16 are cooperated, and tune is facilitated The height of drilling pipe 15 is saved, carry out bore operation that can be more convenient is operated convenient for operator, is improved work efficiency, Convenient for the use of people.
In use, the shaft by the second motor 13 drives first bevel gear 14 to rotate, first bevel gear 14 drives second Bevel gear 16 rotates, and second bevel gear 16 drives drilling pipe 15 to rotate, and drives the rotation of the first belt pulley 5 by the shaft of first motor 4 Turn, the first belt pulley 5 drives the second belt pulley 7 to rotate by belt, and the second belt pulley 7 drives threaded rod 6 to rotate, and passes through screw thread Bar 6 is threadedly coupled with thread bush 9 moves down thread bush 9, and thread bush 9 drives connecting rod 10 to move down, 10 band of connecting rod Dynamic support plate 11 moves down, and support plate 11 drives drilling pipe 15 to move down, to carry out bore operation, water inlet pipe 18 to ground One end be connected to external supply equipment to the left side of 12 inner cavity of seal box and supply water, by the operation of water pump 19 by 12 inner cavity of seal box The water in left side is successively delivered to the inner cavity of connecting tube 20 and drilling pipe 15, and last water is flowed out by through-hole 21, moistened to soil, Convenient for drilling to soil.
In summary: the prefabricated tubular pile borehole cleaning structure passes through cabinet 1, riser 2, first motor 4, the first belt pulley 5, spiral shell Rasp bar 6, the second belt pulley 7, long hole 8, thread bush 9, connecting rod 10, support plate 11, seal box 12, the second motor 13, first cone Gear 14, drilling pipe 15 and second bevel gear 16 are cooperated, and it is not high to solve existing prefabricated tubular pile borehole cleaning structure applicability, are bored The problem of height of bar is inconvenient to adjust, and punching is ineffective, influences operator's working efficiency.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of prefabricated tubular pile borehole cleaning structure, including cabinet (1), it is characterised in that: the two sides of cabinet (1) bottom are fixed It is connected with riser (2), the front-end and back-end of riser (2) bottom are flexibly connected idler wheel (3) by bracket, the cabinet (1) it is fixedly connected at the top of first motor (4), the shaft of the first motor (4) is through to inner cavity and the fixation of cabinet (1) It is connected with the first belt pulley (5), the two sides of cabinet (1) inner cavity top are connected with threaded rod (6), the threaded rod (6) inner cavity that bottom is through to riser (2) is flexibly connected with the bottom of riser (2) inner cavity, and the threaded rod (6) is located at cabinet (1) one end of inner cavity is arranged with the second belt pulley (7), and first belt pulley (5) is driven by belt and the second belt pulley (7) Connection, the opposite side of the riser (2) offer long hole (8), and the threaded rod (6) is located at one end spiral shell of riser (2) inner cavity Line is connected with thread bush (9), and the thread bush (9) is fixedly connected with connecting rod (10), the connection close to the side of long hole (8) The one end of bar (10) far from thread bush (9) is through long hole (8) and is fixedly connected with support plate (11), the top of the support plate (11) Portion is fixedly connected with seal box (12), is fixedly connected with the second motor (13), institute on the right side of seal box (12) inner cavity top The shaft for stating the second motor (13) is fixedly connected with first bevel gear (14), the top movable connection of seal box (12) inner cavity Have drilling pipe (15), support plate (11) are run through in the bottom of the drilling pipe (15), and the drilling pipe (15) is located at seal box (12) inner cavity One end is arranged with second bevel gear (16), and the first bevel gear (14) is engaged with second bevel gear (16).
2. a kind of prefabricated tubular pile borehole cleaning structure according to claim 1, it is characterised in that: seal box (12) the inner cavity top It is fixedly connected on the left of portion partition (17), the bottom of the partition (17) is fixedly connected with support plate (11), the seal box (12) top on the left of is communicated with water inlet pipe (18), and the left side at the top of the support plate (11) is fixedly connected with water pump (19), institute It states and is communicated at the top of water pump (19) connecting tube (20), the connecting tube (20) runs through seal box far from the one end of water pump (19) (12) and the inner cavities of drilling pipe (15) is extended to, the bottom of drilling pipe (15) two sides offers through-hole (21).
3. a kind of prefabricated tubular pile borehole cleaning structure according to claim 1, it is characterised in that: the right side of second motor (13) Side is fixedly connected with fixed plate (22), is fixedly connected at the top of the top and seal box (12) inner cavity of the fixed plate (22), institute The bottom for stating fixed plate (22) is fixedly connected with support plate (11).
4. a kind of prefabricated tubular pile borehole cleaning structure according to claim 1, it is characterised in that: the front of the seal box (12) It is connected with chamber door (23) by articulate, the positive right side of the chamber door (23) is fixedly connected with handle.
5. a kind of prefabricated tubular pile borehole cleaning structure according to claim 1, it is characterised in that: the bottom of the riser (2) is solid Surely it is connected with electric telescopic rod (24), the bottom of the electric telescopic rod (24) is fixedly connected with friction block.
CN201821144166.0U 2018-07-18 2018-07-18 A kind of prefabricated tubular pile borehole cleaning structure Active CN208502659U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821144166.0U CN208502659U (en) 2018-07-18 2018-07-18 A kind of prefabricated tubular pile borehole cleaning structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821144166.0U CN208502659U (en) 2018-07-18 2018-07-18 A kind of prefabricated tubular pile borehole cleaning structure

Publications (1)

Publication Number Publication Date
CN208502659U true CN208502659U (en) 2019-02-15

Family

ID=65289771

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821144166.0U Active CN208502659U (en) 2018-07-18 2018-07-18 A kind of prefabricated tubular pile borehole cleaning structure

Country Status (1)

Country Link
CN (1) CN208502659U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109973010A (en) * 2019-04-04 2019-07-05 嘉兴古辛达贸易有限公司 A kind of deep-well construction equipment
CN110145227A (en) * 2019-04-15 2019-08-20 安徽正融科工实业集团有限公司 A kind of screw pile machine promotion pressurized equipment
CN111282927A (en) * 2020-02-11 2020-06-16 重庆市潼南区百重泉环保科技有限公司 Pipeline dredging equipment capable of being positioned and using method
CN112576210A (en) * 2020-12-15 2021-03-30 中铁北京工程局集团有限公司 Clear hole device of drilling bored concrete pile
CN113356210A (en) * 2021-05-25 2021-09-07 江苏万象建工集团有限公司 Tubular pile core pulling machine
CN113606468A (en) * 2021-07-22 2021-11-05 晋能控股煤业集团有限公司 Coal mine water prevention and control monitoring device
CN114293933A (en) * 2022-01-07 2022-04-08 黄玉华 Geological exploration drilling hydraulic propulsion equipment

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109973010A (en) * 2019-04-04 2019-07-05 嘉兴古辛达贸易有限公司 A kind of deep-well construction equipment
CN109973010B (en) * 2019-04-04 2021-01-26 安徽明峰建筑工程有限公司 Deep well construction equipment
CN110145227A (en) * 2019-04-15 2019-08-20 安徽正融科工实业集团有限公司 A kind of screw pile machine promotion pressurized equipment
CN111282927A (en) * 2020-02-11 2020-06-16 重庆市潼南区百重泉环保科技有限公司 Pipeline dredging equipment capable of being positioned and using method
CN112576210A (en) * 2020-12-15 2021-03-30 中铁北京工程局集团有限公司 Clear hole device of drilling bored concrete pile
CN113356210A (en) * 2021-05-25 2021-09-07 江苏万象建工集团有限公司 Tubular pile core pulling machine
CN113606468A (en) * 2021-07-22 2021-11-05 晋能控股煤业集团有限公司 Coal mine water prevention and control monitoring device
CN114293933A (en) * 2022-01-07 2022-04-08 黄玉华 Geological exploration drilling hydraulic propulsion equipment

Similar Documents

Publication Publication Date Title
CN208502659U (en) A kind of prefabricated tubular pile borehole cleaning structure
CN208543333U (en) A kind of adjustable surface derusting device for steel tubes for building
CN108326539B (en) Screw drill auxiliary dismounting device for petroleum and natural gas exploitation
CN107569186A (en) A kind of construction site ground cleaning device
CN115075728B (en) Petroleum geological exploration drill rod device
CN106638558B (en) Civil engineering high pressure jet grouting device
CN112196236B (en) Decoration construction is with beating mucilage binding and is put convenient to automatic frictioning
CN116479735A (en) Concrete cutting surface bar planting construction device and construction method
CN108661546A (en) A kind of shale gas exploitation exploration drilling equipment
CN208520621U (en) A kind of civil engineering drilling soil property detection device
CN108855694A (en) A kind of gate valve spray-painting plant
CN215842238U (en) Engineering blasting dust treatment device
CN213662904U (en) Novel agricultural machine irrigates mechanism
CN214797087U (en) Transformer bushing oil injection equipment used in power system
CN209063016U (en) A kind of steel body PDC drill bit
CN218911062U (en) Pavement milling device
CN211276575U (en) Drill bit is used in processing of medical parts
CN213556052U (en) Dust device for building site
CN108967154A (en) A kind of gardens water-saving and environmental protection irrigation rig
CN108755686A (en) The pile-driving system of piling machine
CN219284724U (en) Sampling equipment
CN219899436U (en) Tendon planting hole cleaning tool
CN215035502U (en) Double-end single-action drilling machine with good stability
CN216617462U (en) Mud dado drilling section of thick bamboo inner loop device of river regulation engineering
CN216809484U (en) Road repair is with mending seam device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant