CN208502345U - A kind of full-prefabricated assembled concrete wallboard communications equipment room - Google Patents

A kind of full-prefabricated assembled concrete wallboard communications equipment room Download PDF

Info

Publication number
CN208502345U
CN208502345U CN201820890152.7U CN201820890152U CN208502345U CN 208502345 U CN208502345 U CN 208502345U CN 201820890152 U CN201820890152 U CN 201820890152U CN 208502345 U CN208502345 U CN 208502345U
Authority
CN
China
Prior art keywords
side wall
communications equipment
wall panel
full
equipment room
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820890152.7U
Other languages
Chinese (zh)
Inventor
陈丽飞
王辉
郭玉拴
杨立凯
姚星宇
于祥
殷禾生
牛亚卫
杨相彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebi Dongjiang Construction Industry Science And Technology Co Ltd
Henan Dongfang Building Industry Science And Technology Group Co Ltd
Henan Dongfang Construction Group Development Co Ltd
Ruzhou Dongjiang Construction Industry Technology Co Ltd
Original Assignee
Hebi Dongjiang Construction Industry Science And Technology Co Ltd
Henan Dongfang Building Industry Science And Technology Group Co Ltd
Henan Dongfang Construction Group Development Co Ltd
Ruzhou Dongjiang Construction Industry Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebi Dongjiang Construction Industry Science And Technology Co Ltd, Henan Dongfang Building Industry Science And Technology Group Co Ltd, Henan Dongfang Construction Group Development Co Ltd, Ruzhou Dongjiang Construction Industry Technology Co Ltd filed Critical Hebi Dongjiang Construction Industry Science And Technology Co Ltd
Priority to CN201820890152.7U priority Critical patent/CN208502345U/en
Application granted granted Critical
Publication of CN208502345U publication Critical patent/CN208502345U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Panels For Use In Building Construction (AREA)

Abstract

The utility model relates to a kind of full-prefabricated assembled concrete wallboard communications equipment rooms, the cuboid communications equipment room surrounded including two groups of top plates, four groups of side wall panels and two groups of bottom plates, it is provided with fit-up gap seam between adjacent concrete prefabricated element, is provided with sealing element in the seam of fit-up gap;The side wall panel includes multiple side wall panel monomers connected side by side, and the both ends of each side wall panel monomer are provided with built-in fitting.The utility model is structurally reasonable, ingenious in design, and project amount is small, it is fast to produce installation speed, time-consuming short, construction speed is fast, component presentation quality is good, and durability is good, reduces situ wet operation, it is good for the environment, it is long in time limit to solve scene existing for existing traditional communication computer room, is influenced by season and weather, construction quality is difficult to control, and uneven settlement of foundation even also will cause wall crazing, influences the technical problems such as structure safety, for the prior art, have good market prospects and development space.

Description

A kind of full-prefabricated assembled concrete wallboard communications equipment room
Technical field
The utility model relates to assembly concrete building fields, and in particular to a kind of full-prefabricated assembled concrete wallboard Communications equipment room.
Background technique
Prefabrication refers to that some or all of building component is completed in element precast plant produced, then leads to It crosses corresponding means of transportation and transports to construction site, component is assembled using reliable mounting means and installation machinery, is become The construction mode for having the building using function.Assembled architecture have industrialized level it is high, convenient for winter construction, subtract Shaoshi work on-site wet operation amount reduces material consumption, reduces the advantages that dust from construction sites and building waste, it is advantageously implemented raising Construction quality improves production efficiency, and drop is realized with a low cost energy-saving and emission-reduction and protects the purpose of environment.
And existing common classes of traditional type construction has the following deficiencies: that 1, traditional single layer and tier building are largely adopted With brick mix structure, after the completion of brick mix structure construction, need to be plastered again, the processes construction such as insulating layer.Scene is long in time limit, by season Section and weather influence it is very big, construction quality be difficult to control, the common quality defects such as coat of plaster and insulating layer hollowing, crack frequent occurrence, Uneven settlement of foundation even also will cause wall crazing, influence structure safety;If 2, building uses cast-in-place structural, Site Template Scaffold dosage is larger, and cast-in-place concrete presentation quality is difficult to control, and the quality such as honeycomb, pitted skin, hollowing, leakage muscle often occurs Common fault after the completion of concreting, needs to be plastered again, the processes construction such as insulating layer.
How to design a kind of structurally reasonable, ingenious in design, project amount is small, and production installation speed is fast, and it is time-consuming short, meet structure Safely and using on the basis of function, construction speed is fast, and quality is easily controllable, and component presentation quality is good, and durability is good, and subtracts Few situ wet operation, a kind of environmentally friendly full-prefabricated assembled concrete wallboard communications equipment room are current to need what is solved to ask Topic.
Utility model content
It is long in time limit in order to solve scene existing for existing traditional communication computer room, it is influenced by season and weather, construction quality It is difficult to control, frequent occurrence, uneven settlement of foundation even also will cause the common quality defects such as coat of plaster and insulating layer hollowing, crack Wall crazing, influences the technical problems such as structure safety, and the utility model provides a kind of full-prefabricated assembled concrete wallboard communication Computer room, structurally reasonable to realize, ingenious in design, project amount is small, and production installation speed is fast, time-consuming short, meets structure safety and makes On the basis of function, construction speed is fast, and quality is easily controllable, and component presentation quality is good, and durability is good, and reduces situ wet Operation, environmentally friendly purpose.
Used technical solution is the utility model to solve above-mentioned technical problem: a kind of full-prefabricated assembled concrete Wallboard communications equipment room, including the cuboid communications equipment room that two groups of top plates, four groups of side wall panels and two groups of bottom plates surround, the top plate, Side wall panel and bottom plate are concrete prefabricated element, and fit-up gap seam is provided between adjacent concrete prefabricated element, dress With being provided with sealing element in gapped seam;The bottom plate includes two pieces of upper plate and two pieces of lower plates disposed in parallel, and two pieces The seam crossing of upper plate and two pieces of lower plates is all made of L shape fissure of displacement overlap joint, to avoid there is crack;The side wall panel includes multiple The side wall panel monomer connected side by side, the both ends of each side wall panel monomer are provided with built-in fitting, and two adjacent side wall panel monomers are logical The bolt part being arranged on built-in fitting is crossed to be fixedly connected.
The junction of two groups of top plates is swelled upwards forms male portion, and top plate upper end is provided with to be made with male portion cooperation It is in the part that bears down on one of inverted concave.
The sealing element includes sealing rod and grouting material, and the two sides port of fit-up gap seam is provided with sealant.
The reserved fit-up gap joint size of institute is 10 to 25mm between the adjacent concrete prefabricated components.
Battenboard insulating layer is provided in the top plate, side wall panel and bottom plate.
Machine room door is offered in the side wall panel, is provided with prefabricated step below face machine room door.
Upper plate and lower plate are provided with hole to be provided, grouting material is provided in hole to be provided, by upper plate and bottom Plate is located by connecting.
Compared with prior art, the utility model has the beneficial effects that
1) the utility model includes the cuboid communications equipment room that two groups of top plates, four groups of side wall panels and two groups of bottom plates surround, institute Stating top plate, side wall panel and bottom plate is concrete prefabricated element, is provided with fit-up gap between adjacent concrete prefabricated element Seam is provided with sealing element in the seam of fit-up gap, by can volume production standardized components, need cast in situs to process tradition Communications equipment room be changed into casting concrete in advance, and default related accessory structure is directly laid on the scenely, realizes energy saving Emission reduction, product qualification rate is high, easy to operate, simple and practical purpose;
2) bottom plate described in includes two pieces of upper plates and two pieces of lower plates disposed in parallel, two pieces of upper plates and two pieces of bottoms The seam crossing of plate is all made of L shape fissure of displacement overlap joint, and to avoid there is crack, the sealing element includes sealing rod and grouting material, dress Two sides port with gapped seam is provided with sealant, and L-type fissure of displacement overlap joint and linear type joint structure are used at component seam Connection cooperates high strength exploitation, using " concrete special seal gum+water-swelling rubber water bar+strength cement-based grouting material The connection type of+concrete special seal gum " blocks fit-up gap, on the basis of meeting structure safety and using function, solution Determined on-site concrete wet construction the problem of, avoid the influence of season and weather to site operation, have that construction speed is fast, matter The features such as measuring that easily controllable, component presentation quality is good, durability is good, and reducing situ wet operation, be good for the environment;
3) it is laid with to put down in advance in each prefabricated components and hangs embedded part, not only facilitated and poured processing early period, but also facilitate the later period to put down and hang It is laid with;
4) full precast concrete is used, finished product member flatness, dimensional discrepancy very little save later period wall plastering work Sequence saves material and artificial;Concrete curing is not influenced by weather, temperature, is shortened the construction period, and is saved teletostage maintenance measure and is taken With;Construction worker is specialized, and quality is guaranteed;
5) side wall body, top plate and bottom plate are all made of the battenboard insulating layer of " sandwich " structure, concrete and insulating layer shape At structure entirety, reduce the process of the secondary construction of insulating layer, save the duration, and avoids insulating layer and be easy cracking, fall off Equal common quality defects, while ensure that the energy-saving effect of communications equipment room;
6) the full assembly construction in communications equipment room scene, element precast rate 100% avoid on-site concrete operation, improve scene Speed of application.
Detailed description of the invention
Fig. 1 is the utility model overlooking structure diagram;
Fig. 2 is the A-A schematic cross-sectional view of Fig. 1;
Fig. 3 is the B-B schematic cross-sectional view of Fig. 1;
Fig. 4 is bottom plate stitching portion connection schematic diagram;
Fig. 5 is adjacent side wall panel stitching portion connection schematic diagram;
Fig. 6 is side wall panel and bottom plate, top plate stitching portion connection schematic diagram;
Fig. 7 is the utility model assembly stereoscopic schematic diagram;
Marked in the figure: 1, top plate, 101, male portion, 102, bear down on one part, 2, side wall panel, 201, side wall panel monomer, 202, pre- Embedded part, 3, bottom plate, 301, upper plate, 302, lower plate, 303, hole to be provided, 4, sealing element, 401, sealing rod, 402, grouting material, 5, battenboard insulating layer, 6, machine room door, 7, prefabricated step, 8, fit-up gap seam.
Specific embodiment
Specific embodiment of the present utility model is described in further detail with reference to the accompanying drawing.
As shown, a kind of full-prefabricated assembled concrete wallboard communications equipment room, including two groups of top plates, 1, four group of side wall panel 2 The cuboid communications equipment room surrounded with two groups of bottom plates 3, the top plate 1, side wall panel 2 and bottom plate 3 are concrete prefabricated element, phase It is provided with fit-up gap seam 8 between adjacent concrete prefabricated element, sealing element 4 is provided in fit-up gap seam 8;Described Bottom plate 3 includes two pieces of upper plates 301 disposed in parallel and two pieces of lower plates 302, two pieces of upper plates 301 and two pieces of lower plates 302 Seam crossing be all made of the L shape fissure of displacement overlap joint, to avoid there is crack;The side wall panel 2 includes multiple side wall panels connected side by side Monomer 201, the both ends of each side wall panel monomer 201 are provided with built-in fitting 202, and two adjacent side wall panel monomers 201 are by setting The bolt part set on built-in fitting 202 is fixedly connected.
The above are the basic embodiments of the utility model, further can be improved, improved and limited on the basis of above Fixed: the junction of two groups of top plates 1 as mentioned is swelled upwards forms male portion 101, and 1 upper end of top plate is provided with and male portion 101 The part 102 that bears down on one in inverted concave being used cooperatively.
The above are the basic embodiments of the utility model, further can be improved, improved and limited on the basis of above Fixed: sealing element 4 as mentioned includes sealing rod 401 and grouting material 402, and the two sides port of fit-up gap seam 8 is provided with sealing Glue.
The above are the basic embodiments of the utility model, further can be improved, improved and limited on the basis of above Fixed: the reserved fit-up gap seam 8 of institute is having a size of 10 to 25mm between adjacent concrete prefabricated components as mentioned.
The above are the basic embodiments of the utility model, further can be improved, improved and limited on the basis of above It is fixed: to be provided with battenboard insulating layer 5 in top plate 1, side wall panel 2 and bottom plate 3 as mentioned.
The above are the basic embodiments of the utility model, further can be improved, improved and limited on the basis of above It is fixed: to offer machine room door 6 in side wall panel 2 as mentioned, prefabricated step 7 is provided with below face machine room door 6.
The above are the basic embodiments of the utility model, further can be improved, improved and limited on the basis of above It is fixed: as being provided with hole to be provided 303 through upper plate 301 and lower plate 302, grouting material to be provided in hole to be provided 303, by upper bottom Plate 301 and lower plate 302 are located by connecting.
The utility model is structurally reasonable, ingenious in design, and project amount is small, and production installation speed is fast, time-consuming short, meets structure peace Entirely and using on the basis of function, construction speed is fast, and quality is easily controllable, and component presentation quality is good, and durability is good, and reduces Situ wet operation is good for the environment, and it is long in time limit to solve scene existing for existing traditional communication computer room, is influenced by season and weather Greatly, construction quality be difficult to control, the common quality defects such as coat of plaster and insulating layer hollowing, crack frequent occurrence, uneven settlement of foundation It even also will cause wall crazing, influence the technical problems such as structure safety and had good market prospects for the prior art And development space.
The utility model preferred embodiment and embodiment are explained in detail above in conjunction with attached drawing, but this Utility model is not limited to the above embodiment and embodiment, within the knowledge of those skilled in the art, may be used also With various changes can be made without departing from the concept of the premise utility.

Claims (7)

1. a kind of full-prefabricated assembled concrete wallboard communications equipment room, it is characterised in that: including two groups of top plates (1), four groups of side walls The cuboid communications equipment room that plate (2) and two groups of bottom plates (3) surround, the top plate (1), side wall panel (2) and bottom plate (3) are coagulation Native prefabricated components are provided with fit-up gap seam (8) between adjacent concrete prefabricated element, are set in fit-up gap seam (8) It is equipped with sealing element (4);The bottom plate (3) includes two pieces of upper plates (301) disposed in parallel and two pieces of lower plates (302), and two Block upper plate (301) and the seam crossing of two pieces of lower plates (302) are all made of L shape fissure of displacement overlap joint, to avoid there is crack;The side Wallboard (2) includes multiple side wall panel monomers (201) connected side by side, on the both ends of each side wall panel monomer (201), top plate (1) With built-in fitting (202) are provided on bottom plate (3), between two adjacent side wall panel monomers (201), side wall panel monomer (201) It is mutual to pass through bolt part of the setting on built-in fitting (202) between top plate (1), between side wall panel monomer (201) and bottom plate (3) Mutually it is fixedly connected.
2. a kind of full-prefabricated assembled concrete wallboard communications equipment room as described in claim 1, it is characterised in that: described two The junction of group top plate (1) is swelled upwards to be formed male portion (101), and top plate (1) upper end is provided with to be made with male portion (101) cooperation It is in the part that bears down on one (102) of inverted concave.
3. a kind of full-prefabricated assembled concrete wallboard communications equipment room as described in claim 1, it is characterised in that: described is close Sealing (4) includes sealing rod (401) and grouting material (402), and the two sides port of fit-up gap seam (8) is provided with sealant.
4. a kind of full-prefabricated assembled concrete wallboard communications equipment room as described in claim 1, it is characterised in that: the phase The reserved fit-up gap seam (8) of institute is having a size of 10 to 25mm between adjacent concrete prefabricated element.
5. a kind of full-prefabricated assembled concrete wallboard communications equipment room as described in claim 1, it is characterised in that: the top Battenboard insulating layer (5) are provided in plate (1), side wall panel (2) and bottom plate (3).
6. a kind of full-prefabricated assembled concrete wallboard communications equipment room as described in claim 1, it is characterised in that: the side It is offered on wallboard (2) machine room door (6), is provided with prefabricated step (7) below face machine room door (6).
7. a kind of full-prefabricated assembled concrete wallboard communications equipment room as described in claim 1, it is characterised in that: run through upper bottom Plate (301) and lower plate (302) are provided with hole to be provided (303), grouting material are provided in hole to be provided (303), by upper plate (301) it is located by connecting with lower plate (302).
CN201820890152.7U 2018-06-09 2018-06-09 A kind of full-prefabricated assembled concrete wallboard communications equipment room Expired - Fee Related CN208502345U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820890152.7U CN208502345U (en) 2018-06-09 2018-06-09 A kind of full-prefabricated assembled concrete wallboard communications equipment room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820890152.7U CN208502345U (en) 2018-06-09 2018-06-09 A kind of full-prefabricated assembled concrete wallboard communications equipment room

Publications (1)

Publication Number Publication Date
CN208502345U true CN208502345U (en) 2019-02-15

Family

ID=65288873

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820890152.7U Expired - Fee Related CN208502345U (en) 2018-06-09 2018-06-09 A kind of full-prefabricated assembled concrete wallboard communications equipment room

Country Status (1)

Country Link
CN (1) CN208502345U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114808861A (en) * 2022-05-20 2022-07-29 四川省水利电力工程局有限公司 Gate dam building prefabricated member structure and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114808861A (en) * 2022-05-20 2022-07-29 四川省水利电力工程局有限公司 Gate dam building prefabricated member structure and construction method thereof
CN114808861B (en) * 2022-05-20 2024-01-26 四川水发建设有限公司 Gate dam building prefabricated member structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN106436893A (en) Fully-prefabricated structure and construction method thereof
CN106013811B (en) A kind of installation method of assembled architecture
CN208502433U (en) A kind of prefabricated assembled Assembled surrounding wall with vertical curtain wall penel component
CN206220238U (en) Fully-prefabricated assembled structure
CN215253698U (en) Ceramsite foam concrete exterior wall hanging plate in assembly type building
CN107165307A (en) Light steel integrated assembled type wall
CN208072706U (en) A kind of connection structure of the prefabricated steel shear wall horizontal joint of slip installation
CN105544849A (en) Assembly type composite wallboard based on XPS sandwich insulation treatment and preparation method thereof
CN110344535A (en) A kind of prefabricated assembled combined wall board and construction method realized concealed beam and exempt from formwork
CN205776884U (en) A kind of assembled Novel light wall body
CN106499045A (en) A kind of prefabricated composite construction parapet and construction method
CN105401687A (en) Assembled type composite wall board based on heat insulating treatment outside mortar and manufacturing method of assembled type composite wall board
CN210178013U (en) Fully-prefabricated assembled house
CN208502345U (en) A kind of full-prefabricated assembled concrete wallboard communications equipment room
CN104712078A (en) Integrated self-heat-preservation composite outer wall
CN203296209U (en) Self-insulation mortarless block masonry shear wall system
CN206205139U (en) A kind of prefabricated composite construction parapet
CN203129402U (en) Self-insulating building block
CN203412143U (en) Wall body structure of integrally poured building house
CN207296087U (en) A kind of Prefabricated outer wall non-load bearing wall standard component
CN212507608U (en) Full-assembly type concrete low-voltage power distribution room
CN204940206U (en) Riverbed type hydropower house concrete volute construction joint structure
CN204151917U (en) The double combined wall self-insulation system that a kind of insulation blocks is built by laying bricks or stones
CN204151985U (en) Sandwich wall Self-thermal-insulation System
CN211229151U (en) Concrete masonry module

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190215

CF01 Termination of patent right due to non-payment of annual fee