CN204940206U - A kind of power station in river channel Factory Concrete spiral case construction joint structure - Google Patents
A kind of power station in river channel Factory Concrete spiral case construction joint structure Download PDFInfo
- Publication number
- CN204940206U CN204940206U CN201520721374.2U CN201520721374U CN204940206U CN 204940206 U CN204940206 U CN 204940206U CN 201520721374 U CN201520721374 U CN 201520721374U CN 204940206 U CN204940206 U CN 204940206U
- Authority
- CN
- China
- Prior art keywords
- construction
- parting
- joint
- power station
- spiral case
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B10/00—Integration of renewable energy sources in buildings
- Y02B10/50—Hydropower in dwellings
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a kind of power station in river channel Factory Concrete spiral case construction joint structure, belong to Hydraulic and Hydro-Power Engineering technical field, comprise the spiral casing flow passage formed in volute body and volute body, described volute body is reserved with construction parting, described construction parting is that the fissure of displacement is arranged, construction parting seam face is provided with some joint bars and keyway, and the construction parting side that meets water also is provided with expansion sealing strip, and construction parting seam edge, face is also provided with joint grouting system.The technical program is by adopting construction point crack structure, the fissure of displacement is constructed, and throughout between seam face, the structures such as joint bar, keyway, expansion sealing strip are set, on the one hand, make the construction parting of concrete structure seam face can better be in conjunction with, built rear volute body and can better form entirety, respectively built between piecemeal and there is good tensile strength and shear strength, on the other hand, there is again good stagnant water effect.
Description
Technical field
The utility model belongs to Hydraulic and Hydro-Power Engineering technical field, relates to a kind of power station in river channel factory building, especially relates to a kind of power station in river channel Factory Concrete spiral case construction joint structure.
Background technology
In hydraulic structure, spiral case many employings concrete spiral casing of power plant building, low-head hydroelectric plant.And for large-scale concrete spiral casing, because structural span is comparatively large, the reason such as uneven of being in the milk, often there will be structural cracks.For avoiding occurring structural cracks, affecting the normal operation in power station, needing to arrange constuction joint on concrete spiral casing, carry out tile and hierarchy and build.But after arranging constuction joint, easily leak again, seep water in constuction joint place, in engineering practice, percolation-proof process is carried out to constuction joint, comparison structural cracks to carry out reparation much easier.
Utility model content
In order to solve the problem, the utility model provides a kind of power station in river channel Factory Concrete spiral case construction joint structure, thus reaches constructability, the effect of effective antiseepage.
The utility model is achieved by following technical solution.
A kind of power station in river channel Factory Concrete spiral case construction joint structure, comprise the spiral casing flow passage formed in volute body and volute body, described volute body is reserved with construction parting, described construction parting is that the fissure of displacement is arranged, construction parting seam face is provided with some joint bars and keyway, the construction parting side that meets water also is provided with expansion sealing strip, and construction parting seam edge, face is also provided with joint grouting system.
Described construction parting is that the fissure of displacement is arranged, its faulting of slab ends width is 1 ~ 2m.
Described joint bar, perpendicular to seam face, is positioned at construction parting lower edges, and is uniformly distributed in the horizontal direction of seam face.
Described grouting system is positioned at outside point joint bar sewed on of constructing, and lateral arrangement, comprises a hose construction be in the milk for seam crossing.
Described expansion sealing strip lays respectively at the lateral edges that meets water of construction parting.
Described keyway is positioned in the middle part of construction parting, and between two socket muscle, the block construction that setting is formerly built divides to be sewed on.
The beneficial effects of the utility model are:
A kind of power station in river channel described in the utility model Factory Concrete spiral case construction joint structure, by adopting construction point crack structure, the fissure of displacement is constructed, and throughout between seam face, joint bar is set, keyway, the structures such as expansion sealing strip, on the one hand, make the construction parting of concrete structure seam face can better be in conjunction with, build rear volute body and can better form entirety, volute body entirety is stressed meets structure design model more, respectively build between piecemeal and there is good tensile strength and shear strength, and avoid because of thermal stresses, the reasons such as structure is uneven produce crack, on the other hand, there is again good stagnant water effect, meanwhile, carry out after-pouring by grouting system, this construction divides the seam face process of crack structure simple, and difficulty of construction is little, and cost is lower, has broad application prospects.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the A-A construction parting elevation of Fig. 1;
Fig. 3 is the schematic cross-section at the B-B construction parting place of Fig. 2.
In figure: 1-volute body, 2-constructs parting, 3-keyway, 4-joint bar, 5-grouting system, 6-expansion sealing strip, 7-spiral casing flow passage.
Detailed description of the invention
The technical solution of the utility model is further described below in conjunction with accompanying drawing, but described in claimed scope is not limited to.
As shown in Figure 1, Figure 2, Figure 3 shows, a kind of power station in river channel described in the utility model Factory Concrete spiral case construction joint structure, comprise the spiral casing flow passage 7 formed in volute body 1 and volute body 1, described volute body 1 is reserved with construction parting 2, described construction parting 2 is fissure of displacement layout, construction parting 2 seam face is provided with some joint bars 4 and keyway 3, and construction parting 2 side that meets water also is provided with expansion sealing strip 6, and construction parting 2 stitches edge, face and is also provided with joint grouting system 5.
Described construction parting 2 is fissure of displacement layout, and its faulting of slab ends width is 1 ~ 2m.
Described joint bar 4, perpendicular to seam face, is positioned at construction parting 2 lower edges, and is uniformly distributed in the horizontal direction of seam face, makes the connection between two piecemeals more firm, that is to say and improve after-pouring piecemeal and front tensile strength of building between piecemeal.
Described grouting system 5 is positioned at outside the joint bar 4 on construction parting 2, lateral arrangement, comprise a hose construction be in the milk for seam crossing, as cement grout into and out of slurry pipeline, so that be in the milk in place with straight cement slurries butt joint, fill construction parting face, block concrete good combination before and after ensureing.
Described expansion sealing strip 6 lays respectively at the lateral edges that meets water of construction parting 2, to prevent construction parting 2 place, seepage occurs.
Described keyway 3 is positioned in the middle part of construction parting 2, between two socket muscle 4, arranges on the block construction parting 2 of formerly building, after construction parting 2 is built, part Concrete Filled in keyway 3, to improve the shear strength between forward and backward two piecemeals of building.
The technical program is mainly constructed in accordance with the following steps:
The first step, according to power station volute body 1 physical dimension determination spiral case piecemeal quantity, to determine position and the elevation of construction parting 2;
Second step, determines the layer height that spiral case is built and faulting of slab ends width;
3rd step, formerly completes on the block construction parting 2 seam face of building and arranges keyway 3, install joint bar 4.
4th step, after completing first concreting piecemeal, lateral arrangement joint grouting system 5 outside the joint bar 4 on seam face, vertically arranges expansion sealing strip 6 in construction parting 2 side that meets water.
5th step, completing the cloth postpone of arranging keyway 3, joint bar 4, grouting system 5 and expansion sealing strip 6, carries out the construction of after-pouring block; With grouting system 5 for boundary, after-pouring tile and hierarchy is built, form the construction parting of horizontal direction.The same to the construction parting processing method in horizontal direction.
6th step, starts grouting system 5, is in the milk, makes concrete fill up each construction parting, fill up keyway 3 simultaneously, complete construction after air-setting each construction parting 2.
Embodiment
Technique scheme is applied in pillow dam one-level Hydropower Station river formula construction of hydropower, because this power house in river channel spiral case size reaches length × wide × height=34.6m × 29m × 21m, and be heterogeneous texture, crack is there is because of reasons such as variations in temperature for avoiding concrete spiral casing body, have employed layering, piecemeal build mode, be provided with two vertical constuction joints in the horizontal plane, and the fissure of displacement is arranged, technique scheme is adopted: some joint bars are arranged in parting seam face in construction in construction parting, between every two socket muscle, keyway is set, expansion sealing strip is established in the construction parting side that meets water, joint grouting system is established at construction parting seam edge, face.From scene, the joint form process whole structure of concrete spiral casing is good.
Claims (6)
1. power station in river channel's Factory Concrete spiral case construction joint structure, comprise the spiral casing flow passage (7) formed in volute body (1) and volute body (1), described volute body (1) is reserved with construction parting (2), it is characterized in that: described construction parting (2) is fissure of displacement layout, construction parting (2) seam face is provided with some joint bars (4) and keyway (3), construction parting (2) side that meets water also is provided with expansion sealing strip (6), and construction parting (2) seam edge, face is also provided with joint grouting system (5).
2. a kind of power station in river channel according to claim 1 Factory Concrete spiral case construction joint structure, is characterized in that: described construction parting (2) is fissure of displacement layout, and its faulting of slab ends width is 1 ~ 2m.
3. a kind of power station in river channel according to claim 1 Factory Concrete spiral case construction joint structure, it is characterized in that: described joint bar (4) is perpendicular to seam face, be positioned at construction parting (2) lower edges, and be uniformly distributed in the horizontal direction of seam face.
4. a kind of power station in river channel according to claim 1 Factory Concrete spiral case construction joint structure, it is characterized in that: described grouting system (5) is positioned at joint bar (4) outside in construction parting (2), lateral arrangement, comprises a hose construction be in the milk for seam crossing.
5. a kind of power station in river channel according to claim 1 Factory Concrete spiral case construction joint structure, is characterized in that: described expansion sealing strip (6) lays respectively at the lateral edges that meets water of construction parting (2).
6. a kind of power station in river channel according to claim 1 Factory Concrete spiral case construction joint structure, it is characterized in that: described keyway (3) is positioned at construction parting (2) middle part, be positioned between two socket muscle (4), on the block construction parting (2) that setting is formerly built.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520721374.2U CN204940206U (en) | 2015-09-17 | 2015-09-17 | A kind of power station in river channel Factory Concrete spiral case construction joint structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520721374.2U CN204940206U (en) | 2015-09-17 | 2015-09-17 | A kind of power station in river channel Factory Concrete spiral case construction joint structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204940206U true CN204940206U (en) | 2016-01-06 |
Family
ID=55007648
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520721374.2U Active CN204940206U (en) | 2015-09-17 | 2015-09-17 | A kind of power station in river channel Factory Concrete spiral case construction joint structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204940206U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108086407A (en) * | 2017-12-25 | 2018-05-29 | 上海市水利工程集团有限公司 | Vertical shaft Concrete Construction of Powerhouse stitches method for production |
CN108130889A (en) * | 2017-12-25 | 2018-06-08 | 上海市水利工程集团有限公司 | Pump lock main body bottom plate and flow channel layer side wall step construction joint method for production |
-
2015
- 2015-09-17 CN CN201520721374.2U patent/CN204940206U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108086407A (en) * | 2017-12-25 | 2018-05-29 | 上海市水利工程集团有限公司 | Vertical shaft Concrete Construction of Powerhouse stitches method for production |
CN108130889A (en) * | 2017-12-25 | 2018-06-08 | 上海市水利工程集团有限公司 | Pump lock main body bottom plate and flow channel layer side wall step construction joint method for production |
CN108086407B (en) * | 2017-12-25 | 2019-12-27 | 上海市水利工程集团有限公司 | Method for manufacturing second-stage concrete construction joint of vertical shaft |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103422620B (en) | A kind of prefabricated hollow profile steel concrete column and splicing construction thereof and joining method | |
CN106436893A (en) | Fully-prefabricated structure and construction method thereof | |
CN203498799U (en) | Prefabricated hollow pipe pile water-facing envelop enclosure | |
CN103225285B (en) | A kind of steel membrane rock | |
CN203613719U (en) | Prefabricated hollow steel concrete column and splicing structure thereof | |
CN106522407A (en) | Fabricated cast-in-place concrete sandwich insulation wall steel frame formwork system and connecting parts | |
CN203890966U (en) | Asphalt concrete core wall anti-seepage structure | |
CN103774699A (en) | Vertical water-stop structure for concrete engineering expansion joint as well as manufacturing and construction methods for same | |
CN207419711U (en) | Steel plate shear force wall and the connection structure of steel bar girder floor plates | |
CN103993679A (en) | Bolt connecting joint structure of low-rise fabricated composite wall house | |
CN105544849A (en) | Assembly type composite wallboard based on XPS sandwich insulation treatment and preparation method thereof | |
CN105003020A (en) | Ceramsite concrete metal net rack light wallboard and splicing structure thereof | |
CN204040078U (en) | A kind of alter-pouring strips mould plate installs structure | |
CN206220238U (en) | Fully-prefabricated assembled structure | |
CN204940206U (en) | A kind of power station in river channel Factory Concrete spiral case construction joint structure | |
CN112359994A (en) | CL heat preservation system construction method | |
CN204676714U (en) | Water-stopping steel strip and construction joint structure | |
CN202577363U (en) | H-shaped steel joint structure of underground diaphragm wall | |
CN208168032U (en) | Assembled built-in heat insulation layer concrete composite wall-light steel frame-floor connecting node | |
CN101581089B (en) | Connection interface structure of factory building and large dam and construction technology thereof | |
CN203334285U (en) | Underground concrete structure engineering seam waterproof preparation grouting system | |
CN107268675A (en) | The laying method and structure of a kind of many storehouse underground pipe galleries of combined type | |
CN203270856U (en) | Building wall | |
CN104389360A (en) | Externally suspended insulation board type reinforcement brickwork shear wall system and construction method thereof | |
CN102587329B (en) | Arched combined faceplate for earth-rock dam and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |