CN208501862U - A kind of prefabricated pumping plant high intensity cylinder - Google Patents
A kind of prefabricated pumping plant high intensity cylinder Download PDFInfo
- Publication number
- CN208501862U CN208501862U CN201821137069.9U CN201821137069U CN208501862U CN 208501862 U CN208501862 U CN 208501862U CN 201821137069 U CN201821137069 U CN 201821137069U CN 208501862 U CN208501862 U CN 208501862U
- Authority
- CN
- China
- Prior art keywords
- fixed ring
- cylinder
- convex block
- groove
- pedestal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
A kind of prefabricated pumping plant high intensity cylinder, including cylinder, the cylinder body bottom is equipped with pedestal, and pedestal is connected with barrel soldering, the bottom of the cylinder is equipped with third fixed ring, and third fixed ring is connected with barrel soldering, the first water inlet and the second water inlet are symmetrically arranged at the top of the cylinder, and first water inlet and the second water inlet be connected by connecting flange with water pipe, the right side central of the cylinder is equipped with water outlet, and water outlet passes through connecting flange and is connected with water pipe.The prefabricated pumping plant high intensity cylinder, pass through the cooperation between the first fixed ring, the second fixed ring and third fixed ring, under the action of inserted link and top cover, the first fixed ring and the second fixed ring is set to be fixed to each other by grafting, and under the action of inserted link and top cover, the first fixed ring and the second fixed ring can be rapidly assembled and disassembled, so can the height of more cylinder installed additional, using hair with a wide range of features, it is suitble to promote the use of.
Description
Technical field
The utility model relates to machinery field more particularly to water treatment facilities, especially a kind of prefabricated pumping plant high intensity cylinder
Body.
Background technique
Prefabricated pumping plant is widely used in sewage treatment, and cylinder is cylindrical shape, and outside lacks bracing means, cannot transport safely
Row is in the biggish occasion of pressure.
Utility model content
The purpose of this utility model is to provide a kind of prefabricated pumping plant high intensity cylinders, to solve to mention in above-mentioned background technique
Out the problem of.
To achieve the above object, the utility model provides the following technical solutions: a kind of prefabricated pumping plant high intensity cylinder, including
Cylinder, the cylinder body bottom is equipped with pedestal, and pedestal is connected with barrel soldering, and the bottom of the cylinder is fixed equipped with third
Ring, and third fixed ring is connected with barrel soldering, and the first water inlet and the second water inlet are symmetrically arranged at the top of the cylinder, and
First water inlet and the second water inlet are connected by connecting flange with water pipe, and the right side central of the cylinder is equipped with water outlet, and
Water outlet is connected by connecting flange with water pipe, and the outer cover of the cylinder is equipped with the first fixed ring, and the right side of the first fixed ring
Side is equipped with the second fixed ring, and the bottom of the first fixed ring is equipped with the first groove, and the top of the first fixed ring is convex equipped with first
Block, second fixed ring bottom are equipped with the second convex block, and the top of second convex block is equipped with the second groove, and the first convex block with
Second groove activity clamping, and the second convex block and the first groove activity are clamped, the outside of first convex block and the second convex block is set
There is a fixture block, the inside of first groove and the second groove is equipped with groove, and fixture block and groove activity are clamped, first convex block
Mandril is installed with the inside of the second convex block, and the first convex block is connected by mandril with the first groove, and the second convex block passes through top
Bar is connected with the second groove, and the bottom of second fixed ring is equipped with slot, and the inside of slot is equipped with cushion block, and cushion block
Inside is equipped with inserted link, and the inserted link runs through the first fixed ring and the second fixed ring, and the top of the inserted link is equipped with top cover, and pushes up
Lid is threadedly coupled and contrary with inserted link, and the bottom of the slot is equipped with buckle closure, and buckle closure is threadedly coupled with slot and direction
On the contrary, the junction of the top cover and inserted link is equipped with gasket, and the outside of gasket is equipped with sealant, first fixed ring and the
The junction of two fixed rings is equipped with rubber mat.
Preferably, the bottom of the pedestal is welded with set square, and set square is evenly distributed on the outside of pedestal, for pair
Pedestal is reinforced.
Preferably, grout hole is equipped between the set square, and grout hole is used for underfill quotient's concrete to pedestal, the bottom of to
The inside of seat is sealed, in case pedestal inundation corrodes.
Preferably, the top of the cylinder is equipped with access hole, overhauls for the component to inner barrel.
Preferably, the inside of first fixed ring and the second fixed ring is equipped with clip slot, and the inside of clip slot is equipped with
Bottom plate, and the inside of bottom plate is equipped with upright bar, and the top of upright bar is equipped with clamping plate, and clamping plate is connected by upright bar and bottom plate activity
It connects, the outer cover of the upright bar is equipped with compressed spring.
Compared with prior art, the utility model has the beneficial effects that the prefabricated pumping plant high intensity cylinder, solid by first
Determine the cooperation between ring, the second fixed ring and third fixed ring, under the action of inserted link and top cover, makes first to fix by grafting
Ring and the second fixed ring are fixed to each other, and under the action of inserted link and top cover, can to the first fixed ring and the second fixed ring into
Row is rapidly assembled and disassembled, so can the height of more cylinder installed additional, using hair with a wide range of features, thus to the prefabricated pumping plant
The outside of high-intensitive cylinder is reinforced, and is overcome existing prefabricated pumping plant high intensity cylinder and is lacked bracing means, practical function
Can single disadvantage, improve the working efficiency and service life of the prefabricated pumping plant high intensity cylinder, also allow existing prefabricated pump
More approvals can be commercially available in high-intensitive cylinder of standing, and improve the product quality of the prefabricated pumping plant high intensity cylinder,
The purchase cost for saving user avoids the wasting of resources of prefabricated pumping plant high intensity cylinder, is suitble to promote the use of.
Detailed description of the invention
Fig. 1 is cylinder, the first fixed ring, the annexation figure of the second fixed ring and third fixed ring;
Fig. 2 is the first fixed ring, the annexation figure of the second fixed ring and inserted link of Fig. 1;
Fig. 3 is the annexation figure of the clamping plate of Fig. 1, upright bar and compressed spring.
In figure: 1, cylinder, 2, pedestal, 3, grout hole, 4, set square, the 5, first fixed ring, the 6, second fixed ring, 7, first
Water inlet, 8, water outlet, the 9, second water inlet, 10, access hole, the 11, first groove, the 12, first convex block, the 13, second groove,
14, the second convex block, 15, mandril, 16, groove, 17, fixture block, 18, inserted link, 19, cushion block, 20, slot, 21, buckle closure, 22, top cover,
23, gasket, 24, sealant, 25, clip slot, 26, rubber mat, 27, bottom plate, 28, clamping plate, 29, upright bar, 30, compressed spring, 31, third
Fixed ring.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3 is please referred to, the utility model provides a kind of technical solution: a kind of prefabricated pumping plant high intensity cylinder, including cylinder
Body 1, for handling sewage, the top of cylinder 1 is equipped with access hole 10, for being overhauled to the component inside cylinder 1,
1 bottom of cylinder is equipped with pedestal 2, promotes the stability between cylinder 1 and pumping plant, the bottom of pedestal 2 is welded with set square 4, right
Pedestal 2 is reinforced, and bearing capacity is promoted, and grout hole 3 is equipped between set square 4, and grout hole 3 to the bottom of pedestal 2 for filling out
Quotient's concrete is filled, the inside of pedestal 2 is sealed, in order to avoid 2 inundation of pedestal corrodes, and set square 4 is evenly distributed on the outer of pedestal 2
Portion, for reinforcing to pedestal 2, and pedestal 2 is weldingly connected with cylinder 1, and the bottom of cylinder 1 is equipped with third fixed ring 31, and
Third fixed ring 31 is weldingly connected with cylinder 1, reinforces to cylinder 1, and the top of cylinder 1 is symmetrically arranged with 7 He of the first water inlet
Second water inlet 9, and the first water inlet 7 and the second water inlet 9 are connected by connecting flange with water pipe, are added into cylinder 1 dirty
The right side central of water, cylinder 1 is equipped with water outlet 8, and sewage is exported, and water outlet 8 is connected by connecting flange with water pipe, cylinder
1 outer cover is equipped with the first fixed ring 5, cooperates with the second fixed block 6, reinforces to cylinder 1, extends making for cylinder 1
With the service life, the inside of the first fixed ring 5 and the second fixed ring 6 is equipped with clip slot 25, for installing and fixing bottom plate 27 and upright bar
29, and the inside of clip slot 25 is equipped with bottom plate 27, fixed upright bar 29, and the inside of bottom plate 27 is equipped with upright bar 29, strap
28, and the top of upright bar 29 is equipped with clamping plate 28, and inserted link 18 is fixed, and makes the first fixed ring 5 and the second fixed ring 6 quickly
It is fixed, and clamping plate 28 is flexibly connected by upright bar 29 with bottom plate 27, the outer cover of upright bar 29 is equipped with compressed spring 30, compressed spring
30 coefficient of elasticity adjusts the elasticity of clamping plate 28 between 1-10N/CM, and the right side of the first fixed ring 5 is equipped with second and fixes
Ring 6 is connected with each other with the first fixed ring 5, reinforces to the outside of cylinder 1, and the bottom of the first fixed ring 5 is recessed equipped with first
Slot 11, and the top of the first fixed ring 5 is equipped with the first convex block 12,6 bottom of the second fixed ring is equipped with the second convex block 14, the second convex block
14 top is equipped with the second groove 13, and the first convex block 12 and the activity clamping of the second groove 13, and the second convex block 14 and first recessed
The outside of the activity clamping of slot 11, the first convex block 12 and the second convex block 14 is equipped with fixture block 17, the first groove 11 and the second groove 13
Inside is equipped with groove 16, and fixture block 17 and 16 activity of groove are clamped, and the inside of the first convex block 12 and the second convex block 14 is equipped with top
Bar 15, and the first convex block 12 is connected by mandril 15 with the first groove 11, and the second convex block 14 passes through mandril 15 and the second groove
13 are connected, and the first convex block 12 is mutually inserted with the first groove 11, and the second convex block 14 is mutually inserted with the second groove 13, solid to first
Determine ring 5 and the second fixed ring 6 is fixed to each other, easy for installation, easy to operate, the bottom of the second fixed ring 6 is equipped with slot 20, will insert
The bottom of bar 18 is fixed in slot 20, and the inside of slot 20 is equipped with cushion block 19, prevents inserted link 18 from occurring in slot 20
It shakes, and the inside of cushion block 19 is equipped with inserted link 18, the first fixed ring 5 and the second fixed ring 6 is fixed, inserted link 18 runs through
The top of first fixed ring 5 and the second fixed ring 6, inserted link 18 is equipped with top cover 22, and fixation, and top cover are tightened in the top of inserted link 18
22 are threadedly coupled and contrary with inserted link 18, and the bottom of slot 20 is equipped with buckle closure 21, and the bottom of the second fixed ring 6 is sealed
Stifled, and buckle closure 21 is threadedly coupled and contrary with slot 20, the junction of top cover 22 and inserted link 18 is equipped with gasket 23, to first
The top of fixed ring 5 is sealed, and the outside of gasket 23 is equipped with sealant 24, prevents inserted link 18 fixed by cargo sweat, first
The junction of ring 5 and the second fixed ring 6 is equipped with rubber mat 26, is sealed to the gap of the first fixed ring 5 and the second fixed ring 6.
A kind of prefabricated pumping plant high intensity cylinder, the prefabricated pumping plant high intensity cylinder is by cylinder 1, pedestal 2, grout hole 3, triangle
Plate 4, the first fixed ring 5, the second fixed ring 6, the first water inlet 7, water outlet 8, the second water inlet 9, access hole 10, the first groove
11, the first convex block 12, the second groove 13, the second convex block 14, mandril 15, groove 16, fixture block 17, inserted link 18, cushion block 19, slot
20, the components such as buckle closure 21 and top cover 22 form, the main fit dimension of reply components before assembling, especially interference fit ruler
Very little and phase closing precision is checked, when Same Part is fastened with more than one piece screw (bolt), each screw (bolt) needs to intersect, is symmetrical,
Gradually, it uniformly tightens, when installation, the first fixed ring 5 and the second fixed ring 6 is fixed on cylinder 1, made in the first fixed ring 5
The first convex block 12 agree with 13 phase of the second groove in the second fixed ring 6, make the second convex block 14 and first in the second fixed ring 6
11 phase of the first groove in fixed ring 5 is agreed with, the first convex block 12 and the fixture block 17 and the first groove 11 on the second convex block 14 and
16 phase of groove in two grooves 13 is agreed with, and the first fixed ring 5 and the second fixed ring 6 is fixed together, using inserted link 18 under
It is supreme to pass through the first fixed ring 5 and the second fixed ring 6, top cover 22 is rotated, tightens inserted link 18 with top cover 22, by the first fixed ring
5 and second fixed ring 6 be fixed on cylinder 1, cylinder 1 is reinforced, extend cylinder 1 service life, can be according to cylinder 1
Height is installed additional, easy for installation, and is reinforced with being fixedly connected for cylinder 1 to cylinder 1 by third fixed ring 31, complete
At the assembly working of the prefabricated pumping plant high intensity cylinder.
In the description of the present invention, it should be understood that term " coaxial ", " bottom ", " one end ", " top ", " in
The orientation of the instructions such as portion ", " other end ", "upper", " side ", " top ", "inner", " front ", " center ", " both ends " or position are closed
System is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of describing the present invention and simplifying the description, rather than
The device or element of indication or suggestion meaning must have a particular orientation, be constructed and operated in a specific orientation, therefore cannot
It is construed as a limitation of the present invention.
In the present invention unless specifically defined or limited otherwise, term " installation ", " setting ", " connection ", " Gu
Calmly ", the terms such as " being screwed on " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;
It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, can also indirectly connected through an intermediary, it can be with
It is the interaction relationship of the connection or two elements inside two elements, unless otherwise restricted clearly, for this field
For those of ordinary skill, the concrete meaning of above-mentioned term in the present invention can be understood as the case may be.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of prefabricated pumping plant high intensity cylinder, including cylinder (1), it is characterised in that: cylinder (1) bottom is equipped with pedestal
(2), pedestal (2) is weldingly connected with cylinder (1), and the bottom of the cylinder (1) is equipped with third fixed ring (31), third fixed ring
(31) it is weldingly connected with cylinder (1), is symmetrically arranged with the first water inlet (7) and the second water inlet (9) at the top of the cylinder (1),
And first water inlet (7) and the second water inlet (9) be each provided with water pipe connecting flange, the right side central of the cylinder (1) is set
Have water outlet (8), and water outlet (8) is provided with water pipe connecting flange, the outer cover of the cylinder (1) is equipped with the first fixed ring
(5), and the right side of the first fixed ring (5) is equipped with the second fixed ring (6), and the bottom of the first fixed ring (5) is equipped with the first groove
(11), and the top of the first fixed ring (5) is equipped with the first convex block (12), and the second fixed ring (6) bottom is equipped with the second convex block
(14), the top of second convex block (14) is equipped with the second groove (13), and the first convex block (12) and the second groove (13) activity
Outside clamping, and the second convex block (14) and the first groove (11) activity clamping, first convex block (12) and the second convex block (14)
Portion is equipped with fixture block (17), and the inside of first groove (11) and the second groove (13) is equipped with groove (16), and fixture block (17) and
The inside of groove (16) activity clamping, first convex block (12) and the second convex block (14) is equipped with mandril (15), and first is convex
Block (12) is connected by mandril (15) with the first groove (11), and the second convex block (14) passes through mandril (15) and the second groove (13)
It is connected, the bottom of second fixed ring (6) is equipped with slot (20), and the inside of slot (20) is equipped with cushion block (19), and pads
The inside of block (19) is equipped with inserted link (18), and the inserted link (18) runs through the first fixed ring (5) and the second fixed ring (6), described
The top of inserted link (18) is equipped with top cover (22), and top cover (22) is threadedly coupled with inserted link (18) and contrary, the slot
(20) bottom is equipped with buckle closure (21), and buckle closure (21) is threadedly coupled and contrary with slot (20), the top cover (22) and
The junction of inserted link (18) is equipped with gasket (23), and the outside of gasket (23) is equipped with sealant (24), first fixed ring (5)
Rubber mat (26) are equipped with the junction of the second fixed ring (6).
2. a kind of prefabricated pumping plant high intensity cylinder according to claim 1, it is characterised in that: the bottom of the pedestal (2)
It is welded with set square (4), and set square (4) is evenly distributed on the outside of pedestal (2), for being reinforced to pedestal (2).
3. a kind of prefabricated pumping plant high intensity cylinder according to claim 2, it is characterised in that: between the set square (4)
Equipped with grout hole (3), and grout hole (3) is connected to the bottom of pedestal (2), and the underfill of pedestal (2) has quotient's concrete.
4. a kind of prefabricated pumping plant high intensity cylinder according to claim 1, it is characterised in that: the top of the cylinder (1)
Equipped with access hole (10).
5. a kind of prefabricated pumping plant high intensity cylinder according to claim 1, it is characterised in that: first fixed ring (5)
It is equipped with clip slot (25) with the inside of the second fixed ring (6), and the inside of clip slot (25) is equipped with bottom plate (27), and bottom plate (27)
Inside be equipped with upright bar (29), and the top of upright bar (29) is equipped with clamping plate (28), and clamping plate (28) by upright bar (29) with
Bottom plate (27) is flexibly connected, and the outer cover of the upright bar (29) is equipped with compressed spring (30).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821137069.9U CN208501862U (en) | 2018-07-18 | 2018-07-18 | A kind of prefabricated pumping plant high intensity cylinder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821137069.9U CN208501862U (en) | 2018-07-18 | 2018-07-18 | A kind of prefabricated pumping plant high intensity cylinder |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208501862U true CN208501862U (en) | 2019-02-15 |
Family
ID=65289696
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821137069.9U Active CN208501862U (en) | 2018-07-18 | 2018-07-18 | A kind of prefabricated pumping plant high intensity cylinder |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208501862U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110872847A (en) * | 2019-11-29 | 2020-03-10 | 威海天泽建筑材料有限公司 | Building-free inspection well device |
CN114738630A (en) * | 2022-05-07 | 2022-07-12 | 淮北兴业建设工程项目管理有限公司 | Pump station mounting and supporting structure for special geology and adjusting method |
-
2018
- 2018-07-18 CN CN201821137069.9U patent/CN208501862U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110872847A (en) * | 2019-11-29 | 2020-03-10 | 威海天泽建筑材料有限公司 | Building-free inspection well device |
CN114738630A (en) * | 2022-05-07 | 2022-07-12 | 淮北兴业建设工程项目管理有限公司 | Pump station mounting and supporting structure for special geology and adjusting method |
CN114738630B (en) * | 2022-05-07 | 2024-02-20 | 淮北兴业建设工程项目管理有限公司 | Pump station installation supporting structure for special geology and adjusting method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208501862U (en) | A kind of prefabricated pumping plant high intensity cylinder | |
CN208501788U (en) | A kind of pumping plant anti-floating ability enhancement device | |
CN209735587U (en) | reation kettle is used in methyl chloroacetoacetate production and processing that leakproofness is good | |
CN208668590U (en) | A kind of protective device of prefabricated pumping station liquid level meter | |
CN211499737U (en) | Scaffold buckling structure | |
CN209308429U (en) | Conveyer pipe fixing device, cantilever crane and concrete mixer | |
CN211683185U (en) | Detachable injection molding machine body structure | |
CN106195216A (en) | A kind of nested tooth bar | |
CN208374612U (en) | A kind of lead welding fixture | |
CN209025950U (en) | A kind of double fixed fastening clamps of stable type | |
CN208626775U (en) | Stainless steel frame filter head plate | |
CN210567520U (en) | Gas holder for pesticide production | |
CN105715812A (en) | Manual rising stem connection flat valve | |
CN215111111U (en) | Tube bundle with bolt gasket | |
CN109322494A (en) | Conveyer pipe fixing device, cantilever crane and concrete mixer | |
CN210934881U (en) | Combined type chemical industry filled tower convenient to installation | |
CN206130359U (en) | Flange joint device and composite pad thereof | |
CN217177462U (en) | Combined single-seat regulating valve with hard sealing structure | |
CN212718684U (en) | Pipe joint protection device for municipal gas conveying | |
CN211924811U (en) | Durable rigging installation connecting assembly | |
CN210049382U (en) | Steel structure mounting and connecting mechanism | |
CN210593508U (en) | Detachable saddle | |
CN212801780U (en) | Simple water tank for building construction | |
CN209908788U (en) | Improved submersible pump | |
CN213629012U (en) | Anti-deformation flexible buffering three-way valve |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |