CN208501524U - 一种顶推箱涵用下滑车 - Google Patents

一种顶推箱涵用下滑车 Download PDF

Info

Publication number
CN208501524U
CN208501524U CN201820778639.6U CN201820778639U CN208501524U CN 208501524 U CN208501524 U CN 208501524U CN 201820778639 U CN201820778639 U CN 201820778639U CN 208501524 U CN208501524 U CN 208501524U
Authority
CN
China
Prior art keywords
roller
support plate
box culvert
side plate
pushing tow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820778639.6U
Other languages
English (en)
Inventor
王勤富
何凡
鲁泽建
蒋妙强
李丙涛
吴特力根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bridge and Tunnel Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
CCCC First Highway Engineering Co Ltd
Original Assignee
CCCC First Highway Engineering Co Ltd
Bridge and Tunnel Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd, Bridge and Tunnel Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN201820778639.6U priority Critical patent/CN208501524U/zh
Application granted granted Critical
Publication of CN208501524U publication Critical patent/CN208501524U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

本实用新型属于顶推箱涵施工工装技术领域,尤其涉及一种顶推箱涵用下滑车,包括矩形支撑板,位于支撑板底部的多个辊轮,辊轮铺满支撑板底部设置,所述支撑板两侧均向下设置有一块侧板,每个侧板上设有一组均匀分布的圆形通孔,每个辊轮中心均设有支撑转轴,支撑转轴两端分别位于侧板的圆形通孔内,所述辊轮的直径大于侧板的高度,辊轮顶部与支撑板不接触,相邻辊轮之间留有间隙,本实用新型具有结构简单,使用方便的优点。

Description

一种顶推箱涵用下滑车
技术领域
本实用新型属于顶推箱涵施工工装技术领域,尤其涉及一种顶推箱涵用下滑车。
背景技术
在新建高速公路施工时,经常会遇到推路和公路有交叉的地方,这时候就会用到混凝土箱涵顶进施工,一般都是从现有铁路一侧的位置底部挖坑,然后顶进箱涵,再对整个基础以及铁轨进行加固,由于箱涵在顶进过程中要保证火车的正常通行,故对铁轨的平整度有相当高的要求,需要先将铁路现有的基础进行支撑加固,方可进行开挖顶进,由于箱涵的体积和重量大,在顶进的过程中还要保证铁路支撑的稳定性,需要一个工装即能满足上部支撑,又能为下部滑动服务,且本身的位置要保持不动。
发明内容
本实用新型的目的是提供一种顶推箱涵用下滑车,既能够为上部铁路支撑结构提供支撑点,又能满足底部箱涵移动时减少摩擦力。
为达到上述目的,本实用新型采用的技术方案是:
一种顶推箱涵用下滑车,包括矩形支撑板,位于支撑板底部的多个辊轮,辊轮铺满支撑板底部设置,所述支撑板两侧均向下设置有一块侧板,每个侧板上设有一组均匀分布的圆形通孔,每个辊轮中心均设有支撑轴,支撑轴两端分别位于侧板的圆形通孔内,所述辊轮的直径大于侧板的高度,辊轮顶部与支撑板不接触,相邻辊轮之间留有间隙。
进一步的,所述支撑板顶面设有镂空的孔。
进一步的,所述支撑板顶部围绕周边设有一圈护沿。
本实用新型具有的优点是:由于在支撑板两侧设置侧板,辊轮铺满支撑板底板,辊轮顶部与支撑板不接触,当支撑板顶部支撑时,辊轮底部的箱涵向前推进过程中,辊轮可以将滑动摩擦转为滚动摩擦,既能保证箱涵顺利推进,还能保证顶部的铁路支撑结构的稳定。
附图说明
图1是本实用新型结构俯视结构示意图。
图2是本实用新型结构仰视结构示意图。
1、支撑板;2、辊轮;3、侧板;4、孔;5、护沿。
具体实施方式
如图所示,一种顶推箱涵用下滑车,包括矩形支撑板1,位于支撑板1底部的多个辊轮2,辊轮2铺满支撑板1底部设置,所述支撑板1两侧均向下设置有一块侧板3,每个侧板3上设有一组均匀分布的圆形通孔,每个辊轮2中心均设有支撑轴,支撑轴两端分别位于侧板3的圆形通孔内,所述辊轮2的直径大于侧板3的高度,辊轮2顶部与支撑板1不接触,相邻辊轮2之间留有间隙,所述支撑板1顶面设有镂空的孔4,用于减轻下滑车的重量,所述支撑板1顶部围绕周边设有一圈护沿5,当下滑车的高度不足以支撑上部铁路支撑时,在下滑车上部垫木桩时,护沿5可以保证上部的木桩在下滑车辊轮2滑动时,保持上部木桩的稳定性。
具体使用时,下滑车放置于箱涵上,并在下滑车上表面放置木桩垫高至铁路支撑结构,当下滑车底部的箱涵在顶进过程中箱涵顶部和下滑车辊轮发生相对摩擦,由于下滑车高度比较低,辊轮铺满支撑板底部设置,所以重心靠下,在滚轮转动时,下滑车本身并不移动,同时下滑车和木桩共同使得下滑车上部的铁轨支撑结构相对稳定,既保证了箱涵顶进过程的顺利进行,也不影响铁路的正常运行,在保证安全的前提下,加快了工程施工的进度。

Claims (3)

1.一种顶推箱涵用下滑车,其特征在于:包括矩形支撑板,位于支撑板底部的多个辊轮,辊轮铺满支撑板底部设置,所述支撑板两侧均向下设置有一块侧板,每个侧板上设有一组均匀分布的圆形通孔,每个辊轮中心均设有支撑转轴,支撑转轴两端分别位于侧板的圆形通孔内,所述辊轮的直径大于侧板的高度,辊轮顶部与支撑板不接触,相邻辊轮之间留有间隙。
2.如权利要求1所述的顶推箱涵用下滑车,其特征在于:所述支撑板顶面设有镂空的孔。
3.如权利要求2所述的顶推箱涵用下滑车,其特征在于:所述支撑板顶部围绕周边设有一圈护沿。
CN201820778639.6U 2018-05-24 2018-05-24 一种顶推箱涵用下滑车 Expired - Fee Related CN208501524U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820778639.6U CN208501524U (zh) 2018-05-24 2018-05-24 一种顶推箱涵用下滑车

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820778639.6U CN208501524U (zh) 2018-05-24 2018-05-24 一种顶推箱涵用下滑车

Publications (1)

Publication Number Publication Date
CN208501524U true CN208501524U (zh) 2019-02-15

Family

ID=65293083

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820778639.6U Expired - Fee Related CN208501524U (zh) 2018-05-24 2018-05-24 一种顶推箱涵用下滑车

Country Status (1)

Country Link
CN (1) CN208501524U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109944167A (zh) * 2019-03-19 2019-06-28 中建一局集团建设发展有限公司 一种大跨度下框架顶进的临时滑动支撑结构及其施工方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109944167A (zh) * 2019-03-19 2019-06-28 中建一局集团建设发展有限公司 一种大跨度下框架顶进的临时滑动支撑结构及其施工方法

Similar Documents

Publication Publication Date Title
CN103698140A (zh) 地震下铁路桥上列车走行安全的动态模拟试验系统
CN203616153U (zh) 地震下铁路桥上列车走行安全的动态模拟试验系统
CN103669216A (zh) 一种钢箱梁散拼滑移装置及安装方法
CN106289832B (zh) 一种用于室内试验的滚石释放装置及试验方法
CN208501524U (zh) 一种顶推箱涵用下滑车
CN206290286U (zh) 一种地铁管道系统建设用支撑架
CN201671064U (zh) 滚排滑道
CN208009998U (zh) 一种空中立体停车库
CN206768627U (zh) 一种用于桥梁转体后支座的顶推、安装装置
CN103161334B (zh) 能在绿化带上方停车且非工作状态可隐藏的空中停车位
CN205952919U (zh) 一种船舱内搬运螺旋桨轴的轨道小车
CN109649780B (zh) 地铁施工注浆输送管防护装置
CN208453060U (zh) 一种新型电力设备运输装置
CN106193639A (zh) 组装式轨道安全绳吊挂系统
CN108590676B (zh) 一种盾机前部拖车轨道平台
CN203411903U (zh) 一种平拉索桥的索鞍结构
CN203998825U (zh) 一种带有导向轮组的有轨巷道堆垛起重机
CN205113121U (zh) 一种多功能转盘支撑架
CN204728336U (zh) 碾压混凝土运输快速入仓钢坡道
CN203904840U (zh) 新型框架桥顶进小滑车
CN207314044U (zh) 一种地铁轨道的减震导轨
CN204341891U (zh) 一种云梯式送料车
CN205713202U (zh) 一种用于建筑物整体平移或水平旋转的大面积滑道板支座
CN203781688U (zh) 一种新型小型起吊设备
CN209779366U (zh) 一种既有线插铺道岔横纵移装置

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 074000 No. 102 Beijie Street, Gaobeidian City, Baoding City, Hebei Province

Co-patentee after: CHINA FIRST HIGHWAY ENGINEERING Co.,Ltd.

Patentee after: BRIDGE & TUNNEL ENGINEERING CO., LTD. OF CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd.

Address before: 074000 No. 102 Beijie Street, Gaobeidian City, Baoding City, Hebei Province

Co-patentee before: CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd.

Patentee before: BRIDGE & TUNNEL ENGINEERING CO., LTD. OF CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190215

Termination date: 20210524