CN208469433U - Combined type skeleton is shelved in exhibition behind piling and layout of stones modeling mountain - Google Patents

Combined type skeleton is shelved in exhibition behind piling and layout of stones modeling mountain Download PDF

Info

Publication number
CN208469433U
CN208469433U CN201820695368.8U CN201820695368U CN208469433U CN 208469433 U CN208469433 U CN 208469433U CN 201820695368 U CN201820695368 U CN 201820695368U CN 208469433 U CN208469433 U CN 208469433U
Authority
CN
China
Prior art keywords
skeleton
layout
shelved
regularization
stones
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820695368.8U
Other languages
Chinese (zh)
Inventor
王新泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nuclear Industry South-West Construction Group Co., Ltd.
Original Assignee
Hangzhou Jiangrun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Jiangrun Technology Co Ltd filed Critical Hangzhou Jiangrun Technology Co Ltd
Priority to CN201820695368.8U priority Critical patent/CN208469433U/en
Application granted granted Critical
Publication of CN208469433U publication Critical patent/CN208469433U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

Combined type skeleton is shelved in exhibition after moulding mountain the utility model relates to a kind of piling and layout of stones, including the vertical main framing of assembled, lateral skeleton of sizing, regularization support, regularization moulding steel plate and cover top steel wire net rack, the sizing rear exhibition that laterally time skeleton and integral lifting horizontal skeleton are placed in the vertical main framing top of assembled is shelved on hinged bracket, laterally oblique band silk braid cylinder is arranged in time skeleton and integral lifting horizontal skeleton top for sizing, setting cellular concrete fills core inside entire frame body, regularization support is arranged in integral lifting horizontal skeleton top, regularization moulding steel plate is arranged in regularization support top, top steel wire net rack is covered in the setting of regularization moulding steel plate top, it covers top steel wire net rack top and chimeric piling and layout of stones is set, mortar-chalked joint is set between chimeric piling and layout of stones, ring lock foot collar tie beam is arranged in the foot of the hill, gutter is set on the outside of ring lock foot collar tie beam.The beneficial effects of the utility model are: the artificial hillock moulding of the piling and layout of stones modeling mountain skeleton structure shapeable form of diverse of the utility model, application range are wider.

Description

Combined type skeleton is shelved in exhibition behind piling and layout of stones modeling mountain
Technical field
The utility model relates to a kind of pilings and layout of stones to mould mountain combined type skeleton, in particular to exhibition is shelved compound behind a kind of piling and layout of stones modeling mountain Formula skeleton.
Background technique
The historic Landscapes design of China is focused on for man-made tourist site and nature landscape being combined together very much, so, When addressing Garden Architecture, the physiognomy framework around garden architecture is attached great importance to, also, the gardens of Chinese style are mostly with mountain Based on water, and other landscapes are then used as the setoff of landscape.One complete garden landscape is exactly by self-assembling formation Landscape and man-made tourist site combine, and therefore, scenery with hills and waters landform is indispensable important component for garden landscape.It is false Mountain has various Landscaping functions, such as constitutes the main scape or landform skeleton in gardens, divides and organizes garden space, arrange front yard Natural style flower stand is arranged in institute, revetment, slope protection, earth-retaining.Richness can also be combined into garden architecture, garden road, place and ornamental plant Increase the nature joy of life so as to reducing artificial atmospher in the view of variation, merge garden architecture into physiognomy framework.Therefore, false Mountain becomes one of the feature for showing Chinese natural mountain-water garden.
Recent years, the continuous reinforcement of people's environmental consciousness and gradually decreasing for mountain stone resource, China start to limit mountain stone Exploitation behavior, so, in the historic gardens of Chinese style, the artificial hillock resource being able to use also is being gradually decreased, especially needle To some with the biggish artificial hillock of stone amount, therefore, the artificial development trend for moulding stone as current garden landscape.Especially with more than stone Large rockwork.Artificial modeling mountain also has the characteristics that plasticity is big, variation in moulding is more simultaneously, and expressive force is stronger, can more mould The boundless imposing manner of the Nature massif.The knot that artificial plastic stone rockery is generally combined frequently with brick skeleton, steel skeleton and the two at present Structure.
In consideration of it, combined type skeleton is shelved in exhibition after urgently inventing a kind of simple and effective piling and layout of stones modeling mountain, good view is created Feel effect.
Utility model content
The purpose of the utility model is to overcome deficiencies in the prior art, and combined type is shelved in exhibition after providing a kind of piling and layout of stones modeling mountain Skeleton.
Combined type skeleton is shelved in exhibition behind this piling and layout of stones modeling mountain, including the lateral time skeleton, fixed of the vertical main framing of assembled, sizing Type support, regularization moulding steel plate and top steel wire net rack is covered, laterally time skeleton of being formed is placed in integral lifting horizontal skeleton The rear exhibition on the vertical main framing top of assembled is shelved on hinged bracket, is formed on laterally time skeleton and integral lifting horizontal skeleton Oblique band silk braid cylinder is arranged in portion, and setting cellular concrete fills core, the setting of integral lifting horizontal skeleton top inside entire frame body Regularization moulding steel plate is arranged in regularization support, regularization support top, and top steel wire is covered in the setting of regularization moulding steel plate top Frame covers top steel wire net rack top and chimeric piling and layout of stones is arranged, mortar-chalked joint is arranged between chimeric piling and layout of stones, and ring lock foot collar tie beam is arranged in the foot of the hill, Gutter is set on the outside of ring lock foot collar tie beam.
As preferred: hinged bracket is shelved in exhibition after the setting of assembled vertical main framing top, rear exhibition shelve hinged bracket with The vertical main framing of assembled is hinged.
As preferred: rear exhibition shelves hinged bracket using the oblique strut of postposition and be formed laterally time skeleton or integral lifting The oblique band silk sleeve connection on horizontal skeleton top.
As preferred: ring lock foot circle beam setting collar tie beam prestressing force tension rib is anchored in mass raft foundation.
As preferred: the vertical main framing of assembled, sizing laterally the formed frame body inside setting of time skeleton, regularization support Cellular concrete fills core, and reinforcement steel fabric sheet is arranged in cellular concrete.
The beneficial effects of the utility model are:
(1) the artificial hillock moulding of the piling and layout of stones modeling mountain skeleton structure shapeable form of diverse of the utility model, application range are wider.
(2) hinged bracket is shelved in exhibition after the vertical main framing top setting of assembled, is convenient for assembled when articulated structure is constructed Vertical main framing installation, while bracket is set between vertical and horizontal skeleton, skeleton overall stability can be improved.
(3) regularization moulding steel plate is arranged in regularization support top, can be moulded by the moulding of steel plate more polymorphic, makes It is rich in aesthetic characteristic.
Detailed description of the invention
Fig. 1 is that combined type skeleton structure schematic diagram is shelved in exhibition after the utility model piling and layout of stones moulds mountain;
Hinged bracket structure schematic diagram is shelved in exhibition after Fig. 2 is;
Fig. 3 is foot of the hill structural schematic diagram.
Description of symbols: 15- mass raft foundation, the gutter 17-, the vertical main framing of 18- assembled, 19- sizing are laterally It is horizontal to shelve the oblique band silk braid cylinder of hinged bracket, 21-, the oblique strut of 22- postposition, 23- integral lifting for exhibition after secondary skeleton, 20- Skeleton, 24- regularization support, 25- regularization moulding steel plate, 26- cover top steel wire net rack, 27- ring lock foot collar tie beam, 28- collar tie beam Prestressing force tension rib, 29- cellular concrete fill core, 30- reinforcement steel fabric sheet, 43- and are fitted into piling and layout of stones, 44- mortar-chalked joint.
Specific embodiment
The utility model is described further below with reference to embodiment.The explanation of following embodiments is only intended to help to manage Solve the utility model.It should be pointed out that for those skilled in the art, not departing from the utility model principle Under the premise of, several improvements and modifications can be made to this utility model, these improvement and modification also fall into the utility model In scope of protection of the claims.
The requirement of steel skeleton hoisting technology, cellular concrete pouring technique requirement etc., the utility model is not repeated, and emphasis is explained State the embodiment the utility model relates to structure.
Combined type skeleton, including lateral the vertical main framing 18 of assembled, sizing bone are shelved in exhibition behind the piling and layout of stones modeling mountain Frame 19, regularization support 24, regularization moulding steel plate 25 and top steel wire net rack 26 is covered, laterally time skeleton 19 of being formed is promoted with whole The rear exhibition that formula horizontal skeleton 23 is placed in vertical 18 top of main framing of assembled is shelved on hinged bracket 20, laterally time skeleton 19 of being formed Oblique band silk braid cylinder 21 is set with 23 top of integral lifting horizontal skeleton, setting cellular concrete fills core inside entire frame body 29, regularization support 24 is arranged in 23 top of integral lifting horizontal skeleton, and regularization moulding steel is arranged in 24 top of regularization support Top steel wire net rack 26 is covered in plate 25, the setting of 25 top of regularization moulding steel plate, covers top 26 top of steel wire net rack and chimeric piling and layout of stones 43 is arranged, Mortar-chalked joint 44 is set between chimeric piling and layout of stones 43, and the foot of the hill is arranged ring lock foot collar tie beam 27, draining is arranged on the outside of ring lock foot collar tie beam 27 Ditch 17.
The vertical main framing 18 of assembled is square steel tube, side length 600mm, highest point height 20m.Laterally time skeleton 19 is for sizing Square steel tube, side length 400mm.Regularization support 24 is 50 × 50 × 4 angle steel of ∠.Regularization moulding steel plate 25 is with a thickness of 4mm.It is oblique Sleeve diameter with silk braid cylinder 21 is 22mm, length 30mm.Foot of the hill setting ring lock foot collar tie beam 27, collar tie beam section 300mm × 300mm×400mm.The bar diameter of the oblique strut 22 of postposition is 20mm.The diameter of collar tie beam prestressing force tension rib 28 is 20mm.
Hinged bracket 20 is shelved in exhibition after vertical 18 top of the main framing setting of assembled, and hinged bracket 20 and assembly are shelved in rear exhibition The vertical main framing 18 of formula is hinged.
Exhibition shelves hinged bracket 20 using the oblique strut 22 of postposition and sizing lateral skeleton 19 or integral lifting water afterwards The oblique band silk braid cylinder 21 on flat 23 top of skeleton connects.
Collar tie beam prestressing force tension rib 28 is arranged in ring lock foot collar tie beam 27, is anchored in mass raft foundation 15.
Laterally gas is arranged in time skeleton 19, the formed frame body of regularization support 24 inside for the vertical main framing 18 of assembled, sizing It steeps concrete and fills core 29, reinforcement steel fabric sheet 30 is set in cellular concrete.

Claims (5)

1. combined type skeleton is shelved in exhibition behind piling and layout of stones modeling mountain, it is characterised in that laterally including the vertical main framing of assembled (18), sizing Secondary skeleton (19), regularization support (24), regularization moulding steel plate (25) and top steel wire net rack (26) is covered, laterally time skeleton of being formed (19) hinged bracket is shelved in the rear exhibition that the vertical main framing of assembled (18) top is placed in integral lifting horizontal skeleton (23) (20) on, be formed laterally time skeleton (19) and the oblique band silk braid cylinder (21) of integral lifting horizontal skeleton (23) top setting are whole Setting cellular concrete fills core (29) inside a frame body, and regularization support is arranged in integral lifting horizontal skeleton (23) top (24), top is covered in regularization support (24) top setting regularization moulding steel plate (25), the setting of regularization moulding steel plate (25) top Steel wire net rack (26) covers top steel wire net rack (26) top and is arranged chimeric piling and layout of stones (43), mortar-chalked joint is arranged between chimeric piling and layout of stones (43) (44), gutter (17) are arranged in foot of the hill setting ring lock foot collar tie beam (27), ring lock foot collar tie beam (27) outside.
2. combined type skeleton is shelved in exhibition behind piling and layout of stones according to claim 1 modeling mountain, it is characterised in that the vertical main bone of assembled Hinged bracket (20) are shelved in exhibition after the setting of frame (18) top, and hinged bracket (20) and the vertical main framing of assembled (18) are shelved in rear exhibition Hingedly.
3. combined type skeleton is shelved in exhibition behind piling and layout of stones modeling according to claim 2 mountain, it is characterised in that hinge is shelved in exhibition after described Bracket (20) are connect using on lateral skeleton (19) of the oblique strut of postposition (22) and sizing or integral lifting horizontal skeleton (23) The oblique band silk braid cylinder (21) in portion connects.
4. combined type skeleton is shelved in exhibition behind piling and layout of stones modeling according to claim 1 mountain, it is characterised in that the ring lock foot circle Collar tie beam prestressing force tension rib (28) are arranged in beam (27), are anchored in mass raft foundation (15).
5. combined type skeleton is shelved in exhibition behind piling and layout of stones modeling according to claim 1 mountain, it is characterised in that the assembled is vertical Laterally the formed frame body inside setting cellular concrete of time skeleton (19), regularization support (24) fills core for main framing (18), sizing (29), reinforcement steel fabric sheet (30) are set in cellular concrete.
CN201820695368.8U 2018-05-10 2018-05-10 Combined type skeleton is shelved in exhibition behind piling and layout of stones modeling mountain Active CN208469433U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820695368.8U CN208469433U (en) 2018-05-10 2018-05-10 Combined type skeleton is shelved in exhibition behind piling and layout of stones modeling mountain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820695368.8U CN208469433U (en) 2018-05-10 2018-05-10 Combined type skeleton is shelved in exhibition behind piling and layout of stones modeling mountain

Publications (1)

Publication Number Publication Date
CN208469433U true CN208469433U (en) 2019-02-05

Family

ID=65221050

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820695368.8U Active CN208469433U (en) 2018-05-10 2018-05-10 Combined type skeleton is shelved in exhibition behind piling and layout of stones modeling mountain

Country Status (1)

Country Link
CN (1) CN208469433U (en)

Similar Documents

Publication Publication Date Title
CN104878767B (en) Rock slope concrete for plant growth is combined the construction method of ecoscape protection with moulding stone
CN204780949U (en) Rock slope is planted living concrete and is moulded stone and combines ecological landscape protective structure
CN208533453U (en) A kind of gabion type landscape revetment conducive to urban water-body reparation
CN201704636U (en) Novel active protecting net
CN206768834U (en) A kind of deep basal pit combined support structure
CN205040350U (en) Ornamental trees and shrubs strutting arrangement
CN208395838U (en) A kind of cast-in-place eco-concrete protective slope structure
CN207392130U (en) A kind of ecology block stone revetment structure
CN108656831A (en) Combined type skeleton piling and layout of stones moulds mountain and construction method
CN2535449Y (en) Side-slope integrated protection device
CN206189344U (en) Existing stereoplasm shore protection ecological landscape ization transformation structure
CN208469433U (en) Combined type skeleton is shelved in exhibition behind piling and layout of stones modeling mountain
CN202941199U (en) Brick type flowerpot and three-dimensional afforesting wall space formed by brick type flowerpot
CN206070485U (en) Assembled ecological revetment
CN208469434U (en) Band cavern and stream ramp piling and layout of stones artificial hillock
CN210857234U (en) Combined structure for greening and protecting slope packway platform
CN207109727U (en) A kind of bulwark and its mounting structure of prefabricated band flower trough
CN206859274U (en) Dry-hang stone aproll constructs
CN109403370A (en) A kind of cast-in-place green concrete barricade and its construction method
CN207904867U (en) A kind of cross interlocking-type slope protection block
CN108316757A (en) Municipal and environment-friendly protection network
CN103015436A (en) Cemented-type water-blocking curtain and anchor pulling pile compounded supporting structure
CN207812465U (en) A kind of landscape ecology bank protection
CN208668440U (en) A kind of composite soil nailing wall side slope
KR101345761B1 (en) Afforestation method and structure for pavilion roof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191226

Address after: Qingyang District of Chengdu City, Sichuan province 618300 Jade Road No. 80

Patentee after: Nuclear Industry South-West Construction Group Co., Ltd.

Address before: 310015, room 3, unit 3, Gongshu District Wanda Commercial Center, Hangzhou, Zhejiang 1901, China

Patentee before: Hangzhou Jiang Run Science and Technology Ltd.

TR01 Transfer of patent right