CN208421881U CN201821294640.8U CN201821294640U CN208421881U CN 208421881 U CN208421881 U CN 208421881U CN 201821294640 U CN201821294640 U CN 201821294640U CN 208421881 U CN208421881 U CN 208421881U
Authority
CN
China
Prior art keywords
subsystem
data
wind power
analysis
power plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821294640.8U
Other languages
Chinese (zh)
Inventor
王明
王佳欣
施元辉
张扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huanan Branch Of Datang Huachuan Wind Power Generation Co Ltd
China Datang Group Co Ltd
Datang Heilongjiang Power Generation Co Ltd
Original Assignee
Huanan Branch Of Datang Huachuan Wind Power Generation Co Ltd
China Datang Group Co Ltd
Datang Heilongjiang Power Generation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huanan Branch Of Datang Huachuan Wind Power Generation Co Ltd, China Datang Group Co Ltd, Datang Heilongjiang Power Generation Co Ltd filed Critical Huanan Branch Of Datang Huachuan Wind Power Generation Co Ltd
Priority to CN201821294640.8U priority Critical patent/CN208421881U/en
Application granted granted Critical
Publication of CN208421881U publication Critical patent/CN208421881U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning
    • Y02P90/82Energy audits or management systems therefor
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

The utility model discloses a kind of wind power plant generated energy management system, including the testing and analysis system at wind park end is arranged in and is arranged in the display control program of control terminal, the testing and analysis system include it is multiple, be divided into the wind power plant of different zones;The testing and analysis system is used to obtain the operation data and analysis data at wind power plant end;The display control program is used to store, analyze, shows each data that testing and analysis system is sent;The testing and analysis system includes the data acquisition subsystem for acquiring the operation data of wind power plant and the coulometric analysis subsystem for generating generated energy analysis data, and the data acquisition subsystem and coulometric analysis subsystem communicate to connect the display control program.The utility model is based on big data platform, is acquired conducive to the operation information to wind power plant end equipment, forms management database, to facilitate expert's inline diagnosis, carries out on-line analysis to generated energy, ensures that enterprise operation manages sustainable development.

Description

A kind of wind power plant generated energy management system
Technical field
The utility model relates to wind farm device technical fields, and in particular to a kind of wind power plant generated energy management system.
Background technique
National Wind Power Generation Industry policy is implemented and wind power technology is greatly developed, and China installed capacity of wind-driven power position is at the forefront in the world And still in high speed development.It deepens continuously with project development, scale is continuously improved, but the widened speed of power grid power demand is not And the speed of installation popularization, it causes region abandonment and rations the power supply seriously, region-competitive is increasingly serious.The publication of national energy general bureau State can newly can be [2017] No. 52 " notice of the National Energy Board about the annual wind-powered electricity generations investment monitoring and warning results of publication 2017 ", it is right Wind-powered electricity generation investment monitoring and warning result is issued within 2017, and wherein the Inner Mongol, Heilungkiang, Jilin, Ningxia, Gansu, Xinjiang (contain Formation) etc. save (area) be Wind Power Generation build red early warning region, other provinces be green area.The province (area) of red early warning is no It must check and approve and build new Wind Power Project, and to adopt an effective measure and put forth effort to solve the problems, such as abandonment.Power grid enterprises must not accept red Province (area) Wind Power Project of early warning increases grid-connected application (being contained in the project for building, having checked and approved and being included in planning) newly, and agency is not Wind Power Project is created to the province of red early warning (area) again and provides new power generation business license.Meanwhile postponing the quasi- east in construction Xinjiang, spitting The area Lu Fanbailifeng, Jiuquan second phase second batch Wind Power Project have put into operation or have deposited in the passway for transmitting electricity emphasis built for dissolving Measure Wind Power Project.Early warning result is that the area of green will get hold of the rhythm of Wind Power Project construction, is built implementing consumption market etc. If independently determining that annual construction scale and project list, the linking considering construction as a whole and using avoid out on the basis of condition Now new situation of rationing the power supply.
Industry most enterprises are all to be converged by artificial write by hand or fixed point acquisition creation data using artificial at present Always, analysis is carried out to the data summarized by office softwares such as OFFICE and is chatted according to operation result progress artificial cognition and text State the semi-automatic generated energy merit rating system to form Final Report.There is a large amount of work in terms of data acquisition in the system A possibility that loophole, causes a large amount of error for data acquisition.In data summarization and office software calculating process, again Expand error, differentiates that link since the technology of personnel is irregular, causes result to lose science in final personnel.It is same in this When, a large amount of cumbersome manual operations also bring the hysteresis quality of result, can not analyze enterprise in real time and currently generate electricity status.And With the increase of cost of labor and the flowing of personnel, old generated energy analysis method error rate is higher, can not meet gradually current The demand of industry environment informationization.
In addition, if individually managed each wind power plant, being needed when for the management of multiple wind power plant generating capacities A large amount of man power and material is consumed, enterprise is faced with higher management, transportation cost.Electricity power enterprise's emergency response is more passive, Also problems are brought to dispatching of power netwoks and power network safety operation.
Based on the above reasons, it needs to seek solution.
Utility model content
The technical problem to be solved by the present invention is to overcome the deficiencies of the prior art and provide a kind of wind power plant generated energy Management system is based on big data platform, is acquired conducive to the operation information to wind power plant end equipment, forms management database, To facilitate expert's inline diagnosis, on-line analysis is carried out to generated energy, ensures that enterprise operation manages sustainable development.
In order to solve the above technical problems, the basic conception of the technical solution adopted in the utility model is:
A kind of wind power plant generated energy management system, testing and analysis system and setting including wind park end is arranged in are controlling The display control program at end, the testing and analysis system include it is multiple, be divided into the wind power plant of different zones;
The testing and analysis system is used to obtain the operation data and analysis data at wind power plant end;
The display control program is used to store, analyze, shows each data that testing and analysis system is sent;
The testing and analysis system includes data acquisition subsystem for acquiring the operation data of wind power plant and for giving birth to At the coulometric analysis subsystem of generated energy analysis data, the data acquisition subsystem and coulometric analysis subsystem are communicated to connect The display control program.
Preferably, the testing and analysis system further includes having the communication system for being communicatively connected to display control program, described Communication system described in data acquisition subsystem and the equal data connection of coulometric analysis subsystem.
Preferably, the data acquisition subsystem immediate data connection communication system, coulometric analysis System connects the data acquisition subsystem or communication system by firewall;
The firewall protection data acquisition subsystem prevents coulometric analysis subsystem from accessing data acquisition subsystem.
In the above scheme, right because coulometric analysis subsystem, which can analyze generated energy, can be connected with outer net Internal data acquisition subsystem causes risk, therefore, designs coulometric analysis subsystem by firewall and is connected to data acquisition System or communication system.
Preferably, the communication system includes that longitudinal encryption device and router, the coulometric analysis subsystem pass through institute The firewall stated connects data acquisition subsystem, and longitudinal direction encryption device described in the data acquisition subsystem data connection is described Longitudinal encryption device is connect with router data, and the display control program includes multiplexing equipment, the router with The multiplexing equipment communication connection.
Preferably, the data acquisition subsystem include interchanger and the industrial personal computer for being separately connected the interchanger, Blower server, boosting site server;
Data acquisition subsystem obtains the operation data at wind power plant end and is sent to the communication system.
Preferably, the data acquisition subsystem further includes having tide server, and the tide server connects institute The interchanger stated, the coulometric analysis subsystem interchanger described by firewall connection;
The generated energy analysis data of generation are sent to tide server by coulometric analysis subsystem, are sent out by tide server It send to display control program.
In the above scheme, tide server has breakpoint transmission effect, when the number that power channel failure then acquires up According to that can be cached in tide server, data are automatically uploaded to display control program after power channel restores.
Preferably, the coulometric analysis subsystem includes wind power service device and interchanger, wind power service device and is handed over It changes planes data connection, interchanger and the firewall data connection.
Preferably, the coulometric analysis subsystem is also connected with internet, and the data of coulometric analysis demand are obtained by internet; The data acquisition subsystem is isolated with internet.
In the above scheme, data acquisition subsystem connects internet, to obtain the calculating data of demand, realizes wind function The prediction of rate, the calculating of electric flux etc., and data acquisition subsystem is then isolated with internet, to ensure safety.
Preferably, the wind power service device connects ambient weather forecast servers by internet.By weather forecast Server obtains weather forecast information, to analyze generated energy information.
Preferably, the display control program includes storage analyzing subsystem and interactive subsystem;
The storage analyzing subsystem, each data for storing and/or analysis detection analysis system is sent;
The testing and analysis system and storage analyzing subsystem communication connection, the storage analyzing subsystem with interact son System data connection.
By adopting the above technical scheme, the utility model has the following beneficial effects:
The wind power plant generated energy management system of the utility model, including the testing and analysis system at wind park end is arranged in and sets Set the display control program in control terminal, the testing and analysis system include it is multiple, be divided into the wind power plant of different zones;It is described Testing and analysis system be used for obtain wind power plant end operation data and analysis data;The display control program is for depositing Each data that storage, analysis, display testing and analysis system are sent;The testing and analysis system includes the operation for acquiring wind power plant The data acquisition subsystem of data and the coulometric analysis subsystem that data are analyzed for generating generated energy, the data acquisition system System and coulometric analysis subsystem communicate to connect the display control program.The utility model is based on big data platform, is conducive to The operation information of wind power plant end equipment is acquired, management database is formed, so that expert's inline diagnosis is facilitated, to power generation Amount carries out on-line analysis, ensures that enterprise operation manages sustainable development.
Specific embodiment of the present utility model is described in further detail with reference to the accompanying drawing.
Detailed description of the invention
The a part of attached drawing as the application, is further understood from the utility model for providing, the utility model Illustrative embodiments and their description for explaining the utility model, but do not constitute improper limits to the present invention.Obviously, The accompanying drawings in the following description is only some embodiments, to those skilled in the art, is not paying creative labor Under the premise of dynamic, it can also be obtained according to these attached drawings other accompanying drawings.In the accompanying drawings:
Fig. 1 is the schematic diagram of the utility model wind power plant generated energy management system.
It should be noted that these attached drawings and verbal description are not intended to limit the design of the utility model in any way Range, but illustrate the concept of the utility model for those skilled in the art by referring to specific embodiments.
Specific embodiment
It is practical new below in conjunction with this to keep the objectives, technical solutions, and advantages of the embodiments of the present invention clearer The technical solution in embodiment is clearly and completely described in attached drawing in type embodiment, and following embodiment is for illustrating this Utility model, but be not intended to limit the scope of the present invention.
In the description of the present invention, it should be noted that the orientation of the instructions such as term " on ", "lower", "inner", "outside" Or positional relationship is to be merely for convenience of description the utility model based on orientation or positional relationship described in attached drawing and simplification is retouched It states, rather than the device or element of indication or suggestion meaning must have a particular orientation, be constructed and operated in a specific orientation, Therefore it should not be understood as limiting the present invention.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, it can also be indirectly connected through an intermediary.For this For the those of ordinary skill in field, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
Embodiment one
Shown in Figure 1, the present embodiment one provides a kind of wind power plant generated energy management system, including is arranged at wind park end Testing and analysis system and the display control program of control terminal is set, the testing and analysis system include it is multiple, be divided into not With the wind power plant in region;
The testing and analysis system is used to obtain the operation data and analysis data at wind power plant end;
The display control program is used to store, analyze, shows each data that testing and analysis system is sent;
The testing and analysis system includes data acquisition subsystem for acquiring the operation data of wind power plant and for giving birth to At the coulometric analysis subsystem of generated energy analysis data, the data acquisition subsystem and coulometric analysis subsystem are communicated to connect The display control program.
Preferably, the testing and analysis system further includes having the communication system for being communicatively connected to display control program, described Communication system described in data acquisition subsystem and the equal data connection of coulometric analysis subsystem.
Preferably, the data acquisition subsystem immediate data connection communication system, coulometric analysis System connects the data acquisition subsystem or communication system by firewall;
The firewall protection data acquisition subsystem prevents coulometric analysis subsystem from accessing data acquisition subsystem.
In the above scheme, right because coulometric analysis subsystem, which can analyze generated energy, can be connected with outer net Internal data acquisition subsystem causes risk, therefore, designs coulometric analysis subsystem by firewall and is connected to data acquisition System or communication system.
Preferably, the communication system includes that longitudinal encryption device and router, the coulometric analysis subsystem pass through institute The firewall stated connects data acquisition subsystem, and longitudinal direction encryption device described in the data acquisition subsystem data connection is described Longitudinal encryption device is connect with router data, and the display control program includes multiplexing equipment, the router with The multiplexing equipment communication connection.
Preferably, the data acquisition subsystem include interchanger and the industrial personal computer for being separately connected the interchanger, Blower server, boosting site server;
Data acquisition subsystem obtains the operation data at wind power plant end and is sent to the communication system.
Preferably, the data acquisition subsystem further includes having tide server, and the tide server connects institute The interchanger stated, the coulometric analysis subsystem interchanger described by firewall connection;
The generated energy analysis data of generation are sent to tide server by coulometric analysis subsystem, are sent out by tide server It send to display control program.
In the above scheme, tide server has breakpoint transmission effect, when the number that power channel failure then acquires up According to that can be cached in tide server, data are automatically uploaded to display control program after power channel restores.
Preferably, the coulometric analysis subsystem includes wind power service device and interchanger, wind power service device and is handed over It changes planes data connection, interchanger and the firewall data connection.
Preferably, the coulometric analysis subsystem is also connected with internet, and the data of coulometric analysis demand are obtained by internet; The data acquisition subsystem is isolated with internet.
In the above scheme, data acquisition subsystem connects internet, to obtain the calculating data of demand, realizes wind function The prediction of rate, the calculating of electric flux etc., and data acquisition subsystem is then isolated with internet, to ensure safety.
Preferably, the wind power service device connects ambient weather forecast servers by internet.By weather forecast Server obtains weather forecast information, to analyze generated energy information.
Preferably, the display control program includes storage analyzing subsystem and interactive subsystem;
The storage analyzing subsystem, each data for storing and/or analysis detection analysis system is sent;
The testing and analysis system and storage analyzing subsystem communication connection, the storage analyzing subsystem with interact son System data connection.
Embodiment two
Shown in Figure 1, embodiment two is on the basis of example 1 mainly described display control program, implements Wind power plant generated energy management system in example two equally includes display control program and several inspections for being divided into each regional wind power Survey analysis system;
The display control program includes storage analyzing subsystem and interactive subsystem;
The storage analyzing subsystem, each data for storing and/or analysis detection analysis system is sent;
The testing and analysis system and storage analyzing subsystem and/or interactive subsystem communicate to connect, the storage Analyzing subsystem and interactive subsystem data connection.The interactive subsystem carries out letter for user and wind power station control system Breath interaction, which includes work station, can show the data information of storage analyzing subsystem storage and the hair of analysis Coulometric analysis data information, which realizes wind power plant statistical data, analyzes the displaying of data, while being also subjected to Operator's input control information.
Preferably, the storage analyzing subsystem includes data storage server, the data storage server and detection Analysis system communication connection, the interactive subsystem and the data storage server data connection.
In the above scheme, interactive subsystem and the data storage server data connection can show and be stored Generated energy data information.
Preferably, the data storage server includes historic data server and real time data server, the friendship Mutual subsystem and the real time data server and/or historic data server data connection.
In the above scheme, the real time data that real time data server storage testing and analysis system is sent, and historical data Server store historical data.
Preferably, the storage analyzing subsystem includes and the historic data server and/or real time data The calculation server of server data connection, the calculation server is for being analyzed and processed data, the interaction Subsystem and the calculation server data connection.
In the above scheme, interactive subsystem and calculation server data connection, so as to show that calculation server is handled Data.
Preferably, the storage analyzing subsystem further includes having WEB server, the WEB server and described Historic data server and/or real time data server data connection, and connect with the jiao zi system data.
In the above scheme, by the way that WEB server is arranged, then WEB page displaying is realized, announcement is facilitated and checks wind Electric field data.
Preferably, the interactive subsystem includes several interactive terminals;The interactive terminal includes desktop computer, respectively The desktop computer storage analyzing subsystem described by interchanger connection.
Preferably, display control program further includes the data server for being provided with management data, and subsystem is analyzed in the storage System and/or interactive subsystem pass through the positive isolating device connection data server.
In the above scheme, which is directly connected to as general headquarters, therefore security request data is high, in order to ensure peace Entirely, data server is connected to by positive isolating device and stores analyzing subsystem and/or interaction by design in the utility model Subsystem.
The above is only the preferred embodiment of the utility model, not makees in any form to the utility model Limitation, although the utility model has been disclosed with preferred embodiment as above, is not intended to limit the utility model, any to be familiar with The technical staff of this patent is not departing within the scope of technical solutions of the utility model, when the technology contents using above-mentioned prompt are done A little equivalent embodiment changed or be modified to equivalent variations out, but all contents without departing from technical solutions of the utility model, Any simple modification, equivalent change and modification made by the above technical examples according to the technical essence of the present invention, still belong to In the range of the utility model.

Claims (10)

1. a kind of wind power plant generated energy management system, which is characterized in that including be arranged in wind park end testing and analysis system and The display control program of control terminal is set, the testing and analysis system include it is multiple, be divided into the wind power plant of different zones;
The testing and analysis system includes data acquisition subsystem and coulometric analysis subsystem, the data acquisition subsystem and electricity Amount analyzing subsystem communicates to connect the display control program;
The data acquisition subsystem is used to acquire the operation data of wind power plant, and the coulometric analysis subsystem is for generating power generation Amount analysis data, the display control program are used to store, analyze, show each data that testing and analysis system is sent.
2. a kind of wind power plant generated energy management system according to claim 1, which is characterized in that the testing and analysis system It further include having the communication system for being communicatively connected to display control program, the data acquisition subsystem and coulometric analysis subsystem are equal Communication system described in data connection.
3. a kind of wind power plant generated energy management system according to claim 2, which is characterized in that the data acquisition The system immediate data connection communication system, the coulometric analysis subsystem connect the data acquisition by firewall System or communication system.
4. a kind of wind power plant generated energy management system according to claim 3, which is characterized in that the communication system includes Longitudinal encryption device and router, the coulometric analysis subsystem connect data acquisition subsystem, institute by the firewall Longitudinal direction encryption device described in data acquisition subsystem data connection is stated, the longitudinal direction encryption device is connect with router data, institute The display control program stated includes multiplexing equipment, and the router and the multiplexing equipment communicate to connect.
5. according to a kind of any wind power plant generated energy management system of claim 2-4, which is characterized in that the data are adopted Subsystem includes interchanger and the industrial personal computer for being separately connected the interchanger, blower server, boosting site server;
Data acquisition subsystem obtains the operation data at wind power plant end and is sent to the communication system.
6. a kind of wind power plant generated energy management system according to claim 5, which is characterized in that the data acquisition System further includes having tide server, the tide server connection interchanger, the coulometric analysis subsystem Pass through the firewall connection interchanger;
The generated energy analysis data of generation are sent to tide server by coulometric analysis subsystem, are sent to by tide server Display control program.
7. a kind of wind power plant generated energy management system according to claim 3 or 4, which is characterized in that the coulometric analysis Subsystem includes wind power service device and interchanger, and wind power service device is connect with exchange data, interchanger and described Firewall data connection.
8. a kind of wind power plant generated energy management system according to claim 7, which is characterized in that the coulometric analysis subsystem System is also connected with internet, and the data of coulometric analysis demand are obtained by internet;The data acquisition subsystem and internet phase Isolation.
9. a kind of wind power plant generated energy management system according to claim 8, which is characterized in that the wind power service Device connects ambient weather forecast servers by internet.
10. a kind of wind power plant generated energy management system according to claim 1, which is characterized in that the display control System includes storage analyzing subsystem and interactive subsystem;
The testing and analysis system and storage analyzing subsystem communication connection, the storage analyzing subsystem and interactive subsystem Data connection;
The storage analyzing subsystem, each data for storing and/or analysis detection analysis system is sent.
CN201821294640.8U 2018-08-10 2018-08-10 A kind of wind power plant generated energy management system Expired - Fee Related CN208421881U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821294640.8U CN208421881U (en) 2018-08-10 2018-08-10 A kind of wind power plant generated energy management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821294640.8U CN208421881U (en) 2018-08-10 2018-08-10 A kind of wind power plant generated energy management system

Publications (1)

Publication Number Publication Date
CN208421881U true CN208421881U (en) 2019-01-22

Family

ID=65122404

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821294640.8U Expired - Fee Related CN208421881U (en) 2018-08-10 2018-08-10 A kind of wind power plant generated energy management system

Country Status (1)

Country Link
CN (1) CN208421881U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114137357A (en) * 2021-11-11 2022-03-04 国网江西省电力有限公司电力科学研究院 Information interaction comprehensive power management method for power transmission line on-line monitoring device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114137357A (en) * 2021-11-11 2022-03-04 国网江西省电力有限公司电力科学研究院 Information interaction comprehensive power management method for power transmission line on-line monitoring device

Similar Documents

Publication Publication Date Title
CN102545213B (en) System and method for managing line loss of power grid in real time
CN104269922B (en) A kind of distributed power source parameter monitoring method and system based on GPRS/GIS
CN103559648A (en) Grid equipment state inspection and evaluation training system
CN108051709A (en) Transformer state online evaluation analysis method based on artificial intelligence technology
CN107622342B (en) MVC (model view controller) architecture-based distribution network area data analysis system
CN202837985U (en) GPRS-communication based remote online monitoring system for sewage treatment equipment
CN101692575A (en) Method for processing data for real-time load flow calculation in large electric systems
CN106712296A (en) Online monitoring and managing system for electric power
CN108470386A (en) A kind of cable run intelligent inspection system based on GPS and cloud platform
CN106997513A (en) The distribution net equipment state evaluation system analyzed based on big data
CN107368955A (en) The implementation method of power grid risk, equipment Risk and operating risk integration linkage
CN106790699A (en) A kind of diesel engine cloud monitoring and cloud management system
CN208421881U (en) A kind of wind power plant generated energy management system
CN106093636A (en) The analog quantity check method of the secondary device of intelligent grid and device
Zhang et al. Development of the monitoring system in the smart distribution substation in Guangzhou, China
CN201332267Y (en) Electric energy monitoring system
CN101685964A (en) Online scheduling aid decision method and system based on large-scale parallel processing
CN108537457A (en) The working method of electric power construction quality-monitoring, early warning and control system
CN206506563U (en) A kind of diesel engine cloud monitoring and cloud management system
CN204231378U (en) Electric power system snap information repair based on condition of component and service system
CN116522746A (en) Power distribution hosting method for high-energy-consumption enterprises
CN205720421U (en) Remote power measurement monitoring system
CN104376614A (en) One-key ticket outlet method for substation operation tickets
CN2687912Y (en) Intelligent low-voltage box type converting station
CN101123533A (en) Operation and maintenance device for communication power supply

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190122

Termination date: 20210810