CN208421881U - A kind of wind power plant generated energy management system - Google Patents
A kind of wind power plant generated energy management system Download PDFInfo
- Publication number
- CN208421881U CN208421881U CN201821294640.8U CN201821294640U CN208421881U CN 208421881 U CN208421881 U CN 208421881U CN 201821294640 U CN201821294640 U CN 201821294640U CN 208421881 U CN208421881 U CN 208421881U
- Authority
- CN
- China
- Prior art keywords
- subsystem
- data
- wind power
- analysis
- power plant
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
- Y02P90/82—Energy audits or management systems therefor
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Abstract
The utility model discloses a kind of wind power plant generated energy management system, including the testing and analysis system at wind park end is arranged in and is arranged in the display control program of control terminal, the testing and analysis system include it is multiple, be divided into the wind power plant of different zones;The testing and analysis system is used to obtain the operation data and analysis data at wind power plant end;The display control program is used to store, analyze, shows each data that testing and analysis system is sent;The testing and analysis system includes the data acquisition subsystem for acquiring the operation data of wind power plant and the coulometric analysis subsystem for generating generated energy analysis data, and the data acquisition subsystem and coulometric analysis subsystem communicate to connect the display control program.The utility model is based on big data platform, is acquired conducive to the operation information to wind power plant end equipment, forms management database, to facilitate expert's inline diagnosis, carries out on-line analysis to generated energy, ensures that enterprise operation manages sustainable development.
Description
Technical field
The utility model relates to wind farm device technical fields, and in particular to a kind of wind power plant generated energy management system.
Background technique
National Wind Power Generation Industry policy is implemented and wind power technology is greatly developed, and China installed capacity of wind-driven power position is at the forefront in the world
And still in high speed development.It deepens continuously with project development, scale is continuously improved, but the widened speed of power grid power demand is not
And the speed of installation popularization, it causes region abandonment and rations the power supply seriously, region-competitive is increasingly serious.The publication of national energy general bureau
State can newly can be [2017] No. 52 " notice of the National Energy Board about the annual wind-powered electricity generations investment monitoring and warning results of publication 2017 ", it is right
Wind-powered electricity generation investment monitoring and warning result is issued within 2017, and wherein the Inner Mongol, Heilungkiang, Jilin, Ningxia, Gansu, Xinjiang (contain
Formation) etc. save (area) be Wind Power Generation build red early warning region, other provinces be green area.The province (area) of red early warning is no
It must check and approve and build new Wind Power Project, and to adopt an effective measure and put forth effort to solve the problems, such as abandonment.Power grid enterprises must not accept red
Province (area) Wind Power Project of early warning increases grid-connected application (being contained in the project for building, having checked and approved and being included in planning) newly, and agency is not
Wind Power Project is created to the province of red early warning (area) again and provides new power generation business license.Meanwhile postponing the quasi- east in construction Xinjiang, spitting
The area Lu Fanbailifeng, Jiuquan second phase second batch Wind Power Project have put into operation or have deposited in the passway for transmitting electricity emphasis built for dissolving
Measure Wind Power Project.Early warning result is that the area of green will get hold of the rhythm of Wind Power Project construction, is built implementing consumption market etc.
If independently determining that annual construction scale and project list, the linking considering construction as a whole and using avoid out on the basis of condition
Now new situation of rationing the power supply.
Industry most enterprises are all to be converged by artificial write by hand or fixed point acquisition creation data using artificial at present
Always, analysis is carried out to the data summarized by office softwares such as OFFICE and is chatted according to operation result progress artificial cognition and text
State the semi-automatic generated energy merit rating system to form Final Report.There is a large amount of work in terms of data acquisition in the system
A possibility that loophole, causes a large amount of error for data acquisition.In data summarization and office software calculating process, again
Expand error, differentiates that link since the technology of personnel is irregular, causes result to lose science in final personnel.It is same in this
When, a large amount of cumbersome manual operations also bring the hysteresis quality of result, can not analyze enterprise in real time and currently generate electricity status.And
With the increase of cost of labor and the flowing of personnel, old generated energy analysis method error rate is higher, can not meet gradually current
The demand of industry environment informationization.
In addition, if individually managed each wind power plant, being needed when for the management of multiple wind power plant generating capacities
A large amount of man power and material is consumed, enterprise is faced with higher management, transportation cost.Electricity power enterprise's emergency response is more passive,
Also problems are brought to dispatching of power netwoks and power network safety operation.
Based on the above reasons, it needs to seek solution.
Utility model content
The technical problem to be solved by the present invention is to overcome the deficiencies of the prior art and provide a kind of wind power plant generated energy
Management system is based on big data platform, is acquired conducive to the operation information to wind power plant end equipment, forms management database,
To facilitate expert's inline diagnosis, on-line analysis is carried out to generated energy, ensures that enterprise operation manages sustainable development.
In order to solve the above technical problems, the basic conception of the technical solution adopted in the utility model is:
A kind of wind power plant generated energy management system, testing and analysis system and setting including wind park end is arranged in are controlling
The display control program at end, the testing and analysis system include it is multiple, be divided into the wind power plant of different zones;
The testing and analysis system is used to obtain the operation data and analysis data at wind power plant end;
The display control program is used to store, analyze, shows each data that testing and analysis system is sent;
The testing and analysis system includes data acquisition subsystem for acquiring the operation data of wind power plant and for giving birth to
At the coulometric analysis subsystem of generated energy analysis data, the data acquisition subsystem and coulometric analysis subsystem are communicated to connect
The display control program.
Preferably, the testing and analysis system further includes having the communication system for being communicatively connected to display control program, described
Communication system described in data acquisition subsystem and the equal data connection of coulometric analysis subsystem.
Preferably, the data acquisition subsystem immediate data connection communication system, coulometric analysis
System connects the data acquisition subsystem or communication system by firewall;
The firewall protection data acquisition subsystem prevents coulometric analysis subsystem from accessing data acquisition subsystem.
In the above scheme, right because coulometric analysis subsystem, which can analyze generated energy, can be connected with outer net
Internal data acquisition subsystem causes risk, therefore, designs coulometric analysis subsystem by firewall and is connected to data acquisition
System or communication system.
Preferably, the communication system includes that longitudinal encryption device and router, the coulometric analysis subsystem pass through institute
The firewall stated connects data acquisition subsystem, and longitudinal direction encryption device described in the data acquisition subsystem data connection is described
Longitudinal encryption device is connect with router data, and the display control program includes multiplexing equipment, the router with
The multiplexing equipment communication connection.
Preferably, the data acquisition subsystem include interchanger and the industrial personal computer for being separately connected the interchanger,
Blower server, boosting site server;
Data acquisition subsystem obtains the operation data at wind power plant end and is sent to the communication system.
Preferably, the data acquisition subsystem further includes having tide server, and the tide server connects institute
The interchanger stated, the coulometric analysis subsystem interchanger described by firewall connection;
The generated energy analysis data of generation are sent to tide server by coulometric analysis subsystem, are sent out by tide server
It send to display control program.
In the above scheme, tide server has breakpoint transmission effect, when the number that power channel failure then acquires up
According to that can be cached in tide server, data are automatically uploaded to display control program after power channel restores.
Preferably, the coulometric analysis subsystem includes wind power service device and interchanger, wind power service device and is handed over
It changes planes data connection, interchanger and the firewall data connection.
Preferably, the coulometric analysis subsystem is also connected with internet, and the data of coulometric analysis demand are obtained by internet;
The data acquisition subsystem is isolated with internet.
In the above scheme, data acquisition subsystem connects internet, to obtain the calculating data of demand, realizes wind function
The prediction of rate, the calculating of electric flux etc., and data acquisition subsystem is then isolated with internet, to ensure safety.
Preferably, the wind power service device connects ambient weather forecast servers by internet.By weather forecast
Server obtains weather forecast information, to analyze generated energy information.
Preferably, the display control program includes storage analyzing subsystem and interactive subsystem;
The storage analyzing subsystem, each data for storing and/or analysis detection analysis system is sent;
The testing and analysis system and storage analyzing subsystem communication connection, the storage analyzing subsystem with interact son
System data connection.
By adopting the above technical scheme, the utility model has the following beneficial effects:
The wind power plant generated energy management system of the utility model, including the testing and analysis system at wind park end is arranged in and sets
Set the display control program in control terminal, the testing and analysis system include it is multiple, be divided into the wind power plant of different zones;It is described
Testing and analysis system be used for obtain wind power plant end operation data and analysis data;The display control program is for depositing
Each data that storage, analysis, display testing and analysis system are sent;The testing and analysis system includes the operation for acquiring wind power plant
The data acquisition subsystem of data and the coulometric analysis subsystem that data are analyzed for generating generated energy, the data acquisition system
System and coulometric analysis subsystem communicate to connect the display control program.The utility model is based on big data platform, is conducive to
The operation information of wind power plant end equipment is acquired, management database is formed, so that expert's inline diagnosis is facilitated, to power generation
Amount carries out on-line analysis, ensures that enterprise operation manages sustainable development.
Specific embodiment of the present utility model is described in further detail with reference to the accompanying drawing.
Detailed description of the invention
The a part of attached drawing as the application, is further understood from the utility model for providing, the utility model
Illustrative embodiments and their description for explaining the utility model, but do not constitute improper limits to the present invention.Obviously,
The accompanying drawings in the following description is only some embodiments, to those skilled in the art, is not paying creative labor
Under the premise of dynamic, it can also be obtained according to these attached drawings other accompanying drawings.In the accompanying drawings:
Fig. 1 is the schematic diagram of the utility model wind power plant generated energy management system.
It should be noted that these attached drawings and verbal description are not intended to limit the design of the utility model in any way
Range, but illustrate the concept of the utility model for those skilled in the art by referring to specific embodiments.
Specific embodiment
It is practical new below in conjunction with this to keep the objectives, technical solutions, and advantages of the embodiments of the present invention clearer
The technical solution in embodiment is clearly and completely described in attached drawing in type embodiment, and following embodiment is for illustrating this
Utility model, but be not intended to limit the scope of the present invention.
In the description of the present invention, it should be noted that the orientation of the instructions such as term " on ", "lower", "inner", "outside"
Or positional relationship is to be merely for convenience of description the utility model based on orientation or positional relationship described in attached drawing and simplification is retouched
It states, rather than the device or element of indication or suggestion meaning must have a particular orientation, be constructed and operated in a specific orientation,
Therefore it should not be understood as limiting the present invention.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified
Dress ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can
To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, it can also be indirectly connected through an intermediary.For this
For the those of ordinary skill in field, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
Embodiment one
Shown in Figure 1, the present embodiment one provides a kind of wind power plant generated energy management system, including is arranged at wind park end
Testing and analysis system and the display control program of control terminal is set, the testing and analysis system include it is multiple, be divided into not
With the wind power plant in region;
The testing and analysis system is used to obtain the operation data and analysis data at wind power plant end;
The display control program is used to store, analyze, shows each data that testing and analysis system is sent;
The testing and analysis system includes data acquisition subsystem for acquiring the operation data of wind power plant and for giving birth to
At the coulometric analysis subsystem of generated energy analysis data, the data acquisition subsystem and coulometric analysis subsystem are communicated to connect
The display control program.
Preferably, the testing and analysis system further includes having the communication system for being communicatively connected to display control program, described
Communication system described in data acquisition subsystem and the equal data connection of coulometric analysis subsystem.
Preferably, the data acquisition subsystem immediate data connection communication system, coulometric analysis
System connects the data acquisition subsystem or communication system by firewall;
The firewall protection data acquisition subsystem prevents coulometric analysis subsystem from accessing data acquisition subsystem.
In the above scheme, right because coulometric analysis subsystem, which can analyze generated energy, can be connected with outer net
Internal data acquisition subsystem causes risk, therefore, designs coulometric analysis subsystem by firewall and is connected to data acquisition
System or communication system.
Preferably, the communication system includes that longitudinal encryption device and router, the coulometric analysis subsystem pass through institute
The firewall stated connects data acquisition subsystem, and longitudinal direction encryption device described in the data acquisition subsystem data connection is described
Longitudinal encryption device is connect with router data, and the display control program includes multiplexing equipment, the router with
The multiplexing equipment communication connection.
Preferably, the data acquisition subsystem include interchanger and the industrial personal computer for being separately connected the interchanger,
Blower server, boosting site server;
Data acquisition subsystem obtains the operation data at wind power plant end and is sent to the communication system.
Preferably, the data acquisition subsystem further includes having tide server, and the tide server connects institute
The interchanger stated, the coulometric analysis subsystem interchanger described by firewall connection;
The generated energy analysis data of generation are sent to tide server by coulometric analysis subsystem, are sent out by tide server
It send to display control program.
In the above scheme, tide server has breakpoint transmission effect, when the number that power channel failure then acquires up
According to that can be cached in tide server, data are automatically uploaded to display control program after power channel restores.
Preferably, the coulometric analysis subsystem includes wind power service device and interchanger, wind power service device and is handed over
It changes planes data connection, interchanger and the firewall data connection.
Preferably, the coulometric analysis subsystem is also connected with internet, and the data of coulometric analysis demand are obtained by internet;
The data acquisition subsystem is isolated with internet.
In the above scheme, data acquisition subsystem connects internet, to obtain the calculating data of demand, realizes wind function
The prediction of rate, the calculating of electric flux etc., and data acquisition subsystem is then isolated with internet, to ensure safety.
Preferably, the wind power service device connects ambient weather forecast servers by internet.By weather forecast
Server obtains weather forecast information, to analyze generated energy information.
Preferably, the display control program includes storage analyzing subsystem and interactive subsystem;
The storage analyzing subsystem, each data for storing and/or analysis detection analysis system is sent;
The testing and analysis system and storage analyzing subsystem communication connection, the storage analyzing subsystem with interact son
System data connection.
Embodiment two
Shown in Figure 1, embodiment two is on the basis of example 1 mainly described display control program, implements
Wind power plant generated energy management system in example two equally includes display control program and several inspections for being divided into each regional wind power
Survey analysis system;
The display control program includes storage analyzing subsystem and interactive subsystem;
The storage analyzing subsystem, each data for storing and/or analysis detection analysis system is sent;
The testing and analysis system and storage analyzing subsystem and/or interactive subsystem communicate to connect, the storage
Analyzing subsystem and interactive subsystem data connection.The interactive subsystem carries out letter for user and wind power station control system
Breath interaction, which includes work station, can show the data information of storage analyzing subsystem storage and the hair of analysis
Coulometric analysis data information, which realizes wind power plant statistical data, analyzes the displaying of data, while being also subjected to
Operator's input control information.
Preferably, the storage analyzing subsystem includes data storage server, the data storage server and detection
Analysis system communication connection, the interactive subsystem and the data storage server data connection.
In the above scheme, interactive subsystem and the data storage server data connection can show and be stored
Generated energy data information.
Preferably, the data storage server includes historic data server and real time data server, the friendship
Mutual subsystem and the real time data server and/or historic data server data connection.
In the above scheme, the real time data that real time data server storage testing and analysis system is sent, and historical data
Server store historical data.
Preferably, the storage analyzing subsystem includes and the historic data server and/or real time data
The calculation server of server data connection, the calculation server is for being analyzed and processed data, the interaction
Subsystem and the calculation server data connection.
In the above scheme, interactive subsystem and calculation server data connection, so as to show that calculation server is handled
Data.
Preferably, the storage analyzing subsystem further includes having WEB server, the WEB server and described
Historic data server and/or real time data server data connection, and connect with the jiao zi system data.
In the above scheme, by the way that WEB server is arranged, then WEB page displaying is realized, announcement is facilitated and checks wind
Electric field data.
Preferably, the interactive subsystem includes several interactive terminals;The interactive terminal includes desktop computer, respectively
The desktop computer storage analyzing subsystem described by interchanger connection.
Preferably, display control program further includes the data server for being provided with management data, and subsystem is analyzed in the storage
System and/or interactive subsystem pass through the positive isolating device connection data server.
In the above scheme, which is directly connected to as general headquarters, therefore security request data is high, in order to ensure peace
Entirely, data server is connected to by positive isolating device and stores analyzing subsystem and/or interaction by design in the utility model
Subsystem.
The above is only the preferred embodiment of the utility model, not makees in any form to the utility model
Limitation, although the utility model has been disclosed with preferred embodiment as above, is not intended to limit the utility model, any to be familiar with
The technical staff of this patent is not departing within the scope of technical solutions of the utility model, when the technology contents using above-mentioned prompt are done
A little equivalent embodiment changed or be modified to equivalent variations out, but all contents without departing from technical solutions of the utility model,
Any simple modification, equivalent change and modification made by the above technical examples according to the technical essence of the present invention, still belong to
In the range of the utility model.
Claims (10)
1. a kind of wind power plant generated energy management system, which is characterized in that including be arranged in wind park end testing and analysis system and
The display control program of control terminal is set, the testing and analysis system include it is multiple, be divided into the wind power plant of different zones;
The testing and analysis system includes data acquisition subsystem and coulometric analysis subsystem, the data acquisition subsystem and electricity
Amount analyzing subsystem communicates to connect the display control program;
The data acquisition subsystem is used to acquire the operation data of wind power plant, and the coulometric analysis subsystem is for generating power generation
Amount analysis data, the display control program are used to store, analyze, show each data that testing and analysis system is sent.
2. a kind of wind power plant generated energy management system according to claim 1, which is characterized in that the testing and analysis system
It further include having the communication system for being communicatively connected to display control program, the data acquisition subsystem and coulometric analysis subsystem are equal
Communication system described in data connection.
3. a kind of wind power plant generated energy management system according to claim 2, which is characterized in that the data acquisition
The system immediate data connection communication system, the coulometric analysis subsystem connect the data acquisition by firewall
System or communication system.
4. a kind of wind power plant generated energy management system according to claim 3, which is characterized in that the communication system includes
Longitudinal encryption device and router, the coulometric analysis subsystem connect data acquisition subsystem, institute by the firewall
Longitudinal direction encryption device described in data acquisition subsystem data connection is stated, the longitudinal direction encryption device is connect with router data, institute
The display control program stated includes multiplexing equipment, and the router and the multiplexing equipment communicate to connect.
5. according to a kind of any wind power plant generated energy management system of claim 2-4, which is characterized in that the data are adopted
Subsystem includes interchanger and the industrial personal computer for being separately connected the interchanger, blower server, boosting site server;
Data acquisition subsystem obtains the operation data at wind power plant end and is sent to the communication system.
6. a kind of wind power plant generated energy management system according to claim 5, which is characterized in that the data acquisition
System further includes having tide server, the tide server connection interchanger, the coulometric analysis subsystem
Pass through the firewall connection interchanger;
The generated energy analysis data of generation are sent to tide server by coulometric analysis subsystem, are sent to by tide server
Display control program.
7. a kind of wind power plant generated energy management system according to claim 3 or 4, which is characterized in that the coulometric analysis
Subsystem includes wind power service device and interchanger, and wind power service device is connect with exchange data, interchanger and described
Firewall data connection.
8. a kind of wind power plant generated energy management system according to claim 7, which is characterized in that the coulometric analysis subsystem
System is also connected with internet, and the data of coulometric analysis demand are obtained by internet;The data acquisition subsystem and internet phase
Isolation.
9. a kind of wind power plant generated energy management system according to claim 8, which is characterized in that the wind power service
Device connects ambient weather forecast servers by internet.
10. a kind of wind power plant generated energy management system according to claim 1, which is characterized in that the display control
System includes storage analyzing subsystem and interactive subsystem;
The testing and analysis system and storage analyzing subsystem communication connection, the storage analyzing subsystem and interactive subsystem
Data connection;
The storage analyzing subsystem, each data for storing and/or analysis detection analysis system is sent.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821294640.8U CN208421881U (en) | 2018-08-10 | 2018-08-10 | A kind of wind power plant generated energy management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821294640.8U CN208421881U (en) | 2018-08-10 | 2018-08-10 | A kind of wind power plant generated energy management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208421881U true CN208421881U (en) | 2019-01-22 |
Family
ID=65122404
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821294640.8U Expired - Fee Related CN208421881U (en) | 2018-08-10 | 2018-08-10 | A kind of wind power plant generated energy management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208421881U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114137357A (en) * | 2021-11-11 | 2022-03-04 | 国网江西省电力有限公司电力科学研究院 | Information interaction comprehensive power management method for power transmission line on-line monitoring device |
-
2018
- 2018-08-10 CN CN201821294640.8U patent/CN208421881U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114137357A (en) * | 2021-11-11 | 2022-03-04 | 国网江西省电力有限公司电力科学研究院 | Information interaction comprehensive power management method for power transmission line on-line monitoring device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102545213B (en) | System and method for managing line loss of power grid in real time | |
CN104269922B (en) | A kind of distributed power source parameter monitoring method and system based on GPRS/GIS | |
CN103559648A (en) | Grid equipment state inspection and evaluation training system | |
CN108051709A (en) | Transformer state online evaluation analysis method based on artificial intelligence technology | |
CN107622342B (en) | MVC (model view controller) architecture-based distribution network area data analysis system | |
CN202837985U (en) | GPRS-communication based remote online monitoring system for sewage treatment equipment | |
CN101692575A (en) | Method for processing data for real-time load flow calculation in large electric systems | |
CN106712296A (en) | Online monitoring and managing system for electric power | |
CN108470386A (en) | A kind of cable run intelligent inspection system based on GPS and cloud platform | |
CN106997513A (en) | The distribution net equipment state evaluation system analyzed based on big data | |
CN107368955A (en) | The implementation method of power grid risk, equipment Risk and operating risk integration linkage | |
CN106790699A (en) | A kind of diesel engine cloud monitoring and cloud management system | |
CN208421881U (en) | A kind of wind power plant generated energy management system | |
CN106093636A (en) | The analog quantity check method of the secondary device of intelligent grid and device | |
Zhang et al. | Development of the monitoring system in the smart distribution substation in Guangzhou, China | |
CN201332267Y (en) | Electric energy monitoring system | |
CN101685964A (en) | Online scheduling aid decision method and system based on large-scale parallel processing | |
CN108537457A (en) | The working method of electric power construction quality-monitoring, early warning and control system | |
CN206506563U (en) | A kind of diesel engine cloud monitoring and cloud management system | |
CN204231378U (en) | Electric power system snap information repair based on condition of component and service system | |
CN116522746A (en) | Power distribution hosting method for high-energy-consumption enterprises | |
CN205720421U (en) | Remote power measurement monitoring system | |
CN104376614A (en) | One-key ticket outlet method for substation operation tickets | |
CN2687912Y (en) | Intelligent low-voltage box type converting station | |
CN101123533A (en) | Operation and maintenance device for communication power supply |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190122 Termination date: 20210810 |
|
CF01 | Termination of patent right due to non-payment of annual fee |