CN108537457A - The working method of electric power construction quality-monitoring, early warning and control system - Google Patents
The working method of electric power construction quality-monitoring, early warning and control system Download PDFInfo
- Publication number
- CN108537457A CN108537457A CN201810345969.0A CN201810345969A CN108537457A CN 108537457 A CN108537457 A CN 108537457A CN 201810345969 A CN201810345969 A CN 201810345969A CN 108537457 A CN108537457 A CN 108537457A
- Authority
- CN
- China
- Prior art keywords
- early warning
- monitoring
- electric power
- control system
- server
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06395—Quality analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
Abstract
The invention discloses the working methods of a kind of electric power construction quality-monitoring, early warning and control system, for electric power construction quality-monitoring, early warning and the control system mainly including server and more client computer being connected with server, working method includes step in detail below:A, data input;B, monitoring and items for acceptance statistics;C, judge whether appraisal result is abnormal;D, it returns to work.Through the above way, the working method of electric power construction quality-monitoring of the present invention, early warning and control system, it can help that administrative staff are objective, accurately and timely construction quality is managed and is controlled, realize the closed-loop tracking management to quality problems and Non-Compliance, and prompting, alarm function are provided, improve quality management efficiency and effect.
Description
Technical field
The present invention relates to the technical field of power construction more particularly to a kind of electric power construction quality-monitoring, early warning and
The working method of control system.
Background technology
" quality comes first in our mighty construction plan ".Engineering Quality Control is the most important thing of engineering construction management.Power construction is especially
It is large-scale power construction project(Thermoelectricity, nuclear power, water power)Scale is big, long in time limit, to be related to profession numerous(Thermal power project up to 13
Profession), quality management is complicated, is difficult to quantify, and work progress must reinforce pre-control, process control, immediately control, send out at any time
Now and quality problems present in work progress are solved, tend to sex chromosome mosaicism to quality management rectifies a deviation in time.In addition, power construction work
Journey items for acceptance substantial amounts, only thermoelectricity Civil Specialities just up to 10,000(It is secondary), Traditional project quality information statistics mainly according to
By administrative staff's manual operations or common office software statistics, statistical there are heavy workload, time-consuming, accuracy is not high
Problem.
Invention content
The invention mainly solves the technical problem of providing a kind of electric power construction quality-monitoring, early warning and control systems
Working method, can help that administrative staff are objective, accurately and timely construction quality is managed and is controlled, realize to quality
The closed-loop tracking management of problem and Non-Compliance, and prompting, alarm function are provided, improve quality management efficiency and effect.
In order to solve the above technical problems, one aspect of the present invention is:Provide a kind of electric power construction
The working method of quality-monitoring, early warning and control system, the electric power construction quality-monitoring, early warning and control system master
The more client computer that include server and be connected with server, working method include step in detail below:
A, data input, and data input is carried out using the client computer being connected with server, and set content of examination and scoring mark
Standard, each items of typing, which are checked and accepted, to be divided;
B, monitoring and items for acceptance statistics, upload items for acceptance information, server is counted and counted automatically immediately in client computer
Calculate, export each acceptance index, while according to preset examination standards of grading, automatically to unit in charge of construction's quality management situation into
Row scoring;
C, judge whether appraisal result is abnormal, when examination score value is more than or equal to 90 timesharing, quality management system normal operation carries out
Conventional closed loop management;It is less than 90 timesharing when examination score value is more than or equal to 80 points, system pops up early warning, it is desirable that is held to unit in charge of construction
There are problems for workshop analysis, and are rectified and improved;When examination score value is less than 80 timesharing, system pops up early warning, according to deduction of points content
Determine range of stopping work to rectify and improve, it is desirable that unit in charge of construction stops work to rectify and improve;
D, it returns to work, rectification can return to work after meeting the requirements.
In a preferred embodiment of the present invention, database is installed in the server, is pacified in the client computer
Equipped with browser, browser carries out data interaction by Web Server with database.
In a preferred embodiment of the present invention, the software environment of the server:Oracle10g, Java jdk1.6
Or more;The hardware environment of server:Local intranet environment, memory 2G or more, hard disk 500G or more.
In a preferred embodiment of the present invention, the client computer uses PC machine.
In a preferred embodiment of the present invention, 10 days before the calculating cycle of the standards of grading is the same day, full marks
It is 100 points.
In a preferred embodiment of the present invention, each acceptance index, which includes each profession, should check and accept the number of entry,
Items for acceptance quantity checks and accepts progress and checks and accepts primary qualification rate.
The beneficial effects of the invention are as follows:Electric power construction quality-monitoring, early warning and the work of control system of the present invention
Method, can help that administrative staff are objective, accurately and timely construction quality is managed and is controlled, realize to quality problems and
The closed-loop tracking management of Non-Compliance, and prompting, alarm function are provided, improve quality management efficiency and effect.
Description of the drawings
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment
Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for
For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other
Attached drawing, wherein:
Fig. 1 is a preferred embodiment of the working method of electric power construction quality-monitoring of the present invention, early warning and control system
Work flow diagram.
Specific implementation mode
The technical scheme in the embodiments of the invention will be clearly and completely described below, it is clear that described implementation
Example is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is common
All other embodiment that technical staff is obtained without making creative work belongs to the model that the present invention protects
It encloses.
As shown in Figure 1, the embodiment of the present invention includes:
The working method of a kind of electric power construction quality-monitoring, early warning and control system, the electric power construction quality
Monitoring, early warning and control system are mainly including server and more client computer being connected with server, working method packet
Include step in detail below:
A, data input, and data input is carried out using the client computer being connected with server, and set content of examination and scoring mark
Standard, each items of typing, which are checked and accepted, to be divided;
B, monitoring and items for acceptance statistics, upload items for acceptance information, server is counted and counted automatically immediately in client computer
Calculate, export each acceptance index, while according to preset examination standards of grading, automatically to unit in charge of construction's quality management situation into
Row scoring;
C, judge whether appraisal result is abnormal, when examination score value is more than or equal to 90 timesharing, quality management system normal operation carries out
Conventional closed loop management;It is less than 90 timesharing when examination score value is more than or equal to 80 points, system pops up early warning, it is desirable that is held to unit in charge of construction
There are problems for workshop analysis, and are rectified and improved;When examination score value is less than 80 timesharing, system pops up early warning, according to deduction of points content
Determine range of stopping work to rectify and improve, it is desirable that unit in charge of construction stops work to rectify and improve;
D, it returns to work, rectification can return to work after meeting the requirements.
According to the function to be realized, Client/Server can be used(Customer end/server mode, hereinafter referred to as C/S)With
Browser/Server(Browser/Server Mode, hereinafter referred to as B/S)Two kinds of network structure patterns.
C/S is distributed computing fabric, and the processing of application program is by client computer(PC machine)And server(Mainframe or
Server)It shares;Request is usually handled by relevant database, and PC machine realizes display and industry after receiving processed data
Business logic;System support module melts hair, usually there is graphic user interface.C/S structures are because its flexibility has obtained extremely extensively
General application.But for large software system, there is also deficiencies in terms of the deployment of system and autgmentability for this structure.
B/S is a kind of with three tiers model(3-Tier)Application system structure Browser/Server structures.B/S structures
It is to be generated along with the rise of internet.This pattern has unified client, and the core that system function is realized is concentrated
Onto server, the exploitation, maintenance and use of system are simplified.Client computer must install browser, such as Netscape
Navigator or Internet Explorer, server install the databases such as SQL Server, Oracle, MYSQL.Browser
By Web Server data interaction is carried out with database.The management software ratio C/S infrastructure softwares of B/S structures exist certain
Advantage.In the present embodiment, the final choice B/S network structures mode development set software.
Among the above, database is installed in the server, browser is installed in the client computer, browser is logical
It crosses Web Server and carries out data interaction with database.Wherein, the software environment of the server:Oracle10g, Java
Jdk1.6 or more;The hardware environment of server:Local intranet environment, memory 2G or more, hard disk 500G or more.The client
Machine uses PC machine.
Further, 10 days before the calculating cycle of the standards of grading is the same day, full marks are 100 points.
In the present embodiment, each acceptance index include each profession should check and accept the number of entry, items for acceptance quantity,
The examination progress qualification rate primary with examination.
Supervisor administrative staff are by inputting user name, password login system can be at any time into system function main interface
Understand quality management dynamic, meanwhile, supervising engineer is dynamic control of the implementation to engineering construction quality, is needed to engineering construction
Quality-monitoring, early warning, control system are submitted necessary information support, therefore system includes mainly following functions:
(1)All kinds of related quality standard, design documents etc. are stored, foundation is provided for implementation quality control;
(2)Engineering relevant information is stored, such as:The information such as management system, Quality Test Plan, associated construction unit;
(3)The quality in site feedback information for handling typing scores according to examination standards of grading, and provides inquiry, export work(
Energy;
(4)Correlated quality record of acceptance is handled, provides foundation to carry out engineering quality evaluating, and provide inquiry, export function;
(5)Statistical correlation product acceptance data and index, and inquiry, export function are provided.
Quality operation architecture monitoring function:
(1)Quality feedback information typing
Quality information typing includes:Unit in charge of construction's selection, projects title, Non-Compliance content and standard and time of origin,
Standards of grading are to assign certain score value by the range and light and heavy degree of quality problems;
(2)To Non-Compliance closed-loop tracking management
Realize the closed-loop tracking management to quality problems, Non-Compliance.Administrative staff have found construction quality problem, according to setting in advance
Fixed content of examination and standard, from terminal input system, and tracking quality issue handling situation, after rectifying and improving closed loop, correlation is believed
Input system is ceased, to not rectifying and improving the project of closed loop by the regulation time limit, pops up prompt message.System can automatically generate quality problems platform
Account.The information of above-mentioned typing simultaneously as monitoring, early warning, control system basic data;
(3)It deducts points to Non-Compliance
System is examined according to examination scoring content and standard, and deduction of points is accumulative, the examination project accumulated deduction value setting per sport
The upper limit.The arbitrary period that calculating cycle is 10 days, full marks are 100 points.System is in different unit in charge of construction's quality operation architectures
Non-Compliance is deducted points, and lists Non-Compliance content.In inquiry, self defined time can be chosen, to certain unit in charge of construction
Nonconformance is inquired, and simultaneity factor has " export " function, can export Excel tables, other behaviour are carried out convenient for administrative staff
Make.
It reminded when examination score value is popped up less than mark time system, carry out early warning, it is desirable that administrative staff are to associated construction unit
Carry out respective handling.When less than 90 timesharing, it is desirable that open workshop to unit in charge of construction, rectified and improved;When less than 80 timesharing, it is desirable that apply
Work order position suspension of works, rectification can return to work after meeting the requirements.
Electric power construction quality pre-alert, monitoring, the application of control system effectively monitor the quality management of Liao Ge units in charge of construction
System running situation, avoids quality accident(Problem)Generation.Meanwhile human resources are greatly saved in the systematic difference, such as
Electric power construction projects large-scale popularization uses, and the expense of saving will be considerable.
After electric power construction quality-monitoring, early warning and control system are successfully developed, following management benefit will be also generated:
(1)Efficiency:Electric power construction quality-monitoring, early warning and the foundation of control system improve site construction management level,
Typing of score by rules repeatedly utilizes, alleviates the working strength of site administrator, improves the work effect of administrative staff
Fruit and efficiency;
(2)Quality:The built-in module of deducting points of system avoids manual entry and mistake of statistics by Select input, General Promotion matter
Measure accuracy, the reliability of postitallation evaluation;
(3)Decision:By monitoring, early warning means, site operation information in time, is accurately fed back, and is quality management informationization pipe
Reason provides Data safeguard, and accurate foundation is provided to project implementation supervision and decision for related management layer;
(4)Service:Monitoring, early warning system function combine live actual management to need, and flexible customization meets construction site management layer
Regulatory requirement, General Promotion quality regulatory level.
In conclusion the working method of the electric power construction quality-monitoring of the present invention, early warning and control system, can help
Administrative staff are objective, accurately and timely construction quality is managed and is controlled, realize to quality problems and Non-Compliance with
Track closed loop management, and prompting, alarm function are provided, improve quality management efficiency and effect.
Example the above is only the implementation of the present invention is not intended to limit the scope of the invention, every to utilize this hair
Equivalent structure or equivalent flow shift made by bright description is applied directly or indirectly in other relevant technology necks
Domain is included within the scope of the present invention.
Claims (6)
1. the working method of a kind of electric power construction quality-monitoring, early warning and control system, which is characterized in that the electric power
Construction quality-monitoring, early warning and control system include mainly server and more client computer being connected with server,
Its working method includes step in detail below:
A, data input, and data input is carried out using the client computer being connected with server, and set content of examination and scoring mark
Standard, each items of typing, which are checked and accepted, to be divided;
B, monitoring and items for acceptance statistics, upload items for acceptance information, server is counted and counted automatically immediately in client computer
Calculate, export each acceptance index, while according to preset examination standards of grading, automatically to unit in charge of construction's quality management situation into
Row scoring;
C, judge whether appraisal result is abnormal, when examination score value is more than or equal to 90 timesharing, quality management system normal operation carries out
Conventional closed loop management;It is less than 90 timesharing when examination score value is more than or equal to 80 points, system pops up early warning, it is desirable that is held to unit in charge of construction
There are problems for workshop analysis, and are rectified and improved;When examination score value is less than 80 timesharing, system pops up early warning, according to deduction of points content
Determine range of stopping work to rectify and improve, it is desirable that unit in charge of construction stops work to rectify and improve;
D, it returns to work, rectification can return to work after meeting the requirements.
2. the working method of electric power construction quality-monitoring according to claim 1, early warning and control system, feature
It is, database is installed in the server, browser is installed in the client computer, browser passes through Web
Server carries out data interaction with database.
3. the working method of electric power construction quality-monitoring according to claim 2, early warning and control system, feature
It is, the software environment of the server:Oracle10g, Java jdk1.6 or more;The hardware environment of server:Local
Intranet environment, memory 2G or more, hard disk 500G or more.
4. the working method of electric power construction quality-monitoring according to claim 2, early warning and control system, feature
It is, the client computer uses PC machine.
5. the working method of electric power construction quality-monitoring according to claim 1, early warning and control system, feature
It is, the calculating cycle of the standards of grading is 10 days before the same day, and full marks are 100 points.
6. the working method of electric power construction quality-monitoring according to claim 1, early warning and control system, feature
It is, each acceptance index, which includes each profession, should check and accept the number of entry, items for acceptance quantity, examination progress and examination one
Secondary qualification rate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810345969.0A CN108537457A (en) | 2018-04-18 | 2018-04-18 | The working method of electric power construction quality-monitoring, early warning and control system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810345969.0A CN108537457A (en) | 2018-04-18 | 2018-04-18 | The working method of electric power construction quality-monitoring, early warning and control system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108537457A true CN108537457A (en) | 2018-09-14 |
Family
ID=63481361
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810345969.0A Withdrawn CN108537457A (en) | 2018-04-18 | 2018-04-18 | The working method of electric power construction quality-monitoring, early warning and control system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108537457A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110189049A (en) * | 2019-06-05 | 2019-08-30 | 重庆两江新区管理委员会 | A kind of supervisory systems based on early warning mechanism |
CN112949965A (en) * | 2020-07-16 | 2021-06-11 | 中国铁建电气化局集团第五工程有限公司 | High-speed rail contact network completion acceptance technology based on 4C detection technology |
CN113837533A (en) * | 2021-08-16 | 2021-12-24 | 江苏金小满信息科技有限公司 | Multi-dimensional examination and evaluation system for real estate engineering project management |
-
2018
- 2018-04-18 CN CN201810345969.0A patent/CN108537457A/en not_active Withdrawn
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110189049A (en) * | 2019-06-05 | 2019-08-30 | 重庆两江新区管理委员会 | A kind of supervisory systems based on early warning mechanism |
CN112949965A (en) * | 2020-07-16 | 2021-06-11 | 中国铁建电气化局集团第五工程有限公司 | High-speed rail contact network completion acceptance technology based on 4C detection technology |
CN113837533A (en) * | 2021-08-16 | 2021-12-24 | 江苏金小满信息科技有限公司 | Multi-dimensional examination and evaluation system for real estate engineering project management |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101403964B (en) | Integration type software configuration management method based on transaction management | |
CN104574002B (en) | Asset management information processing method and processing device based on big data analysis | |
CN107506462A (en) | Data processing method, system, electronic equipment, the storage medium of Enterprise Data | |
CN104951905A (en) | Equipment dynamic ledger management system | |
CN108932589A (en) | A kind of IT application in enterprises project implementation management system | |
CN108537457A (en) | The working method of electric power construction quality-monitoring, early warning and control system | |
CN101763582A (en) | Scheduled overhaul management module for EAM system of power plant | |
CN108876325A (en) | A kind of Medical Devices total management system | |
CN102024188A (en) | Equipment accounting management module of EAM system of power plant | |
CN101763581A (en) | EAM system of power station and report forms management module thereof | |
CN101763580A (en) | Equipment state overhaul management module for EAM system of power plant | |
CN106022617A (en) | Inspection control system based on marketing multi-system data center | |
CN101763583A (en) | Work sheet management module for EAM system of power plant | |
CN112488612A (en) | Visualization-based full inventory resource monitoring and displaying method | |
CN108510138A (en) | A kind of building facilities device management control method based on analytic hierarchy process (AHP) | |
CN108460541A (en) | Harbour intelligence maintenance system and method | |
CN104123588A (en) | Comprehensive evaluation system and method of smart distribution grid | |
CN101763579A (en) | Equipment management system for power station | |
CN107657399A (en) | A kind of online management-control method of transformer station's electric energy balance for cooperateing with defect elimination | |
KR100584903B1 (en) | System for real time controlling driving data of power plant | |
CN101409396A (en) | Power usage management system for electric power system | |
CN101763576A (en) | Power plant enterprise asset management (EAM) system with Qcode module and Qcode access method thereof | |
CN101763577B (en) | EAM system for power plant | |
CN106169118A (en) | Power marketing industry expands negative inventory management application process | |
CN110378802A (en) | A kind of water power fortune inspection management system and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180914 |
|
WW01 | Invention patent application withdrawn after publication |