CN208414212U - Tin groove roof and floatation glass production line - Google Patents
Tin groove roof and floatation glass production line Download PDFInfo
- Publication number
- CN208414212U CN208414212U CN201820925331.XU CN201820925331U CN208414212U CN 208414212 U CN208414212 U CN 208414212U CN 201820925331 U CN201820925331 U CN 201820925331U CN 208414212 U CN208414212 U CN 208414212U
- Authority
- CN
- China
- Prior art keywords
- top cover
- main body
- brick main
- groove roof
- tin groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Abstract
The utility model provides a kind of tin groove roof and floatation glass production line, is related to the technical field of glass production relevant device, which includes the first top cover, the second top cover and third top cover;First top cover, second top cover and the third top cover set gradually to form the tin groove roof;And the lower surface of first top cover, second top cover and the third top cover is located at same level.The tin groove roof that the tin groove roof of tin groove roof and floatation glass production line provided by the utility model can make full use of different manufacturers production carries out overlap joint and forms the new tin groove roof that can satisfy requirement;So as to which the part tin groove roof to conform to quality requirements in the molten tin bath for having spent service life is used, reuses to realize, reduce the cost of new molten tin bath.
Description
Technical field
The utility model relates to glass production relevant device technical fields, more particularly, to a kind of tin groove roof and float glass process glass
Glass production line.
Background technique
Floatation glass production line is generally with 10 years for a kiln phase, as one of three big Thermal Equipments molten tin bath, a kiln phase
Afterwards, how tin groove roof, which maximizes, reuses and does not influence new kiln phase product quality, is an important subject.It was verified that
Float glass tin bath high temperature section top cover brick bearing temperature is at 1000 DEG C or so, by a use in the kiln phase 10 years, invades under high temperature
Erosion is serious, is not able to satisfy the new kiln phase and reuses the quality requirement of brick material;In molten tin bath, low-temperature zone relative temperature it is lower, tin groove roof can
With recycling.
One of the big Thermal Equipment of floatation glass production line three molten tin bath be glass molding Thermal Equipment, Tin bath top cover brick structure and
Brick material amount directly affects the quality in float glass upper surface face.After generally using 10 years kiln phase, molten tin bath need to carry out cold repair
Transformation cannot achieve the local replacing of tin groove roof because the tin groove roof brick of different manufacturers production is different;More using entirety
It changes, cost of investment is big;Integrally reuse use, there is the hidden danger influenced on glass quality after operation.
Utility model content
The purpose of this utility model is to provide tin groove roof and floatation glass production line, with solve tin groove roof maintenance at
This height, the technical issues of cannot making the best use of everything.
A kind of tin groove roof provided by the utility model, including the first top cover, the second top cover and third top cover;
First top cover, second top cover and the third top cover set gradually to form the tin groove roof;
And the lower surface of first top cover, second top cover and the third top cover is located at same level.
Further, multiple suspender members are provided on first top cover, and each described suspender member is connected by suspender belt
Round steel is connect,
The sunpender for Connection Bracket is provided on the round steel.
Further, first top cover includes at least two first hanger brick main bodys and at least one first face brick master
Body;The first face brick main body is arranged between two the first hanger brick main bodys.
Further, the suspender member is located in the first hanger brick main body.
Further, multiple suspender members are provided in the first hanger brick main body, multiple suspender members pass through
Multiple suspender belts are connected on the round steel.
Further, second top cover includes at least two second hanger brick main bodys and at least one second face brick master
Body;The second face brick main body is arranged between two the second hanger brick main bodys.
Further, wherein the first hanger brick main body is adjacent with the wherein 1 second hanger brick main body.
Further, the third top cover includes at least two third hanger brick main bodys and at least one third face brick master
Body;The third face brick main body is arranged between two third hanger brick main bodys.
Further, wherein a third hanger brick main body is adjacent with the wherein 1 second hanger brick main body.
The utility model also provides a kind of floatation glass production line, including molten tin bath, and the molten tin bath includes molten tin bath described above
Top cover and bottom brick of molten tin bath;
Space in slot is formed between the bottom brick of molten tin bath and the tin groove roof.
The tin groove roof of tin groove roof and floatation glass production line provided by the utility model can make full use of different factories
The tin groove roof of family's production carries out overlap joint and forms the new tin groove roof that can satisfy requirement;So as to which use will have been crossed
The part tin groove roof to conform to quality requirements in the molten tin bath of the time limit is used, thus realize reuse, reduce new molten tin bath at
This.
Detailed description of the invention
It, below will be right in order to illustrate more clearly of specific embodiment of the present invention or technical solution in the prior art
Specific embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, it is described below
In attached drawing be that some embodiments of the utility model are not paying creativeness for those of ordinary skill in the art
Under the premise of labour, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the structural schematic diagram of molten tin bath provided by the embodiment of the utility model;
Fig. 2 is the structural schematic diagram of the first top cover of the tin groove roof of molten tin bath shown in Fig. 1;
Fig. 3 is the structural schematic diagram of the second top cover of the tin groove roof of molten tin bath shown in Fig. 1;
Fig. 4 is the structural schematic diagram of the third top cover of the tin groove roof of molten tin bath shown in Fig. 1.
Icon: the first top cover of 100-;The second top cover of 200-;300- third top cover;400- bottom brick of molten tin bath;500- slot
Interior space;600- fixed frame;700- the first hanger brick main body;800- the first face brick main body;900- suspender member;110- is hung
Band;120- round steel;130- sunpender;140- the second hanger brick main body;150- the second face brick main body;160- third hanger brick
Main body;170- third face brick main body.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing, it is clear that described
Embodiment is the utility model a part of the embodiment, instead of all the embodiments.Based on the embodiments of the present invention, originally
Field those of ordinary skill every other embodiment obtained without making creative work belongs to practical
Novel protected range.
It is in the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", " perpendicular
Directly ", the orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only
For ease of description the utility model and simplify description, rather than the device or element of indication or suggestion meaning must have it is specific
Orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.In addition, term " the
One ", " second ", " third " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified
Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally
Connection;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary,
It can be the connection inside two elements.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition
The concrete meaning of language in the present invention.
As Figure 1-Figure 4, a kind of tin groove roof provided by the utility model, including the first top cover 100, the second top cover
200 and third top cover 300;
First top cover 100, second top cover 200 and the third top cover 300 set gradually to form the molten tin bath
Top cover;
And the lower surface of first top cover 100, second top cover 200 and the third top cover 300 is located at same water
Plane.
In some embodiments, tin groove roof is an entirety, including the first top cover 100, the second top cover 200 and third top
Lid 300;And first between top cover 100 and the second top cover 200 between be divided into 3mm;Between second top cover 200 and third top cover 300
Interval is also 3mm.
As shown in Fig. 2, further, being provided on first top cover 100 multiple on basis based on the above embodiment
Suspender member 900, and each described suspender member 900 connects round steel 120 by suspender belt 110,
The sunpender 130 for Connection Bracket 600 is provided on the round steel 120.
In some embodiments, multiple suspender members 900 are provided on the first top cover 100, multiple suspender members 900 pass through suspender belt
110 are connected on round steel 120, and multiple sunpenders 130 are arranged on round steel 120, and sunpender 130 is connected to the fixed frame 600 of molten tin bath
On, it has been achieved the first top cover 100 vacantly in molten tin bath.
Suspender member 900 on the first top cover 100 is usually arranged multiple rows of, and each row's suspender member 900 is connected to a round steel
On 120, multiple sunpenders 130 are set on a round steel 120;Round steel 120 is connected to the fixed frame on molten tin bath top using sunpender 130
On 600.
In order to ensure suspender member 900 connect with the first top cover 100 secured, general suspender member 900 is arranged to inverted T shaped;?
When use, the resistance for extracting suspender member 900 from the first top cover 100 can be increased, to increase suspender member 900 and
The firmness of one top cover 100 connection.
Based on the above embodiment on basis, further, first top cover 100 includes at least two first hanger bricks
Main body 700 and at least one first face brick main body 800;The first face brick main body 800 is arranged in two first hanger bricks
Between main body 700.
In some embodiments, the both ends of the first top cover 100 are provided with the first hanger brick main body 700, adjacent
The first face brick main body 800 is provided between one hanger brick main body 700;Under first hanger brick main body 700 and the first face brick main body 800
Surface forms the lower surface of the first top cover 100.
The longitudinal section of first hanger brick main body 700 be also it is inverted T shaped, the longitudinal section of the first face brick main body 800 is T-type;First
There is suspender member 900 in hanger brick main body 700, suspender member 900 is hanging by the first hanger brick main body 700, the first hanger brick main body 700
Can be hanging by the first face brick main body 800, to realize that entire first top cover 100 is hanging, and due to the first hanger brick main body 700
The mode being connect with the inverted T shaped and T-type of the first face brick main body 800, it is ensured that the first hanger brick main body 700 can be by the first face brick
Main body 800 is held up, to hang entire first top cover 100.
Based on the above embodiment on basis, further, the suspender member 900 is located at the first hanger brick main body
In 700.
Based on the above embodiment on basis, further, it is provided in the first hanger brick main body 700 multiple described
Suspender member 900, multiple suspender members 900 are connected on the round steel 120 by multiple suspender belts 110.
In some embodiments, multiple suspender members 900 are provided in the first hanger brick main body 700, each first hanging
Suspender member 900 in brick main body 700 is arranged in a row, and a suspender belt 110 is respectively provided on each suspender member 900, each
Suspender belt 110 fall on round steel 120, be generally provided on round steel 120 it is multiple for connecting round steel 120 and fixed frame 600
The sunpender 130 connect.
It is provided with a round steel 120 above each first hanger brick main body 700, each round steel 120 passes through more
A 130 Connection Bracket 600 of sunpender, to realize the hanging of this first top cover 100.
As shown in figure 3, further, second top cover 200 includes at least two based on the above embodiment on basis
Second hanger brick main body 140 and at least one second face brick main body 150;The second face brick main body 150 setting is described in two
Between second hanger brick main body 140.
In some embodiments, the both ends of the second top cover 200 are provided with the second hanger brick main body 140, adjacent
The second face brick main body 150 is provided between two hanger brick main bodys 140;Under second hanger brick main body 140 and the second face brick main body 150
Surface forms the lower surface of the second top cover 200.
The longitudinal section of second hanger brick main body 140 be also it is inverted T shaped, the longitudinal section of the second face brick main body 150 is T-type;Second
There is suspender member 900 in hanger brick main body 140, suspender member 900 is hanging by the second hanger brick main body 140, the second hanger brick main body 140
Can be hanging by the second face brick main body 150, to realize that entire second top cover 200 is hanging, and due to the second hanger brick main body 140
The mode being connect with the inverted T shaped and T-type of the second face brick main body 150, it is ensured that the second hanger brick main body 140 can be by the second face brick
Main body 150 is held up, to hang entire second top cover 200.
Based on the above embodiment on basis, further, wherein the first hanger brick main body 700 and a wherein institute
It is adjacent to state the second hanger brick main body 140.
In some embodiments, the first hanger brick main body 700 and the second hanger brick main body 140 make adjacent, in this way can
Guarantee that the first top cover 100 and the second top cover 200 are hung steadily, stress center of gravity always, to guarantee the first top cover 100 and the second top
The lower surface of lid 200 is concordant.
As shown in figure 4, further, the third top cover 300 includes at least two based on the above embodiment on basis
Third hanger brick main body 160 and at least one third face brick main body 170;The third face brick main body 170 setting is described in two
Between third hanger brick main body 160.
In some embodiments, the both ends of third top cover 300 are provided with third hanger brick main body 160, adjacent
Third face brick main body 170 is provided between three hanger brick main bodys 160;Under third hanger brick main body 160 and third face brick main body 170
The lower surface of surface formation third top cover 300.
The longitudinal section of third hanger brick main body 160 be also it is inverted T shaped, the longitudinal section of third face brick main body 170 is T-type;Third
There is suspender member 900 in hanger brick main body 160, suspender member 900 is hanging by third hanger brick main body 160, third hanger brick main body 160
Can be hanging by third face brick main body 170, to realize that entire third top cover 300 is hanging, and due to third hanger brick main body 160
The mode being connect with the inverted T shaped and T-type of third face brick main body 170, it is ensured that third hanger brick main body 160 can be by third face brick
Main body 170 is held up, to hang entire third top cover 300.
Based on the above embodiment on basis, further, wherein a third hanger brick main body 160 and a wherein institute
It is adjacent to state the second hanger brick main body 140.
In some embodiments, third hanger brick main body 160 and the second hanger brick main body 140 make adjacent, in this way can
Guarantee that third top cover 300 and the second top cover 200 are hung steadily, stress center of gravity always, to guarantee that third top cover 300 and second pushes up
The lower surface of lid 200 is concordant.
First top cover 100, the second top cover 200 and third top cover 300 are hung steadily, and stress center of gravity is consistent, forms it into
Lower surface is concordant;Since tin groove roof has service life, and after a service life, due to the tin of different manufacturers production
Groove top cover block type is not easy, and the brick of timely same production after a certain time, also will do it the improvement such as technique, lead to new production
Brick it is different from the brick of tin groove roof currently in use, lead to not realize tin groove roof local replacing.Using entirety
Replacement, cost of investment are big;Integrally reuse use, there is the hidden danger influenced on glass quality after operation.
The first top cover 100, the second top cover 200 and the third top cover 300 of this tin groove roof can use different manufacturers respectively
The different brick of production;Thus during carrying out cold repair and modification to molten tin bath, by the molten tin bath of low-temperature zone part in former molten tin bath
Top cover recycling, is utilized with regard to the top cover brick that molten tin bath conforms to quality requirements to realize, reduces cost.
The utility model also provides a kind of floatation glass production line, including molten tin bath, and the molten tin bath includes molten tin bath described above
Top cover and bottom brick of molten tin bath 400;
Space 500 in slot is formed between the bottom brick of molten tin bath 400 and the tin groove roof.
The tin groove roof of tin groove roof and floatation glass production line provided by the utility model can make full use of different factories
The tin groove roof of family's production carries out overlap joint and forms the new tin groove roof that can satisfy requirement;So as to which use will have been crossed
The part tin groove roof to conform to quality requirements in the molten tin bath of the time limit is used, thus realize reuse, reduce new molten tin bath at
This
Molten tin bath corrodes serious tin groove roof by replacement high-temperature region, eliminates new kiln phase molten tin bath and generates quality to glass top surface
The hidden danger of defect;In reusing, low-temperature space tin groove roof, realize local replacing, investment reduction cost.
Finally, it should be noted that the above various embodiments is only to illustrate the technical solution of the utility model, rather than it is limited
System;Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should
Understand: it is still possible to modify the technical solutions described in the foregoing embodiments, or to some or all of
Technical characteristic is equivalently replaced;And these are modified or replaceed, it does not separate the essence of the corresponding technical solution, and this is practical new
The range of each embodiment technical solution of type.
Claims (10)
1. a kind of tin groove roof, which is characterized in that including the first top cover, the second top cover and third top cover;
First top cover, second top cover and the third top cover set gradually to form the tin groove roof;
And the lower surface of first top cover, second top cover and the third top cover is located at same level.
2. tin groove roof according to claim 1, which is characterized in that multiple suspender members are provided on first top cover,
And each described suspender member connects round steel by suspender belt,
The sunpender for Connection Bracket is provided on the round steel.
3. tin groove roof according to claim 2, which is characterized in that first top cover includes at least two first hangings
Brick main body and at least one first face brick main body;First face brick main body setting two the first hanger brick main bodys it
Between.
4. tin groove roof according to claim 3, which is characterized in that the suspender member is located at the first hanger brick main body
It is interior.
5. tin groove roof according to claim 4, which is characterized in that be provided with multiple institutes in the first hanger brick main body
Suspender member is stated, multiple suspender members are connected on the round steel by multiple suspender belts.
6. tin groove roof according to claim 3, which is characterized in that second top cover includes at least two second hangings
Brick main body and at least one second face brick main body;Second face brick main body setting two the second hanger brick main bodys it
Between.
7. tin groove roof according to claim 6, which is characterized in that wherein the first hanger brick main body and wherein one
The second hanger brick main body is adjacent.
8. tin groove roof according to claim 6, which is characterized in that the third top cover is hung including at least two thirds
Brick main body and at least one third face brick main body;Third face brick main body setting two third hanger brick main bodys it
Between.
9. tin groove roof according to claim 8, which is characterized in that a wherein third hanger brick main body and wherein one
The second hanger brick main body is adjacent.
10. a kind of floatation glass production line, which is characterized in that including molten tin bath, the molten tin bath includes any one of claim 1-9
The tin groove roof and bottom brick of molten tin bath;
Space in slot is formed between the bottom brick of molten tin bath and the tin groove roof.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820925331.XU CN208414212U (en) | 2018-06-14 | 2018-06-14 | Tin groove roof and floatation glass production line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820925331.XU CN208414212U (en) | 2018-06-14 | 2018-06-14 | Tin groove roof and floatation glass production line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208414212U true CN208414212U (en) | 2019-01-22 |
Family
ID=65108301
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820925331.XU Active CN208414212U (en) | 2018-06-14 | 2018-06-14 | Tin groove roof and floatation glass production line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208414212U (en) |
-
2018
- 2018-06-14 CN CN201820925331.XU patent/CN208414212U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208414212U (en) | Tin groove roof and floatation glass production line | |
CN204151402U (en) | A kind of vananum smelting furnace | |
CN208976814U (en) | Aluminium alloy smelting, heat preservation, casting all-in-one oven | |
CN203487279U (en) | Secondary charging device of quartz tube | |
CN101513667A (en) | Insulating block of lifting system for counter-pressure casting machine | |
CN205128912U (en) | Quick replacement immersion nozzle's fixing device | |
CN106119952A (en) | A kind of single crystal growing furnace secondary charging method | |
CN204911473U (en) | Install blowing filter equipment on resin reation kettle | |
CN205650777U (en) | Flywheel casting mould | |
CN205254067U (en) | Accuse temperature conticaster device | |
CN209664254U (en) | Tilt merotype wearing piece casting machine | |
CN204894156U (en) | Shaking table is used in pouring of pushing off slag stopper guide rod | |
CN201825849U (en) | Glass metal separating device of float glass furnace neck | |
CN203049093U (en) | Novel combined heat shield system of sapphire crystal growth furnace | |
CN210208638U (en) | Tundish current stabilizer with crescent impact surface | |
CN207787668U (en) | Automatic vacuum compression casting machine | |
CN203470831U (en) | Filter device for investment casting | |
CN205347458U (en) | Production lean slag jar for ferrovanadium | |
CN207325928U (en) | Aluminum melt processing is two-mand ladle, aluminium melt purifying system and aluminum products production system | |
CN207344795U (en) | Fused cast refractories incubator | |
CN207130348U (en) | A kind of low-temperature molten salt prepares the process units of high purity titanium | |
CN102978686A (en) | Novel composite heat screen system for sapphire crystal growing furnace | |
CN205740006U (en) | A kind of high intensity suspension and support | |
CN204823651U (en) | But balancing area bolt location hoist | |
CN203495142U (en) | Metal liquid filter device used for investment casting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |