CN208399643U CN201820926736.5U CN201820926736U CN208399643U CN 208399643 U CN208399643 U CN 208399643U CN 201820926736 U CN201820926736 U CN 201820926736U CN 208399643 U CN208399643 U CN 208399643U
Authority
CN
China
Prior art keywords
test
pcba
station
test station
manipulator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820926736.5U
Other languages
Chinese (zh)
Inventor
王浪
成攀
李凯翔
王时斌
华伟
刘焱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan New Technology Co Ltd
Original Assignee
Dongguan New Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan New Technology Co Ltd filed Critical Dongguan New Technology Co Ltd
Priority to CN201820926736.5U priority Critical patent/CN208399643U/en
Application granted granted Critical
Publication of CN208399643U publication Critical patent/CN208399643U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

PCBA test device, it is related to PCBA the field of test technology, it includes test chassis and manipulator, test chassis is equipped with the test station equipped with test equipment, the PCBA being completed is taken out from the test equipment of corresponding test station and completes blanking by manipulator, and the PCBA to be tested test equipment for moving to corresponding test station is completed into feeding, each test station setting stacked on top of one another of test chassis.Each test station of test chassis is laid out using form stacked on top of one another, is reduced the occupied area of the PCBA test device of the utility model creation, is improved space utilization rate.And since the lateral dimension of test station is bigger than longitudinal size, test station is laid out using form stacked on top of one another, the range for needing to cover when can also reduce manipulator loading and unloading, shortens the mobile overall distance of manipulator, the time required to shortening manipulator loading and unloading, production efficiency is improved.

Description

PCBA test device
Technical field
The utility model creation is related to PCBA the field of test technology.
Background technique
PCBA (printed circuit board+assembly) is PCB (printed circuit board, printing Circuit board) pass through SMT piece uploading, in the circuit board formed after DIP plug-in unit.After the completion of PCBA processing procedure, need to carry out PCBA Test, the content of test includes that can stability, safety and function be realized.
In the prior art, automation equipment is used to replace manual testing's operation substantially the test of PCBA.Existing PCBA Test device generally includes several test stations, and test equipment is equipped in test station, and test station makes planar monolayer cloth Office, occupied area is larger, and space utilization rate is not high, and needs the planar range covered also to compare when manipulator loading and unloading Greatly, the distance of overall movement is longer, and the time for causing loading and unloading to expend is longer, and production efficiency is not high.
Utility model content
In view of this, the utility model creation provides a kind of PCBA test device, occupied area is smaller, space utilization rate It is higher, and production efficiency can be improved.
To achieve the above object, the utility model, which is created, provides following technical scheme.
PCBA test device, including test chassis and manipulator, test chassis are equipped with the test station equipped with test equipment, The PCBA being completed is taken out from the test equipment of corresponding test station and completes blanking, and PCBA to be tested is moved by manipulator Test equipment to corresponding test station completes feeding, each test station setting stacked on top of one another of test chassis.
Each test station of test chassis is laid out using form stacked on top of one another, reduces the utility model creation The occupied area of PCBA test device, improves space utilization rate.And since the lateral dimension of test station compares longitudinal size Greatly, test station is laid out using form stacked on top of one another, and the range for needing to cover when can also reduce manipulator loading and unloading shortens machine The mobile overall distance of tool hand the time required to shortening manipulator loading and unloading, improves production efficiency.
Wherein, the stepped setting of each test station of test chassis, each test station is than test work below Position is more posteriorly.In this way, will not block lower section test device when the test device of test station releases jig, manipulator is mobile The test station of lower section is operated, without doing avoidance movement, reduces manipulator mobile time and distance, further mentions High efficiency.
It wherein, further include being arranged side by side from front to back qualified product blanking conveyer belt, feeding conveyer belt and defective products blanking transmission Band, feeding conveyer belt are located between qualified product blanking conveyer belt and defective products blanking conveyer belt.Manipulator is once travelled to and fro between up and down Expect the movement in region and test station achievable feeding and blanking, two blanking conveyer belts and a feeding conveyer belt are arranged side by side And feeding conveyer belt is located at centre, can reduce the moving distance of manipulator, further increase production efficiency.
Wherein, it is penetrated through before and after test chassis is at each test station.In this way, test device and tested PCBA both may be used It is picked and placed from front, can also be picked and placed from rear, carry out artificial detection when facilitating the replacement and failure of jig.
Wherein, there is gap between each test station.The installation of the arrangement, test equipment that can be used for equipment cable is put It sets.
Detailed description of the invention
Fig. 1 is the schematic perspective view for the PCBA test device that the utility model is created;
Fig. 2 is a kind of structural schematic diagram of embodiment of test chassis.
Appended drawing reference includes:
Test chassis 1, test station 11, test equipment 12;
Manipulator 2 executes end 21;
Feeding conveyer belt 31, qualified product blanking conveyer belt 32, defective products blanking conveyer belt 33;
PCBA 4。
Specific embodiment
It elaborates below in conjunction with specific embodiment to the utility model creation.
As shown in Figure 1, the PCBA test device of the present embodiment includes test chassis 1 and manipulator 2, test chassis 1 is equipped with Test station 11 equipped with test equipment 12, manipulator 2 set the PCBA 4 being completed from the test of corresponding test station 11 Standby 12 take out completion blanking, and the PCBA 4 to be tested test equipment 12 for moving to corresponding test station 11 is completed feeding, Fig. 1 In, there are two test chassis 1 or so to be arranged side by side, the setting stacked on top of one another of each test station 11 of each test chassis 1.Test Each test station 11 of rack 1 is laid out using form stacked on top of one another, reduces the PCBA test dress of the utility model creation The occupied area set, improves space utilization rate.And since the lateral dimension of test station 11 is bigger than longitudinal size, work is tested Position 11 is laid out using form stacked on top of one another, and the range for needing to cover when can also reduce 2 loading and unloading of manipulator shortens manipulator 2 Mobile overall distance the time required to shortening 2 loading and unloading of manipulator, improves production efficiency.
Referring to Fig. 1, the PCBA test device of the present embodiment further include be arranged side by side from front to back qualified product blanking conveyer belt 32, Feeding conveyer belt 31 and defective products blanking conveyer belt 33, feeding conveyer belt 31 are located under qualified product blanking conveyer belt 32 and defective products Expect between conveyer belt 33.Manipulator 2 once travels to and fro between the movement in loading and unloading region and test station 11 achievable feeding and blanking, The execution end 21 of manipulator 2 is equipped with two groups of suckers side by side, and every group of sucker can draw one piece of PCBA, executes that end 21 is rotatable to be made Above-mentioned two groups of suckers exchange position, and two blanking conveyer belts and a feeding conveyer belt 31 are arranged side by side and feeding conveyer belt 31 In centre, manipulator 2 is moved to where three conveyer belts after taking out the PCBA 4 being completed from a upper test station 11 The execution end 21 in loading and unloading region, manipulator 2 rotates, and so that one group of idle sucker is located at 31 top of feeding conveyer belt, draws The one group of sucker for the PCBA 4 being completed is located at the top of one of two blanking conveyer belts, is specifically dependent upon the sucker The PCBA 4 being completed drawn is qualified product or defective products, and the execution end 21 of manipulator 2 is completed trusting While 4 PCBA, one group of idle sucker has drawn a new PCBA 4 to be tested, and then manipulator 2 is moved to next A test station 11 that carry out blanking feeding operation so recycles.Three conveyer belts are so set, manipulator 2 can be reduced Moving distance further increases production efficiency.
Test chassis 1 at each test station 11 before and after penetrate through, in this way, test device and tested PCBA both can be from Front picks and places, and can also pick and place from rear, carry out artificial detection when facilitating the replacement and failure of jig.Each test station 11 Between there is gap, can be used for the arrangement of equipment cable, the installation of test equipment is placed.
Further, as shown in Fig. 2, in another embodiment, each test station 11 of test chassis 1 is stepped Setting, each test station 11 is more posteriorly than test station 11 below.In this way, the test device in test station 11 is released When jig, lower section test device will not be blocked, the movement of manipulator 2 operates the test station 11 of lower section, without doing avoidance Movement reduces the mobile time of manipulator 2 and distance, further increases production efficiency.
Finally it should be noted that above embodiments are only to illustrate the technical solution of the utility model creation, rather than it is right The utility model creates the limitation of protection scope, although having made in detail referring to preferred embodiment to the utility model creation It is bright, those skilled in the art should understand that, the technical solution that can be created to the utility model is modified or is waited With replacement, the spirit and scope of technical solution is created without departing from the utility model.

Claims (5)

1.PCBA test device, including test chassis and manipulator, test chassis are equipped with the test station equipped with test equipment, machine The PCBA being completed is taken out from the test equipment of corresponding test station and completes blanking by tool hand, and PCBA to be tested is moved to The test equipment of corresponding test station completes feeding, characterized in that each test station setting stacked on top of one another of test chassis.
2. PCBA test device according to claim 1, characterized in that each test station of test chassis is stepped Setting, each test station is more posteriorly than test station below.
3. PCBA test device according to claim 1, characterized in that further include being arranged side by side from front to back qualified product blanking Conveyer belt, feeding conveyer belt and defective products blanking conveyer belt, feeding conveyer belt are located under qualified product blanking conveyer belt and defective products Expect between conveyer belt.
4. PCBA test device according to claim 1, characterized in that test chassis at each test station before and after pass through It is logical.
5. PCBA test device according to claim 1, characterized in that have gap between each test station.
CN201820926736.5U 2018-06-13 2018-06-13 PCBA test device Expired - Fee Related CN208399643U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820926736.5U CN208399643U (en) 2018-06-13 2018-06-13 PCBA test device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820926736.5U CN208399643U (en) 2018-06-13 2018-06-13 PCBA test device

Publications (1)

Publication Number Publication Date
CN208399643U true CN208399643U (en) 2019-01-18

Family

ID=65132441

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820926736.5U Expired - Fee Related CN208399643U (en) 2018-06-13 2018-06-13 PCBA test device

Country Status (1)

Country Link
CN (1) CN208399643U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108459266A (en) * 2018-06-13 2018-08-28 东莞新友智能科技有限公司 PCBA test devices
CN110031750A (en) * 2019-05-22 2019-07-19 格云特自动化科技(深圳)有限公司 Full-automatic route board test apparatus

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108459266A (en) * 2018-06-13 2018-08-28 东莞新友智能科技有限公司 PCBA test devices
CN110031750A (en) * 2019-05-22 2019-07-19 格云特自动化科技(深圳)有限公司 Full-automatic route board test apparatus
CN110031750B (en) * 2019-05-22 2021-08-31 格云特自动化科技(深圳)有限公司 Full-automatic circuit board test equipment

Similar Documents

Publication Publication Date Title
CN204749476U (en) Automatic silk screen printing equipment of going up unloading in duplex position
CN207061313U (en) One kind is used for the full-automatic loading and unloading systems of AOI
CN208399643U (en) PCBA test device
CN105314422A (en) Circuit board testing system
CN108459266A (en) PCBA test devices
CN203688458U (en) PCB (printed circuit board) appearance detection machine
CN104555396A (en) Automatic loading and unloading mechanism and method for PCB processing and detection device
CN104730466A (en) Battery ATE and BQ testing integrated automatic testing machine
CN105372510A (en) Automatic shielding test device for four-shaft direct manipulator
CN108974938A (en) Inclined automatic turnover device
CN107454820A (en) A kind of inserter
CN104275946A (en) Marking device
CN205111563U (en) Grinding machine feeding agencies
CN204305474U (en) Adopt pcb board plug-in mounting equipment and the production line thereof of robot
CN207030394U (en) One kind is used for dual stage AOI loading and unloading equipment
CN203435237U (en) Flexible circuit board film removing device
CN203912340U (en) Chip mounter
CN207808794U (en) A kind of transfer matic PCB circuit board print platform clamping device
CN211878027U (en) PCBA testing arrangement
CN214622359U (en) Intelligent cyclic motion detection equipment
CN207070598U (en) A kind of inserter
CN209266279U (en) Keyboard spare part automatic assembly equipment
CN209731726U (en) Pcb board welding resistance spray printing windowing automatic assembly line
CN209062343U (en) A kind of Novel welding machine
CN208175116U (en) A kind of loading and unloading system for PCB full automatically punching

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190118

Termination date: 20210613