CN208395813U - A kind of grouting behind shaft or drift lining system increasing perfusion shaft resistance - Google Patents

A kind of grouting behind shaft or drift lining system increasing perfusion shaft resistance Download PDF

Info

Publication number
CN208395813U
CN208395813U CN201820683874.5U CN201820683874U CN208395813U CN 208395813 U CN208395813 U CN 208395813U CN 201820683874 U CN201820683874 U CN 201820683874U CN 208395813 U CN208395813 U CN 208395813U
Authority
CN
China
Prior art keywords
grouting
pipe
pressure
slip casting
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820683874.5U
Other languages
Chinese (zh)
Inventor
陈家骐
胡明明
华建兵
段园煜
司大雄
孙爱琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei University
Hefei College
Original Assignee
Hefei College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei College filed Critical Hefei College
Priority to CN201820683874.5U priority Critical patent/CN208395813U/en
Application granted granted Critical
Publication of CN208395813U publication Critical patent/CN208395813U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of grouting behind shaft or drift lining systems for increasing perfusion shaft resistance, the utility model passes through grouting pressure pipe, annular Grouting Pipe and slip casting bar are to pile body by the way of high-pressure slip-casting, it is that pile concrete is squeezed to soil around pile soil side, pile body generates cyclic annular protuberance, annular concrete structure is formed on the outside of pile body, improve the pressure between stake soil and improves the coefficient of friction between stake and soil around pile, to achieve the purpose that improve pile bearing capacity.Wherein grouting pressure pipe is equipped with necking section, can increase leakproofness when slip casting;Slip casting bar uses special designing, and stability when improving closure when slip casting, and increasing slip casting prevents slip casting bar from generating torsion due to pressure in Grouting Pipe.Grouting system and slurry injection technique in the utility model are used in the long bored concrete pile of various soil layers, different-diameter size and piles with different, and construction technology is simple, and construction method and used material of constructing are flexible and changeable, are convenient for universal and promote.

Description

A kind of grouting behind shaft or drift lining system increasing perfusion shaft resistance
Technical field
The utility model relates to pile foundation engineering and pile foundation reinforcement technical fields more particularly to a kind of increase, and shaft resistance is perfused Grouting behind shaft or drift lining system.
Background technique
With the development of the times, the increase of population, not only the quantity of skyscraper is increasing both at home and abroad, but also high level is built The total height built is also higher and higher, this means that the development for pushing high-bearing capacity deep foundation seems especially in field of civil engineering It is important.So at home and abroad in civil construction project, bored concrete pile using very universal.But since China's geological conditions is multiple It is miscellaneous, can not accomplish all bored concrete piles may be designed to for end-bearing pile or friction end-bearing pile stake, especially in coastal area, friction pile It is more common with point friction pile.
The bearing capacity of stake consists of two parts, side skin friction and end resistance including stake, for friction pile, stake Bearing capacity mainly completed by side skin friction, physically the fundamental formular of frictional resistance is: F- μ N
In above-mentioned formula μ this be to determine that pile body is more coarse by the degree of roughness of pile body, pile body and soil around pile it is opposite Friction coefficient μ is bigger;This is to determine that pressure is bigger by the pressure between pile body and soil around pile to the N of above-mentioned formula, friction resistance Power is bigger.
The so-called grouting system for increasing perfusion shaft resistance and method are the methods for using high-pressure slip-casting to pile body, make pile body Concrete is squeezed to soil around pile soil side, and pile body generates cyclic annular protuberance, is formed annular concrete structure on the outside of pile body, is improved stake soil Between pressure and improve the coefficient of friction between stake and soil around pile, thus achieve the purpose that improve pile bearing capacity.
Utility model content
The utility model aim is exactly in order to make up the defect of prior art, after providing a kind of increase perfusion shaft resistance Grouting system.
The utility model is achieved through the following technical solutions:
A kind of grouting behind shaft or drift lining system increasing perfusion shaft resistance includes slip casting hose, grouting pressure pipe and annular slip casting Pipe, is provided with pressure pipe grout outlet on the grouting pressure pipe, slip casting bar, the note is equipped with inside grouting pressure pipe Slurry hose is connect with the top of slip casting bar, and slip casting bar slurry outlet is provided on slip casting bar, is provided with Grouting Pipe in annular Grouting Pipe Stock inlet and Grouting Pipe grout outlet, the pressure pipe grout outlet are connected to Grouting Pipe stock inlet, and mud enters from slip casting hose In slip casting bar, enter inside grouting pressure pipe from slip casting bar slurry outlet, then enter in annular Grouting Pipe from pressure pipe grout outlet, most Mud is gone out from Grouting Pipe grout outlet afterwards.
The grouting pressure tube cavity wall is set there are three the axial card slot being centrosymmetric, and grouting pressure inside pipe wall is every Every 2m at micro-necking contracting shape, a pressure pipe grout outlet is equipped at every section of micro-necking contracting shape.
The slip casting bar is made of pulp steel pipe, two closed heads, bowl-shape stop grouting plug and pie stop grouting plug, described Several slip casting bar slurry outlets are provided on pulp steel pipe, two closed heads are separately fixed at pulp steel pipe both ends, in closed head Side passes through adjustable spring respectively and is connected with three corresponding with three card slots of the grouting pressure inside pipe wall symmetrically Pulley, pulley are stuck in the card slot of grouting pressure pipe and slide, and the diameter of the bowl-shape stop grouting plug and pie stop grouting plug is greater than note Starch pressure micro-necking contracting shape section diameter and less than grouting pressure pipe diameter, after slip casting bar is put into grouting pressure pipe by when slip casting, bowl Shape stop grouting plug and pie stop grouting plug form a chamber with the inner wall of grouting pressure pipe micro-necking contracting shape section respectively, and the slip casting is soft Pipe is connect with the top of pulp steel pipe.
The closed head is the pie being formed from steel, and the pulley is wrapped up with rubber material, it is described it is bowl-shape only Slurry plug and pie stop grouting plug are made of high elastic rubber material.
There are two centrosymmetric Grouting Pipe stock inlet and several equidistant Grouting Pipes in the annular Grouting Pipe Grout outlet, Grouting Pipe stock inlet connect with pressure pipe grout outlet, check-valves are equipped in each Grouting Pipe stock inlet, in each slip casting Pipe grout outlet is equipped with one-way pressure valve.
One-way pressure valve described in several is equidistantly mounted on Grouting Pipe grout outlet, several one-way pressure valves are dehisced In arranging clockwise or counter-clockwise, one-way pressure valve is steel thin slice, and one end of steel thin slice is fixed on annular by reinforcing stirrup In Grouting Pipe, the other end is according to suffered pressure inlet wire opening and closing, and when by external pressure, one-way pressure valve is in envelope Closed state, by when internal certain pressure be in open configuration.
The utility model has the advantages that: (1) grouting system and slurry injection technique and other technology phase that the utility model use Than can more effectively increase the pressure and coefficient of friction between stake and soil around pile, can effectively improve bored concrete pile and especially rub Wipe the bearing capacity of bored concrete pile;
(2) one-way pressure valve in the annular Grouting Pipe in the utility model is dehisced in equidistant clockwise or counter-clockwise From being arranged in annular Grouting Pipe, uniformity when injection mud is increased, and outside annular Grouting Pipe internal pressure is greater than It is opened automatically when portion's pressure, folding size can be controlled by grouting pressure, certainly when internal pressure is less than external pressure Dynamic closure can prevent after stopping slip casting, due to overpressure forfeiture caused by mud reflux and prevent pile body coagulation Soil flow enters pipe internal congestion pipeline, increases grouting quality and efficiency;
(3) it is equipped with check-valves in the annular Grouting Pipe stock inlet in the utility model, has mud injection in annular Grouting Pipe When open, no mud inject when, due to annular Grouting Pipe internal pressure and be closed automatically, to prevent ring-shaped pouring Mud in slurry pipe flows back into grouting pressure pipe, ensure that slip casting efficiency;
(4) diameter of the grouting pressure pipe necking section of the utility model is slightly less than the stop grouting plug diameter of slip casting bar, Ke Yigeng The closure of good raising stop grouting plug, easily controllable grouting pressure;
(5) stop grouting plug of the slip casting bar of the utility model omits the common section diameter that diameter is less than grouting pressure pipe, completes After the slip casting of grouting pressure pipe necking section, slip casting can be continued while slip casting bar continues to move up, mud passes through the sum of stop grouting plug Gap between the common section of grouting pressure pipe is sprayed downwards, and grouting is compensated, and guarantees continuous grouting in work progress, is improved The working efficiency of entire grouting behind shaft or drift lining system, improves construction quality.
(6) pulley being arranged on the slip casting rod seal head in the utility model is due to using spring to connect, in slip casting bar (figure 8) pulley can be squeezed inwardly when passing through grouting pressure pipe necking section, when slip casting bar passes through the common section of grouting pressure pipe Waiting pulley can flick again, since slip casting rod seal head is equipped with pulley and being stuck in slot, can to avoid when slip casting due to pressure The vibration that effect and hoisting grouting bar generate causes slip casting hose caused by slip casting hose twisting to damage;
(7) the grouting pressure pipe in the utility model is provided with multiple grout outlets along stake length direction and is connected to annular Grouting Pipe, It is constructed using the grouting behind shaft or drift lining that bored concrete pile different depth requirement can be completed in mobile slip casting of the slip casting bar in two grouting pressure pipes, and Traditional grouting behind shaft or drift lining system is compared, and buries more Grouting Pipes different in size without the slip casting demand according to different depth, is reduced Influence of the built-in slip casting pipe to pile body;
(8) the steel closed head in the utility model can be in high-pressure slip-casting for fixing only starching for high-tension rubber Plug, avoids in high-pressure slip-casting, only starches caused by the cavity indoor pressure that two stop grouting plugs and grouting pressure pipe necking section are formed Plug deformation turns over, and improves airtightness;
(9) grouting system in the utility model and slurry injection technique are used in various soil layers, different-diameter size and difference The long bored concrete pile of stake, construction technology is simple, and construction method and used material of constructing are flexible and changeable, is convenient for universal and promotes.
Detailed description of the invention
Fig. 1 is the axial section of the grouting pressure pipe of the utility model.
Fig. 2 is the A-A sectional view of the grouting pressure pipe of the utility model.
Fig. 3 is schematic diagram when the one-way pressure valve collective in the annular Grouting Pipe of the utility model opens.
Fig. 4 is one-way pressure valve closed state schematic diagram in the utility model annular Grouting Pipe.
Fig. 5 be in the utility model annular Grouting Pipe one-way pressure valve by internal pressure open configuration schematic diagram.
Fig. 6 is the non-return valve closure schematic diagram of the utility model annular Grouting Pipe stock inlet.
Fig. 7 is that schematic diagram is opened in the check-valves compression of the utility model annular Grouting Pipe stock inlet.
Fig. 8 is the utility model slip casting rod structure schematic diagram.
Fig. 9 is the utility model slip casting rod seal head schematic top plan view.
Figure 10 is that the utility model slip casting rod seal head is caught in grouting pressure pipe clamp slot schematic diagram.
Figure 11 is the utility model pulley spring connection schematic top plan view.
Figure 12 is schematic top plan view when the utility model pulley is squeezed.
Figure 13 is the schematic diagram that the utility model slip casting bar passes through the common section of grouting pressure pipe.
Figure 14 is the schematic diagram that the utility model slip casting bar passes through grouting pressure pipe necking section.
Figure 15 is the pile body schematic diagram formed after the utility model is constructed.
Specific embodiment
As represented in figures 1 through 14, a kind of grouting behind shaft or drift lining system increasing perfusion shaft resistance, includes slip casting hose 10, slip casting pressure Solenoid 8 and annular Grouting Pipe 4, are provided with pressure pipe grout outlet 2 on the grouting pressure pipe 8, pacify inside grouting pressure pipe 8 Equipped with slip casting bar, the slip casting hose 10 is connect with the top of slip casting bar, and slip casting bar slurry outlet 16 is provided on slip casting bar, It is provided with Grouting Pipe stock inlet 5 and Grouting Pipe grout outlet in annular Grouting Pipe 4, the pressure pipe grout outlet 2 and Grouting Pipe are into slurry Mouth 5 is connected to, and mud enters in slip casting bar from slip casting hose 10, is entered inside grouting pressure pipe 8 from slip casting bar slurry outlet 16, then Enter in annular Grouting Pipe 4 from pressure pipe grout outlet 2, final slurry is gone out from Grouting Pipe grout outlet.
As shown in Figure 1, 2,8 internal chamber wall of grouting pressure pipe is set there are three the axial card slot 3 being centrosymmetric, and is infused 8 inner wall of pressure pipe is starched every 2m into micro-necking contracting shape 1, is equipped with a pressure pipe grout outlet 2 at every section of micro-necking contracting shape 1.
As shown in Fig. 8,9,10,11,12, the slip casting bar is by pulp steel pipe 11, two closed heads 12, bowl-shape stop grouting plugs 14 and pie stop grouting plug 15 form, several slip casting bar slurry outlets 16, two closed heads are provided on the pulp steel pipe 11 12 are separately fixed at 11 both ends of pulp steel pipe, pass through adjustable spring 17 respectively in the side of closed head 12 and are connected with and the note Three card slots 3 corresponding three symmetrical pulleys 13 of 8 inner wall of pressure pipe are starched, pulley 13 is stuck in the card slot 3 of grouting pressure pipe 8 The diameter of interior sliding, the bowl-shape stop grouting plug 14 and pie stop grouting plug 15 be greater than 1 diameter of grouting pressure micro-necking contracting shape section and Less than 8 diameter of grouting pressure pipe, after slip casting bar is put into grouting pressure pipe 8 by when slip casting, bowl-shape stop grouting plug 14 and pie stop grouting plug 15 form a chamber, as shown in Figure 13,14, the slip casting hose with the inner wall of grouting pressure pipe micro-necking contracting shape section 1 respectively 10 connect with the top of pulp steel pipe 11.
The closed head 12 is the pie being formed from steel, and the pulley 13 is wrapped up with rubber material, the bowl Shape stop grouting plug 14 and pie stop grouting plug 15 are made of high elastic rubber material.
As shown in figure 3, in the annular Grouting Pipe 4 there are two centrosymmetric Grouting Pipe stock inlet 5 and several etc. The Grouting Pipe grout outlet of spacing, Grouting Pipe stock inlet 5 connect with pressure pipe grout outlet 2, are equipped with only in each Grouting Pipe stock inlet 5 Valve 9 is returned, as shown in Figure 6,7, is equipped with one-way pressure valve 6 in each Grouting Pipe grout outlet.
As shown in Figure 4,5, the one-way pressure valve 6 described in several is equidistantly mounted on Grouting Pipe grout outlet, several One-way pressure valve 6 is dehisced in arranging clockwise or counter-clockwise, and one-way pressure valve 6 is steel thin slice, and one end of steel thin slice is by adding Gu stirrup 7 is fixed in annular Grouting Pipe 4, the other end be according to suffered pressure inlet wire opening and closing, by external pressure when Wait, one-way pressure valve be in closed state, by when internal certain pressure in open configuration.
A kind of post-grouting method increasing perfusion shaft resistance, comprising the following steps:
1) one-way pressure valve 6 is installed on annular Grouting Pipe grout outlet, and is bound securely with thin stirrup 7, one-way pressure valve 6 During construction, opened automatically since internal pressure is greater than external pressure, one-way pressure valve 6 is less than in internal pressure Be closed automatically when external pressure, can prevent stop slip casting after due to overpressure forfeiture caused by mud flow back, improve The quantity of construction success rate, annular Grouting Pipe grout outlet is determined that general pile body diameter is bigger by pile body diameter and concrete strength, Required grout outlet quantity is more;The opening direction of one-way pressure valve 6 is in annular Grouting Pipe 4 in the clockwise or inverse time Needle is equidistantly arranged;
2) annular Grouting Pipe 4 is installed on the outside of steel reinforcement cage, installs one every 2m or so, clipping room is away from according to practical pile foundation The needs of bearing capacity and the distribution situation of soil layer can be adjusted, and annular Grouting Pipe 4 is tied up by steel wire and pile body steel reinforcement cage Fasten solid, floating when preventing casting concrete;
3) two grouting pressure pipes 8 in a manner of centrosymmetric with steel wire lashing on the outside of steel cage, grouting pressure pipe pulp Mouth 2 is connected with annular Grouting Pipe stock inlet 5 with casing, check-valves 9 is equipped in annular Grouting Pipe stock inlet 5, in annular slip casting The when opening that pipe 4 has mud injection to generate pressure, when no mud injects, due to the inside of annular Grouting Pipe 4 itself Pressure and be closed automatically, to prevent the mud in annular Grouting Pipe 4 from flowing back into grouting pressure pipe 8, ensure that slip casting it is unobstructed with And construction efficiency;From grouting pressure pipe top nozzle injected clear water, its leakproofness is tested;
4) slip casting bar is installed from 8 bottom of grouting pressure pipe, the pulley 13 on slip casting bar is stuck in card slot 3, and connects slip casting The end of hose 10, slip casting hose 10 is stretched out and is closed from 8 head of grouting pressure pipe, and before hanging steel reinforcement cage, slip casting bar is pre- 8 bottom of grouting pressure pipe is first set, after concreting finishes 12h, can directly pull slip casting bar from bottom to top, is such as schemed Shown in 8, grouting behind shaft or drift lining construction is carried out;Pulley 13 is connected using spring 17, when slip casting bar passes through grouting pressure pipe necking section 1 Pulley 13 can be squeezed inwardly, and pulley 13 can flick again when slip casting bar passes through 8 common sections of grouting pressure pipe, due to note Slurry rod seal head 12, which is equipped with, pulley 13 and to be stuck in slot, can to avoid hoisting grouting bar during the vibration that generates cause The torsion of slip casting hose 10, so as to cause the damage of slip casting hose 10
5) guide-localization casing, drill hole of drilling machine pile are set;
6) steel reinforcement cage is hung, casting concrete simultaneously configures mud;
7) after concreting finishes 12 hours, slip casting hose 10 is connected with grouting pump;
8) slip casting hose 10 is slowly moved up, allows the bowl-shape stop grouting plug 14 and pie stop grouting plug 15 and grouting pressure of slip casting bar The chamber that 8 necking section 1 of pipe is formed is aligned grouting pressure pipe grout outlet 2;
9) grouting pump extracts mud out out of mud pit, and mud pours into slip casting bar by slip casting hose 10 using high pressure, infuses Need to be arranged pressure gauge real time monitoring grouting pressure during entering, the depth of general annular Grouting Pipe 4 is deeper, and when slip casting is required Pressure it is bigger;
10) mud is discharged slip casting bar slurry outlet 16, and pressure is formed in chamber of the mud of discharge described in step 8), and It is poured into annular Grouting Pipe 4 by the check-valves of grouting pressure pipe grout outlet 2 and annular Grouting Pipe 4;
11) one-way pressure valve 6 in annular Grouting Pipe 4 is opened by the internal pressure that mud generates, and mud passes through list To pressure valve 6, injection squeezes pile concrete outward, and pile concrete swells outward under the action of spraying mud;
12) pile concrete can be squeezed from the mud that one-way pressure valve 6 sprays, makes concrete outwardly against the soil body, increases Pressure between stake soil, and under the action of several one-way pressure valve 6 of equidistant arrangement clockwise or counter-clockwise, So that forming ring structure around pile body, increase the degree of roughness of pile body, to change the coefficient of friction of stake and soil around pile;
13) after mud injection reaches after certain standard, slip casting bar is moved up, and continue slip casting, the stop grouting plug of slip casting bar Diameter is slightly less than the common section diameter of grouting pressure pipe 8, complete grouting pressure pipe 8 necking section slip casting after, slip casting bar after Slip casting can be continued by continuing while moving up, mud is downward by the gap between the common section of grouting pressure pipe 8 of stop grouting plug Injection compensates grouting, guarantees continuous grouting in work progress, improves the working efficiency of entire grouting behind shaft or drift lining system, raising is applied Working medium amount;11) when slip casting bar reaches next 8 necking section 1 of grouting pressure pipe, step 8) 9) 10) is repeated;
14) after all annular Grouting Pipe (4) slip castings of pile body, continue grouting under pressure from 8 nozzle of grouting pressure pipe, make It is more closely knit to obtain mud;
(15) after slip casting reaches preassigned, stop slip casting, complete to increase perfusion shaft resistance post grouting process, such as Figure 15 It is shown, for construction after pile body schematic diagram, wherein 18 be bored concrete pile pile body, 19 be the concrete knot that is formed after constructing Structure.

Claims (6)

1. it is a kind of increase perfusion shaft resistance grouting behind shaft or drift lining system, it is characterised in that: include slip casting hose, grouting pressure pipe and Annular Grouting Pipe is provided with pressure pipe grout outlet on the grouting pressure pipe, slip casting bar is equipped with inside grouting pressure pipe, The slip casting hose is connect with the top of slip casting bar, and slip casting bar slurry outlet is provided on slip casting bar, is opened in annular Grouting Pipe There are Grouting Pipe stock inlet and Grouting Pipe grout outlet, the pressure pipe grout outlet is connected to Grouting Pipe stock inlet, and mud is from slip casting Hose enters in slip casting bar, enters inside grouting pressure pipe from slip casting bar slurry outlet, then enter ring-shaped pouring from pressure pipe grout outlet It starches in pipe, final slurry is gone out from Grouting Pipe grout outlet.
2. a kind of grouting behind shaft or drift lining system for increasing perfusion shaft resistance according to claim 1, it is characterised in that: the note Slurry pressure pipe internal chamber wall is set there are three the axial card slot being centrosymmetric, grouting pressure inside pipe wall every 2m at micro-necking contracting shape, A pressure pipe grout outlet is equipped at every section of micro-necking contracting shape.
3. a kind of grouting behind shaft or drift lining system for increasing perfusion shaft resistance according to claim 2, it is characterised in that: the note Slurry bar is made of pulp steel pipe, two closed heads, bowl-shape stop grouting plug and pie stop grouting plug, if being provided on the pulp steel pipe Dry slip casting bar slurry outlet, two closed heads are separately fixed at pulp steel pipe both ends, pass through respectively in the side of closed head flexible Spring is connected with three symmetrical pulleys corresponding with three card slots of the grouting pressure inside pipe wall, and pulley is stuck in slip casting The diameter of sliding in the card slot of pressure pipe, the bowl-shape stop grouting plug and pie stop grouting plug is greater than grouting pressure micro-necking contracting shape Duan Zhi Diameter and it is less than grouting pressure pipe diameter, after slip casting bar is put into grouting pressure pipe by when slip casting, bowl-shape stop grouting plug and pie are only starched Plug forms a chamber, the top of the slip casting hose and pulp steel pipe with the inner wall of grouting pressure pipe micro-necking contracting shape section respectively Connection.
4. a kind of grouting behind shaft or drift lining system for increasing perfusion shaft resistance according to claim 3, it is characterised in that: the envelope Closing head is the pie being formed from steel, and the pulley is wrapped up with rubber material, the bowl-shape stop grouting plug and pie stop grouting plug It is made of high elastic rubber material.
5. a kind of grouting behind shaft or drift lining system for increasing perfusion shaft resistance according to claim 3, it is characterised in that: the ring There are two centrosymmetric Grouting Pipe stock inlet and several equidistant Grouting Pipe grout outlets in shape Grouting Pipe, Grouting Pipe is into slurry Mouth connects with pressure pipe grout outlet, is equipped with check-valves in each Grouting Pipe stock inlet, is equipped in each Grouting Pipe grout outlet unidirectional Pressure valve.
6. a kind of grouting behind shaft or drift lining system for increasing perfusion shaft resistance according to claim 5, it is characterised in that: several institutes The one-way pressure valve stated equidistantly is mounted on Grouting Pipe grout outlet, several one-way pressure valves were dehisced in the clockwise or inverse time Needle arrangement, one-way pressure valve are steel thin slice, and one end of steel thin slice is fixed in annular Grouting Pipe by reinforcing stirrup, and the other end is According to suffered pressure inlet wire opening and closing, when by external pressure, one-way pressure valve is in closed state, by internal certain Open configuration is in when pressure.
CN201820683874.5U 2018-05-09 2018-05-09 A kind of grouting behind shaft or drift lining system increasing perfusion shaft resistance Expired - Fee Related CN208395813U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820683874.5U CN208395813U (en) 2018-05-09 2018-05-09 A kind of grouting behind shaft or drift lining system increasing perfusion shaft resistance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820683874.5U CN208395813U (en) 2018-05-09 2018-05-09 A kind of grouting behind shaft or drift lining system increasing perfusion shaft resistance

Publications (1)

Publication Number Publication Date
CN208395813U true CN208395813U (en) 2019-01-18

Family

ID=65062927

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820683874.5U Expired - Fee Related CN208395813U (en) 2018-05-09 2018-05-09 A kind of grouting behind shaft or drift lining system increasing perfusion shaft resistance

Country Status (1)

Country Link
CN (1) CN208395813U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108360510A (en) * 2018-05-09 2018-08-03 合肥学院 A kind of grouting behind shaft or drift lining system and method increasing perfusion shaft resistance
CN113309086A (en) * 2021-06-03 2021-08-27 湖南源源生态工程集团有限公司 High-pressure rotary spraying grouting device for hands-free pipe
CN114411719A (en) * 2022-02-15 2022-04-29 浙江意力管业科技有限公司 Corrosion-resistant impervious prestressed concrete pipe pile

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108360510A (en) * 2018-05-09 2018-08-03 合肥学院 A kind of grouting behind shaft or drift lining system and method increasing perfusion shaft resistance
CN108360510B (en) * 2018-05-09 2024-04-05 合肥学院 Post grouting system and method for increasing side friction of cast-in-place pile
CN113309086A (en) * 2021-06-03 2021-08-27 湖南源源生态工程集团有限公司 High-pressure rotary spraying grouting device for hands-free pipe
CN113309086B (en) * 2021-06-03 2023-12-22 湖南源源生态工程集团有限公司 High-pressure jet grouting device for hands-free pipe
CN114411719A (en) * 2022-02-15 2022-04-29 浙江意力管业科技有限公司 Corrosion-resistant impervious prestressed concrete pipe pile
CN114411719B (en) * 2022-02-15 2023-11-17 浙江意力管业科技有限公司 Corrosion-resistant impervious prestressed concrete pipe pile

Similar Documents

Publication Publication Date Title
CN208395813U (en) A kind of grouting behind shaft or drift lining system increasing perfusion shaft resistance
JP7142835B2 (en) Pile bottom grouting chamber and method of use, and cast-in-place pile body and construction method thereof
CN108457266B (en) Post-grouting device and method for pile side of cast-in-place pile
CN104727319A (en) Slope self-drainage anchor rod and construction method
CN109989396A (en) In conjunction with the novel extruding-enlarging branch tray molding machine and its operating method of post grouting process
CN104790392A (en) Construction device and method for reverse bamboo joint type anti-floating anchor rod
CN201770981U (en) Tube-side injection grouting apparatus for simultaneous drilling pipe pile
CN107513995A (en) A kind of bridge struction pile post grouting construction method
CN107747312A (en) A kind of method of sand and gravel stratum well cementing construction
CN107761722A (en) A kind of device and method for improving steel-pipe pile stake side bearing capacity
CN103114578B (en) Grouting molding pedestal pile and construction method thereof and pedestal expanding device
CN108360510A (en) A kind of grouting behind shaft or drift lining system and method increasing perfusion shaft resistance
CN204475326U (en) The construction equipment of anti-slub type anti-float anchor rod
CN103603337A (en) Grouting precast pile and grouting method
CN206337556U (en) A kind of grouting behind shaft or drift lining Prefabricated hollow pile
CN104929108A (en) Construction method of hard soil field PCC pile
CN206205007U (en) A kind of building underground structure leakage-resistant device
CN205999941U (en) A kind of underground continuous wall section attachment means
CN106869117A (en) A kind of steel-pipe pile stake bottom pre-load means and method
CN212129147U (en) Multi-section sleeve valve pipe layered grouting device
CN210266039U (en) Active ejection type pile end rear grouting valve
CN207919560U (en) The grouting behind shaft or drift lining cast-in-situ concrete thin-wall of reserved grouting pipeline
CN207538058U (en) A kind of soft rock base cut-pff wall cell bottom structure
KR100990321B1 (en) Groundwater inflow decelerating type pipe pile
CN110485478A (en) A kind of casting head and its application method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190118