CN106869117A - A kind of steel-pipe pile stake bottom pre-load means and method - Google Patents

A kind of steel-pipe pile stake bottom pre-load means and method Download PDF

Info

Publication number
CN106869117A
CN106869117A CN201710056469.0A CN201710056469A CN106869117A CN 106869117 A CN106869117 A CN 106869117A CN 201710056469 A CN201710056469 A CN 201710056469A CN 106869117 A CN106869117 A CN 106869117A
Authority
CN
China
Prior art keywords
mud jacking
steel
pipe pile
tube loop
bottom pre
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710056469.0A
Other languages
Chinese (zh)
Inventor
刘斌
潘军
刘建华
余本俊
耿树成
徐平安
熊世坤
李帅举
孙刘洋
倪宇
周琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd MBEC filed Critical China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority to CN201710056469.0A priority Critical patent/CN106869117A/en
Publication of CN106869117A publication Critical patent/CN106869117A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of steel-pipe pile stake bottom pre-load means and method, the device includes:Mud jacking pipe support in the steel-pipe pile;Multigroup mud jacking tube loop, mud jacking tube loop is fixedly arranged on the mud jacking pipe support, and the outlet of every group of mud jacking tube loop is equipped with first pressure table and the first ball valve;The mud jacking external member of the mud jacking tube loop bottom is sheathed on, hole straight down is provided with mud jacking external member;Slip casting current divider, slip casting current divider includes a stock inlet and multiple grout outlets, and each described grout outlet is mounted on one second ball valve, and grout outlet is corresponded and be connected with each other with the mud jacking tube loop, and the stock inlet is connected with a pneumatic mortar machine.Steel-pipe pile stake bottom pre-load means of the invention and method inject cement mortar by stake between soil plug and concrete plug, practical limit end resistance of the steel-pipe pile in ultra-fine closely knit aleuritic texture stratum is surveyed end resistance force value with reaching, ultimate bearing capacity of pile tip can be greatly improved.

Description

A kind of steel-pipe pile stake bottom pre-load means and method
Technical field
The present invention relates to technical field of bridge construction, and in particular to a kind of steel-pipe pile stake bottom pre-load means and method.
Background technology
Extra-fine sand and medium-fine sand stratum are the common bearing formations of bridge bearing pile tube, although Extra-fine sand and medium-fine sand stratum Itself there is ground very high to survey end resistance force value, if but implement to fetch earth step, easily disturbed soil in such stratum work progress, Disturbed rear soil layer stress is released, and causes actual end resistance force value far smaller than to survey end resistance force value;If not fetched earth in stake, Black-out effect cannot be formed at stake end, it is impossible to provide bearing capacity of pile tip, pile foundation deflection is very big, it is impossible to meet requirement of engineering.
Therefore, for security consideration, when carrying out steel-pipe pile Pile Foundations Design under the stratum at present, the limit end resistance of steel-pipe pile The general very little of power design value is ignored, and far smaller than surveys end resistance force value (usually 8~12MPa, even more high).This Sample results in the stratum surveys Resistance Value with ground high in itself can not be used effectively, can only be by increasing stake long, stake footpath and stake The means of radix amount meet the requirement of design bearing capacity, so as to cause construction costs to be significantly increased, are unfavorable for cost savings.
The content of the invention
For defect present in prior art, it is an object of the invention to provide a kind of steel-pipe pile stake bottom pre-load means And method, practical limit end resistance of the steel-pipe pile in ultra-fine closely knit aleuritic texture stratum can be made to survey end resistance force value with reaching, from And greatly improve ultimate bearing capacity of pile tip.
To achieve the above objectives, the present invention is adopted the technical scheme that:
A kind of steel-pipe pile stake bottom pre-load means, including:
Mud jacking pipe support in the steel-pipe pile;
Multigroup mud jacking tube loop, the mud jacking tube loop is fixedly arranged on the mud jacking pipe support, and every group of mud jacking tube loop goes out Mouth is equipped with first pressure table and the first ball valve;
The mud jacking external member of the mud jacking tube loop bottom is sheathed on, hole straight down is provided with the mud jacking external member;
Slip casting current divider, the slip casting current divider includes a stock inlet and multiple grout outlets, and each described grout outlet is equal One second ball valve is installed, the grout outlet is corresponded and be connected with each other, the stock inlet and with the mud jacking tube loop Pneumatic mortar machine is connected.
On the basis of above-mentioned technical proposal, the mud jacking tube loop is uniform in two groups of concentric circles with the steel pipe pile center It is arranged symmetrically.
On the basis of above-mentioned technical proposal, the exit of the pneumatic mortar machine is provided with second pressure table.
On the basis of above-mentioned technical proposal, the mud jacking pipe support is provided with guide plate.
On the basis of above-mentioned technical proposal, the mud jacking external member is rubber case.
The present invention also provides a kind of steel-pipe pile stake bottom pre-add support method using above-mentioned steel-pipe pile stake bottom pre-load means, should Method is comprised the following steps:
S1, by steel-pipe pile inserting piling to designed elevation after, fetched earth in stake and retained the soil plug of certain length;
S2, installation steel-pipe pile stake bottom pre-load means;
S3, to casting concrete in steel-pipe pile;
After S4, concrete initial set, water is pumped into madjack pipe loop using pneumatic mortar machine, for forming cement mortar injection during mud jacking The path at interface;
S5, to soil plug and concrete plug between interface inject cement mortar.
On the basis of above-mentioned technical proposal, the step S5 specifically includes following steps:
S501, mix and stir cement mortar;
S502, cement mortar is pumped into madjack pipe loop using pneumatic mortar machine, until madjack pipe loop internal pressure reaches design pressure Force value;
S503, the first ball valve closed at all mud jacking tube loop grout outlets, open the at slip casting current divider grout outlet Two ball valves;
S504, the maximum grouting pressure for setting pneumatic mortar machine are design pressure value;
S505, startup pneumatic mortar machine, make cement mortar pass through each grout outlet of slip casting current divider while injecting all madjack pipes Loop.
On the basis of above-mentioned technical proposal, when step S505 is carried out, after setting the maximum grouting pressure of pneumatic mortar machine, pressure Pulp grinder automatically adjusts slip casting speed, and pressure maintains design pressure value in making all mud jacking tube loops, and keeps certain hour.
On the basis of above-mentioned technical proposal, after step s 4 is completed, wait 6 hours, be repeated once step S4, then carry out Step S5.
On the basis of above-mentioned technical proposal, the 3rd ball valve is equipped with the stock inlet of each mud jacking tube loop, After the step S5, the 3rd ball valve and the first ball valve of all mud jacking tube loops are closed, until cement mortar final set.
Compared with prior art, the advantage of the invention is that:
(1) steel-pipe pile stake bottom pre-add support method of the invention injects cement mortar by stake between soil layer and concrete layer, Practical limit end resistance of the steel-pipe pile in ultra-fine closely knit aleuritic texture stratum is set to survey end resistance force value with reaching, so as to greatly improve Ultimate bearing capacity of pile tip.
(2) steel-pipe pile of the invention stake bottom pre-load means simple structure, be easily assembled to use, effectively reduce engineering and make Valency, has saved construction cost.
Brief description of the drawings
Fig. 1 is one group of structural representation of mud jacking tube loop in stake bottom pre-load means in the embodiment of the present invention;
Fig. 2 is the structure top view of stake bottom pre-load means in the embodiment of the present invention;
Fig. 3 is mud jacking pipeline arrangement schematic diagram in stake bottom pre-load means in the embodiment of the present invention.
In figure:1- mud jacking tube loops, 7- mud jacking external members, 8- steel-pipe piles, 9- soil plugs, 10- concrete plugs, 11- interfaces, 12- Mud jacking pipe support, 13- guide plates, 14- pneumatic mortar machines, 15- second pressure tables, 16- slip casting current dividers, the ball valves of 17- first, 18- first Pressure gauge, the ball valves of 19- second, the ball valves of 20- the 3rd.
Specific embodiment
The present invention is described in further detail below in conjunction with drawings and Examples.
Referring to shown in Fig. 1, Fig. 2, the embodiment of the present invention provides a kind of steel-pipe pile stake bottom pre-load means, including:
Mud jacking pipe support 12 in the steel-pipe pile 8;
Multigroup mud jacking tube loop 1, the mud jacking tube loop 1 is fixedly arranged on the mud jacking pipe support 12, every group of mud jacking tube loop 12 outlet is equipped with the ball valve 19 of first pressure table 18 and first;
The mud jacking external member 7 of the bottom of mud jacking tube loop 1 is sheathed on, hole straight down is provided with the mud jacking external member 7;
Slip casting current divider 16, the slip casting current divider 16 includes a stock inlet and multiple grout outlets, each described pulp Mouth is mounted on one second ball valve 17, and the grout outlet is corresponded and be connected with each other with the mud jacking tube loop 1, described to enter to starch Mouth is connected with a pneumatic mortar machine 14.
The mud jacking tube loop 1 is symmetrically arranged with the center of the steel-pipe pile 8 in two groups of concentric circles.
The exit of the pneumatic mortar machine 14 is provided with second pressure table 15.
The mud jacking pipe support 12 is provided with guide plate 13.When it is used for each group mud jacking tube loop 1 and the decentralization of mud jacking pipe support 12 Fixed-direction is guided, is easy to mud jacking tube loop 1 and the fix in position of mud jacking pipe support 12.
The mud jacking external member 7 is rubber case, includes the aperture of diameter 8mm or so in mud jacking external member 7, aperture down towards Soil plug 9, rubber case wraps up the steel pipe tube wall being in contact at aperture.
A kind of steel-pipe pile stake bottom pre-add support method using above-mentioned steel-pipe pile stake bottom pre-load means, the method includes following Step:
S1, by the inserting piling of steel-pipe pile 8 to designed elevation after, fetched earth in stake and retained the soil plug 9 of certain length;
S2, installation steel-pipe pile stake bottom pre-load means;
S3, to casting concrete in steel-pipe pile 8;
After S4, concrete initial set, a small amount of water is pumped into mud jacking tube loop 1 using pneumatic mortar machine 14, for being formed during mud jacking Cement mortar injects the path at interface;
Cement mortar is injected at S5, the interface 11 filled in soil between 9 and concrete plug 10.
The mentality of designing of the inventive method is:After steel-pipe pile inserting piling to designed elevation, carry out fetching earth and retaining certain in stake The soil plug of length, the concrete of soil plug top perfusion certain length forms plunger.Fetch earth and cause disturbance to soil plug, make soil layer stress It is released, so that the actual bearing capacity of pile tip of steel-pipe pile significantly surveys ultimate bearing capacity less than stake end.In order that actual stake end Bearing capacity surveys ultimate bearing capacity with reaching an end, after fetching earth, mud jacking tube loop and mud jacking pipe support is transferred in steel-pipe pile.Pour After concrete reaches design strength, carry out bottom and preload, the mud jacking external member set by mud jacking tube loop bottom to soil plug and Interface injection cement mortar between concrete plug, cement mortar applies big precompression at interface to soil plug and concrete plug, to soil Row tunneling boring precompressed is filled in, makes disturbed soil consolidation, closely knit, survey end resistance force value with returning to.
Shown in Figure 3, the step S5 may particularly include following steps:
S501, mix and stir cement mortar;
S502, cement mortar is pumped into mud jacking tube loop 1 using pneumatic mortar machine 14, until pressure reaches and sets in mud jacking tube loop 1 Meter pressure value;
S503, the first ball valve 19 closed at all grout outlets of mud jacking tube loop 1, open at the grout outlet of slip casting current divider 16 The second ball valve 17;
S504, the maximum grouting pressure for setting pneumatic mortar machine 14 are design pressure value;
S505, startup pneumatic mortar machine 14, make cement mortar pass through each grout outlet of slip casting current divider 16 while injecting all pressures Slurry tube loop 1.
The maximum grouting pressure value of pneumatic mortar machine 14 is 12MPa in step S504.
When step S505 is carried out, after setting the maximum grouting pressure of pneumatic mortar machine 14, pneumatic mortar machine 14 can automatically adjust slip casting Speed, pressure maintains design pressure value, and certain time in making all mud jacking tube loops 1, typically continues 1.5-2.5 small When.This step can enable a bottom preloading to keep the precompression that soil plug is formed, and maintain soil layer construction stable.
As shown in figure 3, the 3rd ball valve 20 is equipped with the stock inlet of each mud jacking tube loop 1, can be in the step After S5, the 3rd ball valve 20 and the first ball valve 19 of all mud jacking tube loops 1 are closed, until cement mortar final set.A bottom can so be made Preloading be able to will not be discharged to the precompression that soil plug is formed by permanent locking, the soil layer stress value of recovery.
After step s 4 is completed, may wait for 6 hours, repeat a step S4, then carry out step S5.So can ensure that pump The water for entering is cleaved successfully to interface between soil plug and concrete plug, and cement mortar injects the path at interface when ensureing subsequent step mud jacking.
The condition and inventive principle that the present invention is realized are as follows:
1. stratum residing for is Extra-fine sand and medium-fine sand structure or the very low similar earth formation of porosity.
2. steel-pipe pile soil plug, concrete plug and steel pipe pile lining three form confined space, i.e. interface.
Above-mentioned two conditional decision cement mortar can not be largely permeated in soil plug soil layer, it is impossible to flow to stake side, can only be to envelope Close space, i.e. interface to be filled, and limited penetration, limited grouting amount (typically not greater than 1000L) are carried out to soil plug soil layer Mud jacking pressure high just can be produced, so as to apply big precompression to soil plug and concrete plug at interface.
The present invention is not limited to the above-described embodiments, for those skilled in the art, is not departing from On the premise of the principle of the invention, some improvements and modifications can also be made, these improvements and modifications are also considered as protection of the invention Within the scope of.The content not being described in detail in this specification belongs to prior art known to professional and technical personnel in the field.

Claims (10)

1. a kind of steel-pipe pile stake bottom pre-load means, it is characterised in that including:
Mud jacking pipe support (12) in the steel-pipe pile (8);
Multigroup mud jacking tube loop (1), the mud jacking tube loop (1) is fixedly arranged on the mud jacking pipe support (12), and every group of madjack pipe is returned The outlet on road (12) is equipped with first pressure table (18) and the first ball valve (19);
The mud jacking external member (7) of mud jacking tube loop (1) bottom is sheathed on, is provided with straight down on the mud jacking external member (7) Hole;
Slip casting current divider (16), the slip casting current divider (16) includes a stock inlet and multiple grout outlets, each described pulp Mouth is mounted on one second ball valve (17), and the grout outlet is corresponded and be connected with each other with the mud jacking tube loop (1), described Stock inlet is connected with a pneumatic mortar machine (14).
2. as claimed in claim 1 bottom pre-load means, it is characterised in that:The mud jacking tube loop (1) and the steel pipe Stake (8) center is symmetrically arranged in two groups of concentric circles.
3. as claimed in claim 1 bottom pre-load means, it is characterised in that:The exit of the pneumatic mortar machine (14) is provided with Second pressure table (15).
4. as claimed in claim 1 bottom pre-load means, it is characterised in that:The mud jacking pipe support (12) is provided with guide plate (13)。
5. as claimed in claim 1 bottom pre-load means, it is characterised in that:The mud jacking external member (7) is rubber case.
6. a kind of steel-pipe pile stake bottom pre-add support method using steel-pipe pile as claimed in claim 1 stake bottom pre-load means, it is special Levy and be, the method is comprised the following steps:
S1, by steel-pipe pile (8) inserting piling to designed elevation after, fetched earth in stake and retained soil plug (9) of certain length;
S2, installation steel-pipe pile stake bottom pre-load means;
S3, to steel-pipe pile (8) interior casting concrete;
After S4, concrete initial set, water is pumped into mud jacking tube loop (1) using pneumatic mortar machine (14), for forming cement mortar during mud jacking Inject the path at interface;
Cement mortar is injected at S5, the interface (11) filled in soil between (9) and concrete plug (10).
7. steel-pipe pile as claimed in claim 6 stake bottom pre-add support method, it is characterised in that the step S5 specifically includes following Step:
S501, mix and stir cement mortar;
S502, cement mortar is pumped into mud jacking tube loop (1) using pneumatic mortar machine (14), until mud jacking tube loop (1) interior pressure reaches Design pressure value;
S503, the first ball valve (19) closed at all mud jacking tube loop (1) grout outlets, open slip casting current divider (16) grout outlet Second ball valve (17) at place;
S504, the maximum grouting pressure for setting pneumatic mortar machine (14) are design pressure value;
S505, startup pneumatic mortar machine (14), make cement mortar pass through each grout outlet of slip casting current divider (16) while injecting all pressures Slurry tube loop (1).
8. steel-pipe pile as claimed in claim 7 stake bottom pre-add support method, it is characterised in that:When step S505 is carried out, setting After the maximum grouting pressure of pneumatic mortar machine (14), pneumatic mortar machine (14) automatically adjusts slip casting speed, makes pressure in all mud jacking tube loops (1) Power maintains design pressure value, and keeps certain hour.
9. steel-pipe pile as claimed in claim 6 stake bottom pre-add support method, it is characterised in that:After step s 4 is completed, wait 6 is small When, step S4 is repeated once, then carry out step S5.
10. steel-pipe pile as claimed in claim 6 stake bottom pre-add support method, it is characterised in that:Each described mud jacking tube loop (1) Stock inlet at be equipped with the 3rd ball valve (20), after the step S5, close the 3rd ball valve of all mud jacking tube loops (1) (20) and the first ball valve (19), until cement mortar final set.
CN201710056469.0A 2017-01-25 2017-01-25 A kind of steel-pipe pile stake bottom pre-load means and method Pending CN106869117A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710056469.0A CN106869117A (en) 2017-01-25 2017-01-25 A kind of steel-pipe pile stake bottom pre-load means and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710056469.0A CN106869117A (en) 2017-01-25 2017-01-25 A kind of steel-pipe pile stake bottom pre-load means and method

Publications (1)

Publication Number Publication Date
CN106869117A true CN106869117A (en) 2017-06-20

Family

ID=59158094

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710056469.0A Pending CN106869117A (en) 2017-01-25 2017-01-25 A kind of steel-pipe pile stake bottom pre-load means and method

Country Status (1)

Country Link
CN (1) CN106869117A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108411902A (en) * 2018-02-08 2018-08-17 中铁大桥局集团有限公司 A kind of steel-pipe pile pile base grouting compliance test result method
CN114321728A (en) * 2021-11-25 2022-04-12 中铁大桥科学研究院有限公司 Pump prying system and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103603335A (en) * 2013-11-08 2014-02-26 河海大学 Winged shelter steel-pipe pile capable of reducing influence of soil surface loading to adjacent pile foundations
CN104594357A (en) * 2015-01-19 2015-05-06 赵连平 Grouting device after statically pressing or hammering concrete precast tubular pile base and grouting method
CN104895086A (en) * 2015-05-04 2015-09-09 北京市勘察设计研究院有限公司 Manual grouting layer method pile toe three-dimensional post-pressure grouting structure and pouring method
CN106013098A (en) * 2016-07-14 2016-10-12 淮海工学院 Miniature steel pipe pile and grouting reinforcement method
CN205857161U (en) * 2016-06-07 2017-01-04 中交第二航务工程局有限公司 It is applicable to the steel-pipe pile of coral reef geology

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103603335A (en) * 2013-11-08 2014-02-26 河海大学 Winged shelter steel-pipe pile capable of reducing influence of soil surface loading to adjacent pile foundations
CN104594357A (en) * 2015-01-19 2015-05-06 赵连平 Grouting device after statically pressing or hammering concrete precast tubular pile base and grouting method
CN104895086A (en) * 2015-05-04 2015-09-09 北京市勘察设计研究院有限公司 Manual grouting layer method pile toe three-dimensional post-pressure grouting structure and pouring method
CN205857161U (en) * 2016-06-07 2017-01-04 中交第二航务工程局有限公司 It is applicable to the steel-pipe pile of coral reef geology
CN106013098A (en) * 2016-07-14 2016-10-12 淮海工学院 Miniature steel pipe pile and grouting reinforcement method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108411902A (en) * 2018-02-08 2018-08-17 中铁大桥局集团有限公司 A kind of steel-pipe pile pile base grouting compliance test result method
CN114321728A (en) * 2021-11-25 2022-04-12 中铁大桥科学研究院有限公司 Pump prying system and construction method thereof
CN114321728B (en) * 2021-11-25 2023-10-27 中铁大桥科学研究院有限公司 Pump prying system and construction method thereof

Similar Documents

Publication Publication Date Title
CN102691296B (en) Pipe pile foundation for static-pressure grouting on pile side and rotary jet grouting at pile bottom and construction method thereof
CN108240234B (en) A kind of Along Railway underlies coal mine gob Grouting method
CN103334770B (en) One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method
CN101812843B (en) Centre grouted poured post-grouting pile construction methods, and grouter and grout injector used thereby
CN108119143B (en) A kind of vertical shaft working surface cement soluble glass paste combines grouting method with chemical grout double-round curtain
CN102852141B (en) Rock-socketed pipe pile foundation with pile core by concrete pouring and pile side by static pressure grouting and construction method for rock-socketed pipe pile foundation
CN104631438B (en) Long auger guncreting uplift pile construction method
CN105155563A (en) Reinforcing and treating method for water burst of soft-flow muddy stratum of foundation pit
CN104499479A (en) Dig-hole pile construction method based on penetration of sand gravel backfilling layer
CN101200897A (en) Construction method for grouting curtain combined with steel reinforced concrete guard ring
CN109487777A (en) A method of a reinforcing deep soft soil foundation of filling the span of a man's arms is formed using slip casing by pressure
CN105256795A (en) End support type thread core composite pile and construction device and method for end support type thread core composite pile
CN105484266B (en) The grouting equipment and its construction method of a kind of multifunctional information
CN107761722A (en) A kind of device and method for improving steel-pipe pile stake side bearing capacity
CN104895583A (en) Tunnel surrounding rock control technology combining pressure relief and slip-casting reinforcement
CN108868827A (en) Km deep-well high-ground stress combination of steel rope injection hole sealing device and method for sealing
CN106869117A (en) A kind of steel-pipe pile stake bottom pre-load means and method
CN105300721A (en) Anti-earth-bearing test device of quasi-rectangular shield heading machine and test method thereof
CN105133641A (en) Thin-wall continuous-wall-type foundation reinforcing structure and method
CN107060821A (en) A kind of many lithology method for protecting support of face
CN101575855A (en) Non soil taking hole guiding process for sinking prestressed pipe pile or prefabricated square pile
CN105714827A (en) Post-grouting construction method of cast-in-situ bored pile
CN203613568U (en) Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system
CN206220101U (en) A kind of support reinforcement structure of deep basal pit
CN205062810U (en) End support type screw thread core composite pile's construction equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170620