CN208378982U - A kind of magnetic control spattering target water route backboard - Google Patents

A kind of magnetic control spattering target water route backboard Download PDF

Info

Publication number
CN208378982U
CN208378982U CN201820495608.XU CN201820495608U CN208378982U CN 208378982 U CN208378982 U CN 208378982U CN 201820495608 U CN201820495608 U CN 201820495608U CN 208378982 U CN208378982 U CN 208378982U
Authority
CN
China
Prior art keywords
backboard
water
slot
annular
water route
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820495608.XU
Other languages
Chinese (zh)
Inventor
陈佳
陈宝忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou Acetron Photoelectric Materials Co Ltd
Original Assignee
Fuzhou Acetron Photoelectric Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou Acetron Photoelectric Materials Co Ltd filed Critical Fuzhou Acetron Photoelectric Materials Co Ltd
Priority to CN201820495608.XU priority Critical patent/CN208378982U/en
Application granted granted Critical
Publication of CN208378982U publication Critical patent/CN208378982U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Physical Vapour Deposition (AREA)

Abstract

The utility model discloses a kind of magnetic control spattering target water route backboards, including upper backboard and lower backboard, the upper backboard lower end surface is provided with first annular water route slot, the first annular water route front of the slot is communicated with the first water inlet and the first water outlet, the lower backboard upper surface is provided with the second annular water channel slot, the second annular water channel front of the slot is communicated with the second water inlet and the second water outlet, the first annular water route slot and the second annular water channel slot are the two-wire single-screw annular groove of mirror settings, the first annular water route slot and the second annular water channel slot, which combine, forms total water route slot, first water inlet, first water outlet and the second water inlet, second water inlet combines and forms total water inlet and total water outlet;Total water route slot of the utility model is that two-wire single-screw annular groove forms loop checking installation, may insure the maximization contact area with upper backboard and lower backboard in this way, and keep stable water pressure, it is ensured that cooling good.

Description

A kind of magnetic control spattering target water route backboard
Technical field
The utility model relates to magnetic control spattering target backplane technology field, specifically a kind of magnetic control spattering target is carried on the back with water route Plate.
Background technique
As global electronic information industry is fast-developing, the fast development of FPD industry, planar display surface board size It is required that constantly expanding, this requires sputtering target material sizes also to expand therewith, and full-size has reached 2 meters of 3 meters of X, this kind of target at present Material needs to be fixed on backboard, and the low alloy metal usually with good fluidity and with certain viscosity is as solder, due to magnetic Control in sputtering process, excitaton source particle constantly bombards target material surface under accelerating field traction, and kinetic energy is converted into thermal energy, target because This can accumulate amount of heat, these heats can not transmit in time, and then cause that target deforms or even target can be caused because of overheat Miss target phenomenon influences plated film production, and target bulk temperature must be strictly controlled in a certain range thus, and tradition is usually to plate A cooling trough is designed on film machine, backboard is allowed closely to touch sink, then passes to the cooling target of recirculated cooling water, however such is done Method is only contacted with back plate surface due to cooling water, and the cooling effect thicker for back plate thickness is general, high-power it is even more impossible to meet Sputtering target material, further strengthening target cooling effect is the urgent problem to be solved for improving plating membrane efficiency and quality.
Utility model content
The purpose of this utility model is to provide a kind of magnetic control spattering target water route backboards, realize high-power sputtering target material In magnetron sputtering plating with excellent heat dissipation effect.
To achieve the above object, the utility model provides the following technical solutions:
A kind of magnetic control spattering target water route backboard, including upper backboard and lower backboard, the upper backboard lower end surface are provided with First annular water route slot, the first annular water route front of the slot are communicated with the first water inlet and the first water outlet, the lower backboard Upper surface is provided with the second annular water channel slot, and the second annular water channel front of the slot is communicated with the second water inlet and the second water outlet Mouthful, the two-wire single-screw annular groove of the first annular water route slot and the second annular water channel slot for mirror settings, first ring Shape water route slot and the second annular water channel slot, which combine, forms total water route slot, and first water inlet, the first water outlet and second enter water Mouth, the second water inlet, which combine, forms total water inlet and total water outlet, is respectively arranged with out in total water inlet and total water outlet Water valve fast joint and enter water valve fast joint.
Preferably, the upper backboard and lower backboard are made of metal molybdenum material, the upper backboard lower end surface and lower backboard The surface roughness of upper surface is not higher than Ra1.6.
Preferably, at the surrounding sideline of the upper backboard lower end surface and lower backboard upper surface and first annular water route slot and the Oblique angle is provided at the trough rim of second ring water route slot, the oblique angle is specially C3 chamfering.
Preferably, the corner location of the upper backboard lower end surface four is respectively arranged with the first positioning cotter way, the lower backboard The corresponding first positioning pin groove location of four corners in upper end is respectively arranged with the second positioning cotter way, the first positioning cotter way and the Two positioning cotter way sizes are identical.
Preferably, gasket is provided between the upper backboard and lower backboard, the diaphragm seal is specially heat-conducting silica gel sheet.
Compared with prior art, the utility model has the beneficial effects that
(1), the upper backboard and lower backboard of the utility model are all made of metal molybdenum material, and hardness is high, thermal expansion coefficient is small, have Effect, which is reduced, should thermally expand sputter coating quality decline caused by bring backboard deforms;
(2), the utility model uses the first annular water route slot and the second ring of upper backboard lower end surface and lower backboard upper surface The trough rim of shape water route slot and edge are machined with chamfering, can be minimized size finishing upper backboard lower end surface and lower backboard Upper surface maximizes filling solder, saves processing cost;
(3), total water route slot of the utility model be two-wire single-screw annular groove formed loop checking installation, may insure in this way with The maximization contact area of upper backboard and lower backboard, and keep stable water pressure, it is ensured that it is cooling good.
Detailed description of the invention
Fig. 1 is the upper backboard schematic perspective view of the utility model;
Fig. 2 is the lower backboard schematic perspective view of the utility model;
Fig. 3 is that the upper backboard of the utility model and lower backboard install explosive view;
Fig. 4 is the structural schematic diagram of total water route slot of the utility model;
Fig. 5 is the structural schematic diagram of total water route slot of the embodiments of the present invention two.
In figure: 1- upper backboard;The first annular water route slot of 11-;The first water inlet of 12-;The first water outlet of 13-;14- first is fixed Position cotter way;2- lower backboard;21- the second annular water channel slot;The second water inlet of 22-;The second water outlet of 23-;The second positioning pin of 23- Slot;3- outlet valve fast joint;4- enters water valve fast joint;The oblique angle 5-;6- gasket;7- positioning pin.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Please refer to Fig. 1, Fig. 2, Fig. 3 and Fig. 4, in the utility model embodiment one, a kind of magnetic control spattering target is carried on the back with water route Plate, including upper backboard 1 and lower backboard 2,1 lower end surface of upper backboard are provided with first annular water route slot 11, first annular water route slot 11 Front end is communicated with the first water inlet 12 and the first water outlet 13, and 2 upper surface of lower backboard is provided with the second annular water channel slot 21, and second 21 front end of annular water channel slot is communicated with the second water inlet 22 and the second water outlet 23, first annular water route slot 11 and the second annular water Road slot 21 is the two-wire single-screw annular groove of mirror settings, it is ensured that the maximization contact area with upper backboard 1 and lower backboard 2, again Keep stable water pressure, it is ensured that cooling good, first annular water route slot 11 and the second annular water channel slot 21 combine and form total water route slot, First water inlet 12, the first water outlet 13 and the second water inlet 22, the second water inlet 22, which combine, forms total water inlet and total water outlet Mouthful, it is respectively arranged with outlet valve fast joint 3 in total water inlet and total water outlet and enters water valve fast joint 4, facilitates the access of water pipe, Improve installation effectiveness;
Fig. 1 and Fig. 2 are please referred to, upper backboard 1 and lower backboard 2 are made of metal molybdenum material, 1 lower end surface of upper backboard and lower back The surface roughness of 2 upper surface of plate is not higher than Ra1.6, and metal molybdenum material, hardness is high, thermal expansion coefficient is small, effectively reduces and answers heat Expand sputter coating quality decline caused by bring backboard deforms;
Fig. 1, Fig. 2, Fig. 3 and Fig. 4 are please referred to, at the surrounding sideline of 1 lower end surface of upper backboard and 2 upper surface of lower backboard and first Oblique angle 5 is provided at the trough rim of annular water channel slot 11 and the second annular water channel slot 21, oblique angle 5 is specially C3 chamfering, can be most Smallization size finishes 1 lower end surface of upper backboard and lower backboard upper surface 2, maximizes filling solder, saves processing cost;
Fig. 1 and Fig. 2 are please referred to, upper backboard 1 lower end surface four corner location is respectively arranged with the first positioning cotter way 14, lower back The corner of 2 upper end of plate four corresponding first positioning 14 position of cotter way is respectively arranged with the second positioning cotter way 24, the first positioning cotter way 14 is identical with the second positioning 24 size of cotter way, facilitates positioning when installation and welding, and reduction should weld sealing caused by dislocation not It is good, improve the precision of installation position;
Referring to Fig. 3, being provided with gasket 6 between upper backboard 1 and lower backboard 2, diaphragm seal is specially heat-conducting silica gel sheet, is increased In addition the heat-conducting effect of backboard 1 and lower backboard 2, prevents 1 lower end surface of upper backboard caused by the deformation because of upper backboard 1 and lower backboard 2 With the gap of 2 upper surface both ends of the surface of lower backboard become larger caused by total water route slot mixing, while preventing because of 1 lower end surface of upper backboard The reduction of the heat transfer efficiency of upper backboard 1 caused by becoming larger with the gap of 2 upper surface both ends of the surface of lower backboard and lower backboard 2, improves Radiating efficiency.
Referring to Fig. 5, the present embodiment and embodiment one have no other differences, and difference exists in the utility model embodiment two Different, a kind of magnetic control spattering target water route backboard in the structure of total water channel slot, including upper backboard 1 and lower backboard 2, upper backboard 1 Lower end surface is provided with first annular water route slot 11, and first annular 11 front end of water route slot is communicated with the first water inlet 12 and the first water outlet Mouth 13,2 upper surface of lower backboard is provided with the second annular water channel slot 21, and 21 front end of the second annular water channel slot is communicated with the second water inlet 22 and second water outlet 23, first annular water route slot 11 and the second annular water channel slot 21 are that concentric double annular grooves of mirror settings are first Tail is connected the concentric loop water route slot to be formed, it is ensured that the maximization contact area with upper backboard 1 and lower backboard 2, and keep water Pressure is stablized, it is ensured that cooling good, first annular water route slot 11 and the second annular water channel slot 21 combine and form total water route slot, and first enters The mouth of a river 12, the first water outlet 13 and the second water inlet 22, the second water inlet 22, which combine, forms total water inlet and total water outlet, always enters It is respectively arranged with outlet valve fast joint 3 in the mouth of a river and total water outlet and enters water valve fast joint 4, facilitates the access of water pipe, improves peace Fill efficiency.
The manufacturing method of one of above embodiments magnetic control spattering target water route backboard, the magnetic control spattering target water Road backboard includes upper backboard 1 and lower backboard 2, includes at least at least one of following methods:
(1), the upper surface and lower end surface of upper backboard 1 and lower backboard 2 are rough milled respectively;
(2), the grooving cutter difference first annular water route slot 11 of 1 lower end surface of finish-milling upper backboard, the first water inlet 12, the are used instead The second annular water channel slot 21, the second water inlet 22, second of one water outlet 13, first positioning cotter way 14 and 2 upper surface of lower backboard Water outlet 23, second positions cotter way 24;
(3), it changes rose reamer and chamfered is carried out to above-mentioned sideline respectively, and respectively with 1 upper surface of upper backboard and lower backboard 2 Lower end surface is 1 lower end surface of benchmark face finish-milling upper backboard and 2 upper surface of lower backboard;
(4), heat conductive silica gel is pasted into 2 upper surface of lower backboard and the binding face up and down position of 1 lower end surface of upper backboard respectively Piece, and the second positioning cotter way 24 of lower backboard 2 is installed into positioning pin 7, the second water inlet 22 and the second water outlet 23 are passed through close Seal installs outlet valve fast joint 3 and enters water valve fast joint 4, and the first positioning cotter way 14 of 1 lower end surface of upper backboard is uniformly pressed into On positioning pin 7, and ensure that upper backboard 1 is bonded with lower backboard 2;
(5), by the fitting edge of upper backboard 1 and lower backboard 2 by Welding, and surrounding polishing polishing is handled, it is complete At production.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this is practical new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this is practical new The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing for the equivalent requirements of the claims will be fallen in All changes in justice and range are embraced therein.It should not treat any reference in the claims as limiting Related claim.

Claims (5)

1. a kind of magnetic control spattering target water route backboard, including upper backboard and lower backboard, it is characterised in that: the upper backboard lower end Face is provided with first annular water route slot, and the first annular water route front of the slot is communicated with the first water inlet and the first water outlet, institute It states lower backboard upper surface and is provided with the second annular water channel slot, the second annular water channel front of the slot is communicated with the second water inlet and Two water outlets, the first annular water route slot and the second annular water channel slot are the two-wire single-screw annular groove of mirror settings, described First annular water route slot and the second annular water channel slot, which combine, forms total water route slot, first water inlet, the first water outlet and the Two water inlets, the second water inlet, which combine, forms total water inlet and total water outlet, sets respectively in total water inlet and total water outlet It is equipped with outlet valve fast joint and enters water valve fast joint.
2. a kind of magnetic control spattering target water route backboard according to claim 1, it is characterised in that: the upper backboard is under Backboard is made of metal molybdenum material, and the surface roughness of the upper backboard lower end surface and lower backboard upper surface is not higher than Ra1.6.
3. a kind of magnetic control spattering target water route backboard according to claim 1, it is characterised in that: the upper backboard lower end Face is provided with at the surrounding sideline of lower backboard upper surface and at first annular water route slot and the trough rim of the second annular water channel slot Oblique angle, the oblique angle are specially C3 chamfering.
4. a kind of magnetic control spattering target water route backboard according to claim 2, it is characterised in that: the upper backboard lower end Four, face corner location is respectively arranged with the first positioning cotter way, the corresponding first positioning cotter way of the corner of the lower backboard upper end four Position is respectively arranged with the second positioning cotter way, and the first positioning cotter way and the second positioning cotter way size are identical.
5. a kind of magnetic control spattering target water route backboard according to claim 2, it is characterised in that: the upper backboard is under Gasket is provided between backboard, the diaphragm seal is specially heat-conducting silica gel sheet.
CN201820495608.XU 2018-04-09 2018-04-09 A kind of magnetic control spattering target water route backboard Active CN208378982U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820495608.XU CN208378982U (en) 2018-04-09 2018-04-09 A kind of magnetic control spattering target water route backboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820495608.XU CN208378982U (en) 2018-04-09 2018-04-09 A kind of magnetic control spattering target water route backboard

Publications (1)

Publication Number Publication Date
CN208378982U true CN208378982U (en) 2019-01-15

Family

ID=64975942

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820495608.XU Active CN208378982U (en) 2018-04-09 2018-04-09 A kind of magnetic control spattering target water route backboard

Country Status (1)

Country Link
CN (1) CN208378982U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110284169A (en) * 2019-07-29 2019-09-27 福建阿石创新材料股份有限公司 A kind of the plating protective device and method in copper backboard water route

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110284169A (en) * 2019-07-29 2019-09-27 福建阿石创新材料股份有限公司 A kind of the plating protective device and method in copper backboard water route

Similar Documents

Publication Publication Date Title
CN208378982U (en) A kind of magnetic control spattering target water route backboard
CN110265369A (en) Liquid cooling heat radiator
CN105682431B (en) A kind of liquid cold plate
CN102059421A (en) Ti target material and Al backboard welding method
CN207904355U (en) A kind of rotation chrome-silicon target
WO2003083161A1 (en) Sputtering apparatus comprising a concave cathode body
CN113917650B (en) Cooling structure and method for improving thermal deformation and vibration stability of reflector
CN108645256A (en) A kind of plate heat exchanger and its board-like lamination
CN203831226U (en) Plane grinding cooling pan
CN201202899Y (en) Guide stainless steel conveying pipe with interlayer
CN107509366A (en) A kind of conformal heat exchanger based on porous flat pipe
CN209514528U (en) A kind of Improvement type radiator of heat radiation performance
CN207422974U (en) A kind of pipeline flow spoiler
CN204829804U (en) Honeycomb metal radiator
CN210755167U (en) Be used for direct metal deposition 3D printer nozzle
CN201177473Y (en) Heat converter and its liquid collection tube
CN210974862U (en) Fast-cooling workpiece disc device for film plating machine
CN208657255U (en) A kind of cooling fin adhesive bonding jig and special glue
CN111793789A (en) Vacuum coating machine capable of reducing color channel defects generated after coating
CN208833060U (en) A kind of plate heat exchanger and its board-like lamination
CN206728466U (en) Liquid radiating cold drawing
CN219390634U (en) Hot-pressing steel lining plate for heat exchanger
CN209131468U (en) A kind of ultra-thin phase transformation heat pipe of segmentation
CN219200179U (en) Sealing structure for cold plate seal head of spacecraft
CN104582422A (en) Water-cooled heat sink

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant