CN208378175U - Double rectangular pipe gallery prefabricated component stone tongs of cushion rubber - Google Patents

Double rectangular pipe gallery prefabricated component stone tongs of cushion rubber Download PDF

Info

Publication number
CN208378175U
CN208378175U CN201820663186.2U CN201820663186U CN208378175U CN 208378175 U CN208378175 U CN 208378175U CN 201820663186 U CN201820663186 U CN 201820663186U CN 208378175 U CN208378175 U CN 208378175U
Authority
CN
China
Prior art keywords
bar
prefabricated component
pipe gallery
straight
bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820663186.2U
Other languages
Chinese (zh)
Inventor
吕成杰
仲政惟
王婧
黄丽梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Julong Pipe Industry Science And Technology Co Ltd
Original Assignee
Zhejiang Julong Pipe Industry Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Julong Pipe Industry Science And Technology Co Ltd filed Critical Zhejiang Julong Pipe Industry Science And Technology Co Ltd
Priority to CN201820663186.2U priority Critical patent/CN208378175U/en
Application granted granted Critical
Publication of CN208378175U publication Critical patent/CN208378175U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

This application discloses the rectangular pipe gallery prefabricated component stone tongs of double cushion rubbers, including several bearing bars, hook and clamping device, the bearing bar is connected to one bearing platform of a formation, and is parallel to each other between bearing bar, and bearing platform is used for support pipe gallery prefabricated component;It is described to link up with the both ends for being mounted on bearing bar, link up with the lifting rope for installing crane;The clamping device is mounted on bearing platform, and the clamping device is used to for bearing platform being fixed to the upper surface of pipe gallery prefabricated component.The utility model has the following beneficial effects: increasing forced area of the pipe gallery prefabricated component in lifting, so that pipe gallery prefabricated component is more not easily susceptible to cracking, safety is higher.

Description

Double rectangular pipe gallery prefabricated component stone tongs of cushion rubber
Technical field
The utility model relates to transport fixture fields more particularly to a kind of rectangular pipe gallery prefabricated component hanging clamp of double cushion rubbers Tool.
Background technique
For pipe gallery (the also known as comprehensive corridor of underground urban duct) by electric power, communication, combustion gas, heat supply, plumbing etc. are various Utilities pipeline is integrated in one, and implements unified planning, Uniting, unified construction and management, is the important base for ensureing city operations Infrastructure and " lifeline ", avoid the excavation repeatedly of every maintenance construction.Due to pipe gallery it is possible to prevente effectively from opening repeatedly It digs, more and more cities start to build pipe gallery.
Present pipe gallery construction method is varied, but the most methods applied still first are made in pre-fabricated factory Prefabricated component (present pipe gallery prefabricated component is all rectangular), then transported prefabricated component to construction site by truck, then By prefabricated component, assembly is got up one by one for construction site, is sealed again after the completion of assembled, waterproof and shockproof processing.In the above process by Truck needs to use crane lifting in precast plant, needs crane lifting, current lifting side again to construction site from truck (there are two side end face, a upper surface and one for rectangular prefabricated component setting in order four steel cables are fixed on prefabricated component upper surface for method Lower end surface) four semi-annulars link (link is cast on the upper surface of pipe gallery prefabricated component) on, then by steel Rope lifting be fixed to crane suspension hook on, then crane starts to lift by crane, this lifting mode the biggest problems are that, will be entirely pre- The weight of product (prefabricated component be very heavy, weigh tens tons) relies solely on four links, and (only there are four stress point, stress surfaces Product is excessively small) it undertakes, so that the upper surface (at casting link) of prefabricated component is easily cracked, link is fallen from prefabricated component, hair Raw safety accident.
Utility model content
The utility model is in view of the above-mentioned problems, propose a kind of rectangular pipe gallery prefabricated component stone tongs of double cushion rubbers.
The technical solution that the utility model is taken is as follows:
A kind of rectangular pipe gallery prefabricated component stone tongs of double cushion rubbers, including several bearing bars, hook and clamping device, institute It states bearing bar and is connected to one bearing platform of a formation, and be parallel to each other between bearing bar, bearing platform is comprehensive for support Piping lane prefabricated component;It is described to link up with the both ends for being mounted on bearing bar, link up with the lifting rope for installing crane;The clamping device installation On bearing platform, the clamping device is used to for bearing platform being fixed to the upper surface of pipe gallery prefabricated component.
In the present apparatus, due to being provided with more bearing bars, bearing bar links together into bearing platform, and clip fills Set and be fixed to bearing platform on the upper surface of pipe gallery prefabricated component, when lifting entire pipe gallery prefabricated component weight Undertaken by bearing platform, according to the active force principle of active force, on pipe gallery prefabricated component (with bearing platform contact position that Face) it is also subjected to an equal amount of power, but since forced area increases, (forced area increase is hung relative to original four links For dress), the power born on each stress point greatly reduces, to ensure that pipe gallery prefabricated component during lifting It will not cracking, safety of the pipe gallery prefabricated component in hoisting process has been effectively ensured.Needing to illustrate is this case Middle bearing bar, hook and clamping device are all made of steel production.
The present apparatus increases forced area of the pipe gallery prefabricated component in lifting, so that pipe gallery prefabricated component is more not It is easy cracking, safety is higher.
Optionally, the bearing bar is cuboid bearing bar, and several through-holes are provided on the bearing bar;The hook packet Annulus and screw rod are included, the annulus is fixed on screw rod, and the screw rod is fixedly mounted on the through-hole of bearing bar by nut, and The nut is located at through-hole two sides.
Because pipe gallery prefabricated component is not standard component, other than shape is rectangular, other all such as sizes etc Biggish variation can all occur for parameter, so it is highly desirable to link up with the position on bearing bar, due to holding in above scheme It is provided with through-hole on weight bar, and through-hole is arranged in a linear, convenient for linking up with the installation site on bearing bar at any time, lifted more square Just;Purpose using cuboid bearing bar is in order to which pipe gallery prefabricated component will not break away when being first to lift two It is then the forced area in order to increase pipe gallery prefabricated component, so that the more difficult cracking of pipe gallery prefabricated component.
Optionally, the clamping device includes straight-bar, support rod and raggle block;The straight-bar is the screw rod of pole type, described straight Bar is threadedly secured on straight-bar, and the nut is located at the two sides of through-hole;The support rod is the screw rod of pole type, described straight Screw hole is provided on bar, support rod is rotatably installed in the screw hole of straight-bar, and support rod runs through straight-bar two sides;The spiral shell that the raggle block passes through itself Hole is rotatably installed on straight-bar, and raggle block is for clamping pipe gallery prefabricated component.
First straight-bar is mounted on the through-hole of bearing bar, several through-holes are in addition provided on bearing bar, can be adjusted at any time The installation site of straightening bar, certain straight-bar are necessarily mounted between hook and pipe gallery prefabricated component;The effect of support rod is Clamping pipe gallery prefabricated component, (both ends of bearing bar respectively install one with support rod, and two support rods are located at the two of pipe gallery prefabricated component Side, two clamp pipe gallery prefabricated component with support rod), prevent pipe gallery prefabricated component from side interaction occurs.
Optionally, the raggle block is collar plate shape raggle block, and the center point of the raggle block is provided with screw hole.
The raggle block of collar plate shape is for clamping pipe gallery prefabricated component, since raggle block is to be mounted on straight-bar by threads turn On, for the ease of rotating raggle block, surrounding facilitates people's hand screw capping block along several grooves are opened up out on raggle block;Also it or is covering Central point on block around raggle block opens a regular hexagon type groove, cover just hexagonal slot can nesting T shaped wrench, pass through T word Type spanner is more convenient to operate.
It optionally, further include U-shaped connector, the bearing bar is linked together by the U-shaped connector.
Optionally, the U-shaped connector is flat U-shaped connector, and two straight booms on U-shaped connector are equal For the straight boom of cylindrical type, the straight boom of two of U-shaped connector is stuck on the through-hole of two adjacent bearing bars.
Any two adjacent bearing bars can be linked together using above-mentioned structure, and dismount quick convenience, needed It is important to note that the diameter of the straight boom of two of U-shaped connector need to be equal with the aperture of through-hole, convenient for operation;And just In the radical for adjusting setting bearing bar according to the size of required lifting pipe gallery prefabricated component;Above scheme can also be with simultaneously When adjust the distance between each bearing bar and (need to only select the U-shaped connector of different distance (distance between two straight-bars) Distance).Certainly screw thread can also be opened up on two straight booms of U-shaped connector, then with 4 nuts by U-shaped Two straight-bars of connector are fixed on two adjacent bearing bars (each on each straight boom to fix two nuts, two nuts Positioned at through-hole two sides), consider for convenience, does not pay the utmost attention to such installation method in this programme.
The beneficial effects of the utility model are: forced area of the pipe gallery prefabricated component in lifting is increased, so that comprehensive It closes piping lane prefabricated component to be more not easily susceptible to cracking, safety is higher.
Detailed description of the invention:
Fig. 1 is the rectangular pipe gallery prefabricated component stone tongs structure schematic diagram of double cushion rubbers;
Fig. 2 is the matching relationship schematic diagram of bearing bar and hook;
Fig. 3 is the matching relationship schematic diagram between two bearing bars.
Each appended drawing reference in figure are as follows: 1, pipe gallery prefabricated component, 2, bearing bar, 3, U-shaped connector, 301, straight boom, 4, shrouding disc, 401, screw hole, 5, annulus, 6, screw rod, 7, nut, 8, straight-bar, 9, support rod.
Specific embodiment:
Below with reference to each attached drawing, the utility model is described in detail.
As shown in attached drawing 1, attached drawing 2 and attached drawing 3, a kind of double rectangular pipe gallery prefabricated component stone tongs of cushion rubber, if including Dry bearing bar 2, hook and clamping device, bearing bar 2 are connected to one bearing platform of a formation, and between bearing bar 2 mutually In parallel, bearing platform is used for support pipe gallery prefabricated component 1;Hook is mounted on the both ends of bearing bar 2, links up with for installing crane Lifting rope;Clamping device is mounted on bearing platform, and clamping device is used to bearing platform being fixed to pipe gallery prefabricated component 1 On upper surface.
In the present apparatus, due to being provided with more bearing bars 2, bearing bar 2 links together into bearing platform, and clip Bearing platform has been fixed on the upper surface of pipe gallery prefabricated component 1 by device again, when lifting entire pipe gallery prefabricated component 1 Weight is undertaken by bearing platform, according to the active force principle of active force, (with bearing platform contact position on pipe gallery prefabricated component 1 That face) be also subjected to an equal amount of power, but (forced area increase is relative to original four since forced area increases For link lifting), the power born on each stress point greatly reduces, to ensure that pipe gallery prefabricated component 1 is lifting During will not cracking, safety of the pipe gallery prefabricated component 1 in hoisting process has been effectively ensured.It needs to illustrate Be bearing bar 2 in this case, hook and clamping device be all made of steel production.
The present apparatus increases forced area of the pipe gallery prefabricated component 1 in lifting, so that pipe gallery prefabricated component 1 is more It is not easily susceptible to cracking, safety is higher.
As shown in attached drawing 1, attached drawing 2 and attached drawing 3, bearing bar 2 is cuboid bearing bar 2, and is provided on bearing bar 2 several logical Hole;Hook includes annulus 5 and screw rod 6, and annulus 5 is fixed on screw rod 6, and screw rod 6 is fixedly mounted on bearing bar 2 by nut 7 On through-hole, and nut 7 is located at through-hole two sides.
Because pipe gallery prefabricated component 1 is not standard component, other than shape is rectangular, other all such as sizes etc Biggish variation can all occur for parameter, so be highly desirable to link up with the position on bearing bar 2, due to holding in above scheme It is provided with through-hole on weight bar 2, and through-hole is arranged in a linear, convenient for linking up with the installation site on bearing bar 2 at any time, lifts more square Just;Purpose using cuboid bearing bar 2 be in order to which pipe gallery prefabricated component 1 will not break away when being first to lift, It second is the forced area in order to increase pipe gallery prefabricated component 1, so that the more difficult cracking of pipe gallery prefabricated component 1.
As shown in attached drawing 1, attached drawing 2 and attached drawing 3, clamping device includes straight-bar 8, support rod 9 and raggle block;Straight-bar 8 is pole type Screw rod 6, straight-bar 8 is threadedly secured on straight-bar 8, and nut 7 is located at the two sides of through-hole;Support rod 9 is the screw rod of pole type 6, screw hole 401 is provided on straight-bar 8, support rod 9 is rotatably installed in the screw hole 401 of straight-bar 8, and support rod 9 runs through 8 two sides of straight-bar;Raggle block It is rotatably installed on straight-bar 8 by the screw hole 401 of itself, raggle block is for clamping pipe gallery prefabricated component 1.
First straight-bar 8 is mounted on the through-hole of bearing bar 2, is in addition provided with several through-holes on bearing bar 2, it can be at any time The installation site of straight-bar 8 is adjusted, certain straight-bar 8 is necessarily mounted between hook and pipe gallery prefabricated component 1;Support rod 9 Effect is that (both ends of bearing bar 2 respectively install one with support rod 9 to clamping pipe gallery prefabricated component 1, and two support rods 9 are located at pipe gallery The two sides of prefabricated component 1, two clamp pipe gallery prefabricated component 1 with support rod 9), prevent pipe gallery prefabricated component 1 from side interaction occurs.
As shown in attached drawing 1, attached drawing 2 and attached drawing 3, raggle block is collar plate shape raggle block, and the center point of raggle block is provided with screw hole 401.
The raggle block of collar plate shape is for clamping pipe gallery prefabricated component 1, since raggle block is to be mounted on straight-bar 8 by threads turn On, for the ease of rotating raggle block, surrounding facilitates people's hand screw capping block along several grooves are opened up out on raggle block;Also it or is covering Central point on block around raggle block opens a regular hexagon type groove, cover just hexagonal slot can nesting T shaped wrench, pass through T word Type spanner is more convenient to operate.
It further include U-shaped connector 3 as shown in attached drawing 1, attached drawing 2 and attached drawing 3, bearing bar 2 is connected by U-shaped connector 3 It is connected together.
As shown in attached drawing 1, attached drawing 2 and attached drawing 3, U-shaped connector 3 is flat U-shaped connector 3, and U-shaped connector Two straight booms 301 on 3 are the straight boom 301 of cylindrical type, the straight boom 301 of two of U-shaped connector 3 be stuck in two it is adjacent On the through-hole of bearing bar 2.
Any two adjacent bearing bars 2 can be linked together using above-mentioned structure, and dismount quick convenience, needed It is important to note that the diameter of the straight boom 301 of two of U-shaped connector 3 need to be equal with the aperture of through-hole, convenient for operation; And convenient for adjusting the radical of setting bearing bar 2 according to the size of required lifting pipe gallery prefabricated component 1;While above scheme is also The distance between each bearing bar 2 can be adjusted at any time (need to only select the U-shaped of different distance (distance between two straight-bars 8) The distance of connector 3).Certainly screw thread can also be opened up on two straight booms 301 of U-shaped connector 3, then with 4 Two straight-bars 8 of U-shaped connector 3 are fixed on two adjacent bearing bars 2 (each solid on each straight boom 301 by a nut 7 Fixed two nuts 7, two nuts 7 are located at through-hole two sides), consider for convenience, does not pay the utmost attention to such installation in this programme Method.
The above is only the preferred embodiment of the present invention, not thereby limits the patent protection of the utility model Range, it is all with equivalent structure transformation made by the utility model specification and accompanying drawing content, directly or indirectly it is used in it His relevant technical field similarly includes within the protection scope of the present utility model.

Claims (6)

1. a kind of rectangular pipe gallery prefabricated component stone tongs of double cushion rubbers, which is characterized in that including several bearing bars, hook and card Clamp device, the bearing bar is joined together to form a bearing platform, and is parallel to each other between bearing bar, and bearing platform is used for Support pipe gallery prefabricated component;It is described to link up with the both ends for being mounted on bearing bar, link up with the lifting rope for installing crane;The clip Device is mounted on bearing platform, and the clamping device is used to for bearing platform being fixed to the upper surface of pipe gallery prefabricated component On.
2. the rectangular pipe gallery prefabricated component stone tongs of double cushion rubbers as described in claim 1, which is characterized in that the bearing bar For cuboid bearing bar, and several through-holes are provided on the bearing bar;The hook includes annulus and screw rod, and the annulus is fixed On screw rod, the screw rod is fixedly mounted on the through-hole of bearing bar by nut, and the nut is located at through-hole two sides.
3. the rectangular pipe gallery prefabricated component stone tongs of double cushion rubbers as claimed in claim 2, which is characterized in that the clip dress It sets including straight-bar, support rod and raggle block;The straight-bar is the screw rod of pole type, and the straight-bar is threadedly secured on straight-bar, and The nut is located at the two sides of through-hole;The support rod is the screw rod of pole type, and screw hole, support rod rotational installation are provided on the straight-bar In the screw hole of straight-bar, and support rod runs through straight-bar two sides;The raggle block is rotatably installed on straight-bar by the screw hole of itself, and raggle block is used In clamping pipe gallery prefabricated component.
4. the rectangular pipe gallery prefabricated component stone tongs of cushion rubber as claimed in claim 3 double, which is characterized in that the raggle block is The center point of collar plate shape raggle block, the raggle block is provided with screw hole.
5. the rectangular pipe gallery prefabricated component stone tongs of double cushion rubbers as claimed in claim 2, which is characterized in that further include U-shaped Type connector, the bearing bar are linked together by the U-shaped connector.
6. the rectangular pipe gallery prefabricated component stone tongs of double cushion rubbers as claimed in claim 5, which is characterized in that the U-shaped Connector is flat U-shaped connector, and two straight-bars on U-shaped connector are cylindrical type straight-bar, U-shaped connector Two straight-bars are stuck on the through-hole of two adjacent bearing bars.
CN201820663186.2U 2018-05-04 2018-05-04 Double rectangular pipe gallery prefabricated component stone tongs of cushion rubber Active CN208378175U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820663186.2U CN208378175U (en) 2018-05-04 2018-05-04 Double rectangular pipe gallery prefabricated component stone tongs of cushion rubber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820663186.2U CN208378175U (en) 2018-05-04 2018-05-04 Double rectangular pipe gallery prefabricated component stone tongs of cushion rubber

Publications (1)

Publication Number Publication Date
CN208378175U true CN208378175U (en) 2019-01-15

Family

ID=64973527

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820663186.2U Active CN208378175U (en) 2018-05-04 2018-05-04 Double rectangular pipe gallery prefabricated component stone tongs of cushion rubber

Country Status (1)

Country Link
CN (1) CN208378175U (en)

Similar Documents

Publication Publication Date Title
CN205669345U (en) A kind of construction guardrail
CN104752995B (en) Replacing insulator aid and the method using this tool changing insulator
CN203820287U (en) Composite steel carrying pole for hoisting roof tiles of steel structure workshops
CN201334306Y (en) Hoisting machine for upright post member
CN208378175U (en) Double rectangular pipe gallery prefabricated component stone tongs of cushion rubber
CN203998604U (en) The be threaded vertical reinforcement erecting equipment of form of employing
CN202405695U (en) Lifting tool for overhead ground wire of steel pipe pole
CN206148848U (en) Large -tonnage electrified conducting wire's hoisting device
CN204999517U (en) Coal transporting trestle steel truss hoist device in power plant's chimney
CN202988556U (en) Special lifting appliance for angle-steel type frame body
CN202164039U (en) Device for preventing lifting hook from rotating horizontally
CN204569127U (en) Steel upright post hoisting jig
CN208948679U (en) Assembled hanger
CN202467221U (en) Power plant main workshop steel roof truss hoisting lifting device
CN210366627U (en) A multi-functional scalable hoist for handling concrete prefabricated component
CN204199271U (en) A kind of filling pile cage of reinforcement hangs fastening devices
CN203284092U (en) Transformer substation insulator lifting frame
CN109205469A (en) A kind of split type structure of electric block and its electric control system
CN204793858U (en) Perpendicular two split conductor integrally lift up auxiliary device
CN215666580U (en) Transfer device is used in construction of compound incubation exterior sheathing
CN218862516U (en) Insulator jack-up operation cat ladder under 500kV transmission line
CN209758851U (en) assembled prefabricated plate hoist device
CN203821856U (en) Tie anchor tool of overhanging discharging platform
CN203942036U (en) A kind of interim electrostatic grounding releasing device
CN201792418U (en) Device for lifting, rotating and hoisting prefabricated top cover of cement tub

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant