CN206148848U - Large -tonnage electrified conducting wire's hoisting device - Google Patents

Large -tonnage electrified conducting wire's hoisting device Download PDF

Info

Publication number
CN206148848U
CN206148848U CN201621175065.0U CN201621175065U CN206148848U CN 206148848 U CN206148848 U CN 206148848U CN 201621175065 U CN201621175065 U CN 201621175065U CN 206148848 U CN206148848 U CN 206148848U
Authority
CN
China
Prior art keywords
arm
lifting
cross
support
tonnage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201621175065.0U
Other languages
Chinese (zh)
Inventor
罗天宇
张志勇
刘辉
丁文骏
赵华萍
徐晓频
江楠
倪宏宇
傅振扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Shaoxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Shaoxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Zhejiang Electric Power Co Ltd, Shaoxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201621175065.0U priority Critical patent/CN206148848U/en
Application granted granted Critical
Publication of CN206148848U publication Critical patent/CN206148848U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a power transmission line live working auxiliary device specifically is a large -tonnage electrified conducting wire's hoisting device. Including promoting cross arm, horizontalization support, reinforcement device and hoisting device, the horizontalization support be two and be located the middle section both sides that promote the cross arm respectively, on the angle steel of iron tower cross arm is fixed in to the lower part of horizontalization support, and upper portion and promotion cross arm fixed connection, the reinforcement device locate promote the cross arm the middle part between two horizontalization supports, the upper portion of reinforcement device with promote cross arm fixed connection, the angle steel fixed connection of lower part and iron tower cross arm, the hoisting device symmetry sets up in the both ends that promote the cross arm, and every end all is equipped with two hoisting device. The utility model discloses a 4 promote the structure and have realized utilizing the less insulating material of specification to large -tonnage electrified conducting wire's promotion, have dropproof backup protection to promoting the wire, have ensured that the large -tonnage wire promotes live working's security and reliability.

Description

A kind of lifting device of large-tonnage live wire
Technical field
The utility model is related to a kind of hot line maintenance servicing unit, specifically a kind of large-tonnage live wire Lifting device.
Background technology
In recent years, with the constantly improve of electric network composition, 500kV transmission lines of electricity progressively increase, with carrying for conveying capacity Height, is also synchronously increased more than wire, so as to cause the increase of shaft tower vertical load using many division mode of movements, and line footpath.Meanwhile, The path of general 500kV transmission lines of electricity is more through mountain area, because the shaft tower between two hilltops is across in larger distance, causes wire shelves Away from increase, the vertical load for further making shaft tower is increased.In general, the shaft tower larger to bearing vertical load, to carry The weight capacity of high insulator chain, considers double insulator string hang during design.Secondly 500kV transmission lines of electricity are to across weight Want facility, the such as power circuit of highway, railway, high ferro, river, 110kV and above, military and important communication Circuit etc., also all adopts double insulator string string hang.
When insulator chain is using double string hangs, more cross connecting plate connected mode, general insulation are set in side of wire Son is changed and carried out under power-off condition, to be carried out charged for replacement double insulator string and be brought following problem:
1st, typically the shaft tower of double insulator string is used in mountain area, vertical load is generally larger, according to statistics, mountain area is using double strings Insulation submode, up to 6.5 tons of its vertical load and more than, such as using conventional Work tool livewire work, because Work tool allows lotus Load is unsatisfactory for being lifted and requires and cannot realize livewire work.
If the 2nd, by increasing the load for lifting Work tool, its metal tools will increase lifting tonnage, then certainly will be heavy, So as to increase the difficulty of operating personnel, it is unfavorable for job safety, increases operating risk.Simultaneously to the hoisting tool that insulate, to realize So big loading is lifted, and larger difficulty is all brought in design and manufacture.
3rd, due to not being plane more than cross-arm head, during hot line job, the bending resistance of insulating materials, anti-twisting property are weaker, so High requirement is proposed to raised position, it is impossible to which the requirement according to power failure operation is arbitrarily used like that, while to lift big loading bearing Carry, insulating materials mechanical strength it is difficult to ensure that.
4th, the livewire work to lifting weight more than more than 5 tons, in operation process, the insulation standby fallen in anti-wire is protected In shield measure, the insulating materials of such performance is there is presently no.
Analyze according to more than, need a kind of new lifting operational method of research and Work tool, to lift large-tonnage wire, And realize being lifted and back-up protection integration, solve to change the work of the defect eliminations such as 500kV insulator chains in the case of big loading.Correlation is carried The equipment of liter need to reach easy to operate, and Work tool installs simple, so as to improve the risk control of livewire work and work high above the ground, reduces The labour intensity of operating personnel, strengthens the security of operation, and this case is given birth to therefrom.
Utility model content
For these reasons, the present inventor provides a kind of lifting device of large-tonnage live wire.
In order to achieve the above object, the technical scheme that the utility model is adopted for:
A kind of lifting device of large-tonnage live wire, including lift cross-arm, horizontalization support, reinforcing device and lift dress Put, horizontalization support is two and is located at the stage casing both sides for lifting cross-arm respectively, and steel tower cross-arm is fixed in the bottom of horizontalization support On angle steel, top is fixedly connected with cross-arm is lifted;Reinforcing device is located at the middle part for lifting cross-arm between two horizontalization supports, The top of reinforcing device is fixedly connected with cross-arm is lifted, and bottom is fixedly connected with the angle steel of steel tower cross-arm;Lifting device symmetrically sets The two ends for lifting cross-arm are placed in, often end is equipped with two lifting devices.
The horizontalization support be top be plane U-type groove structure, the bottom both sides of horizontalization support are respectively with bolt and iron The angle steel of tower cross-arm is fixed, and at the top of horizontalization support screw is provided with, and is fixedly connected with cross-arm is lifted by bolt.
The lifting cross-arm includes two pieces of high-strength aluminium alloy plates, the centre of two pieces of aluminium alloy plates by some fixed plates and The aluminium alloy plate of both sides is fixedly connected.
The stage casing and two ends for lifting cross-arm is equipped with some preformed holes.
The reinforcing device includes upper and lower two pieces of high-strength aluminium alloy plates, is fixed with wearing pin bolt between two pieces of aluminium alloy plates Connection.
The lifting device includes lifting leading screw, insulating rod component and four line hoist hooks, and insulating rod component is provided with some Through hole, lifts leading screw and is fixedly connected with the top of insulating rod component, and the bottom of insulating rod component is fixedly connected with four line hoist hooks.
Fix at lifting device on the lifting cross-arm and be provided with fixed support, it is horizontal that fixed support is secured by bolts in lifting In load, support bracket fastened middle part is provided with circular hole, lifts leading screw through the circular hole on fixed support, blending bolt and fixed support and Lift cross-arm to be fixedly connected.
The utility model compared with prior art, has the advantage that:
(1)Solve in the case of the big loading of Great span insulator cannot powered lifting lead wire a difficult problem, its payload is big It is big to be lifted;
(2)4 points of cooperations are formed by four lifting devices to be lifted, creative multipoint cooperative scheme is greatly improved The stressing conditions of insulating rod component in operation, it is achieved thereby that the possibility of large-tonnage wire can be lifted;
(3)Lifting device opsition dependent is divided into main lifting device and auxiliary lifting apparatus, and main lifting device plays master in operation The effect of lifting lead wire stress, auxiliary lifting apparatus is wanted to play secondary load in operation and lifted, protect mainly as standby Shield provides two pipe protections to whole operation process, by major-minor combination, improves the security of powered lifting large-tonnage wire, can By property;
(4)Lifting device is arranged at into the both sides of steel tower cross-arm, the space of steel tower cross-arm head both sides is taken full advantage of;
(5)Using this device lifting lead wire, its lifting process is completed in vertical direction, is solved well in lifting process Stationarity, reliability;
(6)4 points of this device lift cross-arm load traverse point keeps apart with steel tower cross-arm stress point, and horizontalization support has Two stress for improving steel tower tie point, it is to avoid concentrated stress changes load of the conventional hoist point to steel tower cross-arm;
(7)This apparatus structure is simple and easy to operate, reduces the risk of livewire work and work high above the ground, also reduces work The labour intensity of industry personnel, enhances the security of operation, with preferable using value and popularization reference function.
This device is to eliminate such hidden trouble of equipment in time, guarantee power grid security reliable power supply, there is provided reliable solution party Case, while having larger facilitation to further expanding 500kV hot line maintenances field.
The utility model is further elaborated below by way of the drawings and specific embodiments.
Description of the drawings:
Fig. 1 is overall structure diagram of the present utility model;
Fig. 2 is horizontalization rack mounting structure schematic diagram;
Fig. 3 is the structural representation of reinforcing device;
Fig. 4 is four line hoist hook mounting structure schematic diagrams of lifting device bottom;
Fig. 5 is support bracket fastened overlooking the structure diagram;
Fig. 6 is the cross section structure diagram in fixed support main view direction.
Specific embodiment:
With reference to shown in Fig. 1 to Fig. 6, a kind of lifting device of large-tonnage live wire, including lift cross-arm 3, horizontalization support 2nd, reinforcing device 4 and lifting device.Wherein, lifting cross-arm 3 includes the aluminium alloy plate of two pieces of thickness for the high intensity of 150mm, two The centre of block aluminium alloy plate by some width for 150mm fixed plate 11 with the aluminium alloy plate fixed Combination of bolt and both sides Into.Horizontalization support 2 is two and is located at the stage casing both sides for lifting cross-arm 3 respectively, and horizontalization support 2 is U-type groove that top is plane Structure, the bottom of horizontalization support 2 is symmetrically arranged on two with screw, and the bottom of horizontalization support 2 is fixed on into steel tower cross-arm with bolt On angle steel 1, it is ensured that uneven steel tower cross-arm the-head is in horizontality, is conducive to the stress equalization of lifting wire load. The top of horizontalization support 2 is provided with screw, is fixedly connected on the fixed plate 11 on cross-arm 3 is lifted with horizontalization support 2 by bolt Together.The middle part and side of fixed plate 11 is equipped with screw, and the stage casing for lifting cross-arm 3 is provided with some preformed holes, and the preformed hole is used In the fixation of horizontalization support 2, multiple preformed holes facilitate the regulation of the fixed position of horizontalization support 2, different on different steel towers to adapt to The cross-arm of model, bolt is fixedly connected through the preformed hole for lifting the stage casing of cross-arm 3 with the screw of the side of fixed plate 11.
Located at the middle part for lifting cross-arm 3 and between two horizontalization supports 2, reinforcing device 4 includes two pieces to reinforcing device 4 High-strength aluminium alloy plate, its middle and upper part aluminium alloy plate 41 is positioned over the upper surface for lifting cross-arm 3, bottom aluminium alloy plate 42 and steel tower The bottom clamping of angle steel 1 of cross-arm, is fixedly connected with wearing pin bolt 43 between upper and lower two pieces of aluminium alloy plates.Reinforcing device 4 is mainly used In balance due to lifting the torque that the two ends stress of cross-arm 3 and fulcrum horizontalization support 2 are formed, lifted in the middle of cross-arm 3 so as to reduce Shear stress.
Above-mentioned lifting cross-arm 3 is respectively arranged at two ends with some preformed holes, and top and bottom are provided with manhole 71 and side is symmetrical It is provided with the fixed support 7 of screw 72 to be secured by bolts at the preformed hole for lifting the two ends of cross-arm 3, lifts the pre- of the two ends of cross-arm 3 Box out for the installation of fixed support 7, the setting of multiple preformed holes be easy to according to load load need adjust fixed support 7 Installation site.Fixed support 7 is mainly used in fixing lifting device, and fixed support 7 is symmetrically arranged on the two ends for lifting cross-arm 3, and Often end arranges two, and two need keep at a certain distance away.
Wherein, lifting device arranges altogether four, is symmetricly set in the two ends for lifting cross-arm 3, near the middle part of lifting cross-arm 3 Lifting device 5 based on two lifting devices, positioned at two of outside as auxiliary lifting apparatus 6.Main lifting device 5 is in operation Play main lift wire stress, and auxiliary lifting apparatus 6 are dropproof to two roads of wire offer mainly as back-up protection Protective effect, by major-minor combination the safety and reliability that large-tonnage live wire is lifted is increased.
Above-mentioned lifting device is mainly made up of lifting leading screw 8, the line hoist hook 10 of insulating rod component 9 and four, is lifted leading screw 8 and is worn The manhole crossed on fixed support 7, blending bolt will lift leading screw 8, lifting cross-arm 3 and fixed support 7 and be fixed on one. Some through holes are longitudinally provided with insulating rod component 9, the top that leading screw 8 is secured by bolts in insulating rod component 9, insulating bar is lifted The bottom of component 9 is bolted to connection with four line hoist hooks 10.The multiple through holes arranged on insulating rod component 9, are available for carrying The regulation of the position of 8 and four line hoist hook of leading screw 10 is risen, so as to realize the regulation of integral lifting apparatus length.When lifting operation, lead Line is hung on four line hoist hooks 10, is lifted leading screw 8 and wire is lifted and is put down by tightening up and loosening.
Lifting device is arranged at the utility model the outer space of steel tower cross-arm, and four hoist points are formed to wire, right Lifting force is decomposed and is balanced so that four hoist points exert a force and make the powered lifting of large-tonnage wire be possibly realized jointly.This Apparatus structure is simple, and easy accessibility can bear the loading more than 6 tons, and the whole string for facilitating straight line pole insulator is changed.
Above example only to illustrate the technical solution of the utility model and unrestricted, those of ordinary skill in the art couple Other modifications or equivalent that the technical solution of the utility model is made, without departing from technical solutions of the utility model Spirit and scope, all should cover in right of the present utility model.

Claims (7)

1. a kind of lifting device of large-tonnage live wire, it is characterised in that:Including lifting cross-arm, horizontalization support, reinforcing device And lifting device, horizontalization support is two and is located at the stage casing both sides for lifting cross-arm respectively, and iron is fixed in the bottom of horizontalization support On the angle steel of tower cross-arm, top is fixedly connected with cross-arm is lifted;Reinforcing device is located at the middle part of lifting cross-arm between two horizontalizations Between support, the top of reinforcing device is fixedly connected with cross-arm is lifted, and bottom is fixedly connected with the angle steel of steel tower cross-arm;Lift dress Put and be symmetricly set in the two ends for lifting cross-arm, often end is equipped with two lifting devices.
2. the lifting device of a kind of large-tonnage live wire according to claim 1, it is characterised in that:The horizontalization support It is the U-type groove structure of plane for top, the bottom both sides of horizontalization support are fixed respectively with bolt with the angle steel of steel tower cross-arm, horizontalization Screw is provided with the top of support, is fixedly connected with cross-arm is lifted by bolt.
3. the lifting device of a kind of large-tonnage live wire according to claim 1, it is characterised in that:The lifting cross-arm Including two pieces of high-strength aluminium alloy plates, the centre of two pieces of aluminium alloy plates is fixed by the aluminium alloy plate of some fixed plates and both sides and is connected Connect.
4. the lifting device of a kind of large-tonnage live wire according to claim 1, it is characterised in that:The lifting cross-arm Stage casing and two ends be equipped with some preformed holes.
5. the lifting device of a kind of large-tonnage live wire according to claim 1, it is characterised in that:The reinforcing device Including upper and lower two pieces of high-strength aluminium alloy plates, it is fixedly connected with wearing pin bolt between two pieces of aluminium alloy plates.
6. the lifting device of a kind of large-tonnage live wire according to claim 1, it is characterised in that:The lifting device Including leading screw, insulating rod component and four line hoist hooks are lifted, insulating rod component is provided with some through holes, lifts leading screw and insulating bar The top of component is fixedly connected, and the bottom of insulating rod component is fixedly connected with four line hoist hooks.
7. the lifting device of a kind of large-tonnage live wire according to claim 6, it is characterised in that:The lifting cross-arm Fixed support is provided with upper fixed lifting device, fixed support is secured by bolts on lifting cross-arm, support bracket fastened middle part Circular hole is provided with, leading screw is lifted through the circular hole on fixed support, blending bolt is fixedly connected with fixed support and lifting cross-arm.
CN201621175065.0U 2016-10-27 2016-10-27 Large -tonnage electrified conducting wire's hoisting device Withdrawn - After Issue CN206148848U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621175065.0U CN206148848U (en) 2016-10-27 2016-10-27 Large -tonnage electrified conducting wire's hoisting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621175065.0U CN206148848U (en) 2016-10-27 2016-10-27 Large -tonnage electrified conducting wire's hoisting device

Publications (1)

Publication Number Publication Date
CN206148848U true CN206148848U (en) 2017-05-03

Family

ID=58623998

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621175065.0U Withdrawn - After Issue CN206148848U (en) 2016-10-27 2016-10-27 Large -tonnage electrified conducting wire's hoisting device

Country Status (1)

Country Link
CN (1) CN206148848U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106329389A (en) * 2016-10-27 2017-01-11 国网浙江省电力公司绍兴供电公司 Hoisting device for large-tonnage live wire
CN106684756A (en) * 2017-01-19 2017-05-17 国网山东省电力公司临沂供电公司 Power transmission angle iron tower conductor and ground wire lifting tool and application method of the same
CN109437038A (en) * 2018-11-12 2019-03-08 国网浙江省电力有限公司绍兴供电公司 Power transmission lines overhauling and construction and installation ground wire lifting device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106329389A (en) * 2016-10-27 2017-01-11 国网浙江省电力公司绍兴供电公司 Hoisting device for large-tonnage live wire
CN106329389B (en) * 2016-10-27 2018-04-10 国网浙江省电力公司绍兴供电公司 A kind of lifting device of large-tonnage live wire
CN106684756A (en) * 2017-01-19 2017-05-17 国网山东省电力公司临沂供电公司 Power transmission angle iron tower conductor and ground wire lifting tool and application method of the same
CN109437038A (en) * 2018-11-12 2019-03-08 国网浙江省电力有限公司绍兴供电公司 Power transmission lines overhauling and construction and installation ground wire lifting device

Similar Documents

Publication Publication Date Title
CN206148848U (en) Large -tonnage electrified conducting wire's hoisting device
CN201882763U (en) Special carrying pole type beam of double-machine lifting crane
CN107069562A (en) Replacing insulator under electrified method and load transfer device
CN105932601B (en) Disconnected strand of overhead grounding wire method for repairing and mending
CN106329389B (en) A kind of lifting device of large-tonnage live wire
CN101692548A (en) Tool for live replacing of hanging bottle string of drainage wire
CN205791238U (en) A kind of 10kV distribution line charged lifter of straightway three-phase conducting wire
CN206289544U (en) A kind of simple electric nacelle device
CN102255261A (en) Shifting device for two-circuit hot-line work of transmission line
CN201466574U (en) Device for isoelectrically replacing insulator and accessory of iron tower of transmission line
CN103825222A (en) Tool for changing 220kV narrow base tower strain insulator string with charges
CN211266372U (en) Cable laying equipment
CN209948529U (en) Live lifting mechanism for three-phase lead of straight-line section of 10kV distribution network line
CN208241185U (en) Double job platform on livewire work bar
CN209098084U (en) Power transmission lines overhauling and construction and installation ground wire lifting device
CN108979102B (en) Safe construction method for high-voltage line
CN106450835A (en) Shoe manufacturer high voltage wire landing device
CN205772813U (en) For 40 tons of door machines built-in decelerator remove and install one suspender
CN204130994U (en) A kind of tangent tower charged lifting double bundle conductor device
CN206345608U (en) A kind of precasting yard door machine electric power system
CN109205469A (en) A kind of split type structure of electric block and its electric control system
CN205953345U (en) Broken tooth hoist and mount special fixture of breaker
CN204633221U (en) A kind of rotating lifting gear of power transmission line overhead ground wire
CN208835590U (en) A kind of cable terminal pole with operating platform
CN104563554A (en) Combined lattice beam for integrated framework of 500kV transformer substation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20170503

Effective date of abandoning: 20180410