CN208347011U CN201820980769.8U CN201820980769U CN208347011U CN 208347011 U CN208347011 U CN 208347011U CN 201820980769 U CN201820980769 U CN 201820980769U CN 208347011 U CN208347011 U CN 208347011U
Authority
CN
China
Prior art keywords
profiled sheet
interpolation
shear wall
vertical
horizontal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820980769.8U
Other languages
Chinese (zh)
Inventor
沈程
任国亮
徐小明
徐苗苗
戴玉伟
魏建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Vocational Institute of Engineering
Original Assignee
Changzhou Vocational Institute of Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou Vocational Institute of Engineering filed Critical Changzhou Vocational Institute of Engineering
Priority to CN201820980769.8U priority Critical patent/CN208347011U/en
Application granted granted Critical
Publication of CN208347011U publication Critical patent/CN208347011U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model discloses a kind of assembleds to shear orthogonal wall profiled sheet perps connection unit, belongs to prefabricated assembled concrete technical field of structures.A kind of assembled of the utility model shears orthogonal wall profiled sheet perps connection unit, including right shear wall, left shear wall and split bolt, the perps connecting pin of right shear wall and left shear wall is respectively equipped with interpolation profiled sheet, interpolation profiled sheet on right shear wall and left shear wall includes the horizontal profiled sheet of interpolation and the vertical profiled sheet of interpolation, the horizontal profiled sheet vertical direction of interpolation is provided with horizontal groove, and the vertical profiled sheet of interpolation is horizontally arranged vertical groove.The utility model is using the horizontal profiled sheet of interpolation and the vertical profiled sheet of interpolation the two orthogonal profiled sheets, two pieces of the left and right horizontal profiled sheet of interpolation is fixed by the occlusion of horizontal tongue and groove, two pieces of the left and right vertical profiled sheet of interpolation is fixed by the occlusion of vertical tongue and groove, interaction is strengthened, the waterproof performance at occlusion is improved.

Description

A kind of assembled shears orthogonal wall profiled sheet perps connection unit
Technical field
The utility model relates to a kind of prefabricated assembled concrete technical field of structures, more specifically to a kind of dress Orthogonal wall profiled sheet perps connection unit is sheared with formula.
Background technique
In assembled arthitecutral structure work progress, the connection of vertical abutment joint is always priority control of constructing between shear wall exterior wall Critical process, traditional construction technology be shear wall reserve protruding bar, at vertical abutment joint be arranged additional bar connected It connects.Traditional construction complex process, working procedure is more and perps water-stagnating effect is undesirable.Therefore, vertical for fabricated shear wall The connection of seam, there is an urgent need to a kind of easy interconnection techniques, can simplify technique, improve efficiency, have good waterproofness Energy.
China Patent No. ZL201510794608.0, authorized announcement date are on April 13rd, 2016, invention and created name are as follows: A kind of prefabricated assembled shear wall perps connection structure and its construction method, this application are related to a kind of prefabricated assembled shear wall Perps connection structure, comprising: left side shear wall, the pre-buried fashioned iron in left side, right side shear wall, the pre-buried fashioned iron in right side and multiple pairs of drawings Bolt;The pre-buried fashioned iron in left side, the pre-buried fashioned iron in right side are placed between left side shear wall and right side shear wall, the pre-buried fashioned iron in left side It is identical with the pre-buried formed steel construction in right side;The pre-buried fashioned iron in left side includes: side plate, front side board and back side panel;Front side board is with after Side plate is set to the front-rear position of side plate;Front side board and back side panel are inwardly provided with a groove, there is a plurality of bolts on groove Hole, split bolt, which is set on the bolt hole, carries out sealed fixation for the pre-buried fashioned iron of the pre-buried fashioned iron in left side and right side.This application Case additionally provides a kind of construction method of prefabricated assembled shear wall perps connection structure, connection structure bearing capacity height, construction party Just and construction quality is good, provides operative constraint to concrete, but it is needed to be further strengthened in the waterproof performance of seam crossing.
Summary of the invention
1. utility model technical problems to be solved
It is complicated that the purpose of the utility model is to overcome existing fabricated shear wall vertical abutment joint Joining Technologies, and technique is more And the deficiency that water-stagnating effect is undesirable, a kind of assembled is provided and shears orthogonal wall profiled sheet perps connection unit, using this reality With novel technical solution, interpolation profiled sheet includes the horizontal profiled sheet of interpolation and the vertical profiled sheet of interpolation, and interpolation is horizontal Vertical groove is arranged in the horizontal groove of profiled sheet setting, the vertical profiled sheet of interpolation, using horizontal direction and vertically to groove, It can facilitate and be engaged in seam crossing, is not only simple in structure, it is easy to operate quick, and also waterproof performance enhances.
2. technical solution
In order to achieve the above objectives, technical solution provided by the utility model are as follows:
A kind of assembled of the utility model shears orthogonal wall profiled sheet perps connection unit, including right shear wall, a left side The perps connecting pin of shear wall and split bolt, the right shear wall and left shear wall is respectively equipped with interpolation profiled sheet, institute The interpolation profiled sheet on the interpolation profiled sheet and left shear wall on right shear wall stated is mutually twisted, the right shear wall Reserving hole is provided with the interpolation profiled sheet on left shear wall and is attached by split bolt, it is described to drawing spiral shell Bolt is by the sealed fixation of interpolation profiled sheet drawknot on right shear wall and left shear wall, on the right shear wall and left shear wall Interpolation profiled sheet include the horizontal profiled sheet of interpolation and the vertical profiled sheet of interpolation, the horizontal profiled sheet of the interpolation Vertical direction is provided with horizontal groove, and the vertical profiled sheet of the interpolation is horizontally arranged vertical groove, left and right Two pieces of horizontal profiled sheets of interpolation are fixed by the occlusion of horizontal tongue and groove, and two pieces of the left and right vertical profiled sheet of interpolation passes through vertical tongue and groove Occlusion is fixed.
Further, it is also poured in the region surrounded between the horizontal profiled sheet of the interpolation and the vertical profiled sheet of interpolation It is marked with rear pouring concrete, the rear pouring concrete and interpolation profiled sheet form the vertical abutment joint of shear wall.
Further, the rear pouring concrete is normal concrete, high-strength concrete, high performance concrete, Regenerated Bone Expect concrete or lightweight aggregate concrete.
Further, the horizontal profiled sheet of the interpolation and the vertical profiled sheet of interpolation are all made of steel plate cold bending, welding Or roll forming.
3. beneficial effect
It is had the following beneficial effects: compared with existing well-known technique using technical solution provided by the utility model
(1) a kind of assembled of the utility model shears orthogonal wall profiled sheet perps connection unit, using interpolation level Profiled sheet and the vertical profiled sheet of interpolation the two orthogonal profiled sheets reinforce the interaction at tongue and groove, and globality is more It is good, the waterproof performance at occlusion is enhanced, there is preferable economic benefit;
(2) a kind of assembled of the utility model shears orthogonal wall profiled sheet perps connection unit, the horizontal die mould of interpolation Pouring concrete after being poured in the region surrounded between steel plate and the vertical profiled sheet of interpolation, rear pouring concrete and interpolation profiled sheet The vertical abutment joint of shear wall is formed, easy construction has given full play to the compound action of rear pouring concrete and interpolation profiled sheet, has Have the advantages that bearing capacity height, plasticity good toughness, anti-seismic performance are good;
(3) a kind of assembled of the utility model shears orthogonal wall profiled sheet perps connection unit, and split bolt improves Connection speed, increases the stability of interpolation profiled sheet, short construction period, construction quality is secure, and improves to rear The binding effect of pouring concrete, while can also delay steel plate local deformation.
Detailed description of the invention
Fig. 1 is that a kind of assembled of the utility model shears the vertical abutment joint company of orthogonal wall profiled sheet perps connection unit Connect plan view;
Fig. 2 is that a kind of assembled of the utility model shears the vertical abutment joint three of orthogonal wall profiled sheet perps connection unit Tie up schematic diagram;
Fig. 3 is that a kind of assembled of the utility model shears the vertical abutment joint peace of orthogonal wall profiled sheet perps connection unit Fill plan view;
Fig. 4 is vertical for the shear wall that a kind of assembled of the utility model shears orthogonal wall profiled sheet perps connection unit Seam installs schematic three dimensional views.
Label declaration in schematic diagram:
1, right shear wall;1-1, left shear wall;2, the horizontal profiled sheet of interpolation;3, the vertical profiled sheet of interpolation;4, to drawing Bolt.
Specific embodiment
To further appreciate that the contents of the present invention, the present invention is described in detail in conjunction with the accompanying drawings and embodiments.
Embodiment
In conjunction with shown in Fig. 1, Fig. 2 and Fig. 4, it is single that a kind of assembled of the present embodiment shears orthogonal wall profiled sheet perps connection The perps connecting pin of member, including right shear wall 1, left shear wall 1-1 and split bolt 4, right shear wall 1 and left shear wall 1-1 point Not She You interpolation profiled sheet, the interpolation profiled sheet on interpolation profiled sheet and left shear wall 1-1 on right shear wall 1 is mutual Occlusion, the interpolation profiled sheet on right shear wall 1 and left shear wall 1-1 be provided with reserving hole and by split bolt 4 into Row connection, hole to be provided is single-row or multiple row is arranged, and symmetrically or can be staggered with horizontal direction, in the present embodiment, we are preferential Consider the column setting of hole to be provided two, and be distributed neat, about central symmetry, split bolt 4 is by right shear wall 1 and left shear wall 1-1 On the sealed fixation of interpolation profiled sheet drawknot, split bolt 4 improves bonding strength, increases the stabilization of interpolation profiled sheet Property, and connected using split bolt 4, speed of application can be accelerated, shorten construction period, improve construction quality, improved to rear The binding effect of pouring concrete, while can also delay steel plate local deformation.Interpolation on right shear wall 1 and left shear wall 1-1 Profiled sheet includes the horizontal profiled sheet 2 of interpolation and the vertical profiled sheet 3 of interpolation, and the horizontal profiled sheet 2 of two pieces of interpolations is distinguished It is embedded on right shear wall 1 and left shear wall 1-1, and the position of the horizontal profiled sheet 2 of two pieces of interpolations is corresponding, two pieces of interpolations are perpendicular It is also embedded in respectively on right shear wall 1 and left shear wall 1-1 to profiled sheet 3, and the position of the vertical profiled sheet 3 of two pieces of interpolations Also corresponding, horizontal 2 vertical direction of profiled sheet of interpolation is provided with horizontal groove, vertical 3 horizontal direction of profiled sheet of interpolation It is provided with vertical groove, in the present embodiment, we might as well be by horizontal groove in horizontal 2 vertical direction of profiled sheet of interpolation It is arranged evenly and at intervals, same vertical groove can be configured evenly and at intervals in vertical 3 horizontal direction of profiled sheet of interpolation, The left and right horizontal profiled sheet 2 of two pieces of interpolations is fixed by the occlusion of horizontal tongue and groove, and the left and right vertical profiled sheet 3 of two pieces of interpolations passes through perpendicular Straight tongue and groove occlusion is fixed, and is enhanced interaction using tongue and groove, so that globality is more preferable, and then is enhanced the waterproofness at occlusion Can, there is preferable economic benefit, the horizontal profiled sheet 2 of interpolation and the vertical profiled sheet 3 of interpolation are all made of steel plate cold bending, weldering It connects or roll forming.
It is shown in Figure 3, it is also poured in the region surrounded between the horizontal profiled sheet 2 of interpolation and the vertical profiled sheet 3 of interpolation It is marked with rear pouring concrete, rear pouring concrete and interpolation profiled sheet form the vertical abutment joint of shear wall, and easy construction gives full play to The compound action of rear pouring concrete and interpolation profiled sheet has bearing capacity height, plasticity good toughness, anti-seismic performance good etc. excellent Point.Pouring concrete can be mixed for normal concrete, high-strength concrete, high performance concrete, regenerated aggregate concrete or lightweight aggregate afterwards Solidifying soil.
A kind of assembled of the utility model shears orthogonal wall profiled sheet perps connection unit, using the horizontal die mould of interpolation Steel plate and the vertical profiled sheet of interpolation the two orthogonal profiled sheets, two pieces of the left and right horizontal profiled sheets of interpolation pass through horizontal enterprise Mouth occlusion is fixed, and two pieces of the left and right vertical profiled sheets of interpolation are engaged by vertical tongue and groove and are fixed, and is strengthened interaction, is enhanced Waterproof performance at occlusion is poured mixed after being poured in the region surrounded between the horizontal profiled sheet of interpolation and the vertical profiled sheet of interpolation Solidifying soil, rear pouring concrete and interpolation profiled sheet form the vertical abutment joint of shear wall, and easy construction pours coagulation after having given full play to The compound action of soil and interpolation profiled sheet, has many advantages, such as that bearing capacity height, plasticity good toughness, anti-seismic performance are good, split bolt Bonding strength is improved, the stability of interpolation profiled sheet is increased, short construction period, construction quality is secure, and improves To the binding effect of rear pouring concrete, while it can also delay steel plate local deformation.
Schematically the utility model and embodiments thereof are described above, description is not limiting, attached drawing Shown in be also one of the embodiments of the present invention, actual structure is not limited to this.So if this field Those of ordinary skill enlightened by it, without deviating from the purpose of the present invention, not inventively design Frame mode similar with the technical solution and embodiment, all should belong to the protection range of the utility model.

Claims (4)

1. a kind of assembled shears orthogonal wall profiled sheet perps connection unit, including right shear wall (1), left shear wall (1-1) With split bolt (4), the perps connecting pin of the right shear wall (1) and left shear wall (1-1) is respectively equipped with interpolation die mould steel Plate, the interpolation profiled sheet on interpolation profiled sheet and left shear wall (1-1) on the right shear wall (1) are mutually twisted, Interpolation profiled sheet on the right shear wall (1) and left shear wall (1-1) is provided with reserving hole and by drawing spiral shell Bolt (4) is attached, and the split bolt (4) draws the interpolation profiled sheet on right shear wall (1) and left shear wall (1-1) Tie sealed fixation, it is characterised in that: the interpolation profiled sheet on the right shear wall (1) and left shear wall (1-1) includes The horizontal profiled sheet of interpolation (2) and the vertical profiled sheet of interpolation (3), the horizontal profiled sheet of the interpolation (2) vertical direction are set It is equipped with horizontal groove, the vertical profiled sheet of the interpolation (3) is horizontally arranged vertical groove, the two pieces of interpolations in left and right Horizontal profiled sheet (2) is fixed by the occlusion of horizontal tongue and groove, and the two pieces of vertical profiled sheets of interpolation (3) in left and right are stung by vertical tongue and groove It closes and fixes.
2. a kind of assembled according to claim 1 shears orthogonal wall profiled sheet perps connection unit, it is characterised in that: It is poured after being also cast in the region surrounded between the horizontal profiled sheet of the interpolation (2) and the vertical profiled sheet of interpolation (3) mixed Solidifying soil, the rear pouring concrete and interpolation profiled sheet form the vertical abutment joint of shear wall.
3. a kind of assembled according to claim 2 shears orthogonal wall profiled sheet perps connection unit, it is characterised in that: The rear pouring concrete is that normal concrete, high-strength concrete, high performance concrete, regenerated aggregate concrete or lightweight aggregate are mixed Solidifying soil.
4. a kind of assembled according to claim 1 shears orthogonal wall profiled sheet perps connection unit, it is characterised in that: The horizontal profiled sheet of the interpolation (2) and the vertical profiled sheet of interpolation (3) are all made of steel plate cold bending, weld or be rolled into Type.
CN201820980769.8U 2018-06-25 2018-06-25 A kind of assembled shears orthogonal wall profiled sheet perps connection unit Expired - Fee Related CN208347011U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820980769.8U CN208347011U (en) 2018-06-25 2018-06-25 A kind of assembled shears orthogonal wall profiled sheet perps connection unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820980769.8U CN208347011U (en) 2018-06-25 2018-06-25 A kind of assembled shears orthogonal wall profiled sheet perps connection unit

Publications (1)

Publication Number Publication Date
CN208347011U true CN208347011U (en) 2019-01-08

Family

ID=64880870

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820980769.8U Expired - Fee Related CN208347011U (en) 2018-06-25 2018-06-25 A kind of assembled shears orthogonal wall profiled sheet perps connection unit

Country Status (1)

Country Link
CN (1) CN208347011U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565840A (en) * 2019-09-30 2019-12-13 北京和筑科技有限公司 Concave steel plate concrete composite wall
CN110748008A (en) * 2019-10-24 2020-02-04 中国十七冶集团有限公司 Built-in steel plate embedded combined type occlusion member for prefabricated concrete building
CN112942626A (en) * 2021-02-22 2021-06-11 山东建筑大学 Formwork-supporting-free assembled shear wall structure and connecting method
CN113338478A (en) * 2021-06-23 2021-09-03 重庆大学 A assembled building wallboard for build fast
CN114517596A (en) * 2022-03-10 2022-05-20 山东省建筑科学研究院有限公司 Prestressing force key connection structure of prefabricated wall board and brickwork wall
CN114541596A (en) * 2022-03-17 2022-05-27 常州工程职业技术学院 Simple connecting structure for vertical joints of assembled shear wall

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565840A (en) * 2019-09-30 2019-12-13 北京和筑科技有限公司 Concave steel plate concrete composite wall
CN110748008A (en) * 2019-10-24 2020-02-04 中国十七冶集团有限公司 Built-in steel plate embedded combined type occlusion member for prefabricated concrete building
CN110748008B (en) * 2019-10-24 2020-10-02 中国十七冶集团有限公司 Built-in steel plate embedded combined type occlusion member for prefabricated concrete building
CN112942626A (en) * 2021-02-22 2021-06-11 山东建筑大学 Formwork-supporting-free assembled shear wall structure and connecting method
CN112942626B (en) * 2021-02-22 2022-03-18 山东建筑大学 Formwork-supporting-free assembled shear wall structure and connecting method
CN113338478A (en) * 2021-06-23 2021-09-03 重庆大学 A assembled building wallboard for build fast
CN113338478B (en) * 2021-06-23 2022-11-01 重庆大学 A assembled building wallboard for build fast
CN114517596A (en) * 2022-03-10 2022-05-20 山东省建筑科学研究院有限公司 Prestressing force key connection structure of prefabricated wall board and brickwork wall
CN114517596B (en) * 2022-03-10 2024-04-02 山东省建筑科学研究院有限公司 Prestress pin key connection structure of prefabricated wallboard and masonry wall
CN114541596A (en) * 2022-03-17 2022-05-27 常州工程职业技术学院 Simple connecting structure for vertical joints of assembled shear wall
CN114541596B (en) * 2022-03-17 2023-08-29 常州工程职业技术学院 Simple connecting structure for vertical joints of assembled shear wall

Similar Documents

Publication Publication Date Title
CN208347011U (en) A kind of assembled shears orthogonal wall profiled sheet perps connection unit
CN105297887B (en) The D light Steel Structure that two-way continuous twin beams is constituted
CN105863111A (en) Embedded prefabricated concrete shear wall anti-bending steel frame structure
CN205954921U (en) Novel big board shear wall structure is secretly supported in bolted connection's prefabricated assembled area
CN207419803U (en) A kind of high-strength connection structure of laminated floor slab and girder steel
CN201212191Y (en) Connecting structure of precast shear wall
CN106759858B (en) A kind of connecting node and preparation method of H profile steel beam and rectangular steel-tube concrete column
CN208201914U (en) One kind is faced forever in conjunction with covered back-digging structure
CN107217787A (en) A kind of assembled coupling beam of built-in profiled sheet groove structure
CN107130715A (en) Teeth groove is poured after a kind of to be linked and packed the construction method of formula building roof system
CN110512765A (en) A kind of fabricated shear wall and construction method with steel plate peg combined type diagonal brace
CN205907855U (en) Steel pipe board combination steel sheet shear force wall
CN203452271U (en) Tie bar connecting structure of profile steel reinforced concrete beam
CN110439142A (en) A kind of assembly concrete shear wall and construction method with H profile steel diagonal brace
CN108775098A (en) The production method of across floor PEC shear walls-steel coupling beam coupled wall connecting node
CN209637027U (en) A kind of fabricated shear wall
CN108571094A (en) Web holes part compound shear wall-composite coupling beams coupled wall and preparation method thereof
CN208815673U (en) The connecting joint structure of square steel tube concrete column and reinforced beam
CN104746791B (en) Semirigid frame-interior fills out regeneration concrete wallboard and manufacture method
CN208137189U (en) A kind of Honeycomb Beam X-shaped concealed bracings concrete shear force wall and building
CN205530819U (en) Steel frame structure of embedded precast concrete shear force wall bending resistance simultaneously
CN207296062U (en) A kind of honeycomb hole combined steel plate shearing force wall
CN205189170U (en) Disconnect -type shaped steel concrete shear force wall by lacing connection
CN109853782A (en) A kind of fabricated shear wall and construction method
CN216042045U (en) Embedded steel reinforced concrete floor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190108

Termination date: 20210625

CF01 Termination of patent right due to non-payment of annual fee