Prior art keywords
wall
face
flange
fabricated shear
steel plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910004724.6A
Other languages
Chinese (zh)
Inventor
蔡健
罗翼锋
李名铠
陈庆军
左志亮
杨春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
South China University of Technology SCUT
Original Assignee
South China University of Technology SCUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by South China University of Technology SCUT filed Critical South China University of Technology SCUT
Priority to CN201910004724.6A priority Critical patent/CN109853782A/en
Publication of CN109853782A publication Critical patent/CN109853782A/en
Pending legal-status Critical Current

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The present invention discloses a kind of fabricated shear wall and construction method, fabricated shear wall includes wall and multiple ribbed stiffeners, can mutually it splice between the wall and wall, wall is at least equipped with flange in splicing side, and wall has front end face and rear end face, and flange is mutually perpendicular to front end face, there are multiple fixation holes on flange, bolt passes through fixation hole, the flange on two walls mutually spliced is bolted, multiple ribbed stiffeners are connect with flange and front end face respectively.The construction method of above-mentioned fabricated shear wall, fixation hole is passed through using bolt to be fixedly connected with the flange on mutually splice two walls, then by the continuous steel plate on mutually splice two walls by being welded and fixed, the front end face for welding tie rod and another wall at wall rear is welded to connect again, it is poured after finally carrying out concrete between two wall of front and back, forms a stay.

Description

A kind of fabricated shear wall and construction method
Technical field
The present invention relates to building structure technology field, in particular to a kind of fabricated shear wall and construction method.
Background technique
As the application of skyscraper is increasingly extensive, steel plate-concrete combined shear wall is got over its superior mechanical property To be applied in practical engineering project more.Shear wall is in house or building for bearing wind load or geological process The wall of caused horizontal loading and vertical load.Fabricated shear wall is prefabricated in the factory, and installation is in place at the construction field (site) After be attached, the performance of connection will will affect the globality and anti-seismic performance of structure.Due to the limited length of steel, Between floors it is generally necessary to which the steel plate compared with muti-piece is vertically stitched together, then needed at this time to steel plate water between upper and lower shear wall Certain processing is carried out at carvel joint.
The horizontal joint connection of fabricated shear wall should have enough bearing capacity abilities, construct the spies such as convenient Point.And current routine adds one piece of support plate using outside and connects and weld two kinds for upper lower steel plate using split bolt Mode, but former approach makes support plate and shear wall outer surface not concordant, if setting groove makes support plate and shear wall Flush with outer surface then leads to the complexity of construction, and construction cost is larger.And later approach site welding difficulty is larger, cost compared with Greatly.And causing molten metal to flow downward due to gravity, the thin lower part in weld seam top is thick, and it is thick that thin part thickness is less than steel plate Degree, such way make shear wall steel plate shear resistance weld seam position appearance weaken to a certain degree, meanwhile, be also unfavorable for and other The connection of horizontal member such as floor, beam.Therefore, it is necessary to design a kind of more reasonable splicing knot for upper lower steel plate junction Structure.
Summary of the invention
It is reasonable in design it is an object of the invention to overcome the deficiencies of the prior art and provide a kind of fabricated shear wall, Quality of connection and effect can be effectively ensured, while the requirement to construction environment and operator's technical level is lower.
Another object of the present invention is to provide the construction methods of above-mentioned fabricated shear wall.
The technical solution of the present invention is as follows: a kind of fabricated shear wall, including wall and multiple ribbed stiffeners, the wall and wall Can mutually it splice between body, wall is at least equipped with flange in splicing side, and wall has front end face and rear end face, flange and front end face It is mutually perpendicular to, there are multiple fixation holes on flange, bolt passes through fixation hole, is bolted on two walls mutually spliced Flange, multiple ribbed stiffeners connect with flange and front end face respectively.
Further, the ribbed stiffener is vertically connected at flange and front end face, and ribbed stiffener prevents the buckling of wall, enables The internal force between two walls mutually spliced is effectively transmitted, the globality between two walls mutually spliced is improved.
Further, the ribbed stiffener and fixation hole interval are arranged.
Further, the fabricated shear wall further includes multiple welding tie rods, and welding tie rod one end is vertically connected at rear end Face, other end connection are located at the front end face of another wall at rear end face rear, the casting concrete between two walls of front and back Stay is formed, guarantees that concrete can preferably cooperate with wall.
Further, the fabricated shear wall further includes the continuous steel plate of muti-piece, and continuous steel plate vertical welding is in rear end face, even Continuous steel plate is arranged along rear end face overall height.
Further, the continuous steel plate and the setting of welding tie rod interval.
Further, the continuous steel plate alignment on two walls mutually spliced, passes through between continuous steel plate and continuous steel plate It is welded and fixed, continuous steel plate guarantees that concrete can preferably cooperate with wall.
Further, the wall is equipped with the perforation through front end face and rear end face, horizontal when there is horizontal member to pass through Reinforcing bar in component passes through perforation, pours rear horizontal member and stay forms entirety.
Further, the wall is rectangular, and four sides of wall all have flange, have each wall for connecting The flange connect does not need individually to select middle wall body and edge wall, facilitates construction, be also convenient for producing in batches.
The construction method of above-mentioned fabricated shear wall first opens up fixation hole on flange, multiple ribbed stiffeners is welded to connect In flange and front end face, the rear end face setting continuous steel plate of muti-piece of wall and multiple welding tie rods pass through fixation hole using bolt Flange on mutually splice two walls is fixedly connected, then passes through the continuous steel plate on mutually splice two walls It is welded and fixed, then the front end face for welding tie rod and another wall at wall rear is welded to connect, finally in two wall of front and back It is poured after carrying out concrete between body, forms a stay.
The present invention compared with the existing technology, has the advantages that
Fabricated shear wall of the present invention is fixed by bolts flange and adds between two walls mutually spliced The method of strength rib, splicing is more reasonable, quality of connection and effect can be effectively ensured, to construction environment and operator's technical level Requirement it is lower, speed of application can be improved.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that fabricated shear wall of the present invention mutually splices.
Fig. 2 is the structural schematic diagram mutually spliced at another visual angle of fabricated shear wall of the present invention.
Fig. 3 is the stereoscopic schematic diagram in second embodiment of the invention under the splicing state of fabricated shear wall.
Fig. 4 is the side view in second embodiment of the invention under the splicing state of fabricated shear wall.
Specific embodiment
Below with reference to embodiment, the present invention is described in further detail, and embodiments of the present invention are not limited thereto.
Embodiment 1
As depicted in figs. 1 and 2, a kind of fabricated shear wall of the present embodiment, including wall 1, multiple ribbed stiffeners 2, multiple welderings Tie rod 3 and the continuous steel plate 4 of muti-piece are connect, can mutually be spliced between the wall and wall.
As depicted in figs. 1 and 2, the splicing side of wall is equipped with flange 5, and wall has front end face and rear end face, and flange is with before End face is mutually perpendicular to, and has multiple fixation holes on flange, and bolt 6 passes through fixation hole, two mutually spliced are bolted Flange on wall, multiple ribbed stiffeners, which are respectively perpendicular, is connected to flange and front end face, multiple ribbed stiffeners and multiple fixation holes difference Interval setting, ribbed stiffener prevent the buckling of wall, enable effectively to transmit the internal force between two walls mutually spliced, mention The globality between two walls that height mutually splices.
As depicted in figs. 1 and 2, welding tie rod one end vertical welding is located at rear end face rear in rear end face, other end welding Another wall front end face, casting concrete forms stay between two walls of front and back, guarantees concrete and wall Physical efficiency preferably cooperates.
As depicted in figs. 1 and 2, the continuous steel plate of muti-piece, which is respectively perpendicular, is welded in rear end face, and continuous steel plate is along rear end face overall height Arrangement, continuous steel plate and the setting of welding tie rod interval, the continuous steel plate alignment on two walls mutually spliced, continuous steel plate with By being welded and fixed between continuous steel plate, continuous steel plate guarantees that concrete can preferably cooperate with wall.
The construction method of above-mentioned fabricated shear wall first opens up fixation hole on flange, multiple ribbed stiffeners is welded to connect In flange and front end face, the rear end face welding continuous steel plate of muti-piece of wall and multiple welding tie rods pass through fixation hole using bolt Flange on mutually splice two walls is fixedly connected, then passes through the continuous steel plate on mutually splice two walls It is welded and fixed, then the front end face for welding tie rod and another wall at wall rear is welded to connect, finally in two wall of front and back It is poured after carrying out concrete between body, forms a stay.
Embodiment 2
As shown in Figure 3 and Figure 4, the present embodiment the difference from embodiment 1 is that, wall be equipped with run through front end face and rear end The perforation (not shown) in face, the steel when there is the horizontal member vertical with stay (such as crossbeam) to pass through, in horizontal member Muscle 7 passes through perforation, pours rear horizontal direction component and vertical member forms entirety.
Embodiment 3
The present embodiment the difference from embodiment 1 is that, the wall be it is rectangular, four sides of wall all have flange, Make each wall that there is the flange for connection, does not need individually to select middle wall body and edge wall, facilitate construction, also just In batch production.
As described above, the present invention can be better realized, above-described embodiment is only presently preferred embodiments of the present invention, is not used To limit practical range of the invention;It is i.e. all according to equivalent changes and modifications made by the content of present invention, all wanted for right of the present invention Range claimed is asked to be covered.

Claims (10)

1. a kind of fabricated shear wall, which is characterized in that, can phase between the wall and wall including wall and multiple ribbed stiffeners Mutually splicing, wall are at least equipped with flange in splicing side, and wall has front end face and rear end face, and flange is mutually perpendicular to front end face, There are multiple fixation holes, bolt passes through fixation hole, the flange on two walls mutually spliced is bolted, more on flange A ribbed stiffener is connect with flange and front end face respectively.
2. fabricated shear wall according to claim 1, which is characterized in that the ribbed stiffener is vertically connected at flange with before End face.
3. fabricated shear wall according to claim 1, which is characterized in that the ribbed stiffener and fixation hole interval are arranged.
4. fabricated shear wall according to claim 1, which is characterized in that further include multiple welding tie rods, weld tie rod One end is vertically connected at rear end face, and other end connection is located at the front end face of another wall at rear end face rear, positioned at the two of front and back Casting concrete forms stay between wall.
5. fabricated shear wall according to claim 4, which is characterized in that further include the continuous steel plate of muti-piece, continuous steel plate Vertical welding is arranged in rear end face, continuous steel plate along rear end face overall height.
6. fabricated shear wall according to claim 5, which is characterized in that the continuous steel plate is set with welding tie rod interval It sets.
7. fabricated shear wall according to claim 5, which is characterized in that the continuous steel on two walls mutually spliced Plate alignment, by being welded and fixed between continuous steel plate and continuous steel plate.
8. fabricated shear wall according to claim 1, which is characterized in that the wall is equipped with through front end face with after The perforation of end face.
9. fabricated shear wall according to claim 1, which is characterized in that the wall is rectangular, four sides of wall While all having flange.
10. a kind of construction method of any fabricated shear wall of claim 1-9, which is characterized in that first on flange Open up fixation hole, multiple ribbed stiffeners be welded to connect in flange and front end face, the rear end face setting continuous steel plate of muti-piece of wall and Multiple welding tie rods pass through fixation hole using bolt and are fixedly connected with the flange on mutually splice two walls, then by phase The continuous steel plate on two walls mutually spliced is by being welded and fixed, then before welding tie rod and another wall at wall rear End face is welded to connect, and is poured after finally carrying out concrete between two wall of front and back, is formed a stay.
CN201910004724.6A 2019-01-03 2019-01-03 A kind of fabricated shear wall and construction method Pending CN109853782A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910004724.6A CN109853782A (en) 2019-01-03 2019-01-03 A kind of fabricated shear wall and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910004724.6A CN109853782A (en) 2019-01-03 2019-01-03 A kind of fabricated shear wall and construction method

Publications (1)

Publication Number Publication Date
CN109853782A true CN109853782A (en) 2019-06-07

Family

ID=66893759

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910004724.6A Pending CN109853782A (en) 2019-01-03 2019-01-03 A kind of fabricated shear wall and construction method

Country Status (1)

Country Link
CN (1) CN109853782A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112726942A (en) * 2021-01-27 2021-04-30 北京市住宅产业化集团股份有限公司 Concrete prefabricated shear wall structure with sandwich steel plates and construction method
CN113202208A (en) * 2021-04-30 2021-08-03 福州大学 Assembled steel-concrete combined shear wall and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010013858A1 (en) * 2008-07-30 2010-02-04 Korea Hydro & Nuclear Power Co., Ltd Steel plate structure and steel plate concrete wall
CN104563333A (en) * 2014-12-30 2015-04-29 长安大学 Exterior steel plate and in-fill concrete combined shear wall
CN204983269U (en) * 2015-05-31 2016-01-20 山东建筑大学 Assembled double -layer steel plate intussuseption concrete compound shear wall structure system
CN105780971A (en) * 2016-03-31 2016-07-20 初明进 I-shaped steel and concrete combined structural member
CN106869329A (en) * 2017-04-12 2017-06-20 山东科技大学 The splicing of assembling steel plate concrete shear force wall scene node and its construction method
CN206328896U (en) * 2016-12-30 2017-07-14 杭州汉拓建筑设计有限公司 A kind of lattice pillar compound shear wall
CN209637027U (en) * 2019-01-03 2019-11-15 华南理工大学 A kind of fabricated shear wall

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010013858A1 (en) * 2008-07-30 2010-02-04 Korea Hydro & Nuclear Power Co., Ltd Steel plate structure and steel plate concrete wall
CN104563333A (en) * 2014-12-30 2015-04-29 长安大学 Exterior steel plate and in-fill concrete combined shear wall
CN204983269U (en) * 2015-05-31 2016-01-20 山东建筑大学 Assembled double -layer steel plate intussuseption concrete compound shear wall structure system
CN105780971A (en) * 2016-03-31 2016-07-20 初明进 I-shaped steel and concrete combined structural member
CN206328896U (en) * 2016-12-30 2017-07-14 杭州汉拓建筑设计有限公司 A kind of lattice pillar compound shear wall
CN106869329A (en) * 2017-04-12 2017-06-20 山东科技大学 The splicing of assembling steel plate concrete shear force wall scene node and its construction method
CN209637027U (en) * 2019-01-03 2019-11-15 华南理工大学 A kind of fabricated shear wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112726942A (en) * 2021-01-27 2021-04-30 北京市住宅产业化集团股份有限公司 Concrete prefabricated shear wall structure with sandwich steel plates and construction method
CN113202208A (en) * 2021-04-30 2021-08-03 福州大学 Assembled steel-concrete combined shear wall and construction method thereof

Similar Documents

Publication Publication Date Title
CN106567458B (en) Assembled steel-is mixed to combine Beam-post Frame Structure system
CN206289751U (en) A kind of assembled steel plate concrete combined shear wall and floor support plate connecting node
CN106677336A (en) Connecting joint structure of square concrete filled steel tubular column and I-shaped section steel beam
CN109057023A (en) One kind is for rigidly connected node structure of beam column of steel structure and preparation method thereof, Housing Structure System
CN106703184A (en) Connection node construction of concrete-filled square steel tube column and rectangular section steel beam
CN105863111A (en) Embedded prefabricated concrete shear wall anti-bending steel frame structure
CN103883025B (en) Assembling type combination steel plate shear wall
CN209637027U (en) A kind of fabricated shear wall
CN108678220A (en) A kind of concrete shear force wall of steel bar template integrative installation technology
CN109853782A (en) A kind of fabricated shear wall and construction method
CN208201914U (en) One kind is faced forever in conjunction with covered back-digging structure
CN108571063A (en) A kind of shear wall structure building assembly System Design
CN108867869A (en) A kind of separate type bracket node structure and production method, Housing Structure System for beam column of steel structure connection
CN107130715A (en) Teeth groove is poured after a kind of to be linked and packed the construction method of formula building roof system
CN208950057U (en) One kind being used for the rigidly connected node structure of beam column of steel structure and Housing Structure System
CN107130716A (en) After pour teeth groove and be linked and packed formula building roof system
CN208293814U (en) A kind of fabricated shear wall horizontal connection structure
CN206769150U (en) After pour teeth groove and be linked and packed formula building roof system
CN206829461U (en) After pour teeth groove and be linked and packed formula precast slab
CN108951862A (en) One kind is for rolling girder steel and the rigidly connected node structure of steel column and production method, Housing Structure System
CN205935193U (en) Concrete frame with high steadiness beam column node
CN209179178U (en) A kind of assembled beam-column node structure positioned at plastic zone energy dissipation
CN105735529B (en) A kind of stull formula steel frame steel plate shear wall structure being easily assembled
CN209053231U (en) A kind of separate type bracket node structure and Housing Structure System for beam column of steel structure connection
CN208870184U (en) One kind being used for the rigidly connected node structure of beam column of steel structure and Housing Structure System

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination