CN108571094A - Web holes part compound shear wall-composite coupling beams coupled wall and preparation method thereof - Google Patents

Web holes part compound shear wall-composite coupling beams coupled wall and preparation method thereof Download PDF

Info

Publication number
CN108571094A
CN108571094A CN201810617114.9A CN201810617114A CN108571094A CN 108571094 A CN108571094 A CN 108571094A CN 201810617114 A CN201810617114 A CN 201810617114A CN 108571094 A CN108571094 A CN 108571094A
Authority
CN
China
Prior art keywords
web
coupling beams
composite coupling
trepanning
lattice
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810617114.9A
Other languages
Chinese (zh)
Other versions
CN108571094B (en
Inventor
徐国军
蒋路
张莉莉
杨宇焜
宋生志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Green Building Design Shanghai Co ltd
Jinggong Lvzhu Technology Group Co ltd
Zhejiang Green Building Integration Technology Co Ltd
Original Assignee
Zhejiang Green Building Integration Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Green Building Integration Technology Co Ltd filed Critical Zhejiang Green Building Integration Technology Co Ltd
Priority to CN201810617114.9A priority Critical patent/CN108571094B/en
Publication of CN108571094A publication Critical patent/CN108571094A/en
Application granted granted Critical
Publication of CN108571094B publication Critical patent/CN108571094B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • E04B2/58Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces

Abstract

This application involves a kind of web holes part compound shear wall composite coupling beams coupled walls and preparation method thereof, including at least 2 PEC shear walls, and composite coupling beams, the PEC shear walls are the H profile steel skeletons being formed by connecting with multiple one words of T shaped steels and are filled in the intraskeletal Combined concrete of H profile steel and form;Along the length direction of H profile steel skeleton, in the spaced set trepanning of web center;The composite coupling beams include H profile steel beam, the H profile steel beam includes steel beam web plate and the steel beam flange for being set to steel beam web plate both ends, hole is opened up in steel beam web plate center, multi-disc PEC shear walls are connected piecewise by composite coupling beams and form novel compositions shear wall composite coupling beams coupled wall.Combination prefabricated components in part are prepared using the achievable web holes pouring type of the present invention, one-time-concreting, primary maintenance may be implemented, reduce the period prepared by component.

Description

Web holes part compound shear wall-composite coupling beams coupled wall and preparation method thereof
Technical field:
This application involves a kind of building element and its construction methods, more particularly to a kind of web holes part compound shear wall- Composite coupling beams coupled wall and preparation method thereof, belongs to construction engineering technical field.
Background technology:
Part outsourcing compound shear wall(Partially Encased Composite Shear Wall, hereinafter referred to as PEC shearings Wall)It is a kind of novel fabricated steel-concrete compound shear wall, the shear wall is without carrying out vertical and horizontal steel bar tie up It pricks, overall construction is simple;Component can be completed in factory process, and scene only carries out splicing installation, can ensure component construction quality On the basis of efficiently reduce construction period, have good economic benefits.
Coupled wall system is that two panels or multi-disc shear wall are connected with concrete connecting-beam, resists water as a whole Tilting moment under flat force effect.Coupling beam transmits the vertical load between adjacent wall limb, causes to generate couple to resist earthquake Tilting moment.
Since traditional PEC shearing wall preparation methods are to be horizontally arranged H profile steel component in such a way that web is parallel to ground On pedestal, in the both ends branch cheek board of steel member, toward casting concrete between web and the edge of a wing, wait for that the concrete of component side is supported After shield knot is hard, flip component, then pour another side.This preparation method needs to carry out curing concrete twice to a component, Period prepared by component is longer.
Invention content:
In view of the above-mentioned drawbacks of the prior art, the purpose of the present invention is to provide a kind of web holes part combined shears Wall-composite coupling beams coupled wall combines two panels or the outsourcing of multi-disc part(PEC)Shear wall is connected with steel coupling beam;And For Optimizing construction technique, implements web holes pouring type and prepare part combination prefabricated components, one-time-concreting may be implemented, once support Shield reduces the period prepared by component.
To achieve the goals above, the technical solution adopted by the present invention is:A kind of web holes part compound shear wall- Composite coupling beams coupled wall, including 2 or 2 or more PEC shear walls, and the composite coupling beams for connecting PEC shear walls, institute The PEC shear walls stated are the H profile steel skeletons being formed by connecting with multiple one words of T shaped steels and are filled in the intraskeletal coagulation of H profile steel Soil is composed;The H profile steel skeleton includes web and the wing plate perpendicular to web, along the length direction of H profile steel skeleton, The spaced set trepanning of web center;The composite coupling beams include H profile steel beam and the coagulation local soil type that is filled in H profile steel beam At the H profile steel beam includes steel beam web plate and the steel beam flange for being set to steel beam web plate both ends, is opened in steel beam web plate center Multi-disc PEC shear walls are connected by composite coupling beams and form novel compositions shear wall-composite coupling beams coupled wall by apertured hole piecewise.
The application be further disposed in:
The H profile steel skeleton is formed by connecting using one word of at least three T shaped steels, and H profile steel skeleton is divided into centre by wing plate Middle area's lattice and both sides border area lattice, along the length direction of H profile steel skeleton, the web of middle area's lattice and border area lattice center equidistantly Trepanning is set.
The trepanning size and spacing can be adjusted according to the length and width of girder steel, and trepanning is made to be suitble to concrete flowing.
Further, the trepanning of both sides border area lattice is symmetrical set, the trepanning of position of opening and border area lattice on middle area's lattice In being staggered, the connecting portion of PEC shear walls and composite coupling beams does not set trepanning for position.
Distance of the trepanning of border area lattice away from PEC shear walls bottom be more than middle area's lattice trepanning away from PEC shear walls bottom away from From.
Preferably, it is welded perpendicular to the left and right of steel beam flange at the left and right beam side 50mm of distance between the steel beam flange of both sides Vertical stiffener, the fill concrete between upper and lower steel beam flange and left and right vertical stiffener, forming portion subassembly coupling beam.
In the PEC shear walls upper, lower horizontal is welded close to the border area lattice position of composite coupling beams connecting node to stiffener, The upper, lower horizontal is corresponding with the upper and lower steel beam flange of composite coupling beams to the installation position of stiffener.
The lateral stiffening plate thickness is composite coupling beams web thickness tf+2.
Another object of the present invention is to provide a kind of web holes part compound shear wall-composite coupling beams coupled walls Production method.
In order to realize that the second purpose, the technical solution adopted by the present invention be:
A kind of production method of web holes part compound shear wall-composite coupling beams coupled wall comprising following steps:
1)The H profile steel skeleton being formed by connecting by multiple one words of T shaped steels;
2)Along H profile steel skeleton length direction steel skeleton middle area's lattice and border area lattice the spaced set trepanning of web center, The trepanning of both sides border area lattice is symmetrical set, and the position of opening of the position of opening on middle area's lattice and border area lattice is in be staggered, PEC The trepanning of shear wall and composite coupling beams connecting portion not trepanning, border area lattice is more than middle area's lattice away from the distance of PEC shear walls bottom Distance of the trepanning away from PEC shear walls bottom;
3)H profile steel skeleton formwork after trepanning is poured, web is up in horizontal positioned, both ends branch cheek board, from abdomen Casting concrete above plate face constantly vibrates in casting process so that concrete is reached enough by open flow to web lower part Enough compactness realize that unilateral side pours preparation part combination prefabricated components;
4)Open up hole in the steel beam web plate of H profile steel beam, after trepanning steel beam web plate away from the 50mm of wall side weld vertical stiffener, When pouring, web is in horizontal positioned, the casting concrete above web surface upward, is constantly vibrated in casting process so that coagulation Soil reaches enough compactness by open flow to web lower part, completes the prefabricated of composite coupling beams;
5)After PEC shear walls and the equal pouring molding of composite coupling beams, the coupling beam edge of a wing is welded on web on left and right PEC shear walls, Form PEC coupled walls.
Compared with prior art the beneficial effects of the present invention are:
1, PEC shear walls and composite coupling beams can be prefabricated in the factory molding, greatly reduce site operation working hour, keep site operation fast Degree is fast, and assembly rate is high.
2, it is both provided with trepanning on prefabricated PEC shear walls and composite coupling beams component web, PEC shear walls may be implemented With the concrete in composite coupling beams can unilateral side pour, and primary concreting complete, component conservation is primary, reduce construction working hour with And curing time.
3, vertical stiffener is welded at the 50mm of beam side in composite coupling beams, this section is made to play resistance in casting concrete Every effect, the fastness for both being welded to connect, and ensureing connection convenient for coupling beam and PEC shear walls.
4, lateral stiffening plate is welded close to the border area lattice position of steel coupling beam connecting node in PEC shear walls, further strengthened The rigidity of node region.
The application is described in further detail with reference to the accompanying drawings and detailed description.
Description of the drawings:
Fig. 1 is the front view of web holes part compound shear wall-composite coupling beams coupled wall of the application;
Fig. 2 is the stereogram of Fig. 1;
Fig. 3 is the vertical view of Fig. 1;
Fig. 4 is that the monolithic PEC shear walls of the application pour front and back structural schematic diagram;
Fig. 5 is that the composite coupling beams of the application pour front and back structural schematic diagram.
Specific implementation mode:
As shown in attached drawing 1 to attached drawing 5, a kind of web holes part compound shear wall-composite coupling beams coupled wall of the application, including 2 or 2 or more PEC shear walls 1, and the composite coupling beams 2 for connecting PEC shear walls 1, will be more by composite coupling beams 2 Piece PEC shear walls 1 connect form novel compositions shear wall-composite coupling beams coupled wall piecewise.
The PEC shear walls 1 are the H profile steel skeletons 11 being formed by connecting with multiple one words of T shaped steels and are filled in H profile steel Concrete 3 in skeleton 11 is composed.
The H profile steel skeleton 11 includes web 12 and the wing plate 13 perpendicular to web 12, in the present embodiment, described H profile steel skeleton 11 is formed by connecting using 3 one words of T shaped steels, and H profile steel skeleton 11 is divided into intermediate middle area's lattice by wing plate 13 14 and both sides border area lattice 15, along the length direction of H profile steel skeleton 11, between web center of middle area's lattice 14 and border area lattice 15 etc. Away from setting trepanning 16,16 size of trepanning and spacing can be adjusted according to the physical length of girder steel and width so that trepanning 16 suitable concrete flowings.By being arranged a large amount of trepannings 16 on the web of H profile steel skeleton 11,11 both sides of perforation H profile steel skeleton, It is when pouring, the web of H profile steel skeleton 11 is face-up, only it need to pass through trepanning 16 in the unilateral casting concrete of web 12, concrete 12 other side of web is flowed into, overall effect only can be reached by one-time-concreting.
In order to ensure that the intensity of prefabricated PEC shear walls 1, the trepanning 16 of both sides border area lattice 15 are symmetrical set, middle area's lattice 16 position of trepanning of 16 position of trepanning and border area lattice 15 on 14 is in be staggered, the connection of PEC shear walls 1 and composite coupling beams 2 Position does not set trepanning, and the trepanning that the trepannings 16 of border area lattice 14 is more than middle area's lattice 14 away from the distance of 1 bottom of PEC shear walls is cut away from PEC The distance of 1 bottom of power wall.
The composite coupling beams 2 include that H profile steel beam 21 and the concrete 3 being filled in H profile steel beam 21 form, described H profile steel beam 21 includes steel beam web plate 22 and the steel beam flange 23 for being set to 22 both ends of steel beam web plate, in 22 center of steel beam web plate Open up hole 24,24 size of hole, quantity are determined by the developed width of girder steel, length;The spacing of steel beam flange 23 in both sides From welding at left and right beam side 50mm perpendicular to the left and right vertical stiffener 25 of steel beam flange 23, in 23 He of upper and lower steel beam flange Fill concrete between left and right vertical stiffener 25, forming portion subassembly coupling beam 2.In the application, welded at the 50mm of beam side Vertical stiffener 25 is connect, this section can be made to play iris action in casting concrete, ensures composite coupling beams 2 and PEC shear walls 1 Be welded to connect.
Upper, lower horizontal is welded to adding close to 15 position of border area lattice of 2 connecting node of composite coupling beams in the PEC shear walls 1 Strength plate 17, the upper, lower horizontal is corresponding with the upper and lower steel beam flange 23 of composite coupling beams 2 to the installation position of stiffener 17, Thickness is 2 web thickness tf+2 of composite coupling beams;Its purpose is used to reinforce the stability and firmness of node region.
The production method of web holes part compound shear wall-composite coupling beams coupled wall of the application is as follows:
1)The H profile steel skeleton 11 being formed by connecting by multiple one words of T shaped steels.
2)Length direction along H profile steel skeleton is equidistantly set in middle area's lattice 14 of steel skeleton and the web center of border area lattice 15 Trepanning 16 is set, the trepanning 16 of both sides border area lattice 15 is symmetrical set, and 16 position of trepanning on middle area's lattice 14 is opened with border area lattice 15 16 position of hole is in being staggered, and PEC shear walls 1 and 2 connecting portion not trepanning of composite coupling beams, the trepanning 16 of border area lattice 14 is away from PEC The distance of 1 bottom of shear wall is more than distance of the trepanning away from 1 bottom of PEC shear walls of middle area's lattice 14.
3)11 formwork of H profile steel skeleton after trepanning is poured, web up in horizontal positioned, aid the border areas mould by both ends Plate, the casting concrete above web surface constantly vibrate in casting process so that concrete passes through under open flow to web Portion reaches enough compactness, realizes that unilateral side pours preparation part combination prefabricated components, as shown in Figure 3.
4)Hole 24 is opened up in the steel beam web plate 22 of H profile steel beam, in steel beam web plate 22 away from welding at the 50mm of wall side after trepanning Vertical stiffener 25, when pouring, web is in be horizontally arranged upward, the casting concrete above web surface, in casting process constantly It vibrates so that concrete reaches enough compactness by open flow to web lower part, completes the prefabricated of composite coupling beams.It pours When building, due to the vertical stiffener 25 of setting barrier both sides, does not pour to separate this position, cut convenient for composite coupling beams 2 and PEC Power wall 1 is welded to connect.
5)After PEC shear walls and the equal pouring molding of composite coupling beams, the coupling beam edge of a wing is welded on left and right PEC with web and shears On wall, PEC coupled walls are formed, as shown in Figure 1.
The above content is the preferred embodiments of combination the invention to further detailed made by provided technical solution Describe in detail bright, and it cannot be said that the invention specific implementation is confined to these above-mentioned explanations, for the affiliated technology of the invention For the those of ordinary skill in field, without departing from the concept of the premise of the invention, several simple deductions can also be made Or replace, it all shall be regarded as belonging to the protection domain of the invention.

Claims (9)

1. a kind of web holes part compound shear wall-composite coupling beams coupled wall, it is characterised in that:Including 2 or 2 or more PEC shear walls, and the composite coupling beams for connecting PEC shear walls, the PEC shear walls are with multiple one words of T shaped steels It the H profile steel skeleton that is formed by connecting and is filled in the intraskeletal Combined concrete of H profile steel and forms;The H profile steel skeleton includes abdomen Plate and wing plate perpendicular to web, along the length direction of H profile steel skeleton, in the spaced set trepanning of web center;The group Close coupling beam include H profile steel beam and the coagulation local soil type being filled in H profile steel beam at, the H profile steel beam include steel beam web plate with And it is set to the steel beam flange at steel beam web plate both ends, hole is opened up in steel beam web plate center, is cut multi-disc PEC by composite coupling beams Power wall connects piecewise forms novel compositions shear wall-composite coupling beams coupled wall.
2. a kind of web holes part compound shear wall-composite coupling beams coupled wall according to claim 1, feature exist In:The H profile steel skeleton is formed by connecting using one word of at least three T shaped steels, and H profile steel skeleton is divided into centre by wing plate Middle area's lattice and both sides border area lattice, along the length direction of H profile steel skeleton, the web of middle area's lattice and border area lattice center equidistantly Trepanning is set.
3. a kind of web holes part compound shear wall-composite coupling beams coupled wall according to claim 1 or 2, feature It is:The trepanning size and spacing can be adjusted according to the length and width of girder steel, and trepanning is made to be suitble to concrete flowing.
4. a kind of web holes part compound shear wall-composite coupling beams coupled wall according to claim 2, feature exist In:The trepanning of both sides border area lattice is symmetrical set, and the position of opening of the position of opening on middle area's lattice and border area lattice is in be staggered, The connecting portion of PEC shear walls and composite coupling beams does not set trepanning.
5. a kind of web holes part compound shear wall-composite coupling beams coupled wall according to claim 2 or 4, feature It is:Distance of the trepanning of border area lattice away from PEC shear walls bottom is more than the trepanning of middle area's lattice away from the distance of PEC shear walls bottom.
6. a kind of web holes part compound shear wall-composite coupling beams coupled wall according to claim 5, feature exist In:The left and right vertical stiffener perpendicular to steel beam flange is welded at the left and right beam side 50mm of distance between the steel beam flange of both sides, The fill concrete between upper and lower steel beam flange and left and right vertical stiffener, forming portion subassembly coupling beam.
7. a kind of web holes part compound shear wall-composite coupling beams coupled wall according to claim 6, feature exist In:It is described in the PEC shear walls close to the border area lattice position of composite coupling beams connecting node welding upper, lower horizontal to stiffener Upper, lower horizontal it is corresponding with the upper and lower steel beam flange of composite coupling beams to the installation position of stiffener.
8. a kind of web holes part compound shear wall-composite coupling beams coupled wall according to claim 7, feature exist In:The lateral stiffening plate thickness is composite coupling beams web thickness tf+2.
9. a kind of system of web holes part compound shear wall-composite coupling beams coupled wall according to one of claim 1-8 It is as follows to make method:
1)The H profile steel skeleton being formed by connecting by multiple one words of T shaped steels;
2)Along H profile steel skeleton length direction steel skeleton middle area's lattice and border area lattice the spaced set trepanning of web center, The trepanning of both sides border area lattice is symmetrical set, and the position of opening of the position of opening on middle area's lattice and border area lattice is in be staggered, PEC The trepanning of shear wall and composite coupling beams connecting portion not trepanning, border area lattice is more than middle area's lattice away from the distance of PEC shear walls bottom Distance of the trepanning away from PEC shear walls bottom;
3)H profile steel skeleton formwork after trepanning is poured, web is up in horizontal positioned, both ends branch cheek board, from abdomen Casting concrete above plate face constantly vibrates in casting process so that concrete is reached enough by open flow to web lower part Enough compactness realize that unilateral side pours preparation part combination prefabricated components;
4)Open up hole in the steel beam web plate of H profile steel beam, after trepanning steel beam web plate away from the 50mm of wall side weld vertical stiffener, When pouring, web is in horizontal positioned, the casting concrete above web surface upward, is constantly vibrated in casting process so that coagulation Soil reaches enough compactness by open flow to web lower part, completes the prefabricated of composite coupling beams;
5)After PEC shear walls and the equal pouring molding of composite coupling beams, the coupling beam edge of a wing is welded on web on left and right PEC shear walls, Form PEC coupled walls.
CN201810617114.9A 2018-06-15 2018-06-15 Web plate open hole part combined shear wall-combined connecting beam connecting limb wall and manufacturing method thereof Active CN108571094B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810617114.9A CN108571094B (en) 2018-06-15 2018-06-15 Web plate open hole part combined shear wall-combined connecting beam connecting limb wall and manufacturing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810617114.9A CN108571094B (en) 2018-06-15 2018-06-15 Web plate open hole part combined shear wall-combined connecting beam connecting limb wall and manufacturing method thereof

Publications (2)

Publication Number Publication Date
CN108571094A true CN108571094A (en) 2018-09-25
CN108571094B CN108571094B (en) 2023-11-10

Family

ID=63573193

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810617114.9A Active CN108571094B (en) 2018-06-15 2018-06-15 Web plate open hole part combined shear wall-combined connecting beam connecting limb wall and manufacturing method thereof

Country Status (1)

Country Link
CN (1) CN108571094B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258845A (en) * 2019-05-22 2019-09-20 浙江绿筑集成科技有限公司 A kind of construction method of steel coupling beam-PEC coupled walls rigid connection node construction
CN110453850A (en) * 2019-07-22 2019-11-15 重庆大学 A kind of assembled steel Combined concrete coupling beam
CN114135054A (en) * 2021-11-23 2022-03-04 福建省城投科技有限公司 Full-covering type fireproof support column, pouring mold and pouring method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437457A (en) * 2013-08-16 2013-12-11 长安大学 Replaceable steel coupling beam and double-steel-plate high-strength concrete combined coupled shear wall
WO2014193323A1 (en) * 2013-05-27 2014-12-04 Süleyman Bahadir Yüksel Shear and bending reinforcements of coupling beams of coupled shear walls
CN205688619U (en) * 2016-05-17 2016-11-16 长安大学 A kind of steel coupling beam-double-layer plate Combined concrete Coupled Shear Wall
CN107053456A (en) * 2017-05-04 2017-08-18 浙江绿筑集成科技有限公司 Combine the preparation method of prefabricated components in a kind of web holes cast-type part
CN108035483A (en) * 2017-12-19 2018-05-15 浙江绿筑集成科技有限公司 H-type edge posts are put more energy into arc floor steel reinforced concrete compound shear wall and production method
CN208545847U (en) * 2018-06-15 2019-02-26 浙江绿筑集成科技有限公司 A kind of web holes part compound shear wall-composite coupling beams coupled wall

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014193323A1 (en) * 2013-05-27 2014-12-04 Süleyman Bahadir Yüksel Shear and bending reinforcements of coupling beams of coupled shear walls
CN103437457A (en) * 2013-08-16 2013-12-11 长安大学 Replaceable steel coupling beam and double-steel-plate high-strength concrete combined coupled shear wall
CN205688619U (en) * 2016-05-17 2016-11-16 长安大学 A kind of steel coupling beam-double-layer plate Combined concrete Coupled Shear Wall
CN107053456A (en) * 2017-05-04 2017-08-18 浙江绿筑集成科技有限公司 Combine the preparation method of prefabricated components in a kind of web holes cast-type part
CN108035483A (en) * 2017-12-19 2018-05-15 浙江绿筑集成科技有限公司 H-type edge posts are put more energy into arc floor steel reinforced concrete compound shear wall and production method
CN208545847U (en) * 2018-06-15 2019-02-26 浙江绿筑集成科技有限公司 A kind of web holes part compound shear wall-composite coupling beams coupled wall

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258845A (en) * 2019-05-22 2019-09-20 浙江绿筑集成科技有限公司 A kind of construction method of steel coupling beam-PEC coupled walls rigid connection node construction
CN110453850A (en) * 2019-07-22 2019-11-15 重庆大学 A kind of assembled steel Combined concrete coupling beam
CN114135054A (en) * 2021-11-23 2022-03-04 福建省城投科技有限公司 Full-covering type fireproof support column, pouring mold and pouring method
CN114135054B (en) * 2021-11-23 2023-11-03 福建左海科技有限公司 Full-package type fireproof support column, pouring mold and pouring method

Also Published As

Publication number Publication date
CN108571094B (en) 2023-11-10

Similar Documents

Publication Publication Date Title
CN105002816B (en) The fish belly I shape prestressing force steel reinforced concrete composite continuous bridge of precast assembly and construction method
CN208545847U (en) A kind of web holes part compound shear wall-composite coupling beams coupled wall
CN108571094A (en) Web holes part compound shear wall-composite coupling beams coupled wall and preparation method thereof
CN107419824A (en) The full precast shear wall structural system of regenerative steel skeleton and construction method
CN106223183B (en) Assembled concrete-filled rectangular steel tube combines truss bridge and construction method
CN108756061A (en) A kind of partial precast assembly prestress steel reinforced concrete hybrid beam and construction method
CN110409617A (en) Zigzag double fastener plate node assembled H profile steel beam quadrate steel pipe column steel structure system
CN110273544A (en) The production method that part cladding steel reinforced concrete shear walls vertically splice tempering node
CN209760578U (en) Novel hidden beam type connecting full-prefabricated plate structure
CN108775098A (en) The production method of across floor PEC shear walls-steel coupling beam coupled wall connecting node
CN110512765A (en) A kind of fabricated shear wall and construction method with steel plate peg combined type diagonal brace
CN110439142A (en) A kind of assembly concrete shear wall and construction method with H profile steel diagonal brace
CN107419810A (en) A kind of rectangular steel-tube concrete column and beam and slab type superstructure attachment means and its construction technology
CN106193340A (en) Cast-in-place prestressing without bondn ultralong floor combination type reinforcing strip anti-cracking structure and construction method
CN207017483U (en) The full precast shear wall structural system of regenerative steel skeleton
CN205874944U (en) Double T type wave form steel web profiled steel sheet combination beam
CN209760544U (en) Floor slab with overhanging rectangular ribs and shear wall structure
CN208137189U (en) A kind of Honeycomb Beam X-shaped concealed bracings concrete shear force wall and building
CN108716191A (en) A kind of concrete arch rib Covered with Angles sleeve-board group and its bracing means
CN205874960U (en) Profiled sheet wave form steel web truss combination beam
CN208545849U (en) Across the floor part compound shear wall of one kind-steel coupling beam coupled wall connecting node construction
CN210049435U (en) T-shaped node of upper punch type steel concrete combined pipe of channel steel
CN107201782A (en) A kind of wall of assembled architecture, floor connecting node and method
CN208950062U (en) A kind of assembled steel frame concrete building plate composite structure
CN208899352U (en) A kind of concrete arch rib Covered with Angles sleeve-board group and its bracing means

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20231012

Address after: 312000 Building 1, 816 Bujin Road, Qixian street, Keqiao District, Shaoxing City, Zhejiang Province

Applicant after: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

Applicant after: Green Building Design (Shanghai) Co.,Ltd.

Applicant after: Jinggong Lvzhu Technology Group Co.,Ltd.

Address before: 312030 Shaoxing, Keqiao, Zhejiang Keqiao Economic Development Zone, the second phase of the North Industrial Park, Merlin Road South.

Applicant before: ZHEJIANG GREEN BUILDING INTEGRATION TECHNOLOGIES Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant