CN110439142A - A kind of assembly concrete shear wall and construction method with H profile steel diagonal brace - Google Patents
A kind of assembly concrete shear wall and construction method with H profile steel diagonal brace Download PDFInfo
- Publication number
- CN110439142A CN110439142A CN201910698547.6A CN201910698547A CN110439142A CN 110439142 A CN110439142 A CN 110439142A CN 201910698547 A CN201910698547 A CN 201910698547A CN 110439142 A CN110439142 A CN 110439142A
- Authority
- CN
- China
- Prior art keywords
- shear
- plate
- wall
- sleeper
- wall element
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
The invention discloses a kind of assembly concrete shear walls and construction method with H profile steel diagonal brace, and wherein concrete shear force wall includes the first shear-wall element and the second shear-wall element in mounted on top, and is connected and fixed between the two by bindiny mechanism;First shear-wall element and the second shear-wall element all have shear wall structure;Shear wall frame is surrounded by left sleeper, upper concealed beam, right sleeper and lower concealed beam;The front and rear sides of shear wall frame are fixed with the first facade steel plate and the second facade steel plate;Skewed horizontal load part is fixed in shear wall frame;Skewed horizontal load part includes two H profile steels, and two H profile steels intersect in X-type structure.In shear wall frame, the equal casting concrete of edge posts.The present invention improves anti-side rigidity, shear-carrying capacity, anti-bending bearing capacity, ductility and energy dissipation capacity in the face of shear wall by the design of skewed horizontal load part, while shear-wall element can pre-install the construction at the scene of facilitating in advance.
Description
Technical field
The present invention relates to construction engineering technical fields, more particularly to a kind of assembly concrete with H profile steel diagonal brace
Shear wall and construction method.
Background technique
In Super High Mixed Architecture, shear wall is a kind of important lateral resistant member.With building structure height
Increase, common cast-in-situ steel reinforced concrete shear wall is unable to satisfy building requirement, deficiency in economic performance.
The use of double-layer plate-combined concrete shear wall has given full play to that Resistance of Reinforced Concrete Structures side rigidity is big and steel
The good advantage of structure ductility, improves the bearing capacity and anti-seismic performance of shear wall, while avoiding reinforced concrete structure ductility
Difference, energy consumption difference and steel construction lateral resistant ability are poor, are easy to appear the disadvantages of local buckling.
Shear wall with diagonal brace adds the oblique branch that reinforcing bar or fashioned iron are constituted on the basis of common shear wall arrangement of reinforcement
Support has better anti-seismic performance compared to common shear wall, effectively improves rigidity, energy dissipation capacity and ductility, while oblique branch
Support plays restriction effect to the development of concrete panel diagonal crack.But use plus the concealed bracings that are formed with vertical muscle and stirrup or
The ordinary reinforced concrete shear wall of type steel support will appear the problem that partial reinforcement quantity is excessive, structural form is complicated, increase
Site operation difficulty.
Summary of the invention
For the technical problems in the prior art, the object of the present invention is to provide a kind of dresses with H profile steel diagonal brace
With formula concrete shear force wall, anti-side rigidity, shear-carrying capacity, bending resistance in the face of shear wall are improved by the design of simple structure
Bearing capacity, ductility and energy dissipation capacity, while facilitating the construction at scene.
The purpose of the invention is achieved by the following technical solution: including the first shear-wall element, the second shear-wall element and
Bindiny mechanism;
First shear-wall element and second shear-wall element are in mounted on top and between the two by the company
Connection mechanism is connected and fixed;The bindiny mechanism includes the first connecting plate and the second connecting plate;First connecting plate is used for the
It is connected and fixed on front side of the front side of one shear-wall element and the second shear-wall element, second connecting plate is used for the first shearing
It is connected and fixed on rear side of the rear side of wall unit and second shear-wall element;
First shear-wall element and second shear-wall element all have shear wall structure;The shear wall structure
Including left sleeper, right sleeper, upper concealed beam, lower concealed beam, skewed horizontal load part, the first facade steel plate and the second facade steel plate;The left side
Concrete has been poured in sleeper and the right sleeper;The both ends of the upper concealed beam and the lower concealed beam are respectively and fixedly installed to institute
It states on left sleeper and the right sleeper;The left sleeper, the upper concealed beam, the right sleeper and the lower concealed beam surround shear wall
Frame;
The first facade steel plate and the second facade steel plate are separately fixed at the front and rear sides of the shear wall frame;
The skewed horizontal load part is fixed in the shear wall frame;The skewed horizontal load part includes two H profile steels, two H-types
Steel intersects in X-type structure;The H profile steel include the first flange plate, the second flange plate and connection first flange plate and
The web of second flange plate;Several webs for concrete flowing are provided on the web to perforate.
The above-mentioned assembly concrete shear wall with H profile steel diagonal brace, wherein the bindiny mechanism further includes the first spiral shell
Bolt and the second bolt;
First bolt sequentially pass through first connecting plate, first shear-wall element the first facade steel plate,
The upper concealed beam of first shear-wall element, the second facade steel plate of first shear-wall element and second connecting plate are simultaneously
Cooperate with first nut the bindiny mechanism and the first shear-wall element to be connected and fixed;
The first end of second bolt sequentially pass through first connecting plate, second shear-wall element it is first vertical
Face steel plate, the lower concealed beam of second shear-wall element, second shear-wall element the second facade steel plate and described second
Connecting plate simultaneously cooperates with second nut the bindiny mechanism and second shear-wall element to be connected and fixed.
The above-mentioned assembly concrete shear wall with H profile steel diagonal brace, wherein first connecting plate and described second
Connecting plate structure having the same is I-shaped template;First connecting plate includes the first wing plate, the second wing plate and connection institute
State the wing plate connecting plate of the first wing plate and second wing plate;
The left sleeper and second shear-wall element of the position of first wing plate and first shear-wall element
The position of the junction of left sleeper is opposite;
The right sleeper and first shear-wall element of the position of second wing plate and second shear-wall element
The position of the junction of right sleeper is opposite;
The upper concealed beam and second shear-wall element of the wing plate connecting plate position and first shear-wall element
The position of the junction of lower concealed beam is opposite.
The above-mentioned assembly concrete shear wall with H profile steel diagonal brace, wherein first flange plate and described first
The connection of facade Interal fixation, second flange plate are connect with the second facade Interal fixation.
The above-mentioned assembly concrete shear wall with H profile steel diagonal brace, wherein be provided on the first facade steel plate
Compatible with first flange plate first perforates, and is provided on the second facade steel plate and mutually fits with second flange plate
The second perforation matched.
The above-mentioned assembly concrete shear wall with H profile steel diagonal brace, wherein the upper concealed beam and the lower concealed beam have
There is identical structure, wherein the upper concealed beam includes the first beam, the second beam and connector;
First beam and second beam interval are arranged, and are spaced between first beam and second beam
Gap for concrete flow;The connector is for connecting first beam and second beam.
The above-mentioned assembly concrete shear wall with H profile steel diagonal brace, wherein first beam and second beam
Part is angle steel, and first beam and second beam are symmetrical arranged, and the connector is batten plate.
The above-mentioned assembly concrete shear wall with H profile steel diagonal brace, wherein be provided on the left sleeper for
First irrigation hole of placing concrete in the left sleeper is provided on the right sleeper mixed for pouring into the right sleeper
Coagulate the second irrigation hole of soil.
A kind of construction method of the above-mentioned assembly concrete shear wall with H profile steel diagonal brace, includes the following steps:
1) the left sleeper of prefabricated components, right sleeper, upper concealed beam, lower concealed beam, skewed horizontal load part, the first facade steel plate, second
Facade steel plate, the first connecting plate, the second connecting plate and bolt;
2) precast shear wall unit:
Sequentially left sleeper, upper concealed beam, right sleeper and lower concealed beam are welded to form shear wall frame;
Skewed horizontal load part is fixed in shear wall frame;
First facade steel plate and the second facade steel plate be welded to the front and rear sides of shear wall frame respectively, while passing through the
Perforation on one facade steel plate and the second facade steel plate is by the first facade steel plate and the second facade Interal fixation to skewed horizontal load part
On;
3) prefabricated shear-wall element, the first connecting plate, the second connecting plate and bolt are transported to installation point;By two
Shear-wall element stacks down in the height direction, and is connected and fixed two of mounted on top with the first connecting plate and the second connecting plate
Shear-wall element;
4) casting concrete into shear-wall element, while casting concrete in sleeper and right sleeper to the left.
The present invention has the following advantages and effects with respect to the prior art:
1, the connection structure of shear-wall element and shear-wall element can be in steel structure in scheme disclosed by the embodiments of the present invention
Part processing factory is prefabricated, constructs convenient for in-site installation, improves construction rate.And in the left sleeper of shear-wall element and right sleeper
Casting concrete enhances the deformability at fabricated shear wall edge, bearing capacity keeps shear wall more secured;And it shears
It is fixed with the skewed horizontal load part being made of H profile steel in wall unit, makes skewed horizontal load part and the facade steel plate of shear-wall element, concealed beam
And sleeper works together, and can effectively improve anti-side rigidity in the face of compound shear wall, shear-carrying capacity, anti-bending bearing capacity, ductility
And energy dissipation capacity.Meanwhile the Out-of Plane Stiffness of shear wall can be effectively improved, to improve the ratio of height to thickness limit value of shear wall, reduce
Shear wall self weight.
2, the flange plate of the first facade steel plate, the second facade steel plate and H profile steel is attached by the present invention, makes skewed horizontal load
Part and the first facade steel plate and the second facade steel plate cooperate.This combined method makes the mechanical property of compound shear wall better than one
As steel plate-concrete combined shear wall, the simple superposition for both not being: the facade steel plate for having the following advantages that front and back is arranged exists
Fixed boundary is increased at the flange plate of skewed horizontal load part 5, effective width-thickness ratio can be reduced, is facilitated outside the face for reducing facade steel plate
Deformation, the local buckling for postponing facade steel plate.
3, upper and lower concealed beam is set the intermediate structure with gap by the embodiment of the present invention, facilitates from upper concealed beam to cutting
Casting concrete in power wall frame.
4, left sleeper and right sleeper are designed as being arranged between the first attaching means and the second attaching means by the embodiment of the present invention
Vertical gap improves the anti-seismic performance of the assembly concrete shear wall with H profile steel diagonal brace, while left sleeper and the right side is dark
Edge constraint component of the column as shear-wall element solves in the existing fabricated shear wall system with vertical gap, because
The problem of shear-wall element lacks edge member constraint, and wall shearing resistance, anti-bending bearing capacity is caused to weaken.
Detailed description of the invention
Fig. 1 is the perspective view for the assembly concrete shear wall that the embodiment of the present invention has H profile steel diagonal brace.
Fig. 2 is the exploded view of Fig. 1.
Fig. 3 is the first shear-wall element of assembly concrete shear wall and that the embodiment of the present invention has H profile steel diagonal brace
The schematic diagram of internal structure of two shear-wall elements assembly.
Fig. 4 is the solid that the embodiment of the present invention has the first connecting plate in the assembly concrete shear wall of H profile steel diagonal brace
Figure.
Fig. 5 is the solid that the embodiment of the present invention has shear-wall element in the assembly concrete shear wall of H profile steel diagonal brace
Figure.
Fig. 6 is that there is shear-wall element in the assembly concrete shear wall of H profile steel diagonal brace of the embodiment of the present invention not have
The exploded view of installation front and back facade steel plate.
Fig. 7 is the vertical view that the embodiment of the present invention has shear-wall element in the assembly concrete shear wall of H profile steel diagonal brace
Figure.
Fig. 8 is the perspective view that the embodiment of the present invention has upper concealed beam in the assembly concrete shear wall of H profile steel diagonal brace.
Fig. 9 is the solid that the embodiment of the present invention has skewed horizontal load part in the assembly concrete shear wall of H profile steel diagonal brace
Figure.
Figure 10 is the master that the embodiment of the present invention has the first facade steel plate in the assembly concrete shear wall of H profile steel diagonal brace
View.
Wherein, in the embodiment of the present invention: 100, the first shear-wall element;200, the second shear-wall element;300, machine is connected
Structure;301, the first connecting plate;3011, the first wing plate;3012, the second wing plate;3013, wing plate connecting plate;302, the second connecting plate;
303, the first bolt;304, the second bolt;400, the first attaching means;500, the second attaching means;600, vertical gap;
1, left sleeper;10, the first pouring hole;2, right sleeper;20, the second pouring hole;3, upper concealed beam;31, the first beam;
32, the second beam;33, connector;4, lower concealed beam;5, skewed horizontal load part;51, H profile steel;511, the first flange plate;512, second
Flange plate;513, web;5130, web is perforated;6, the first facade steel plate;61, the first perforation;7, the second facade steel plate.
Specific embodiment
Present invention will now be described in further detail with reference to the embodiments and the accompanying drawings, but embodiments of the present invention are unlimited
In this.
As shown in Figs 1-4, a kind of assembly concrete shear wall with H profile steel diagonal brace of the preferred embodiment of the present invention,
Including the first shear-wall element 100, the second shear-wall element 200 and bindiny mechanism 300;
First shear-wall element 100 and the second shear-wall element 200 pass through in mounted on top and between the two bindiny mechanism
300 are connected and fixed, wherein the second shear-wall element 200 is located at the upside of the first shear-wall element 100;Bindiny mechanism 300 includes
First connecting plate 301 and the second connecting plate 302;First connecting plate 301 is used for the front side and second of the first shear-wall element 100
The front side of shear-wall element 200 is connected and fixed, and the second connecting plate 302 is used for the rear side and second of the first shear-wall element 100
The rear side of shear-wall element 200 is connected and fixed.First shear-wall element 100 and the second shear-wall element 200 can be in parts
Processing factory carry out preprocessing, by after preprocessing the first shear-wall element 100 and the second shear-wall element 200 transport band installation
Then place is assembled by bindiny mechanism 300, then casting concrete is carried out to the shear-wall element after assembly, with tradition
Cast-in-place building structure construction method compare, on-site hoisting combination is convenient, has saved the activity duration, has reduced field workforce and improve
Assembly efficiency.
As viewed in figures 5-8, the first shear-wall element 100 and the second shear-wall element 200 all have shear wall structure;Shearing
Wall construction includes left sleeper 1, right sleeper 2, upper concealed beam 3, lower concealed beam 4, skewed horizontal load part 5, the first facade steel plate 6 and the second facade
Steel plate 7;Concrete has been poured in left sleeper 1 and right sleeper 2.For left sleeper 1 with right sleeper 2 at a distance of being arranged, left sleeper 1 and the right side are dark
2 inner hollow of column, and casting concrete is used in left sleeper 1 and right sleeper 2.Left sleeper 1 is with right sleeper 2 as with H-type
The main support of the assembly concrete shear wall of steel diagonal brace, while being cut as the assembly concrete with H profile steel diagonal brace
The edge constraint component of power wall.Left sleeper 1 is made of steel plate with right sleeper 2, in the present embodiment left sleeper 1 and right sleeper
2 are set as cube rod, i.e., the cross section of left sleeper 1 and right sleeper 2 is rectangular or square.Certainly left sleeper 1 and right sleeper 2
Also cylinder can be set into, do not do excessive limitation to it herein.By in left sleeper 1 and casting concrete in right sleeper 2
The intensity of sleeper is enhanced, the fabricated shear wall of H profile steel concrete diagonal brace is enhanced by steel plate and concrete co-operation
Deformability, the bearing capacity at edge keep shear wall more secured.
The both ends of upper concealed beam 3 and lower concealed beam 4 are respectively and fixedly installed on left sleeper 1 and right sleeper 2;Upper concealed beam 3 with it is lower dark
Beam 4 is for connecting left sleeper 1 and right sleeper 2, wherein the high position of layer that upper concealed beam 3 is located at respective storey with lower concealed beam 4.On
The left end of concealed beam 3 is fixedly attached to the top of left sleeper 1, and the right end of upper concealed beam 3 is fixedly attached to the top of right sleeper 2.It is lower dark
The left end of beam 4 is fixedly attached to the bottom end of left sleeper 1, and the right end of lower concealed beam 4 is fixedly attached to the bottom end of right sleeper 2.Left sleeper
1, upper concealed beam 3, right sleeper 2 and lower concealed beam 4 surround shear wall frame.First facade steel plate 6 is fixed respectively with the second facade steel plate 7
In the front and rear sides of shear wall frame.Herein it should be noted that " preceding " " rear " of shear wall frame here refers to shearing
Two aperture positions of the frame that wall frame is formed, are defined as " preceding " as that opening and do not do specific restriction, can be with
Figure of description is illustrated as referring to, and the first facade steel plate 6 and the second facade steel plate 7 seal two openings of shear wall frame
It is stifled, it can be used for casting concrete in the space that such first facade steel plate 6, the second facade steel plate 7 and shear wall frame are formed.
The space formed in first facade steel plate 6, the second facade steel plate 7 and shear wall frame is concreting space, due to first
The presence of facade steel plate 6 and the second facade steel plate 7 itself has certain restraining force to the concrete poured, thus mixed pouring
It can not need to set up template when solidifying soil, improve construction rate.
As shown in Fig. 6 and Fig. 9, skewed horizontal load part 5 is fixed in shear wall frame;Skewed horizontal load part 5 includes two H profile steels
51, two H profile steels 51 intersect in X-type structure;H profile steel 51 includes the first flange plate 511, the second flange plate 512 and connection
The web 513 of first flange plate 511 and the second flange plate 512;Several webs for concrete flowing are provided on web 513 to wear
Hole 5130.Installation is oblique in the concreting space formed in first facade steel plate 6, the second facade steel plate 7 and shear wall frame
To supporting element 5, the casting concrete into casting space is facilitated by setting web perforation 5130.It is oblique by two H profile steels 51
Skewed horizontal load part 5 its axial rigidity intersected to form is big, can become one of the main stressed member of shear-wall element.Skewed horizontal load
Part 5 and the first facade steel plate 6, the second facade steel plate 7, left sleeper 1 and right sleeper 2 work together, and can effectively improve combined shear
Anti-side rigidity, shear-carrying capacity, anti-bending bearing capacity, ductility and energy dissipation capacity in the face of wall.Meanwhile shear wall can be effectively improved
Out-of Plane Stiffness reduce shear wall self weight to improve the ratio of height to thickness limit value of shear wall.Four ends of skewed horizontal load part 5 point
Not Gu Dingdao four corner locations on the inside of shear wall frame, the design of above structure improves the skew force of skewed horizontal load part 5
To the transmission capacity of transverse joint, the stress concentration phenomenon that the end of skewed horizontal load part is also easy to produce can be alleviated.
As in Figure 2-4, bindiny mechanism 300 further includes the first bolt 303 and the second bolt 304;The of first bolt 303
One end sequentially passes through the first connecting plate 301, the first facade steel plate 6 of the first shear-wall element 100, the first shear-wall element 100
Upper concealed beam, the first shear-wall element 100 the second facade steel plate 7 and the second connecting plate 302 and with the first nut cooperate with will
Bindiny mechanism 300 is connected and fixed with the first shear-wall element 100;The first end of second bolt 304 sequentially passes through the first connecting plate
301, the first facade steel plate 6 of the second shear-wall element 200, the lower concealed beam of the second shear-wall element 200, the second shear-wall element
200 the second facade steel plate 7 and the second connecting plate 302 simultaneously cooperate with the second nut with by bindiny mechanism 300 and the second shear wall
Unit 200 is connected and fixed.First connecting plate 301 and the second connecting plate 302 are located at the first shear-wall element 100 and second and cut
The front and rear sides of 200 intersection location of power wall unit.By the cooperation of the first bolt 303 and the first nut by the first connecting plate 301
Lower end and the second connecting plate 302 lower end be fixed to the first shear-wall element 100 upper concealed beam on.Pass through the second bolt 304
The upper end of first connecting plate 301 and the upper end of the second connecting plate 302 are fixed to the second shear wall list by the cooperation with the second nut
In the lower concealed beam of member 100.Wherein the first bolt 303 and the second bolt 304 are split bolt, and the both ends of split bolt are spiral shell
Mother, nut offset with corresponding first connecting plate 301 or the second connecting plate 302.
As shown in figure 4, the first connecting plate 301 and the structure having the same of the second connecting plate 302 are I-shaped template;Its
In, the first connecting plate 301 includes the first wing plate 3011, the second wing plate 3012 and the first wing plate 301 of connection and the second wing plate 302
Wing plate connecting plate 3013;
The position of first wing plate 3011 and the left sleeper of the first shear-wall element 100 and a left side for the second shear-wall element 200
The position of the junction of sleeper is opposite.The width of first wing plate 3011 is greater than the width of wing plate connecting plate 3013, to make
The both ends of one wing plate 3011 can be respectively fixed to the left sleeper and second shear-wall element 200 of the first shear-wall element 100
On left sleeper, to improve the bonding strength of the first connecting plate 301.
The position of second wing plate 3012 and the right sleeper of the second shear-wall element 200 and the right side of the first shear-wall element 100
The position of the junction of sleeper is opposite.The width of same second wing plate 3012 is greater than the width of wing plate connecting plate 3013, from
And the both ends of the first wing plate 3011 is enable to be respectively fixed to the right sleeper and the second shear-wall element of the first shear-wall element 100
On 200 right sleeper, to improve the bonding strength of the first connecting plate 301.
Under the upper concealed beam and the second shear-wall element 200 of 3013 position of wing plate connecting plate and the first shear-wall element 100
The position of the junction of concealed beam is opposite.Likewise, the structure of the second connecting plate 302 is identical as the structure of the first connecting plate 301, only
It is the front and rear sides that the first connecting plate 301 and the second connecting plate 302 are located at shear wall.
In order to further enhance the support strength of skewed horizontal load part 5, in this implementation the first flange plate 511 and the first facade steel
Plate 6 is fixedly connected, and the second flange plate 512 is fixedly connected with the second facade steel plate 7.Namely 5 front and back sides of skewed horizontal load part point
It Gu Dingdao not be on the first facade steel plate 6 and the second facade steel plate 7, to enable skewed horizontal load part 5 to 6 He of the first facade steel plate
Second facade steel plate 7 plays certain constraint fixed function, avoids pouring between the first facade steel plate 6 and the second facade steel plate 7
When the concrete built, since the pressure of concrete causes the first facade steel plate 6 and the second facade steel plate 7 to deform.The application passes through
The flange plate of first facade steel plate 6, the second facade steel plate 7 and H profile steel is attached, skewed horizontal load part 5 and the first facade are made
Steel plate 6 and the second facade steel plate 7 cooperate.This combined method keeps the mechanical property of compound shear wall mixed better than general steel plate-
Solidifying local soil type's combination shearing wall, is not the simple superposition of the two: having the following advantages that the facade steel plate of front and back setting in skewed horizontal load
Fixed boundary is increased at the flange plate of part 5, effective width-thickness ratio can be reduced, helps to reduce the out-of-plane deformation of facade steel plate, push away
The local buckling of slow facade steel plate.The flange plate of skewed horizontal load part 5 together forms effective width with facade steel plate and is greater than simultaneously
" compression bar and the pull rod system " of diagonal brace range, helps to promote contribution of the oblique supporting element to shear wall stress performance.
As shown in Figure 10, solid in order to facilitate the connection of skewed horizontal load part 5 and the first facade steel plate 6 and the second facade steel plate 7
It is fixed, first perforation 61 compatible with the first flange plate 511 is provided on the first facade steel plate 6.First perforation 61 is provided with
Multiple, the arrangement of the first perforation 61 is consistent with the extending direction of the first flange plate 511, is realized by the setting of the first perforation 61
It in the outside of the first facade steel plate 6 can be to the welding of the first facade steel plate 6 and the first flange plate 511.Facilitate construction behaviour
Make, improves the efficiency of assembly.
Likewise, being also equipped with second perforation compatible with the second flange plate 512 on the second facade steel plate 7.Second
Perforation is also equipped with multiple, and the biperforate arrangement is consistent with the extending direction of the second flange plate 511, biperforate by the
It is arranged that realize can be to the welding of the second facade steel plate 7 and the second flange plate 512 in the outside of the second facade steel plate 7.
Specifically, as shown in figure 3, upper concealed beam 3 and lower concealed beam 4 structure having the same, wherein upper concealed beam 3 includes the first beam
Part 31, the second beam 32 and connector 33;
First beam 31 and the second beam 32 interval are arranged, and the gap being spaced between the first beam 31 and the second beam 32 supplies
Concrete flowing;Connector 33 is for connecting the first beam 31 and the second beam 32.It will be between the first beam 31 and the second beam 32
Every setting convenient for the casting concrete into shear wall frame.The first beam 31 and the second beam 32 are disposed as in the present embodiment
Angle steel, connector 33 are batten plate.First beam 31 and the second beam 32 are L-type structure, the first beam 31 and the second beam 32
It is symmetrical set centered on the gap formed between the first beam 31 and the second beam 32.
The first beam 31 and the second beam 32 are channel steel in another embodiment, and the notch of the channel steel of the first beam 31
It is opposite with the notch of channel steel of the second beam 32.The upper end of the first beam 31 is connected by the upper end of batten plate and the second beam 32 at this time
Fixation is connect, the lower end of the first beam 31 is connected and fixed by batten plate and the lower end of the second beam 32.
Specifically, being provided with the first pouring hole 10 for casting concrete in sleeper 1 to the left, right sleeper 2 on left sleeper 1
On be provided with the second pouring hole 20 for casting concrete in sleeper 2 to the right.By in 10 pairs of left sleeper 1 of the first pouring hole into
Row concreting carries out casting concrete by the cavity in 20 pairs of right sleeper 2 of the second pouring hole.First pouring hole 10 and
The setting of two pouring holes 20 facilitates pouring for shear-wall element sleeper inner concrete.And first shear-wall element 100 first
The first of pouring hole and the second shear-wall element 200 pours that hole site is opposite, is only needed in this way to the second shear-wall element 200
Left sleeper 1 is poured, then the concrete poured can enter the first of the first shear-wall element 100 by the first pouring hole 10
In pouring hole, to be poured to the sleeper of the first shear-wall element.
Further, as shown in Figs. 1-2, the left sleeper 1 of the shear-wall element assembled and right sleeper 2 are additionally arranged at first
Between attaching means 400 and the second attaching means 500, and it is provided with vertical gap 600 between left sleeper 1 and the first attaching means 400, it is right
Vertical gap 600 is also equipped between sleeper 2 and the second attaching means 500.It sets left sleeper 1 and right sleeper 2 to first about
Vertical gap 600 is set between bundle 400 and the second attaching means 500, improves the assembly concrete with H profile steel diagonal brace and cuts
The anti-seismic performance of power wall, while the edge constraint component by left sleeper 1 and right sleeper 2 as shear-wall element solve existing
In fabricated shear wall system with vertical gap 600, because shear-wall element lacks edge member constraint, cause wall anti-
Cut, anti-bending bearing capacity weaken the problem of.
Another embodiment of the present invention also discloses the construction party of the above-mentioned assembly concrete shear wall with H profile steel diagonal brace
Method includes the following steps:
1) the left sleeper 1 of prefabricated components, right sleeper 2, upper concealed beam 3, lower concealed beam 4, skewed horizontal load part 5, the first facade steel plate
6, the second facade steel plate 7, the first connecting plate 301, the second connecting plate 302 and bolt.The prefabricated left sleeper 1 of steel member processing factory,
Concealed beam 3 and the first beam 31 of lower concealed beam 4 and the second beam 32 on right sleeper 2, composition connect the first beam 31 and the second beam
32 connector 33, the first connecting plate 301 and the second connecting plate 302.In prefabricated left sleeper 1, right sleeper 2, upper concealed beam 3, lower dark
In above-mentioned parts phase when beam 4, the first facade steel plate 6, the second facade steel plate 7, the first connecting plate 301 and the second connecting plate 302
The perforation for facilitating bolt to pass through is set on the position answered.It is opened up on prefabricated first facade steel plate 6 and the second facade steel plate 7 simultaneously
It is easily installed the first perforation and the second perforation for fixing the first facade steel plate 6 and the second facade steel plate 7.In the web 513 of H profile steel
Upper setting web perforation 5130.First beam 31 and the second beam 32 are connected and fixed by connector 33 to form concealed beam 3
With lower concealed beam 4.
2) precast shear wall unit:
Sequentially left sleeper 1, upper concealed beam 3, right sleeper 2 and lower concealed beam 4 are welded to form shear wall frame;
Skewed horizontal load part 5 is fixed in shear wall frame;
First facade steel plate 6 and the second facade steel plate 7 are welded to the front and rear sides of shear wall frame respectively, passed through simultaneously
First facade steel plate 6 is welded on the first flange plate 511 of H profile steel 51 by the perforation on the first facade steel plate 6, vertical by second
Second facade steel plate 7 is welded on the second flange plate 512 of H profile steel 51 by the perforation on face steel plate 7.
3) prefabricated shear-wall element, the first connecting plate 301, the second connecting plate 302 and bolt are transported to installation point;
Two shear-wall elements are stacked down in the height direction, and are connected and fixed with the first connecting plate 301 and the second connecting plate 302
Under two shear-wall elements stacking;
4) casting concrete into shear-wall element, while casting concrete in sleeper 1 and right sleeper 2 to the left.It maintains into
Work progress is completed after type.
The connection structure of shear-wall element and shear-wall element can be in steel member in scheme disclosed by the embodiments of the present invention
Processing factory is prefabricated, constructs convenient for in-site installation, improves construction rate.And it is poured in the left sleeper of shear-wall element and right sleeper
Build that concrete enhances the deformability at fabricated shear wall edge, bearing capacity keeps shear wall more secured;And shear wall
It is fixed with the skewed horizontal load part being made of H profile steel in unit, makes the facade steel plate and sleeper of skewed horizontal load part and shear-wall element
It works together, anti-side rigidity in the face of compound shear wall, shear-carrying capacity, anti-bending bearing capacity, ductility and consumption can be effectively improved
It can ability.Meanwhile the Out-of Plane Stiffness of shear wall can be effectively improved, to improve the ratio of height to thickness limit value of shear wall, reduce shear wall
Self weight.
The flange plate of first facade steel plate, the second facade steel plate and H profile steel is attached by the embodiment of the present invention, is made oblique
Supporting element and the first facade steel plate and the second facade steel plate cooperate.This combined method keeps the mechanical property of compound shear wall excellent
It is not the simple superposition of the two in general steel plate-concrete combined shear wall: has the following advantages that the facade steel that front and back is arranged
Plate increases fixed boundary at the flange plate of skewed horizontal load part 5, can reduce effective width-thickness ratio, helps to reduce facade steel plate
Out-of-plane deformation, the local buckling for postponing facade steel plate.
Upper and lower concealed beam is set the intermediate structure with gap by the embodiment of the present invention, facilitates from upper concealed beam to shearing
Casting concrete in wall frame.
Left sleeper and right sleeper are designed as being arranged between the first attaching means and the second attaching means perpendicular by the embodiment of the present invention
To gap, the anti-seismic performance of the assembly concrete shear wall with H profile steel diagonal brace is improved, while by left sleeper and right sleeper
As the edge constraint component of shear-wall element, solve in the existing fabricated shear wall system with vertical gap, because cutting
The problem of power wall unit lacks edge member constraint, and wall shearing resistance, anti-bending bearing capacity is caused to weaken.
The above embodiment is a preferred embodiment of the present invention, but embodiments of the present invention are not by above-described embodiment
Limitation, other any changes, modifications, substitutions, combinations, simplifications made without departing from the spirit and principles of the present invention,
It should be equivalent substitute mode, be included within the scope of the present invention.
Claims (9)
1. a kind of assembly concrete shear wall with H profile steel diagonal brace, which is characterized in that including the first shear-wall element,
Two shear-wall elements and bindiny mechanism;
First shear-wall element and second shear-wall element pass through in mounted on top and between the two the connection machine
Structure is connected and fixed;The bindiny mechanism includes the first connecting plate and the second connecting plate;First connecting plate by first for cutting
It is connected and fixed on front side of the front side of power wall unit and the second shear-wall element, second connecting plate is used for the first shear wall list
It is connected and fixed on rear side of the rear side and second shear-wall element of member;
First shear-wall element and second shear-wall element all have shear wall structure;The shear wall structure includes
Left sleeper, right sleeper, upper concealed beam, lower concealed beam, skewed horizontal load part, the first facade steel plate and the second facade steel plate;The left sleeper
Concrete has been poured in the right sleeper;The both ends of the upper concealed beam and the lower concealed beam are respectively and fixedly installed to the left side
On sleeper and the right sleeper;The left sleeper, the upper concealed beam, the right sleeper and the lower concealed beam surround shear wall frame
Frame;
The first facade steel plate and the second facade steel plate are separately fixed at the front and rear sides of the shear wall frame;It is described
Skewed horizontal load part is fixed in the shear wall frame;The skewed horizontal load part includes two H profile steels, two H profile steel phases
Mutually intersect is in X-type structure;The H profile steel includes the first flange plate, the second flange plate and connection first flange plate and described
The web of second flange plate;Several webs for concrete flowing are provided on the web to perforate.
2. the assembly concrete shear wall according to claim 1 with H profile steel diagonal brace, which is characterized in that the company
Connection mechanism further includes the first bolt and the second bolt;
First bolt sequentially passes through the first facade steel plate, described of first connecting plate, first shear-wall element
The upper concealed beam of first shear-wall element, the second facade steel plate of first shear-wall element and second connecting plate and with institute
The cooperation of the first nut is stated so that the bindiny mechanism and the first shear-wall element to be connected and fixed;
The first end of second bolt sequentially passes through the first facade steel of first connecting plate, second shear-wall element
Plate, the lower concealed beam of second shear-wall element, the second facade steel plate of second shear-wall element and second connection
Plate simultaneously cooperates with second nut the bindiny mechanism and second shear-wall element to be connected and fixed.
3. the assembly concrete shear wall according to claim 2 with H profile steel diagonal brace, which is characterized in that described
One connecting plate and the second connecting plate structure having the same are I-shaped template;First connecting plate includes first wing
The wing plate connecting plate of plate, the second wing plate and connection first wing plate and second wing plate;
A left side for the left sleeper and second shear-wall element of the position of first wing plate and first shear-wall element is dark
The position of the junction of column is opposite;
The right side of the right sleeper and first shear-wall element of the position of second wing plate and second shear-wall element is dark
The position of the junction of column is opposite;
The upper concealed beam of the wing plate connecting plate position and first shear-wall element and second shear-wall element it is lower dark
The position of the junction of beam is opposite.
4. the assembly concrete shear wall according to claim 1 with H profile steel diagonal brace, which is characterized in that described
One flange plate is connect with the first facade Interal fixation, and second flange plate is connect with the second facade Interal fixation.
5. the assembly concrete shear wall according to claim 4 with H profile steel diagonal brace, which is characterized in that described
The first perforation compatible with first flange plate is provided on one facade steel plate, be provided on the second facade steel plate with
Second flange plate compatible second is perforated.
6. the assembly concrete shear wall according to claim 1 with H profile steel diagonal brace, which is characterized in that on described
Concealed beam and the lower concealed beam structure having the same, wherein the upper concealed beam includes the first beam, the second beam and connector;
First beam and second beam interval are arranged, the sky being spaced between first beam and second beam
Gap is flowed for concrete;The connector is for connecting first beam and second beam.
7. the assembly concrete shear wall according to claim 6 with H profile steel diagonal brace, which is characterized in that described
One beam and second beam are angle steel, and first beam and second beam are symmetrical arranged, and the connector is
Batten plate.
8. the assembly concrete shear wall according to claim 1 with H profile steel diagonal brace, which is characterized in that the left side
The first irrigation hole for the placing concrete into the left sleeper is provided on sleeper, be provided on the right sleeper for
Second irrigation hole of placing concrete in the right sleeper.
9. a kind of construction method of the assembly concrete shear wall a method as claimed in any one of claims 1-8 with H profile steel diagonal brace,
It is characterized by comprising the following steps:
1) the left sleeper of prefabricated components, right sleeper, upper concealed beam, lower concealed beam, skewed horizontal load part, the first facade steel plate, the second facade
Steel plate, the first connecting plate, the second connecting plate and bolt;
2) precast shear wall unit:
Sequentially left sleeper, upper concealed beam, right sleeper and lower concealed beam are welded to form shear wall frame;
Skewed horizontal load part is fixed in shear wall frame;
First facade steel plate and the second facade steel plate are welded to the front and rear sides of shear wall frame respectively, while vertical by first
Perforation on face steel plate and the second facade steel plate will be on the first facade steel plate and the second facade Interal fixation to skewed horizontal load part;
3) prefabricated shear-wall element, the first connecting plate, the second connecting plate and bolt are transported to installation point;Two are sheared
Wall unit stacks down in the height direction, and two shearings of mounted on top are connected and fixed with the first connecting plate and the second connecting plate
Wall unit;
4) casting concrete into shear-wall element, while casting concrete in sleeper and right sleeper to the left.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910698547.6A CN110439142A (en) | 2019-07-31 | 2019-07-31 | A kind of assembly concrete shear wall and construction method with H profile steel diagonal brace |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910698547.6A CN110439142A (en) | 2019-07-31 | 2019-07-31 | A kind of assembly concrete shear wall and construction method with H profile steel diagonal brace |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110439142A true CN110439142A (en) | 2019-11-12 |
Family
ID=68432267
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910698547.6A Pending CN110439142A (en) | 2019-07-31 | 2019-07-31 | A kind of assembly concrete shear wall and construction method with H profile steel diagonal brace |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110439142A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110886410A (en) * | 2019-11-29 | 2020-03-17 | 宁波大学科学技术学院 | Assembled shear-resistant unit and wall assembled by using same |
CN114232841A (en) * | 2021-12-29 | 2022-03-25 | 广州市设计院集团有限公司 | Construction method of inclined column conversion frame shear wall structure |
CN114718217A (en) * | 2022-05-10 | 2022-07-08 | 新余学院 | Novel structure and construction method of horizontal node of prefabricated shear wall |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101338890B1 (en) * | 2012-08-28 | 2013-12-09 | 경희대학교 산학협력단 | Wall system with frame pannel and method for fabricating and constructing the wall system |
CN103469933A (en) * | 2013-09-25 | 2013-12-25 | 华北水利水电大学 | Double steel plate embedded supporting composite thermal insulation shear wall and manufacturing method thereof |
CN105089177A (en) * | 2015-07-21 | 2015-11-25 | 重庆欧冠钢结构有限公司 | Prefabricated sectional steel truss concrete shear wall and manufacturing method of prefabricated sectional steel truss concrete shear wall |
CN206428853U (en) * | 2017-01-23 | 2017-08-22 | 青岛理工大学 | Energy-dissipation and shock-absorption oblique prestressed shear wall structure system suitable for prefabricated assembly |
CN107761997A (en) * | 2017-09-26 | 2018-03-06 | 华南理工大学 | A kind of assembled steel plate concrete combined shear wall bolt fastening structure and method |
CN108277903A (en) * | 2018-03-19 | 2018-07-13 | 北京工业大学 | Assembling truss type light steel frame-punching sheet metal-Combined concrete wall |
CN211548221U (en) * | 2019-07-31 | 2020-09-22 | 华南理工大学 | Assembled concrete shear force wall with H shaped steel bracing |
-
2019
- 2019-07-31 CN CN201910698547.6A patent/CN110439142A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101338890B1 (en) * | 2012-08-28 | 2013-12-09 | 경희대학교 산학협력단 | Wall system with frame pannel and method for fabricating and constructing the wall system |
CN103469933A (en) * | 2013-09-25 | 2013-12-25 | 华北水利水电大学 | Double steel plate embedded supporting composite thermal insulation shear wall and manufacturing method thereof |
CN105089177A (en) * | 2015-07-21 | 2015-11-25 | 重庆欧冠钢结构有限公司 | Prefabricated sectional steel truss concrete shear wall and manufacturing method of prefabricated sectional steel truss concrete shear wall |
CN206428853U (en) * | 2017-01-23 | 2017-08-22 | 青岛理工大学 | Energy-dissipation and shock-absorption oblique prestressed shear wall structure system suitable for prefabricated assembly |
CN107761997A (en) * | 2017-09-26 | 2018-03-06 | 华南理工大学 | A kind of assembled steel plate concrete combined shear wall bolt fastening structure and method |
CN108277903A (en) * | 2018-03-19 | 2018-07-13 | 北京工业大学 | Assembling truss type light steel frame-punching sheet metal-Combined concrete wall |
CN211548221U (en) * | 2019-07-31 | 2020-09-22 | 华南理工大学 | Assembled concrete shear force wall with H shaped steel bracing |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110886410A (en) * | 2019-11-29 | 2020-03-17 | 宁波大学科学技术学院 | Assembled shear-resistant unit and wall assembled by using same |
CN114232841A (en) * | 2021-12-29 | 2022-03-25 | 广州市设计院集团有限公司 | Construction method of inclined column conversion frame shear wall structure |
CN114718217A (en) * | 2022-05-10 | 2022-07-08 | 新余学院 | Novel structure and construction method of horizontal node of prefabricated shear wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102587495B (en) | Steel beam and concrete wall semi-rigid full-bolted-connection joint | |
CN103572873B (en) | Assembled integral floor and construction method thereof | |
CN110512765A (en) | A kind of fabricated shear wall and construction method with steel plate peg combined type diagonal brace | |
CN106088434A (en) | A kind of assembling type steel structure overlapped hollow floor system and construction method thereof | |
CN110439142A (en) | A kind of assembly concrete shear wall and construction method with H profile steel diagonal brace | |
CN211037273U (en) | Steel joint is connected to assembled concrete structure primary and secondary roof beam | |
KR20060042561A (en) | Hybrid beam structure using thin steel plate and concrete | |
CN103195172B (en) | A kind of prefabrication and assembly construction concrete frame beam-column connection structure | |
CN113062476B (en) | Heavy-load large-span combined beam-column structure and construction method | |
CN207003822U (en) | Buckling-restrained steel coupling beam and its steel plate concrete combined shear wall structural system | |
CN106760036A (en) | A kind of prefabricated steel combined concrete shear wall | |
CN211548221U (en) | Assembled concrete shear force wall with H shaped steel bracing | |
CN206016007U (en) | A kind of assembling type steel structure overlapped hollow floor system | |
CN110670732A (en) | Connection node of steel truss with inverted V-shaped section and reinforced concrete structure and construction method | |
CN114482400A (en) | Superposed beam connected with prefabricated vertical component | |
CN210238768U (en) | Prefabricated assembled concrete rectangular beam column connected node | |
CN209538451U (en) | Column plate concrete combined type shear wall | |
CN210164057U (en) | Assembled steel and concrete flat wall column composite structure | |
CN111779190A (en) | Hollow combined beam and manufacturing method thereof | |
CN217027725U (en) | Prefabricated reinforced concrete foundation structure that can splice | |
CN217537332U (en) | Connecting structure of assembled type steel reinforced concrete beam and steel-concrete composite board | |
CN217027742U (en) | Superposed beam connected with prefabricated vertical component | |
CN107060069B (en) | Assembled steel pipe concrete truss building system | |
CN109944336A (en) | Steel concrete compound shear wall and the combination assembled structural system of reinforced concrete shear wall | |
JPS6349776B2 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |