CN208327926U - A kind of interactive double-fixed bed gasification furnace of high temperature - Google Patents

A kind of interactive double-fixed bed gasification furnace of high temperature Download PDF

Info

Publication number
CN208327926U
CN208327926U CN201821009011.6U CN201821009011U CN208327926U CN 208327926 U CN208327926 U CN 208327926U CN 201821009011 U CN201821009011 U CN 201821009011U CN 208327926 U CN208327926 U CN 208327926U
Authority
CN
China
Prior art keywords
gas
gasification furnace
steam
channel
connecting tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821009011.6U
Other languages
Chinese (zh)
Inventor
庞赟佶
陈义胜
吴丹
陈俊俊
许嘉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inner Mongolia University of Science and Technology
Original Assignee
Inner Mongolia University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inner Mongolia University of Science and Technology filed Critical Inner Mongolia University of Science and Technology
Priority to CN201821009011.6U priority Critical patent/CN208327926U/en
Application granted granted Critical
Publication of CN208327926U publication Critical patent/CN208327926U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Processing Of Solid Wastes (AREA)
  • Gasification And Melting Of Waste (AREA)

Abstract

The utility model discloses a kind of interactive double-fixed bed gasification furnaces of high temperature, including gasification furnace A, gasification furnace B, high temperature resistant connecting tube, and assisted heating device, the structures such as temperature control cabinet and material preprocess method, equipment regulate and control method and reaction principle;The utility model can carry out pyrolytic gasification processing to biomass, house refuse and Biohazard Waste etc., the gas that the device is collected into has many advantages, such as that hydrogen-rich, low tar, calorific value are high, can further hydrogen manufacturing, for boiler heat supplying, power plants generating electricity and as industrial chemicals etc., achieve the purpose that biomass energy efficiently utilizes with this.

Description

A kind of interactive double-fixed bed gasification furnace of high temperature
Technical field
The utility model belongs to Thermal Power Engineering Field more particularly to a kind of interactive double-fixed bed gasification furnace of high temperature.
Background technique
With the continuous development of society with the continuous improvement of scientific and technological level, the reasonable utilization of the energy is more and more to obtain people Attention, currently, the Solid Waste Treatments such as biomass, domestic waste and medical waste mode mainly have landfill, compost, Burn, be pyrolyzed and gasify etc., wherein pyrolytic gasification technology has biggish advantage in terms of handling reclamation of solid wastes, especially It is provided simultaneously with recycling, minimizing and harmless in terms of the high heating value solid waste (including domestic waste, medical waste) The advantages such as change;Pyrolytic gasification technology is an important technology in solid fuel processing, has adaptability to raw material good, transformation efficiency The features such as height, reaction rate is fast, and system scale is flexible is widely used to during the pyrolytic gasification of different solid fuels, especially It is the most extensive with biomass economy, such as timber, rice husk, stalk;However, this kind of technology equally exists many problems, it is as follows:
(1) tar containing 5%-10% in the gas that existing pyrolysis gasification method generates, meeting during production and transport It blocks pipeline, influence terminal device, when burning generates carbon black, pollutes environment, reduces energy utilization rate, constrain this method It promotes;
(2) existing equipment production efficiency is lower, product gas poor quality, cannot efficient output hydrogen-rich combustion gas;
(3) coke that solid waste pyrolysis generates utilizes insufficient, and utilization is complicated for operation, is unable to local use.
Summary of the invention
The purpose of this utility model is to provide a kind of interactive double-fixed bed gasification furnaces of high temperature, solve existing pyrolytic gasification Existing for method: generating big containing tar content in gas;Existing equipment production efficiency is lower, product gas poor quality, cannot be efficient Output hydrogen-rich combustion gas;For the coke that solid waste pyrolysis generates using insufficient, utilization is complicated for operation, is unable to local use etc. and asks Topic.
The technical solution of the utility model are as follows: a kind of interactive double-fixed bed gasification furnace of high temperature, including gasification furnace A, gasification Furnace B, high temperature resistant connecting tube, assisted heating device, temperature control cabinet;It is characterized by:
The gasification furnace A, gasification furnace B are identical two pyrolysis gasification furnaces of structure;The high temperature resistant connecting tube connects gas Gas crossover passage on change furnace A, gasification furnace B furnace body;
The assisted heating device includes adding thermal resistance, exchange exhaust switch valve, gas flowmeter A, gas flowmeter B, temperature Spend sensor one;The adding thermal resistance surrounds the installation of high temperature resistant connecting tube in a spiral form, and adding thermal resistance is connected by control line Temperature control cabinet;The exchange exhaust switch valve is mounted among high temperature resistant connecting tube;The gas flowmeter A is mounted on high temperature resistant In connecting tube, on the left of exchange exhaust switch valve, close to the gas crossover passage of gasification furnace A;The gas flowmeter B is mounted on In high temperature resistant connecting tube, on the right side of exchange exhaust switch valve, close to the gas crossover passage of gasification furnace B;The temperature sensor One is mounted in high temperature resistant connecting tube, and signal output terminal connects temperature control cabinet;
The gasification furnace A includes gasification furnace body, collects slag device, and fire grate feeds butterfly valve, heats Elema, steam generation Device, air-washer, gas collecting apparatus, blower, temperature sensor two, feeding device;
The gasification furnace body includes cylindrical internal bladder cavity, the insulating layer for being wrapped in internal bladder cavity outer ring;The gasification furnace The feed inlet of furnace body upper end setting connection internal bladder cavity;The gas exchanges of gasification furnace sidewall of the furnace body top setting connection internal bladder cavity are logical Road, the first steam channel of setting connection internal bladder cavity below gas crossover passage, setting is parallel below the first steam channel the Two steam channels;Channel of gas collection is arranged in gasification furnace sidewall of the furnace body lower part, and channel of gas collection is located at the second steam channel with respect to one Side, and the second steam channel is higher than channel of gas collection;
The gasification furnace body lower end using flange seal connection type installation collection slag device, collect slag device slag trapping cavity with The internal bladder cavity of top is connected to;The fire grate is mounted on internal bladder cavity bottom, frame on slag trapping cavity, and fire grate upper end cylinder plate is located at second More than steam channel, cylinder plate is gap-matched with internal bladder cavity;The steam for running through cylinder plate vertically is set on the cylinder plate Through-hole;
The charging butterfly valve is mounted at feed inlet;The heating Elema is gasified in furnace body with being spirally mounted on, Heating Elema helical centre is overlapped with internal bladder cavity vertical axis, and heating Elema connects temperature control cabinet by control line; The steam generation facility connects the first steam channel, the second steam channel, two steam inlet ducts by steam inlet pipeline Steam cock valve is respectively set on road;
The air-washer is provided with water, and is provided with product gas air inlet and product gas gas outlet;The channel of gas collection Air-washer is connected by connecting tube, and connecting tube protrudes into from product gas air inlet, is inserted into the water surface hereinafter, product gas gas outlet position Above the water surface, gas collecting apparatus is connected by connecting tube at product gas gas outlet;It connects and wind is installed in the connecting tube of air-washer Machine, collection exhaust switch valve one;It connects and gas collection flowmeter sum aggregate exhaust switch valve two is installed in the connecting tube of gas collecting apparatus;Product gas is successively By channel of gas collection, blower, collection exhaust switch valve one, air-washer, gas collection flowmeter, collection exhaust switch valve two, gas collection is eventually entered into Device;
The temperature sensor two is mounted on gasification furnace body, and signal output terminal connects temperature control cabinet;
The feeding device includes material storing box, feeding motor, delivery pipe, and delivery pipe upper end is connect with feed inlet.
Preferably, the gas collecting apparatus uses steel storage cylinder.
Preferably, the air-washer liquid level arrangement above discharge outlet.
The process of the interactive double-fixed bed gasification furnace of above-mentioned high temperature, the process includes material pretreatment side Method, equipment regulation method and reaction principle:
(1) the material preprocess method are as follows: dry materials to moisture content are lower than 15%, are crushed to particle size range in 10- 30mm;The material handled well is placed in material storing box;
(2) the equipment regulation method and reaction principle are as follows:
(01) the charging butterfly valve for opening gasification furnace A, opens feeding motor, material is transported to gasification furnace by feeding device In A, filler terminates to close the charging butterfly valve of gasification furnace A;Exhaust switch valve is exchanged to open;
(02) gasification furnace A is regulated and controled: by the heating Elema electrified regulation of gasification furnace A, the first steam of gasification furnace A Channel, the second steam channel, the valve at channel of gas collection are in close state, steam generation facility, blower, the collection of gasification furnace A Device of air is in close state;Gasification furnace A effect at this time is material pyrolysis oven, generates charcoal, pyrolysis gas etc. for material to be pyrolyzed Substance;
Meanwhile regulating and controlling to gasification furnace B: by the heating Elema electrified regulation of gasification furnace B, the first of gasification furnace B is steamed Vapour channel, the second steam channel, the valve at channel of gas collection are in the open state, the steam generation facility of gasification furnace B, blower, Gas collecting apparatus is in the open state;The charging butterfly valve of gasification furnace B is closed, and places layer of charcoal on gasification furnace B fire grate;Gasification furnace B at this time Effect is pyrolysis gas and high-temperature steam reacting furnace;
(03) temperature and it is sent to temperature control cabinet in one real-time Transmission high temperature resistant connecting tube of temperature sensor, temperature control Cabinet controls adding thermal resistance fever, is maintained at temperature in high temperature resistant connecting tube between 350 DEG C -550 DEG C, prevents gasification furnace A from generating Pyrolysis gas condensation;The two real-time Transmission liner cavity temperature of temperature sensor of gasification furnace A is simultaneously sent to temperature control cabinet, temperature Control cabinet controls the heating Elema fever of gasification furnace A, is maintained at liner cavity temperature between 800 DEG C -1200 DEG C;Gasification The two real-time Transmission liner cavity temperature of temperature sensor of furnace B is simultaneously sent to temperature control cabinet, and temperature control cabinet controls gasification furnace B Heating Elema fever, be maintained at liner cavity temperature between 800 DEG C -1200 DEG C;
(04) pyrolysis gas that material reaction generates in gasification furnace A enters gasification furnace B, gasification furnace A by high temperature resistant connecting tube The charcoal that interior material reaction generates is fallen on the fire grate of gasification furnace A;
(05) contain a large amount of tar, volatile matter in the pyrolysis gas generated in gasification furnace A, into gasification furnace B's and gasification furnace B The layer of charcoal reaction placed on the high-temperature steam and gasification furnace B fire grate that steam generation facility generates, generates the high heating value for being rich in hydrogen Gas;At the same time, the high-temperature steam that the second steam channel of gasification furnace B sprays passes through layer of charcoal bottom on steam passage holes and fire grate Reaction speed is accelerated in reaction, improves product gas formation efficiency, key reaction are as follows: C+ H2O→CO+ H2 C+ 2H2O→CO2+ 2H2 C+ CO2→2CO CO + H2O→2CO2+ H2 CO+3H2→CH4+ H2O tar+H2O→H2+ CH4+ CO(1000 takes the photograph Under the conditions of family name's degree);
(06) reaction speed is faster than gasification furnace B reaction speed in gasification furnace A, in order to avoid gasification furnace A suck-back, when gas stream When meter A detects that gas is no longer flowed to gasification furnace B, exchange exhaust switch valve is closed;The reaction was continued in gasification furnace B, until charcoal Layer has reacted;
(07) after, the valve at the first steam channel, the second steam channel, channel of gas collection of gasification furnace B is closed, gas The steam generation facility, blower, gas collecting apparatus for changing furnace B are closed;The charging butterfly valve of gasification furnace B is opened, and the feeding of gasification furnace B is opened Material is transported in gasification furnace B by motor by feeding device, and filler terminates to close the charging butterfly valve of gasification furnace B;Exchange gas is opened Valve is closed to open;Gasification furnace B effect at this time is material pyrolysis oven, generates the substances such as charcoal, pyrolysis gas for material to be pyrolyzed;
(08) simultaneously, the first steam channel of gasification furnace A, the second steam channel, the valve at channel of gas collection are opened, gasification Steam generation facility, blower, the gas collecting apparatus of furnace A is opened;The charging butterfly valve of gasification furnace A is closed, and gasification furnace A fire grate has last time anti- The layer of charcoal that should be generated;Gasification furnace A effect at this time is pyrolysis gas and high-temperature steam reacting furnace;
(09) product gas successively passes through channel of gas collection, blower, collection exhaust switch valve one, air-washer, gas collection flowmeter, gas collection Switch valve two, eventually enters into gas collecting apparatus;Air-washer stays in the vapor cooling in product gas in air-washer;
(10) after gas collecting apparatus is filled, pipeline is closed by collection exhaust switch valve, replaces gas collecting apparatus.
The utility model has the beneficial effects that: it is interactive double to provide a kind of high temperature for capableing of efficient output hydrogen-rich combustion gas Fixed-bed gasification furnace;Pyrolytic gasification processing can be carried out to biomass, house refuse and Biohazard Waste etc., which is collected into Gas have many advantages, such as that hydrogen-rich, low tar, calorific value are high, can further hydrogen manufacturing, be used for boiler heat supplying, power plants generating electricity and conduct Industrial chemicals etc. achievees the purpose that biomass energy efficiently utilizes with this.
Further, gasification furnace A, gasification furnace B are used interchangeably, and the coke that pyrolysis generates in gasification furnace is directly made without discharge Pyrolytic reaction is participated in for reactant, local use saves the operation for removing coke, improves production efficiency, while by solid Salvage value maximizes.
Further, the first steam channel, the second steam channel is arranged in gasification furnace, is passed through high-temperature vapour simultaneously up and down, provides Partial heat needed for reaction, while simultaneous reactions, quickening reaction speed improve product gas production efficiency to layer of charcoal up and down.
Detailed description of the invention
Fig. 1 is the overall structure cross-sectional view of the utility model.
Fig. 2 is the high temperature resistant connecting pipe connecting structure cross-sectional view of the utility model.
Fig. 3 is the gasification furnace A structure sectional view of the utility model.
Fig. 4 is the gasification furnace furnace structure cross-sectional view of the utility model.
Fig. 5 is the air-washer structure sectional view of the utility model.
Fig. 6 is the feeding device structure sectional view of the utility model.
Fig. 7 is the temperature control cabinet connection schematic diagram of the utility model.
In figure: gasification furnace A1, gasification furnace B2, high temperature resistant connecting tube 3, assisted heating device 4, temperature control cabinet 5, heating Resistance 4-1 exchanges exhaust switch valve 4-2, gas flowmeter A4-3, gas flowmeter B4-4, one 4-5 of temperature sensor, gasification furnace Furnace body 1-1 collects slag device 1-2, fire grate 1-3, feeds butterfly valve 1-4, heats Elema 1-5, steam generation facility 1-6, gas washing dress Set 1-7, gas collecting apparatus 1-8, blower 1-9, temperature sensor two 1-10, feeding device 1-11, internal bladder cavity 1-12, insulating layer 1- 13, feed inlet 1-14, gas crossover passage 1-15, the first steam channel 1-16, the second steam channel 1-17, channel of gas collection 1- 18, slag trapping cavity 1-19, cylinder plate 1-20, steam passage holes 1-21, steam inlet pipeline 1-22, steam cock valve 1-23, water 1-24, Product gas air inlet 1-25, product gas gas outlet 1-26, connecting tube 1-27 collect one 1-28 of exhaust switch valve, gas collection flowmeter 1-29, Collect two 1-30 of exhaust switch valve, material storing box 1-31, feeding motor 1-32, delivery pipe 1-33, discharge outlet 1-34.
Specific embodiment
A kind of interactive double-fixed bed gasification furnace of high temperature, including gasification furnace A1, gasification furnace B2, high temperature resistant connecting tube 3 are auxiliary Help heating device 4, temperature control cabinet 5;It is characterized by:
The gasification furnace A1, gasification furnace B2 are identical two pyrolysis gasification furnaces of structure;The high temperature resistant connecting tube 3 connects Gas crossover passage 1-15 on gasification furnace A1, gasification furnace B2 furnace body;
The assisted heating device 4 includes adding thermal resistance 4-1, exchange exhaust switch valve 4-2, gas flowmeter A4-3, gas Flowmeter B4-4, one 4-5 of temperature sensor;The adding thermal resistance 4-1 surrounds the installation of high temperature resistant connecting tube 3 in a spiral form, adds Thermal resistance 4-1 connects temperature control cabinet 5 by control line;The exchange exhaust switch valve 4-2 is mounted in high temperature resistant connecting tube 3 Between;The gas flowmeter A4-3 is mounted in high temperature resistant connecting tube 3, is located on the left of exchange exhaust switch valve 4-2, close to gasification furnace The gas crossover passage 1-15 of A1;The gas flowmeter B4-4 is mounted in high temperature resistant connecting tube 3, is located at exchange exhaust switch valve Gas crossover passage 1-15 on the right side of 4-2, close to gasification furnace B2;One 4-5 of temperature sensor is mounted on high temperature resistant connecting tube 3 On, signal output terminal connects temperature control cabinet 5;
The gasification furnace A includes gasification furnace body 1-1, collects slag device 1-2, fire grate 1-3, feeds butterfly valve 1-4, heats silicon-carbon Stick 1-5, steam generation facility 1-6, air-washer 1-7, gas collecting apparatus 1-8, blower 1-9, two 1-10 of temperature sensor, charging dress Set 1-11;
The gasification furnace body 1-1 includes cylindrical internal bladder cavity 1-12, the insulating layer 1-13 for being wrapped in internal bladder cavity outer ring; The feed inlet 1-14 of the gasification upper end the furnace body 1-1 setting connection internal bladder cavity 1-12;The furnace body 1-1 side wall upper part that gasifies setting It is connected to the gas crossover passage 1-15 of internal bladder cavity 1-12, the first of setting connection internal bladder cavity 1-12 below gas crossover passage 1-15 The second parallel steam channel 1-17 of setting below steam channel 1-16, the first steam channel 1-16;The gasification furnace body 1-1 Channel of gas collection 1-18 is arranged in lower sidewall, and channel of gas collection 1-18 is located at the second steam channel 1-17 opposite side, and the second steam Channel 1-17 is higher than channel of gas collection 1-18;
The gasification lower end furnace body 1-1 collects slag device 1-2 using flange seal connection type installation collection slag device 1-2 Slag trapping cavity 1-19 be connected to the internal bladder cavity 1-12 of top;The fire grate 1-3 is mounted on the bottom internal bladder cavity 1-12, frame in slag trapping cavity On 1-19, the upper end fire grate 1-3 cylinder plate 1-20 is located at the second steam channel 1-17 or more, and cylinder plate 1-20 is adopted with internal bladder cavity 1-12 Use clearance fit;The steam passage holes 1-21 for running through cylinder plate vertically is set on the cylinder plate 1-20;
The charging butterfly valve 1-4 is mounted at feed inlet 1-14;The heating Elema 1-5 is to be spirally mounted on gasification In furnace body 1-1, heating Elema 1-5 helical centre is overlapped with internal bladder cavity 1-12 vertical axis, and heating Elema 1-5 passes through Control line connects temperature control cabinet 5;The steam generation facility 1-6 passes through steam inlet pipeline 1-22 the first steam channel of connection Steam cock valve 1-23 is respectively set on two steam inlet pipelines in 1-16, the second steam channel 1-17;
The air-washer 1-7 is provided with water 1-24, and is provided with product gas air inlet 1-25 and product gas gas outlet 1- 26;The channel of gas collection 1-18 is by connecting tube 1-27 connection air-washer 1-7, and connecting tube 1-27 is from product gas air inlet 1- It 25 protrudes into, be inserted into the water surface hereinafter, product gas gas outlet 1-26 is located above the water surface, pass through connecting tube at the 1-26 of product gas gas outlet 1-27 connection gas collecting apparatus 1-8;It connects and blower 1-9, collection one 1-28 of exhaust switch valve is installed in the connecting tube of air-washer 1-7;Even Meet installation two 1-30 of gas collection flowmeter 1-29 sum aggregate exhaust switch valve in the connecting tube of gas collecting apparatus 1-8;Product gas is successively by collection Gas channel 1-18, blower 1-9, collection one 1-28 of exhaust switch valve, air-washer 1-7, gas collection flowmeter 1-29, collection two 1- of exhaust switch valve 30, eventually enter into gas collecting apparatus 1-8;
Two 1-10 of temperature sensor is mounted on gasification furnace body 1-1, and signal output terminal connects temperature control Cabinet 5;
The feeding device 1-11 includes material storing box 1-31, feeding motor 1-32, delivery pipe 1-33, delivery pipe upper end with into Material mouth connection.
Preferably, the gas collecting apparatus 1-8 uses steel storage cylinder.
Preferably, the air-washer 1-7 liquid level arrangement above discharge outlet 1-34, facilitates draining.
Although the utility model is described in detail referring to previous examples, come for those skilled in the art It says, still technical solution documented by foregoing embodiments can be carried out and be modified, or to part of technical characteristic It is equivalently replaced, within the spirit and principle of the utility model, any modification, equivalent substitution, improvement and etc. done, It should be included within the scope of protection of this utility model.

Claims (3)

1. a kind of interactive double-fixed bed gasification furnace of high temperature, including gasification furnace A, gasification furnace B, high temperature resistant connecting tube, auxiliary heating Device, temperature control cabinet;It is characterized by:
The gasification furnace A, gasification furnace B are identical two pyrolysis gasification furnaces of structure;The high temperature resistant connecting tube connects gasification furnace A, the gas crossover passage on gasification furnace B furnace body;
The assisted heating device includes adding thermal resistance, exchange exhaust switch valve, gas flowmeter A, gas flowmeter B, temperature biography Sensor one;The adding thermal resistance surrounds the installation of high temperature resistant connecting tube in a spiral form, and adding thermal resistance connects temperature by control line Control cabinet;The exchange exhaust switch valve is mounted among high temperature resistant connecting tube;The gas flowmeter A is mounted on high temperature resistant connection Guan Shang, on the left of exchange exhaust switch valve, close to the gas crossover passage of gasification furnace A;The gas flowmeter B is mounted on resistance to height In warm connecting tube, on the right side of exchange exhaust switch valve, close to the gas crossover passage of gasification furnace B;The temperature sensor one is pacified In high temperature resistant connecting tube, signal output terminal connects temperature control cabinet;
The gasification furnace A include gasification furnace body, collect slag device, fire grate, feed butterfly valve, heat Elema, steam generation facility, Air-washer, gas collecting apparatus, blower, temperature sensor two, feeding device;
The gasification furnace body includes cylindrical internal bladder cavity, the insulating layer for being wrapped in internal bladder cavity outer ring;The gasification furnace body The feed inlet of upper end setting connection internal bladder cavity;The gas crossover passage of gasification furnace sidewall of the furnace body top setting connection internal bladder cavity, gas First steam channel of setting connection internal bladder cavity below body interchange channel, the second parallel steam of the first steam channel lower section setting Channel;Channel of gas collection is arranged in gasification furnace sidewall of the furnace body lower part, and channel of gas collection is located at the second steam channel opposite side, and the Two steam channels are higher than channel of gas collection;
The gasification furnace body lower end collects slag trapping cavity and the top of slag device using flange seal connection type installation collection slag device Internal bladder cavity connection;The fire grate is mounted on internal bladder cavity bottom, frame on slag trapping cavity, and fire grate upper end cylinder plate is located at the second steam More than channel, cylinder plate is gap-matched with internal bladder cavity;The steam passage holes for running through cylinder plate vertically are set on the cylinder plate;
The charging butterfly valve is mounted at feed inlet;The heating Elema is to be spirally mounted in gasification furnace body, heating Elema helical centre is overlapped with internal bladder cavity vertical axis, and heating Elema connects temperature control cabinet by control line;It is described Steam generation facility connects the first steam channel, the second steam channel by steam inlet pipeline, on two steam inlet pipelines Steam cock valve is respectively set;
The air-washer is provided with water, and is provided with product gas air inlet and product gas gas outlet;The channel of gas collection passes through Connecting tube connects air-washer, and connecting tube protrudes into from product gas air inlet, is inserted into the water surface hereinafter, product gas gas outlet is located at water Above face, gas collecting apparatus is connected by connecting tube at product gas gas outlet;It connects and blower, collection is installed in the connecting tube of air-washer Exhaust switch valve one;It connects and gas collection flowmeter sum aggregate exhaust switch valve two is installed in the connecting tube of gas collecting apparatus;Product gas is successively passed through Channel of gas collection, blower, collection exhaust switch valve one, air-washer, gas collection flowmeter, collection exhaust switch valve two, eventually enter into gas collecting apparatus;
The temperature sensor two is mounted on gasification furnace body, and signal output terminal connects temperature control cabinet;
The feeding device includes material storing box, feeding motor, delivery pipe, and delivery pipe upper end is connect with feed inlet.
2. the interactive double-fixed bed gasification furnace of a kind of high temperature according to claim 1, it is characterized in that: the gas collecting apparatus Using steel storage cylinder.
3. the interactive double-fixed bed gasification furnace of a kind of high temperature according to claim 1, it is characterized in that: the air-washer Liquid level arrangement above discharge outlet.
CN201821009011.6U 2018-06-28 2018-06-28 A kind of interactive double-fixed bed gasification furnace of high temperature Active CN208327926U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821009011.6U CN208327926U (en) 2018-06-28 2018-06-28 A kind of interactive double-fixed bed gasification furnace of high temperature

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821009011.6U CN208327926U (en) 2018-06-28 2018-06-28 A kind of interactive double-fixed bed gasification furnace of high temperature

Publications (1)

Publication Number Publication Date
CN208327926U true CN208327926U (en) 2019-01-04

Family

ID=64785634

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821009011.6U Active CN208327926U (en) 2018-06-28 2018-06-28 A kind of interactive double-fixed bed gasification furnace of high temperature

Country Status (1)

Country Link
CN (1) CN208327926U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108676580A (en) * 2018-06-28 2018-10-19 内蒙古科技大学 A kind of interactive double-fixed bed gasification furnace of high temperature and its process

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108676580A (en) * 2018-06-28 2018-10-19 内蒙古科技大学 A kind of interactive double-fixed bed gasification furnace of high temperature and its process
CN108676580B (en) * 2018-06-28 2023-09-12 内蒙古科技大学 High Wen Jiaohu type double-fixed bed gasification furnace and process method thereof

Similar Documents

Publication Publication Date Title
CN104099111B (en) The continuous overall pyrolysis oven of biomass
CN105368497A (en) Biomass material microwave-assisted pyrolysis gasification device, and application method thereof
CN101457147B (en) No-oxygen pyrolysis gasification processing device of urban domestic garbage and technique thereof
CN104804775A (en) Method and system for producing combustible gas from domestic waste through pyrolysis gasification
CN102942941A (en) Biomass distillation and power generation system
CN107022363A (en) A kind of continuous biomass pyrolysis gas is reversely flowd back towards with charcoal gas cogeneration facility
CN101508902A (en) Biomass fuel cycle gasifying device and method thereof
CN108410503B (en) Reflux type high-temperature fixed bed gasifier and process method thereof
CN208327926U (en) A kind of interactive double-fixed bed gasification furnace of high temperature
CN106479527A (en) One kind carries out rubbish charcoal processing system using straw burning heat release
CN105349186B (en) Biogas system and technique based on microwave heating
CN110127975A (en) A kind of sludge treating system and method
CN206176390U (en) Domestic waste pyrolysis gasification treatment system
CN207276461U (en) Pyrolyzing sludge device
CN208038385U (en) A kind of reverse-flow type high temperature fixed bed gasification furnace
CN108676580B (en) High Wen Jiaohu type double-fixed bed gasification furnace and process method thereof
CN218665673U (en) Superconducting efficient harmless sludge treatment device
CN205261567U (en) Waste gasification boiler
CN109486530A (en) Sludge gasification furnace
CN109609192B (en) Two-section biomass gasification furnace gasification system
CN207276564U (en) sludge gasification furnace
CN201367415Y (en) Biomass fuel circulating gasification device
CN208292935U (en) A kind of equipment for the charing of anaerobic fermentation biogas residue
US11667525B2 (en) Petroleum sludge or other wastes recycle treatment system
CN105694984A (en) Biomass gasifying device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant