CN208309616U - A kind of assembled prefabricated house prefabricated foundation that piece is staggered - Google Patents

A kind of assembled prefabricated house prefabricated foundation that piece is staggered Download PDF

Info

Publication number
CN208309616U
CN208309616U CN201820834117.3U CN201820834117U CN208309616U CN 208309616 U CN208309616 U CN 208309616U CN 201820834117 U CN201820834117 U CN 201820834117U CN 208309616 U CN208309616 U CN 208309616U
Authority
CN
China
Prior art keywords
connecting elements
type connecting
type
entity
nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820834117.3U
Other languages
Chinese (zh)
Inventor
洪佳杰
吴刚
杨利月
孔亚军
吴守忠
王峰
夏明峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG XINSHENG CONSTRUCTION GROUP CO Ltd
Original Assignee
ZHEJIANG XINSHENG CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG XINSHENG CONSTRUCTION GROUP CO Ltd filed Critical ZHEJIANG XINSHENG CONSTRUCTION GROUP CO Ltd
Priority to CN201820834117.3U priority Critical patent/CN208309616U/en
Application granted granted Critical
Publication of CN208309616U publication Critical patent/CN208309616U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

A kind of assembled prefabricated house prefabricated foundation that piece is staggered, belongs to technical field of building construction.It includes L-type corner component, Z-type connecting elements and T-type connecting elements, L-type corner component is arranged in basic corner location, it is connected between two neighboring L-type corner component by several Z-type connecting elements, form the long side and broadside of assembled prefabricated house prefabricated foundation, T-type connecting elements is symmetrically arranged between the two neighboring Z-type connecting elements of corresponding position in two long sides, it is connected between two T-type connecting elements by several Z-type connecting elements, assembled prefabricated house prefabricated foundation is divided into several compartments.The utility model passes through bolt for adjacent connecting elements, obtain the assembled prefabricated house prefabricated foundation that piece is staggered, substitute brick foundation or concrete foundation, raw material is saved, and the processes such as brick body masonry, concrete curing are saved, construction cost is reduced, labour is saved, and can repeat to recycle, it is suitable for popularization and application.

Description

A kind of assembled prefabricated house prefabricated foundation that piece is staggered
Technical field
The utility model belongs to construction foundation working technical field, in particular to a kind of assembled prefabricated house that piece is staggered Prefabricated foundation.
Background technique
Prefabricated house is one kind using light steel as skeleton, using battenboard as cladding, carries out spatial group with standard module series It closes, component is connected by screw bolts, the environmental protection and economy type movable dwellings of novel concept.Assembly and disassembly can be conveniently and efficiently carried out, Realize the series of temporary building
It melts hair, integrated production, supporting supply, inventory and can repeatedly be used in turn.Assembled prefabricated house is to build It builds industry and faces and build important component part in construction, mainly as office occupancy, life room, the impermanency produced and used Buildings or structures and other facilities.
Traditional prefabricated house basis way needs hand excavation cubic metre of earth, brick foundation bed course concrete placings, and brick foundation is built, concrete Ground beam construction, the backfill of the room heart, flooring cushion construction, ground tile paving, complex procedures are long in time limit;Using concrete ground beam and One layer of ground integrated construction, although accelerating the duration than traditional reinforced concrete circle beam base section, having saved formwork erection With the expense of room heart backfilling of earthwork, but still there are can not having enough to meet the need and generate a large amount of rubbish, conventional assembled activity Foundations plinth adds the ways such as plain concrete collar tie beam using plain concrete strip footing or brick foundation, though house itself, which can have enough to meet the need, to be made With, but existence foundation and ground are disposable investment, the disadvantages of cannot being reused after dismounting, and generate a large amount of building wastes. Therefore, a kind of arrangement and method for construction being simple and efficient is needed at present to solve the above problems.
Utility model content
For the deficiencies in the prior art, the utility model is intended to provide a kind of assembled prefabricated house that piece is staggered Prefabricated foundation.
The assembled prefabricated house prefabricated foundation that a kind of piece is staggered, including L-type corner component, Z-type connecting elements With T-type connecting elements, it is characterised in that the corner location of assembled prefabricated house prefabricated foundation is arranged in L-type corner component, adjacent It is connected between two L-type corner components by several Z-type connecting elements, forms the long side and width of assembled prefabricated house prefabricated foundation Side is symmetrically arranged with T-type connecting elements, two T-types connections in two long sides between the two neighboring Z-type connecting elements of corresponding position It is connected between component by several Z-type connecting elements, assembled prefabricated house prefabricated foundation is divided into several compartments.
The assembled prefabricated house prefabricated foundation that a kind of piece is staggered, it is characterised in that L-type corner component entirety shape Shape is L-shaped, including L-type corner component entity, and the both ends of L-type corner component entity are equipped with step structure, and step direction On the contrary, wherein lower spill of dashing forward is presented in one end, the other end is in staggered distribution in lower prominent upper spill, and from centre is longitudinal;In protruding part Between be equipped with perforative prepared screw-bolt hole, and reserved groove is respectively set around prepared screw-bolt hole outer surface, is convenient for upper and lower position spiral shell Cap, nut installation, and nut, nut are concordant with L-type corner component solid object surface;The corner centre bit of L-type corner component entity Pre embedded bolt has been installed, it is convenient to be fixedly connected with the upright bar of superstructure;The side of L-type corner component entity is equipped with pre-buried guy Rope connector.
The assembled prefabricated house prefabricated foundation that a kind of piece is staggered, it is characterised in that Z-type connecting elements entirety shape Shape is Z-shape, including Z-type connecting elements entity, and Z-type connecting elements entity both ends end is set as step structure, one end present it is prominent under Spill, the other end is in lower prominent upper spill, and entire Z-type connecting elements entity is in staggered distribution from intermediate longitudinal direction, in tip protrusion position Between be equipped with perforative prepared screw-bolt hole, and reserved groove is respectively set around prepared screw-bolt hole outer surface, is convenient for upper and lower position spiral shell Cap, nut installation, and nut, nut are concordant with Z-type connecting elements solid object surface;The middle part centre bit of Z-type connecting elements entity Pre embedded bolt has been installed, it is convenient to be fixedly connected with the upright bar of superstructure.
The assembled prefabricated house prefabricated foundation that a kind of piece is staggered, it is characterised in that T-type connecting elements entirety shape Shape is T-shaped, including T-type connecting elements entity, and three end end of T-type connecting elements entity is equipped with step structure, left and right ends pair Claim, the step direction of left and right ends is with third end stand rank towards on the contrary, intermediate longitudinal direction is in staggered distribution, in the protruding part at three ends Between be equipped with perforative prepared screw-bolt hole, and reserved groove is respectively set around prepared screw-bolt hole outer surface, is convenient for upper and lower position spiral shell Cap, nut installation, and nut, nut are concordant with T-type connecting elements solid object surface;The middle part centre bit of T-type connecting elements entity Pre embedded bolt is installed, convenient to be fixedly connected with the upright bar of superstructure, the side of T-type connecting elements entity is equipped with pre-buried guy Rope connector.
The assembled prefabricated house prefabricated foundation that a kind of piece is staggered, it is characterised in that reserved groove is square recessed Slot, depth 20-30mm.
Compared with prior art, the assembled prefabricated house prefabricated foundation of the utility model has the advantages that
1) the utility model prefabricated foundation use prefabricated components be equipped with it is matched protrusion and groove, by protrusion with it is recessed Slot is inlayed and is bolted to connection, and can easily realize the integral assembling connection of prefabricated house prefabricated foundation, construction is facilitated to pacify Assembly and disassembly, assembled height, width and formation can be depending on prefabricated house scales, and the scope of application is more extensive, and each prefabricated Construction weight is lighter, facilitates lifting and transport;
2) each component of the prefabricated foundation of the utility model can be in factory's centralized production, and mass of foundation is secure, construction is simple Folk prescription just, easy assembly and disassembly, shorten the construction period and recycling and reusing may be implemented, reduce economic cost;
3) the utility model substitutes brick foundation or concrete foundation by the prefabricated foundation, has saved a large amount of construction and has used Brick amount or amount of concrete reduce the stacking and transport of construction material, are conducive to civilized construction, save brick body masonry, coagulation The processes such as soil maintenance, reduce construction cost, while having saved a large amount of labours, and can repeat to recycle, suitable for pushing away Wide application.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model prefabricated foundation;
Fig. 2 is the L-type corner element structure schematic diagram of the utility model;
Fig. 3 is the Z-type connecting elements structural schematic diagram of the utility model;
Fig. 4 is the T-type connecting elements structural schematic diagram of the utility model.
In figure: 1-L type corner component, 11-L type corner component entity, a- reserve groove, b- prepared screw-bolt hole, and c- is pre-buried Screw rod, the pre-buried cable wind rope connector of d-, 2-Z type connecting elements, 21-Z type connecting elements entity, 3-T type connecting elements, 31-T type Connecting elements entity.
Specific embodiment
Below in conjunction with Figure of description, the utility model will be further described, but the protection scope of the utility model is simultaneously It is not limited only to this:
As shown in Figs 1-4, the assembled prefabricated house prefabricated foundation that a kind of piece of the utility model is staggered, including L-type turn Assembled prefabricated house prefabricated foundation is arranged in corner member 1, Z-type connecting elements 2 and T-type connecting elements 3, L-type corner component 1 Corner location is connected by several Z-type connecting elements 2 between two neighboring L-type corner component 1, and it is pre- to form assembled prefabricated house The long side and broadside on basis are made, is symmetrically arranged with T-type company in two long sides between the two neighboring Z-type connecting elements 2 of corresponding position Connection member 3 is connected by several Z-type connecting elements 2 between two T-type connecting elements 3, by assembled prefabricated house prefabricated foundation point Several compartments are divided into, each junction passes through corresponding prepared screw-bolt hole b by bolt and is fixedly connected.
As shown in Fig. 2, the L-type corner component 1 of the utility model includes L-type corner component entity 11, L-type corner component is real The both ends end of body 11 is respectively equipped with step structure, and the direction of step structure is towards on the contrary, reserved groove a, prepared screw-bolt hole B, pre embedded bolt c and pre-buried cable wind rope connector d composition, L-type corner component 11 global shapes of entity are L-shaped, and one end is presented Prominent lower spill, and be in staggered distribution from intermediate longitudinal direction, the other end is equally in staggered distribution from intermediate longitudinal direction, in lower prominent upper spill two It holds among protruding part up and down, is uniformly distributed two perforative prepared screw-bolt hole b, and in upper process position top and lower process The square for being reserved with 20 ~ 30mm depth around the surface prepared screw-bolt hole b of position lower part respectively reserves groove a, facilitates top and the bottom It is just concordant with L-type corner component upper and lower surface when nut and the nut installation of position, in the corner center of L-type corner component, Four pre embedded bolt c are embedded with, it is convenient to be fixedly connected with the upright bar of superstructure, in 11 lateral surface of L-type corner component entity Between be equipped with pre-buried cable rope connector d, pre-buried cable rope connector d is that annulus reinforcing bar and L-type steel muscle are welded, convenient and cable The connection of wind rope.
As shown in figure 3, the Z-type connecting elements 2 includes Z-type corner component entity 21, the Z-type corner component is real For 21 global shape of body in Z-shaped, prominent lower spill is presented in one end, and is in staggered distribution from intermediate longitudinal direction, and the other end is in lower prominent upper spill, Equally it is in staggered distribution from intermediate longitudinal direction.Among the protruding part of both ends, two perforative prepared screw-bolt hole b are uniformly distributed, and It is deep just to be reserved with 20 ~ 30mm respectively around the prepared screw-bolt hole surface of upper process position top and protruding part lower part of going down Rectangular reserved groove a, convenient position nut up and down and nut are just flat with 21 upper and lower surface of Z-type corner component entity when installing Together.In the middle part center of Z-type corner component entity 21, it is embedded with four pre embedded bolt c, the convenient upright bar with superstructure It is fixedly connected.
As shown in figure 4, the T-type connecting elements 3 includes T-type corner component entity 31, T-type corner component entity 31 is whole Shape is " T " shape, and prominent lower spill is presented in left and right ends, and is in staggered distribution from intermediate longitudinal direction, and third end is in lower prominent upper spill, together Sample is in staggered distribution from intermediate longitudinal direction;Or left and right ends are in staggered distribution in lower prominent upper spill, and from centre is longitudinal, third end is presented Prominent lower spill, is equally in staggered distribution from intermediate longitudinal direction;Among left and right ends and third end protruding part, it is uniformly distributed two and passes through The prepared screw-bolt hole b worn, and divide around the prepared screw-bolt hole surface of upper process position top and protruding part lower part of going down The square for not being reserved with 20 ~ 30mm depth reserves groove a, when convenient position nut up and down and nut are installed just with T-type corner 31 upper and lower surface of component entity is concordant.In the middle part center of T-type connecting elements, be embedded with four pre embedded bolt c, it is convenient with The upright bar of superstructure is fixedly connected.Pre-buried cable rope connector d is equipped among 31 lateral surface of T-type corner component entity, in advance Burying cable rope connector d is that annulus reinforcing bar and L-type steel muscle are welded, convenient to connect with cable wind rope.

Claims (5)

1. a kind of assembled prefabricated house prefabricated foundation that piece is staggered, including L-type corner component (1), Z-type connecting elements (2) and T Type connecting elements (3), it is characterised in that the corner location of assembled prefabricated house prefabricated foundation, phase is arranged in L-type corner component (1) It is connected between adjacent two L-type corner components (1) by several Z-type connecting elements (2), forms assembled prefabricated house prefabricated foundation Long side and broadside are symmetrically arranged with T-type connecting elements between the two neighboring Z-type connecting elements (2) of corresponding position in two long sides (3), it is connected between two T-type connecting elements (3) by several Z-type connecting elements (2), by assembled prefabricated house prefabricated foundation point It is divided into several compartments.
2. the assembled prefabricated house prefabricated foundation that a kind of piece according to claim 1 is staggered, it is characterised in that L-type corner Component (1) global shape is L-shaped, including L-type corner component entity (11), and the both ends of L-type corner component entity (11) are all provided with There is step structure, and step is contrary, wherein prominent lower spill is presented in one end, and the other end is in lower prominent upper spill, and vertical from centre To being in staggered distribution;Perforative prepared screw-bolt hole (b) is equipped among protruding part, and around prepared screw-bolt hole (b) outer surface respectively Reserved groove (a) is set, is installed convenient for upper and lower position nut, nut, and nut, nut and L-type corner component entity (11) table Face is concordant;The corner center of L-type corner component entity (11) is equipped with pre embedded bolt (c), the convenient upright bar with superstructure It is fixedly connected;The side of L-type corner component entity (11) is equipped with pre-buried cable wind rope connector (d).
3. the assembled prefabricated house prefabricated foundation that a kind of piece according to claim 1 is staggered, it is characterised in that Z-type connection Component (2) global shape is Z-shape, including Z-type connecting elements entity (21), and Z-type connecting elements entity (21) both ends end is set as Prominent lower spill is presented in step structure, one end, and for the other end in lower prominent upper spill, entire Z-type connecting elements entity (21) is vertical from centre To being in staggered distribution, perforative prepared screw-bolt hole (b) is equipped among tip protrusion position, and around prepared screw-bolt hole (b) outer surface Reserved groove (a) is respectively set, is installed convenient for upper and lower position nut, nut, and nut, nut and Z-type connecting elements entity (21) flush;The middle part center of Z-type connecting elements entity (21) is equipped with pre embedded bolt (c), convenient and superstructure Upright bar be fixedly connected.
4. the assembled prefabricated house prefabricated foundation that a kind of piece according to claim 1 is staggered, it is characterised in that T-type connection Component (3) global shape is T-shaped, including T-type connecting elements entity (31), and (31) three end end of T-type connecting elements entity is all provided with Have step structure, left and right ends are symmetrical, the steps of left and right ends towards with third end stand rank towards on the contrary, intermediate longitudinal be staggered point Cloth is equipped with perforative prepared screw-bolt hole (b) among the protruding part at three ends, and around prepared screw-bolt hole (b) outer surface respectively Reserved groove (a) is set, is installed convenient for upper and lower position nut, nut, and nut, nut and T-type connecting elements entity (31) table Face is concordant;The middle part center of T-type connecting elements entity (31) is equipped with pre embedded bolt (c), the convenient upright bar with superstructure It is fixedly connected, the side of T-type connecting elements entity (31) is equipped with pre-buried cable wind rope connector (d).
5. a kind of assembled prefabricated house prefabricated foundation that piece is staggered according to Claims 2 or 3 or 4, it is characterised in that Reserved groove (a) is square groove, depth 20-30mm.
CN201820834117.3U 2018-05-31 2018-05-31 A kind of assembled prefabricated house prefabricated foundation that piece is staggered Active CN208309616U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820834117.3U CN208309616U (en) 2018-05-31 2018-05-31 A kind of assembled prefabricated house prefabricated foundation that piece is staggered

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820834117.3U CN208309616U (en) 2018-05-31 2018-05-31 A kind of assembled prefabricated house prefabricated foundation that piece is staggered

Publications (1)

Publication Number Publication Date
CN208309616U true CN208309616U (en) 2019-01-01

Family

ID=64710051

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820834117.3U Active CN208309616U (en) 2018-05-31 2018-05-31 A kind of assembled prefabricated house prefabricated foundation that piece is staggered

Country Status (1)

Country Link
CN (1) CN208309616U (en)

Similar Documents

Publication Publication Date Title
CN107842035B (en) Ultra-high performance concrete prefabricated assembled comprehensive pipe gallery system and construction method
CN105735325B (en) A kind of intensive permanent support assembled basement structure system and construction method
CN206070562U (en) Subassembly formula underground structure
CN201546227U (en) Steel support beam for supporting foundation pit bracing piling wall and basement structure outer wall
CN101117805A (en) Underground engineering one-pile multi-use semi reverse construction method
CN101418569B (en) Optimization complex arch wall combining prefabricated arch leaf, support and major structure
CN103306289A (en) Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof
CN211517947U (en) Bridge case roof beam is prefabricated with shaped steel pedestal
CN108678751B (en) Assembly type construction method of shield cutter head manhole by jacking and excavating firstly
CN105587097A (en) Ground aerial structure capable of being leveled
CN111794254A (en) Railway slope prefabricated assembled post-cast framework slope protection structure and construction method thereof
CN113338451A (en) Assembly type structure adaptive to deformed steel pipe column and construction method thereof
CN112177036A (en) Height-adjustable modular prestressed fan foundation and construction method thereof
CN106088318A (en) The overlapping assembled integral basement that flat slab system is combined with post and lintel system
CN103741970A (en) Assembled machining shed for building construction and manufacture and installation method thereof
CN109868726A (en) A kind of prefabricated assembled cylindricality bridge pier and its construction method
CN205224271U (en) Mortise type concrete superposed beam cross connection structure
CN202247719U (en) Corresponding corrugated pre-stressed anti-sedimentation culvert pipe for bridge
CN109267578B (en) Inclined plane plain concrete structure and construction method thereof
CN208309616U (en) A kind of assembled prefabricated house prefabricated foundation that piece is staggered
CN106368445A (en) Existing building reinforcing and self-supporting thermal insulation integrated system and construction method
CN207714358U (en) A kind of transmission line of electricity composite structure assembled cushion cap anchor rod foundation
CN203755171U (en) Bridge back-pulling bearing construction support
CN206457838U (en) A kind of assembling type base for power transmission tower
CN106088762B (en) A kind of prefabricated assembled round underground granary of insertion slot type encased steel plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Prefabricated foundation of prefabricated movable house with staggered joints

Effective date of registration: 20200819

Granted publication date: 20190101

Pledgee: Industrial and Commercial Bank of China Limited Hangzhou Banshan sub branch

Pledgor: ZHEJIANG XINSHENG CONSTRUCTION GROUP Co.,Ltd.

Registration number: Y2020330000621

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20211026

Granted publication date: 20190101

Pledgee: Industrial and Commercial Bank of China Limited Hangzhou Banshan sub branch

Pledgor: ZHEJIANG XINSHENG CONSTRUCTION GROUP Co.,Ltd.

Registration number: Y2020330000621

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Prefabricated foundation of prefabricated movable house with staggered joints

Effective date of registration: 20211111

Granted publication date: 20190101

Pledgee: Industrial and Commercial Bank of China Limited Hangzhou Banshan sub branch

Pledgor: ZHEJIANG XINSHENG CONSTRUCTION GROUP Co.,Ltd.

Registration number: Y2021330002221

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20221201

Granted publication date: 20190101

Pledgee: Industrial and Commercial Bank of China Limited Hangzhou Banshan sub branch

Pledgor: ZHEJIANG XINSHENG CONSTRUCTION GROUP Co.,Ltd.

Registration number: Y2021330002221

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Prefabricated foundation of prefabricated movable house with staggered joints

Effective date of registration: 20221214

Granted publication date: 20190101

Pledgee: Industrial and Commercial Bank of China Limited Hangzhou Banshan sub branch

Pledgor: ZHEJIANG XINSHENG CONSTRUCTION GROUP Co.,Ltd.

Registration number: Y2022330003664

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20231204

Granted publication date: 20190101

Pledgee: Industrial and Commercial Bank of China Limited Hangzhou Banshan sub branch

Pledgor: ZHEJIANG XINSHENG CONSTRUCTION GROUP Co.,Ltd.

Registration number: Y2022330003664

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A prefabricated foundation for prefabricated activity rooms with staggered joints

Effective date of registration: 20231222

Granted publication date: 20190101

Pledgee: Industrial and Commercial Bank of China Limited Hangzhou Banshan sub branch

Pledgor: ZHEJIANG XINSHENG CONSTRUCTION GROUP Co.,Ltd.

Registration number: Y2023330003083

PE01 Entry into force of the registration of the contract for pledge of patent right