CN208309582U - Integrated anti-floating device of open prestressed high-strength concrete pipe pile and anti-floating anchor rod - Google Patents

Integrated anti-floating device of open prestressed high-strength concrete pipe pile and anti-floating anchor rod Download PDF

Info

Publication number
CN208309582U
CN208309582U CN201820809459.XU CN201820809459U CN208309582U CN 208309582 U CN208309582 U CN 208309582U CN 201820809459 U CN201820809459 U CN 201820809459U CN 208309582 U CN208309582 U CN 208309582U
Authority
CN
China
Prior art keywords
anchor rod
steel
float anchor
rod body
gfrp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820809459.XU
Other languages
Chinese (zh)
Inventor
张明义
桑松魁
白晓宇
王永洪
苗德滋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao University of Technology
Original Assignee
Qingdao University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao University of Technology filed Critical Qingdao University of Technology
Priority to CN201820809459.XU priority Critical patent/CN208309582U/en
Application granted granted Critical
Publication of CN208309582U publication Critical patent/CN208309582U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model belongs to the technical field of foundation engineering, a integrated anti-floating device of an open prestressed high-strength concrete pipe pile and an anti-floating anchor rod is related to, one end of a GFRP anti-floating anchor rod body positioner is bound on a GFRP anti-floating anchor rod body, the other end is bound at a hole reserved on an annular steel plate, a fixed support is installed on the flat ground, a centering bracket is installed on the GFRP anti-floating anchor rod body and is connected with the open prestressed high-strength concrete pipe pile, a thread round hole is manufactured on the reserved inner wall of the center of an expansion head, the expansion head is installed on the outer surface of the top end of the GFRP anti-floating anchor rod body and is poured in a foundation slab, and a round steel plate is placed inside the open prestressed high-strength concrete; the reverse L-shaped steel bar is welded with the round steel plate, the cushion layer is laid on the ground, the foundation slab is arranged on the cushion layer, the structure is simple, the installation is quick and simple, the operability is strong, the energy is saved, the environment is protected, the economic benefit and the social benefit are obvious, the construction process of independently making the anti-floating anchor rod is reduced, the construction period is shortened, and the cost is reduced.

Description

A kind of opening prestressed high strength coagulation tubular pole anti-floating system integrated with anti-float anchor rod
Technical field:
The utility model belongs to ground foundation engineering technical field, is related to a kind of composite material anti-float anchor rod and prestressing force is high The integrated anti-floating system of reinforced concrete tubular pole, especially a kind of open prestressed high strength coagulation tubular pole and anti-float anchor rod one Change anti-floating system.
Background technique:
PHC piles are easily controllable with the raw quality of industrial scale with it and check, pile sinking Quality is more guaranteed than bored concrete pile, bearing capacity of single pile is high, adaptable to engineering geological condition, the construction period is short, construction site without The advantages that pollution, has been widely used in the field of civil engineering such as industry and civil buildings, highway bridge, harbour, has become China and answer With one of widest pile-type.In particular by the PHC piles of static pressure construction, meet green assembly The developing direction of formula.
But with the utilization of the underground space and being continuously increased for building embedded depth of foundation, anti-floating problem is also following. And pressure bearing pile itself cannot support underground water anti-floating power bring and endanger, so it is highly important for selecting suitable measure of anti float. Compared with the measure of anti float such as Yield rainfall relation method, ballast method, uplift pile, anti-float anchor rod has ground adaptability strong, and dispersive stress is convenient for It the advantages that construction, saving construction cost, is widely applied in field of civil engineering.Currently, the material of anti-float anchor rod is substantially with steel Based on muscle, and environment locating for anti-float anchor rod is poor, throughout the year in underwater or alternation of wetting and drying region, present in underground water Chloride ion makes reinforced anchor bolt by chemical attack.Especially in Construction of Urban Rail Traffic, the stray electrical current of generation makes reinforcing bar anchor Bar greatly reduces the service life of anti-float anchor rod, therefore, the Anticorrosion of anchor structure is more simultaneously by electrochemical corrosion It is prominent, but the breakthrough that the Anticorrosion of anchor pole obtains essence not yet at present uses nonmetallic materials anchor in this case Bar becomes optimal selection.GFRP (Glass Fiber Reinforced Polymer) material is using glass fibre as strengthening material Material, synthetic resin is basis material, and using silvalin dipping, there are also the unsaturated polyester (UP) trees of a variety of auxiliary agents such as curing agent, promotor After the resin adhesive liquids such as rouge, by pultrusion, a kind of composite material for winding screw thread, solidifying one-pass molding and being formed, GFRP anchor pole tool Have the advantages that tensile strength height, light weight, anticorrosive, anti-electromagnetic interference capability be strong, low cost, in recent years slope reinforcement, There are more research and application in the fields such as pattern foundation pit supporting structure.
Urban construction at present is just in progress like a raging fire, and the usage amount of anti-float anchor rod is continuously increased, GFRP anti-float anchor rod It is a urgent and significant job using advantageously reducing project cost and building safety engineering.Nowadays by prestressing force High-strength concrete pipe pile and GFRP anti-float anchor rod combine anti-floating, on the one hand can compensate PHC piles Vertical compression bearing capacity, save the cost;Without drilling when another aspect anti-float anchor rod is constructed, the disengaging of large scale equipment is avoided , equally reduce project cost, it is seen then that economic benefit is very significant.Therefore, a kind of reasonable, reliable prestressed high-strength is designed Spend coagulation tubular pole anti-floating system integrated with composite material anti-float anchor rod it is extremely urgent, have broad application prospects with it is good Economic benefit.
Summary of the invention:
The purpose of the utility model is to overcome disadvantages of the existing technology, under the premise of not improving cost, provide A kind of open prestressed high strength coagulation tubular pole anti-floating system integrated with anti-float anchor rod is by corrosion resistance good, tension is strong High nonmetallic materials are spent to connect as the anti-float anchor rod body of rod, and by anti-float anchor rod and PHC piles Connect, so that PHC piles are linked together with anti-float anchor rod, reduce working procedure, shorten the construction period, reduce at This, realize PHC piles can resist vertical pressure with but also resist the target of buoyancy force of underground water.
To achieve the goals above, open prestressed high strength coagulation tubular pole described in the utility model and anti-float anchor rod one The main structure for changing anti-floating system includes GFRP anti-float anchor rod body of rod locator, hold-down support, centering bracket, GFRP anti-float anchor rod The body of rod, open PHC piles, enlarged footing, inverted L-shaped reinforcing bar, circular steel plate, bed course, sole plate;GFRP One end of anti-float anchor rod body of rod locator is bound on the GFRP anti-float anchor rod body of rod, other end binding ring steel in hold-down support At the reserving hole of plate, prevent the GFRP anti-float anchor rod body of rod of centering from sliding downwards;Hold-down support is mounted on smooth ground On, to guarantee its stability;Centering bracket be mounted on the GFRP anti-float anchor rod body of rod and with open prestressed high strength concrete Tubular pole connection, the GFRP anti-float anchor rod body of rod are on the center line in open PHC piles aperture;GFRP is anti- Drogue club shaft is the solid anchor pole of full thread glass fiber reinforced polymer, and the material of enlarged footing is glass fiber reinforced polymer Material (identical as the material of the GFRP anti-float anchor rod body of rod), circular hole is reserved at center, is formed with screw thread on the inner wall of aperture, enlarged footing it is outer Outline diameter is 5 times of reserved Circularhole diameter, and enlarged footing is mounted on GFRP anti-float anchor rod body of rod top in a manner of screw thread couple Outer surface and be cast in sole plate, be marked at the screw thread couple of enlarged footing and the GFRP anti-float anchor rod body of rod mass ratio be 2: 1 epoxy resin and EP type curing agent mixed liquor, on the one hand for increasing the forced area of anchored end, diffusion-induced stress improves anchor Gu on the other hand the effect of power is able to achieve the purpose of sealing;Inverted L-shaped reinforcing bar is made of the plain bar of diameter 8mm, circular steel plate With a thickness of 4mm, diameter is slightly less than the internal diameter of PHC piles, and circular steel plate is just put into open answers in advance Inside power high-strength concrete pipe pile;Inverted L-shaped reinforcing bar and circular steel plate are welded, and are uniformly distributed in circular steel with 120 ° of angle The edge of plate avoids injecting anchorage mortar in the long range of the entire stake of open PHC piles, only by anchor Gu injecting anchorage mortar within the scope of the anchorage depth that power determines, achievees the purpose that save material, reduces cost;Bed course is thin by C15 Stone element mixed mud is made, and on the ground, top surface smoothes out setting cushion, is convenient for its surfacing in assembling reinforcement above, Play the role of protecting sole plate;Sole plate is made of armored concrete, and according to construction drawing and " building foundation designs Specification " requirement of (GB50007-2011) constructed and is arranged on bed course, and the GFRP anti-float anchor rod body of rod anchors into sole plate It is interior.
GFRP anti-float anchor rod body of rod locator described in the utility model is made of iron wire, specification 18#, diameter 1.6mm.
Hold-down support described in the utility model is welded by seamless steel pipe and doughnut-shaped steel plate, and seamless steel pipe is higher by prestressing force High-strength concrete pipe pile stake top upper surface at least 10cm, diameter is 10cm bigger than PHC piles stake diameter, The width of doughnut-shaped steel plate is 8cm, and symmetrical hole is reserved on doughnut-shaped steel plate, and the size of hole keeps the GFRP anti-float anchor rod body of rod fixed Position device passes through, for fixing GFRP anti-float anchor rod body of rod locator, to prevent the GFRP anti-float anchor rod body of rod from sliding up and down.
Centering bracket described in the utility model is by bolt, nut, steel valve, the first steel disc, steel sleeve, the second steel disc, trapezoidal Steel disc, silk stick, interior mantle fiber seamless steel pipe, ribbed stiffener steel disc composition, wherein steel valve is by seamless steel pipe by 90 ° of even partition systems At the first steel disc is welded at the both ends of steel valve, and in the position of form center reserving hole of the first steel disc, hole is sized so that spiral shell Bolt passes through, adjacent steel valve by screw bolt and nut be of coupled connections together, by tighten screw bolt and nut improve steel valve and The bond stress of the GFRP anti-float anchor rod body of rod;On the Axisymmetric Distributed Line of each steel valve along steel valve outer surface weld steel sleeve, steel sleeve by Seamless steel pipe is made, and with a thickness of 2mm, diameter 2.5cm, length of the silk stick in steel sleeve is two of the length outside steel sleeve Times;The solid iron staff that silk stick is diameter 2cm, and surface has screw thread, the side length of the second steel disc is 5cm, with a thickness of 2mm, silk stick One end be mounted in steel sleeve, the other end is welded in the centroid of the second steel disc, mixed for increasing open prestressed high strength The forced area of solidifying soil tubular pole inner wall, improves overall stability, interior mantle fiber seamless steel pipe and silk stick are by way of screw thread couple Connection, the length is 3cm, trapezoidal steel disc height is 5cm, and with a thickness of 2mm, trapezoidal steel disc is welded on the outer of interior mantle fiber seamless steel pipe Wall welds ribbed stiffener steel disc between interior mantle fiber seamless steel pipe and trapezoidal steel disc, and ribbed stiffener steel disc shape is triangle, with a thickness of 2mm, the side length of two right-angle sides are 3cm, for enhancing the strength and stability of trapezoidal steel disc and interior mantle fiber seamless steel pipe, are installed The interior mantle fiber seamless steel pipe on silk stick is adjusted when centering bracket, so that the GFRP anti-float anchor rod body of rod is in open prestressed high strength mixed On the center line in solidifying soil tubular pole aperture, and so that the second steel disc is tightly attached to prestressed high strength by mantle fiber seamless steel pipe in adjusting and mix On the inner wall of solidifying soil tubular pole.
The utility model compared with prior art, open PHC piles can not only bear pressure and And buoyancy force of underground water can also be resisted, so that resistance to compression and anti-floating is integrated in one, to reduce the construction work for individually doing anti-float anchor rod Sequence is marched into the arena without large scale equipments such as jumbolters, and then can be shortened the construction period, and open PHC piles Belong to prefabricated pile (assembling type base), it is easy for construction, pressure can be born but also bear pulling force brought by anti-floating, optimize stake Mechanical characteristic, and then improve the mechanical property of pile body;On this basis, by original open PHC piles Size (including stake diameter, stake long) can advanced optimize, to reach saving material, reduce energy consumption, save the mesh of project cost , structure is simple, installs fast and convenient, strong operability, energy conservation and environmental protection, economic benefit and social benefit are significant, reduce The working procedure for individually doing anti-float anchor rod, shortens the duration, reduces cost, and can obtain higher, more reliable withdrawal resistance.
Detailed description of the invention:
Fig. 1 is open prestressed high strength coagulation tubular pole described in the utility model anti-floating system integrated with anti-float anchor rod Main structure schematic illustration.
Fig. 2 is the schematic diagram of centering bracket described in the utility model
Fig. 3 is the relative position figure of trapezoidal steel disc described in the utility model, interior mantle fiber seamless steel pipe, ribbed stiffener steel disc.
Fig. 4 is the A-A sectional view of the utility model Fig. 3.
Fig. 5 is the principle schematic diagram of enlarged footing described in the utility model.
Fig. 6 is the top view of enlarged footing described in the utility model.
Fig. 7 is the top view of hold-down support described in the utility model.
Fig. 8 is the B-B sectional view of hold-down support described in the utility model Fig. 7.
Fig. 9 is the relative position figure of inverted L-shaped reinforcing bar 7 described in the utility model and circular steel plate 8.
Figure 10 is the C-C sectional view of the utility model Fig. 9
Figure 11 is the principle schematic diagram of inverted L-shaped reinforcing bar 7 described in the utility model.
Specific embodiment:
The utility model is described in further details by way of example and in conjunction with the accompanying drawings.
Embodiment:
The main body knot of the anti-floating system integrated with anti-float anchor rod of opening prestressed high strength coagulation tubular pole described in the present embodiment Structure includes GFRP anti-float anchor rod body of rod locator 1, hold-down support 2, centering bracket 3, the GFRP anti-float anchor rod body of rod 4, open answers in advance Power high-strength concrete pipe pile 5, enlarged footing 6, inverted L-shaped reinforcing bar 7, circular steel plate 8, bed course 9, sole plate 10;GFRP anti-floating anchor One end of club shaft locator 1 is bound on the GFRP anti-float anchor rod body of rod 4, other end binding doughnut-shaped steel plate in hold-down support 2 At the reserving hole of 2-2, prevent the GFRP anti-float anchor rod body of rod 4 of centering from sliding downwards, it is ensured that anchorage length meets design and wants It asks;Hold-down support 2 is mounted on smooth ground, to guarantee its stability;Centering bracket 3 is mounted on the GFRP anti-float anchor rod body of rod It is connect on 4 and with open PHC piles 5, it is ensured that it is high that the GFRP anti-float anchor rod body of rod 4 is in open prestressing force On the center line in 5 aperture of strength concrete tubular pole;The GFRP anti-float anchor rod body of rod 4 is that full thread glass fiber reinforced polymer is solid Anchor pole;The material of enlarged footing 6 is glass fiber reinforced polymer material (identical as the material of the GFRP anti-float anchor rod body of rod 4), in The heart reserves circular hole, and screw thread is formed on the inner wall of aperture, and the outer profile diameter of enlarged footing 6 is 5 times of reserved Circularhole diameter, enlarged footing 6 It is mounted on the outer surface on 4 top of the GFRP anti-float anchor rod body of rod in a manner of screw thread couple and is cast in sole plate 10, expands First 6 and the GFRP anti-float anchor rod body of rod 4 screw thread couple at be marked with mass ratio be 2:1 epoxy resin and EP type curing agent mixing Liquid, on the one hand for increasing the forced area of anchored end, diffusion-induced stress improves the effect of anchor force, is on the other hand able to achieve only The purpose of water;Inverted L-shaped reinforcing bar 7 is made of the plain bar of diameter 8mm;Circular steel plate 8 with a thickness of 4mm, diameter is slightly less than The internal diameter of PHC piles 5, circular steel plate 8 are just put into open PHC piles 5 Portion;Inverted L-shaped reinforcing bar 7 and circular steel plate 8 are welded, and the edge of circular steel plate 8 is uniformly distributed in 120 ° of angle, avoid opening Anchorage mortar is injected in the mouth 5 long range of entire stake of PHC piles, it is only deep in the anchoring determined by anchor force It spends and injects anchorage mortar in range, achieve the purpose that save material, reduce cost;Bed course 9 is made of C15 microlith element mixed mud, Bed course 9 is laid on the ground, and top surface smoothes out, its surfacing is made to be convenient for also functioning to the basic bottom of protection in assembling reinforcement above The effect of plate 10;Sole plate 10 is made of armored concrete, according to construction drawing and " Code for design of building " The requirement of (GB50007-2011) is constructed and is arranged on bed course 9, and the GFRP anti-float anchor rod body of rod 4 anchors into sole plate 10 In.
GFRP anti-float anchor rod body of rod locator 1 described in the present embodiment is made of iron wire, specification 18#, diameter 1.6mm.
Hold-down support 2 described in the present embodiment is welded by seamless steel pipe 2-1 and doughnut-shaped steel plate 2-2, seamless steel pipe 2-1 high 5 stake top upper surface at least 10cm of PHC piles out, diameter is than PHC piles 5 The width of diameter big 10cm, doughnut-shaped steel plate 2-2 are 8cm, reserve symmetrical hole on doughnut-shaped steel plate 2-2, the size of hole makes GFRP anti-float anchor rod body of rod locator 1 passes through, for fixing GFRP anti-float anchor rod body of rod locator 1, to prevent GFRP anti-floating Anchor rod body 4 slides up and down.
Centering bracket 3 described in the present embodiment by bolt 3-1, nut 3-2, steel valve 3-3, the first steel disc 3-4, steel sleeve 3-5, Second steel disc 3-6, trapezoidal steel disc 3-7, silk stick 3-8, the seamless steel pipe 3-9 of interior mantle fiber, ribbed stiffener steel disc 3-10 are formed, wherein steel Valve 3-3 is made of seamless steel pipe by 90 ° of even partitions, and the first steel disc 3-4 is welded at the both ends of steel valve 3-3, and in the first steel The position of form center reserving hole of piece 3-4, hole are sized so that bolt 3-1 is passed through, and adjacent steel valve 3-3 passes through bolt 3-1 Together with being of coupled connections with nut 3-2, steel valve 3-3 and the GFRP anti-float anchor rod body of rod are improved by tightening bolt 3-1 and nut 3-2 4 bond stress;Steel sleeve 3-5 is welded along the steel outer surface valve 3-3 on the Axisymmetric Distributed Line of each steel valve 3-3, steel sleeve 3-5 is by seamless Steel pipe is made, and with a thickness of 2mm, diameter 2.5cm, silk stick 3-8 are the length outside steel sleeve 3-5 in the length in steel sleeve 3-5 Twice, silk stick 3-8 is the solid iron staff of diameter 2cm, and surface has screw thread, and the side length of the second steel disc 3-6 is 5cm, thickness One end for 2mm, silk stick 3-8 is mounted in steel sleeve 3-5, and the other end is welded in the centroid of the second steel disc 3-6, for increasing The forced area of open 5 inner wall of PHC piles, improve overall stability, interior mantle fiber seamless steel pipe 3-9 with Silk stick 3-8 is connected by way of screw thread couple, and the length is 3cm, trapezoidal steel disc 3-7 height is 5cm, trapezoidal with a thickness of 2mm Steel disc 3-7 is welded on the outer wall of interior mantle fiber seamless steel pipe 3-9, welds between interior mantle fiber seamless steel pipe 3-9 and trapezoidal steel disc 3-7 Ribbed stiffener steel disc 3-10, ribbed stiffener steel disc 3-10 shape are triangle, and with a thickness of 2mm, the side length of two right-angle sides is 3cm, are used In the strength and stability for enhancing trapezoidal steel disc 3-7 and interior mantle fiber seamless steel pipe 3-9, silk stick 3-8 is adjusted when centering bracket 3 is installed On interior mantle fiber seamless steel pipe 3-9, so that the GFRP anti-float anchor rod body of rod 4 is in open 5 aperture of PHC piles Center line on, and by adjust in mantle fiber seamless steel pipe 3-9 so that the second steel disc 3-6 is tightly attached to prestressed high strength concrete pipe On the inner wall of stake 5.
The present embodiment realizes the detailed process of open prestressed high strength coagulation tubular pole anti-floating integrated with anti-float anchor rod are as follows:
(1) it first squeezes into or static pressure opening PHC piles 5, by open prestressed high strength concrete pipe The inner wall cleaning of stake 5 is smooth, clean, and stake week ground is flattened;
(2) by three inverted L-shaped reinforcing bars 7 with 120 ° of angle uniform welding to the edge of circular steel plate 8, and installed To open 5 top surface of PHC piles, it is ensured that the bottom end of the GFRP anti-float anchor rod body of rod 4 is in circular steel plate 8 The distance on surface is no less than 50cm;
(3) seamless steel pipe 2-1 and doughnut-shaped steel plate 2-2 are welded together into composition hold-down support 2, and in doughnut-shaped steel plate 2-2 Upper symmetrical reserving hole, hole size can guarantee across iron wire;Then hold-down support 2 is installed, and guarantee hold-down support 2 The lower end 5cm that buries keep it firm;
(4) reserving hole at the centroid of the first steel disc 3-4, hole size guarantee that bolt 3-1 is passed through;And by first Steel disc 3-4 is welded to the both ends of steel valve 3-3, then welds rigid casing 3-5 on the arc bisector of each steel valve 3-3, direction to Outside, and by screw bolt and nut by four steel valve 3-3 it is of coupled connections together;
(5) silk stick 3-8 is closely welded at the centroid of the second steel disc 3-6, is guaranteed on silk stick 3-8 and the second steel disc 3-6 Surface is vertical;
(6) trapezoidal steel disc 3-7 is close-coupled to the outer wall of interior mantle fiber seamless steel pipe 3-9 in a welding manner, guarantees ladder The shape upper surface steel disc 3-7 is vertical with interior mantle fiber seamless steel pipe 3-9, and between interior mantle fiber seamless steel pipe 3-9 and trapezoidal steel disc 3-7 Weld ribbed stiffener steel disc 3-10;
(7) steel valve 3-3 is fixed on the GFRP anti-float anchor rod body of rod 4, by tightening bolt 3-1 and nut 3-2 to improve The bond stress of the steel valve 3-3 and GFRP anti-float anchor rod body of rod 4 installs two sets of steel valves according to practical anchorage length, then in two sets of steel Two iron wires are bound on the GFRP anti-float anchor rod body of rod 4 in valve middle position, and guarantee to tighten and cannot slide;
(8) interior mantle fiber seamless steel pipe 3-9 and silk stick 3-8 are linked together by screw thread couple, and is answered in advance according to opening The inner diameter size of power high-strength concrete pipe pile 5 adjusts interior mantle fiber seamless steel pipe 3-9, it is ensured that mantle fiber seamless steel pipe 3-9 in adjusting The length ratio of top and bottom silk stick 3-8 be 2:1;
(9) silk stick 3-8 is inserted into steel sleeve 3-5, by adjusting the interior mantle fiber seamless steel pipe 3-9 on silk stick 3-8, is made The GFRP anti-float anchor rod body of rod is located on the central axes of 5 internal diameter of open PHC piles, and ensures the second steel disc 3-6 is tightly attached on open 5 inner wall of PHC piles, and the final fixed GFRP anti-float anchor rod body of rod is answered in advance in opening Length in power high-strength concrete pipe pile 5 is anchorage length design value, and ensures lower end and the circle of the GFRP anti-float anchor rod body of rod 4 Protective layer thickness between shape steel plate 8 is not less than 20cm;
(10) two iron wires on the GFRP anti-float anchor rod body of rod 4 are fixed on two reserving holes of hold-down support, and Ensure that every iron wire will be tightened, be tensed, avoids 4 slide downward of the GFRP anti-float anchor rod body of rod;
(11) upper end of the GFRP anti-float anchor rod body of rod 4 is sealed and (when preventing from pouring mortar, splashes mortar) with plastic film, It pours mortar and is flushed with open 5 stake top face of PHC piles;
(12) it is cut with snips along top of concrete after conserving 24 hours, and the GFRP anti-float anchor rod body of rod 4 is pushed up The plastic film in portion is dismantled, and installs enlarged footing 6, and be tightened on the GFRP anti-float anchor rod body of rod 4, guarantees the GFRP anti-float anchor rod body of rod 4 flush with enlarged footing upper surface;After the installation is completed, by the requirement construction cushion coat 9 and sole plate 10 of construction drawing and related specifications.

Claims (4)

1. a kind of opening prestressed high strength coagulation tubular pole anti-floating system integrated with anti-float anchor rod, it is characterised in that main structure Including GFRP anti-float anchor rod body of rod locator, hold-down support, centering bracket, the GFRP anti-float anchor rod body of rod, open prestressed high-strength Spend concrete tubular pile, enlarged footing, inverted L-shaped reinforcing bar, circular steel plate, bed course, sole plate;GFRP anti-float anchor rod body of rod locator One end is bound on the GFRP anti-float anchor rod body of rod, and other end binding is in hold-down support at the reserving hole of doughnut-shaped steel plate;It is fixed Support is mounted on smooth ground, and centering bracket is mounted on the GFRP anti-float anchor rod body of rod and mixes with open prestressed high strength Solidifying soil tubular pole connection, the GFRP anti-float anchor rod body of rod are on the center line in open PHC piles aperture;Expand Circular hole is reserved at the center of major part, and screw thread is formed on circular-hole internal-wall, and the outer profile diameter of enlarged footing is 5 times of reserved Circularhole diameter, Enlarged footing is mounted on the outer surface on GFRP anti-float anchor rod body of rod top in a manner of screw thread couple and is cast in sole plate, is expanded The epoxy resin and the mixing of EP type curing agent that mass ratio is 2:1 are marked at the screw thread couple of major part and the GFRP anti-float anchor rod body of rod Liquid;Inverted L-shaped reinforcing bar is made of the plain bar of diameter 8mm, circular steel plate with a thickness of 4mm, diameter is less than prestressed high-strength The internal diameter of concrete tubular pile is spent, circular steel plate is put into inside open PHC piles;Inverted L-shaped reinforcing bar and circle Steel plate welds, and the edge of circular steel plate is uniformly distributed in 120 ° of angle;Bed course is made of C15 microlith element mixed mud, On the ground, sole plate is made of armored concrete and is arranged on bed course setting cushion, and the GFRP anti-float anchor rod body of rod anchors into In sole plate.
2. open prestressed high strength coagulation tubular pole anti-floating system integrated with anti-float anchor rod according to claim 1, special Sign is that the GFRP anti-float anchor rod body of rod locator is made of iron wire, specification 18#, diameter 1.6mm.
3. open prestressed high strength coagulation tubular pole anti-floating system integrated with anti-float anchor rod according to claim 1, special Sign is that the hold-down support is welded by seamless steel pipe and doughnut-shaped steel plate, and seamless steel pipe is higher by prestressed high strength concrete Tubular pole stake top upper surface at least 10cm, diameter is 10cm bigger than PHC piles stake diameter, the width of doughnut-shaped steel plate Degree is 8cm, reserves symmetrical hole on doughnut-shaped steel plate, the size of hole is passed through for GFRP anti-float anchor rod body of rod locator.
4. open prestressed high strength coagulation tubular pole anti-floating system integrated with anti-float anchor rod according to claim 1, special Sign is the centering bracket by bolt, nut, steel valve, the first steel disc, steel sleeve, the second steel disc, trapezoidal steel disc, silk stick, interior Mantle fiber seamless steel pipe, ribbed stiffener steel disc composition, wherein steel valve is made of seamless steel pipe by 90 ° of even partitions, the both ends of steel valve The first steel disc is welded, and in the position of form center reserving hole of the first steel disc, adjacent steel valve is coupled by screw bolt and nut to be connected It is connected together, welds steel sleeve along steel valve outer surface on the Axisymmetric Distributed Line of each steel valve, steel sleeve is made of seamless steel pipe, thickness For 2mm, diameter 2.5cm, length of the silk stick in steel sleeve is twice of the length outside steel sleeve;Silk stick is diameter 2cm's Solid iron staff, and surface has screw thread, the side length of the second steel disc is 5cm, and with a thickness of 2mm, one end of silk stick is mounted on steel sleeve Interior, the other end is welded in the centroid of the second steel disc;Interior mantle fiber seamless steel pipe is connect by way of screw thread couple with silk stick, Length is 3cm, and trapezoidal steel disc height is 5cm, and with a thickness of 2mm, trapezoidal steel disc is welded on the outer wall of interior mantle fiber seamless steel pipe, inside Ribbed stiffener steel disc is welded between mantle fiber seamless steel pipe and trapezoidal steel disc, ribbed stiffener steel disc shape is triangle, with a thickness of 2mm, two The side length of right-angle side is 3cm.
CN201820809459.XU 2018-05-28 2018-05-28 Integrated anti-floating device of open prestressed high-strength concrete pipe pile and anti-floating anchor rod Expired - Fee Related CN208309582U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820809459.XU CN208309582U (en) 2018-05-28 2018-05-28 Integrated anti-floating device of open prestressed high-strength concrete pipe pile and anti-floating anchor rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820809459.XU CN208309582U (en) 2018-05-28 2018-05-28 Integrated anti-floating device of open prestressed high-strength concrete pipe pile and anti-floating anchor rod

Publications (1)

Publication Number Publication Date
CN208309582U true CN208309582U (en) 2019-01-01

Family

ID=64715550

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820809459.XU Expired - Fee Related CN208309582U (en) 2018-05-28 2018-05-28 Integrated anti-floating device of open prestressed high-strength concrete pipe pile and anti-floating anchor rod

Country Status (1)

Country Link
CN (1) CN208309582U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112281928A (en) * 2020-11-03 2021-01-29 北京万兴建筑集团有限公司 Anti-floating anchor rod centering positioning device for single main rib and manufacturing method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112281928A (en) * 2020-11-03 2021-01-29 北京万兴建筑集团有限公司 Anti-floating anchor rod centering positioning device for single main rib and manufacturing method thereof
CN112281928B (en) * 2020-11-03 2022-03-08 北京万兴建筑集团有限公司 Anti-floating anchor rod centering positioning device for single main rib and manufacturing method thereof

Similar Documents

Publication Publication Date Title
CN108677945A (en) Integrated anti-floating device of open prestressed high-strength concrete pipe pile and anti-floating anchor rod
CN108560613A (en) Integrated anti-floating method for open prestressed high-strength concrete pipe pile and anti-floating anchor rod
CN202509532U (en) Multi-rib tension type anti-floating anchor
CN105604100B (en) External anchoring method for non-metal anti-floating anchor rod
CN109162289B (en) Prefabricated bearing pier structure and construction method thereof
CN105625421B (en) External anchoring device for non-metal anti-floating anchor rod
CN213173336U (en) Novel prefabricated assembled anticollision wall
CN109706925A (en) Novel fiber rib anti-floating anchor rod anchoring method
CN113550348A (en) Land large-plate foundation anchor rod reinforcing structure, construction method and fan foundation structure
CN106193644B (en) Basement reconstruction structure with raft foundation building
CN208309582U (en) Integrated anti-floating device of open prestressed high-strength concrete pipe pile and anti-floating anchor rod
CN113668576A (en) Assembled type flaky stone slope surface protection structure and construction method
CN211689844U (en) Corrugated steel reinforcing arch utilizing high-strength grouting material
CN106088758B (en) A kind of bilayer assembled underground granary
CN111719580B (en) Basement anti-floating pile foundation
CN108643215B (en) Construction method of anchor pier type foundation after rotary spraying and pressing into variable cross section
CN203559419U (en) Prestressed concrete precast pile
CN206189966U (en) Circular underground granary of slot -in type prefabricated assembled of inside and outside equal steel plated
CN210507433U (en) Novel fiber rib anti-floating anchor rod anchoring device
CN113152446A (en) Multi-section type prestressed hollow pile and construction method thereof
CN206034482U (en) Circular prefabricated assembled underground granary of interior steel plated
CN109706926A (en) Novel fiber rib anti-floating anchor rod anchoring device
CN206189414U (en) Circular underground granary of slot -in type prefabricated bulkhead of outer steel plated
CN206189969U (en) Prefabricated assembled rectangle underground granary of interior steel plated echelonment
CN206189971U (en) Circular underground granary of prefabricated assembled of outer steel plated

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190101

CF01 Termination of patent right due to non-payment of annual fee