CN108677945A - A kind of opening prestressed high strength coagulation pile pile anti-floating system integrated with anti-float anchor rod - Google Patents

A kind of opening prestressed high strength coagulation pile pile anti-floating system integrated with anti-float anchor rod Download PDF

Info

Publication number
CN108677945A
CN108677945A CN201810524694.7A CN201810524694A CN108677945A CN 108677945 A CN108677945 A CN 108677945A CN 201810524694 A CN201810524694 A CN 201810524694A CN 108677945 A CN108677945 A CN 108677945A
Authority
CN
China
Prior art keywords
float anchor
rod
steel
anchor rod
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810524694.7A
Other languages
Chinese (zh)
Other versions
CN108677945B (en
Inventor
白晓宇
张明义
桑松魁
王永洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao University of Technology
Original Assignee
Qingdao University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao University of Technology filed Critical Qingdao University of Technology
Priority to CN201810524694.7A priority Critical patent/CN108677945B/en
Publication of CN108677945A publication Critical patent/CN108677945A/en
Application granted granted Critical
Publication of CN108677945B publication Critical patent/CN108677945B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/10Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure
    • E02D31/12Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure against upward hydraulic pressure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • E02D5/665Mould-pipes or other moulds for making piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention belongs to ground foundation engineering technical fields, it is related to a kind of open prestressed high strength coagulation pile pile anti-floating system integrated with anti-float anchor rod, one end of GFRP anti-float anchor rod body of rod locators is bound on the GFRP anti-float anchor rod bodies of rod, the other end is bound at doughnut-shaped steel plate reserving hole, hold-down support is mounted on smooth ground, centering holder is mounted on the GFRP anti-float anchor rod bodies of rod and is connect with open PHC piles, it reserves and is formed with screw thread part circular hole on inner wall in the center of enlarged footing, enlarged footing is mounted on the outer surface on GFRP anti-float anchor rod bodies of rod top and is cast in sole plate, circular steel plate is put into inside open PHC piles;Inverted L-shaped reinforcing bar is welded with circular steel plate, and on the ground, sole plate is arranged on bed course setting cushion, simple in structure, install fast and convenient, operability is strong, energy conservation and environmental protection, and economic benefit and social benefit are notable, the working procedure for individually doing anti-float anchor rod is reduced, shortens the construction period, reduces cost.

Description

A kind of opening prestressed high strength coagulation pile pile anti-floating system integrated with anti-float anchor rod
Technical field:
The invention belongs to ground foundation engineering technical field, it is related to a kind of composite material anti-float anchor rod and prestressed high-strength is mixed The integrated anti-floating system of solidifying soil pile pile, especially a kind of open prestressed high strength coagulation pile pile are integrated with anti-float anchor rod anti- Floating device.
Background technology:
PHC piles with its with industrial scale life quality it is easily controllable and check, pile sinking Quality is more guaranteed than bored concrete pile, bearing capacity of single pile is high, adaptable to engineering geological condition, the construction period is short, construction site without The advantages that pollution, has been widely used in the field of civil engineering such as industry and civil buildings, highway bridge, harbour, has become China and answer With one of widest pile-type.In particular by the PHC piles of static pressure construction, meet green assembly The developing direction of formula.
But with being continuously increased for the utilization of the underground space and building embedded depth of foundation, anti-floating problem is also following. And pressure bearing pile itself cannot support the harm that underground water anti-floating power is brought, so it is highly important to select suitable measure of anti float. Compared with the measure of anti float such as Yield rainfall relation method, ballast method, uplift pile, anti-float anchor rod has ground adaptability strong, and dispersive stress is convenient for It the advantages that construction, saving construction cost, is widely applied in field of civil engineering.Currently, the material of anti-float anchor rod is substantially with steel Environment based on muscle, and residing for anti-float anchor rod is poor, throughout the year in underwater or alternation of wetting and drying region, present in underground water Chlorion makes reinforced anchor bolt by chemical attack.Especially in Construction of Urban Rail Traffic, the stray electrical current of generation makes reinforcing bar anchor Bar greatly reduces the service life of anti-float anchor rod, therefore, the Anticorrosion of anchor structure is more simultaneously by electrochemical corrosion It is prominent, but the Anticorrosion of anchor pole obtains the breakthrough of essence and uses nonmetallic materials anchor in this case not yet at present Bar becomes optimal selection.GFRP (Glass Fiber Reinforced Polymer) material is using glass fibre as strengthening material Material, synthetic resin is basis material, also has the unsaturated polyester (UP) tree of a variety of auxiliary agents such as curing agent, accelerating agent using silvalin dipping After the resin adhesive liquids such as fat, by pultrusion, a kind of composite material for winding screw thread, curing one-pass molding and being formed, GFRP anchor poles tool Have the advantages that tensile strength height, light weight, anticorrosive, anti-electromagnetic interference capability be strong, low cost, in recent years slope reinforcement, There are more research and application in the fields such as pattern foundation pit supporting structure.
Urban construction at present is just in progress like a raging fire, and the usage amount of anti-float anchor rod is continuously increased, GFRP anti-float anchor rods It is a urgent and significant job using advantageously reducing project cost and building safety engineering.Nowadays by prestressing force High-strength concrete pipe pile and GFRP anti-float anchor rods combine anti-floating, on the one hand can compensate PHC piles Vertical compression bearing capacity, it is cost-effective;Without drilling when another aspect anti-float anchor rod is constructed, the disengaging of large scale equipment is avoided , equally reduce project cost, it is seen then that economic benefit is very notable.Therefore, a kind of reasonable, reliable prestressed high-strength of design Spend coagulation pile pile anti-floating system integrated with composite material anti-float anchor rod it is extremely urgent, have broad application prospects with it is good Economic benefit.
Invention content:
It is an object of the invention to overcome disadvantage of the existing technology, under the premise of not improving cost, provide one Kind of open prestressed high strength coagulation pile pile anti-floating system integrated with anti-float anchor rod is good by corrosion resistance, tensile strength is high Nonmetallic materials be attached as the anti-float anchor rod body of rod, and by anti-float anchor rod and PHC piles, make It obtains PHC piles to be linked together with anti-float anchor rod, reduces working procedure, shorten the construction period, reduce cost, it is real Existing PHC piles can resist vertical pressure with but also resist the target of buoyancy force of underground water.
To achieve the goals above, open prestressed high strength coagulation pile pile of the present invention is integrated with anti-float anchor rod anti- The agent structure of floating device includes GFRP anti-float anchor rod bodies of rod locator, hold-down support, centering holder, GFRP anti-float anchor rod bars Body, open PHC piles, enlarged footing, inverted L-shaped reinforcing bar, circular steel plate, bed course, sole plate;GFRP is anti- One end of drogue club shaft locator is bound on the GFRP anti-float anchor rod bodies of rod, other end binding doughnut-shaped steel plate in hold-down support Reserving hole at, prevent the GFRP anti-float anchor rod bodies of rod of centering from sliding downwards, it is ensured that anchorage length meets design requirement;Gu Bearing is determined on smooth ground, to ensure its stability;Centering holder be mounted on the GFRP anti-float anchor rod bodies of rod on and with Open PHC piles connection, it is ensured that the GFRP anti-float anchor rod bodies of rod are in open prestressed high strength concrete On the center line in pile pile aperture;The GFRP anti-float anchor rod bodies of rod are the solid anchor pole of full thread glass fiber reinforced polymer, anchoring Length is determined with diameter according to anchor force;The material of enlarged footing is glass fiber reinforced polymer material (with GFRP anti-float anchor rods The material identical of the body of rod), circular hole is reserved at center, screw thread is formed on the inner wall of aperture, the size in aperture is according to GFRP anti-float anchor rod bars Body diameter determines that the outer profile diameter of enlarged footing is 5 times of reserved Circularhole diameter, and enlarged footing is mounted in a manner of screw thread couple The outer surface on GFRP anti-float anchor rod bodies of rod top is simultaneously cast in sole plate, the screw thread of enlarged footing and the GFRP anti-float anchor rod bodies of rod It is 2 that mass ratio is marked at coupling:On the one hand 1 epoxy resin and EP type curing agent mixed liquors is used to increase the stress of anchored end Area, diffusion-induced stress improve the effect of anchor force, on the other hand can realize the purpose of sealing;Inverted L-shaped reinforcing bar is by diameter 8mm's Plain bar is made, and length is determined according to anchorage length;The thickness of circular steel plate is 4mm, and diameter is slightly less than prestressing force The internal diameter of high-strength concrete pipe pile, circular steel plate are just put into inside open PHC piles;Inverted L-shaped steel Muscle is welded with circular steel plate, and the edge of circular steel plate is uniformly distributed in 120 ° of angle, avoids open prestressed high-strength It spends and injects anchorage mortar in the long range of the entire stake of concrete tubular pile, only inject anchor within the scope of the anchorage depth determined by anchor force Gu mortar achievees the purpose that save material, reduces cost;Bed course is made of C15 microlith element mixed muds, and setting cushion is on ground On, top surface smoothes out, its surfacing is made to be convenient for also functioning to the effect of protection sole plate in assembling reinforcement above;Basic bottom Plate is made of armored concrete, according to construction drawing and《Code for design of building》The requirement of (GB50007-2011) into Row is constructed and is arranged on bed course, and the length that the GFRP anti-float anchor rod bodies of rod anchor into sole plate is determined by anchor force.
GFRP anti-float anchor rods body of rod locator of the present invention is made of iron wire, specification 18#, a diameter of 1.6mm, length Degree is determined according to the anchorage length of anti-float anchor rod.
Hold-down support of the present invention is welded by seamless steel pipe and doughnut-shaped steel plate, and the height of seamless steel pipe is by open pre- The height that stress high-strength concrete pipe pile bassets is adjusted, and is higher by PHC piles stake top upper surface extremely Few 10cm, diameter is bigger 10cm than PHC piles stake diameter, and the width of doughnut-shaped steel plate is 8cm, doughnut-shaped steel plate Upper to reserve symmetrical hole, the size of hole makes GFRP anti-float anchor rod body of rod locators pass through, for fixing GFRP anti-floating anchors Club shaft locator, to prevent the GFRP anti-float anchor rod bodies of rod from sliding up and down.
Centering holder of the present invention by bolt, nut, steel valve, the first steel disc, steel sleeve, the second steel disc, trapezoidal steel disc, Silk stick, the seamless steel pipe of interior mantle fiber, ribbed stiffener steel disc composition, wherein steel valve is made of seamless steel pipe by 90 ° of even partitions, Diameter determines that the first steel disc is welded at the both ends of steel valve, and in the shape of the first steel disc according to the diameter of the GFRP anti-float anchor rod bodies of rod Heart position reserving hole, hole are sized so that bolt passes through, and adjacent steel valve is of coupled connections by screw bolt and nut one It rises, the bond stress of steel valve and the GFRP anti-float anchor rod bodies of rod is improved by tightening screw bolt and nut;On the Axisymmetric Distributed Line of each steel valve Weld steel sleeve along steel valve outer surface, steel sleeve is made of seamless steel pipe, thickness 2mm, a diameter of 2.5cm, length according to The internal diameter of open PHC piles determines, and ensures that length of the stick in steel sleeve is in steel sleeve foreign minister Twice of degree, so that it is determined that the length of wire vent stick, silk stick is the solid iron staff of diameter 2cm, and surface is threaded, the second steel disc The length of side be 5cm, thickness 2mm, one end of silk stick is mounted in steel sleeve, and the other end is welded in the centre of form of the second steel disc, Forced area for increasing open PHC piles inner wall improves overall stability, interior mantle fiber seamless steel The diameter of pipe determines that interior mantle fiber seamless steel pipe is connect with silk stick by way of screw thread couple, length according to the diameter of silk stick For 3cm, trapezoidal steel disc height is 5cm, and thickness 2mm, trapezoidal steel disc is welded on the outer wall of interior mantle fiber seamless steel pipe, in interior mantle fiber Ribbed stiffener steel disc is welded between seamless steel pipe and trapezoidal steel disc, ribbed stiffener steel disc shape is triangle, thickness 2mm, two right angles The length of side on side is 3cm, the strength and stability for enhancing trapezoidal steel disc and interior mantle fiber seamless steel pipe, when installing centering holder The interior mantle fiber seamless steel pipe on silk stick is adjusted, the GFRP anti-float anchor rod bodies of rod is made to be in open PHC piles hole On the center line of diameter, and the second steel disc is set to be tightly attached to PHC piles by mantle fiber seamless steel pipe in adjusting On inner wall.
Compared with prior art, the present invention open PHC piles can not only bear pressure but also Buoyancy force of underground water can be resisted, resistance to compression and anti-floating is made to be integrated in one, to reduce the working procedure for individually doing anti-float anchor rod, nothing It needs the large scale equipments such as jumbolter to march into the arena, and then can shorten the construction period, and open PHC piles belong to pre- Stake (assembling type base) processed, it is easy for construction, pressure can be born but also bear pulling force caused by anti-floating, optimize the stress of stake Characteristic, and then improve the mechanical property of pile body;On this basis, by the ruler of original open PHC piles Very little (including stake diameter, stake long) can advanced optimize, and to reach saving material, reduce energy consumption, save the purpose of project cost, Simple in structure, installation is fast and convenient, and operability is strong, energy conservation and environmental protection, and economic benefit and social benefit are notable, reduces and individually does The working procedure of anti-float anchor rod, shortens the duration, reduces cost, and can obtain higher, more reliable withdrawal resistance.
Description of the drawings:
Fig. 1 is the main body of open prestressed high strength coagulation pile pile of the present invention anti-floating system integrated with anti-float anchor rod Principle schematic diagram.
Fig. 2 is the schematic diagram of centering holder of the present invention
Fig. 3 is the relative position figure of trapezoidal steel disc of the present invention, the seamless steel pipe of interior mantle fiber, ribbed stiffener steel disc.
Fig. 4 is the A-A sectional views of Fig. 3 of the present invention.
Fig. 5 is the principle schematic diagram of enlarged footing of the present invention.
Fig. 6 is the vertical view of enlarged footing of the present invention.
Fig. 7 is the vertical view of hold-down support of the present invention.
Fig. 8 is the B-B sectional views of hold-down support described in Fig. 7 of the present invention.
Fig. 9 is the relative position figure of inverted L-shaped reinforcing bar 7 of the present invention and circular steel plate 8.
Figure 10 is the C-C sectional views of Fig. 9
Figure 11 is the principle schematic diagram of inverted L-shaped reinforcing bar 7 of the present invention.
Specific implementation mode:
The present invention is described in further details by way of example and in conjunction with the accompanying drawings.
Embodiment:
The main body knot of open prestressed high strength coagulation pile pile anti-floating system integrated with anti-float anchor rod described in the present embodiment Structure includes GFRP anti-float anchor rod bodies of rod locator 1, hold-down support 2, centering holder 3, the GFRP anti-float anchor rods body of rod 4, open answers in advance Power high-strength concrete pipe pile 5, enlarged footing 6, inverted L-shaped reinforcing bar 7, circular steel plate 8, bed course 9, sole plate 10;GFRP anti-floating anchors One end of club shaft locator 1 is bound on the GFRP anti-float anchor rods body of rod 4, other end binding doughnut-shaped steel plate in hold-down support 2 At the reserving hole of 2-2, prevent the GFRP anti-float anchor rods body of rod 4 of centering from sliding downwards, it is ensured that anchorage length meets design and wants It asks;Hold-down support 2 is mounted on smooth ground, to ensure its stability;Centering holder 3 is mounted on the GFRP anti-float anchor rod bodies of rod It is connect on 4 and with open PHC piles 5, it is ensured that it is high that the GFRP anti-float anchor rods body of rod 4 is in open prestressing force On the center line in 5 aperture of strength concrete pile pile;The GFRP anti-float anchor rods body of rod 4 is that full thread glass fiber reinforced polymer is solid Anchor pole, anchorage length are determined with diameter according to anchor force;The material of enlarged footing 6 be glass fiber reinforced polymer material (with The material identical of the GFRP anti-float anchor rods body of rod 4), circular hole is reserved at center, is formed with screw thread on the inner wall of aperture, the size in aperture according to 4 diameter of the GFRP anti-float anchor rods body of rod determines that the outer profile diameter of enlarged footing 6 is 5 times of reserved Circularhole diameter, and enlarged footing 6 is with spiral shell The mode of line coupling is mounted on the outer surface on 4 top of the GFRP anti-float anchor rods body of rod and is cast in sole plate 10,6 He of enlarged footing It is 2 that mass ratio is marked at the screw thread couple of the GFRP anti-float anchor rods body of rod 4:1 epoxy resin and EP type curing agent mixed liquors, a side Face is used to increase the forced area of anchored end, and diffusion-induced stress improves the effect of anchor force, on the other hand can realize the mesh of sealing 's;Inverted L-shaped reinforcing bar 7 is made of the plain bar of diameter 8mm, and length is determined according to anchorage length;The thickness of circular steel plate 8 For 4mm, diameter is slightly less than the internal diameter of PHC piles 5, and it is high that circular steel plate 8 is just put into open prestressing force Inside strength concrete pile pile 5;Inverted L-shaped reinforcing bar 7 is welded with circular steel plate 8, and is uniformly distributed in circular steel with 120 ° of angle The edge of plate 8 avoids injecting anchorage mortar in the 5 long range of entire stake of open PHC piles, only by Anchorage mortar is injected within the scope of the anchorage depth that anchor force determines, is achieved the purpose that save material, is reduced cost;Bed course 9 is by C15 Microlith element mixed mud is made, and bed course 9 is laid on the ground, and top surface smoothes out, its surfacing is made to be convenient in assembling reinforcement above, Also function to the effect of protection sole plate 10;Sole plate 10 is made of armored concrete, according to construction drawing and《Building lot base Plinth design specification》The requirement of (GB50007-2011) is constructed and is arranged on bed course 9, and the GFRP anti-float anchor rods body of rod 4 anchors into Length in sole plate 10 is determined by anchor force.
GFRP anti-float anchor rods body of rod locator 1 described in the present embodiment is made of iron wire, specification 18#, a diameter of 1.6mm, Its length is determined according to the anchorage length of anti-float anchor rod.
Hold-down support 2 described in the present embodiment is welded by seamless steel pipe 2-1 and doughnut-shaped steel plate 2-2, seamless steel pipe 2-1's Height is adjusted by the height that open PHC piles 5 basset, and is higher by prestressed high strength concrete pipe 5 stake top upper surface at least 10cm of stake, diameter is bigger 10cm than 5 diameters of PHC piles, doughnut-shaped steel plate 2-2's Width is 8cm, reserves symmetrical hole on doughnut-shaped steel plate 2-2, the size of hole makes GFRP anti-float anchor rod bodies of rod locator 1 wear It crosses, for fixing GFRP anti-float anchor rod bodies of rod locator 1, to prevent the GFRP anti-float anchor rods body of rod 4 from sliding up and down.
Centering holder 3 described in the present embodiment by bolt 3-1, nut 3-2, steel valve 3-3, the first steel disc 3-4, steel sleeve 3-5, Second steel disc 3-6, trapezoidal steel disc 3-7, silk stick 3-8, the seamless steel pipe 3-9 of interior mantle fiber, ribbed stiffener steel disc 3-10 compositions, wherein steel Valve 3-3 is made of seamless steel pipe by 90 ° of even partitions, and diameter is determined according to the diameter of the GFRP anti-float anchor rods body of rod 4, steel valve The first steel disc 3-4 is welded at the both ends of 3-3, and in the position of form center reserving hole of the first steel disc 3-4, and hole is sized so that Bolt 3-1 is passed through, together with adjacent steel valve 3-3 is of coupled connections by bolt 3-1 with nut 3-2, by tighten bolt 3-1 and Nut 3-2 improves the bond stress of the steel valve 3-3 and GFRP anti-float anchor rod body of rod 4;The Axisymmetric Distributed Line upper edge steel valve 3- of each steel valve 3-3 Steel sleeve 3-5 is welded in 3 outer surfaces, and steel sleeve 3-5 is made of seamless steel pipe, thickness 2mm, a diameter of 2.5cm, length according to The internal diameter of open PHC piles 5 determines, and ensures that length of the stick 3-8 in steel sleeve 3-5 is in steel Twice of the outer length of casing 3-5, so that it is determined that the length of wire vent stick 3-8, silk stick 3-8 is the solid iron staff of diameter 2cm, and surface It is threaded, the length of side of the second steel disc 3-6 is 5cm, and one end of thickness 2mm, silk stick 3-8 are mounted in steel sleeve 3-5, another End is welded in the centre of form of the second steel disc 3-6, the stress surface for increasing 5 inner wall of open PHC piles Product improves overall stability, and the diameter of interior mantle fiber seamless steel pipe 3-9 is determined according to the diameter of silk stick 3-8, interior mantle fiber seamless steel pipe 3-9 is connect with silk stick 3-8 by way of screw thread couple, the length of 3cm, and trapezoidal steel disc 3-7 height is 5cm, and thickness is 2mm, trapezoidal steel disc 3-7 are welded on the outer wall of interior mantle fiber seamless steel pipe 3-9, in interior mantle fiber seamless steel pipe 3-9 and trapezoidal steel disc 3-7 Between weld ribbed stiffener steel disc 3-10, ribbed stiffener steel disc 3-10 shapes are triangle, and thickness 2mm, the length of side of two right-angle sides is equal For 3cm, the strength and stability for enhancing trapezoidal steel disc 3-7 and interior mantle fiber seamless steel pipe 3-9, tune when installing centering holder 3 The interior mantle fiber seamless steel pipe 3-9 on silk stick 3-8 is saved, the GFRP anti-float anchor rods body of rod 4 is made to be in open prestressed high strength concrete On the center line in 5 aperture of pile pile, and the second steel disc 3-6 is set to be tightly attached to prestressed high-strength by mantle fiber seamless steel pipe 3-9 in adjusting It spends on the inner wall of concrete tubular pile 5.
The present embodiment realizes that the detailed process of open prestressed high strength coagulation pile pile anti-floating integrated with anti-float anchor rod is:
(1) it first squeezes into or static pressure opening PHC piles 5, by open prestressed high strength concrete pipe The inner wall cleaning of stake 5 is smooth, clean, and stake week ground is flattened;
(2) by three inverted L-shaped reinforcing bars 7 with 120 ° of angle uniform welding to the edge of circular steel plate 8, and installed To 5 top surface of open PHC piles, it is ensured that the bottom end of the GFRP anti-float anchor rods body of rod 4 is in circular steel plate 8 The distance on surface is no less than 50cm;
(3) seamless steel pipe 2-1 and doughnut-shaped steel plate 2-2 are welded together into composition hold-down support 2, and in doughnut-shaped steel plate 2-2 Upper symmetrical reserving hole, hole size can guarantee across iron wire;Then hold-down support 2 is installed, and ensure hold-down support 2 The lower end 5cm that buries keep it firm;
(4) reserving hole at the centre of form of the first steel disc 3-4, hole size ensure that bolt 3-1 is passed through;And by first Steel disc 3-4 is welded to the both ends of steel valve 3-3, then welds rigid casing 3-5 on the arc bisector of each steel valve 3-3, direction to Outside, and by screw bolt and nut by four steel valve 3-3 it is of coupled connections together;
(5) silk stick 3-8 is closely welded at the centre of form of the second steel disc 3-6, is ensured on silk stick 3-8 and the second steel disc 3-6 Surface is vertical;
(6) trapezoidal steel disc 3-7 is close-coupled to the outer wall of interior mantle fiber seamless steel pipe 3-9 in a welding manner, ensures ladder The shape upper surfaces steel disc 3-7 are vertical with interior mantle fiber seamless steel pipe 3-9, and between interior mantle fiber seamless steel pipe 3-9 and trapezoidal steel disc 3-7 Weld ribbed stiffener steel disc 3-10;
(7) steel valve 3-3 is fixed on the GFRP anti-float anchor rods body of rod 4, by tightening bolt 3-1 and nut 3-2 to improve The bond stress of the steel valve 3-3 and GFRP anti-float anchor rod body of rod 4, and two sets of steel valves are installed according to anchorage length, wherein two sets of steel valves it Between spacing according to the anchorage length of the GFRP anti-float anchor rods body of rod 4 determine, then in the GFRP anti-floatings in two sets of steel valve centre positions Two iron wires are bound on anchor rod body 4, and ensure to tighten and cannot slide;
(8) interior mantle fiber seamless steel pipe 3-9 and silk stick 3-8 are linked together by screw thread couple, and is answered in advance according to opening The inner diameter size of power high-strength concrete pipe pile 5 adjusts interior mantle fiber seamless steel pipe 3-9, it is ensured that mantle fiber seamless steel pipe 3-9 in adjusting The length ratio of top and bottom silk stick 3-8 be 2:1;
(9) silk stick 3-8 is inserted into steel sleeve 3-5, by adjusting the interior mantle fiber seamless steel pipe 3-9 on silk stick 3-8, is made The GFRP anti-float anchor rod bodies of rod are located on the central axes of 5 internal diameter of open PHC piles, and ensure the second steel disc 3-6 is tightly attached on 5 inner wall of open PHC piles, and the final fixed GFRP anti-float anchor rods body of rod is answered in advance in opening Length in power high-strength concrete pipe pile 5 is anchorage length design value, and ensures lower end and the circle of the GFRP anti-float anchor rods body of rod 4 Protective layer thickness between shape steel plate 8 is not less than 20cm;
(10) two iron wires on the GFRP anti-float anchor rods body of rod 4 are fixed on two reserving holes of hold-down support, and Ensure that every iron wire will be tightened, be tensed, avoids 4 slide downward of the GFRP anti-float anchor rods body of rod;
(11) upper end of the GFRP anti-float anchor rods body of rod 4 is sealed and (when preventing from pouring mortar, splashes mortar) with plastic film, It pours mortar and is flushed with 5 stake top face of open PHC piles;
(12) it is cut along top of concrete with snips after conserving 24 hours, and the GFRP anti-float anchor rods body of rod 4 is pushed up The plastic film in portion is dismantled, and installs enlarged footing 6, and be tightened on the GFRP anti-float anchor rods body of rod 4, ensures the GFRP anti-float anchor rod bodies of rod 4 with enlarged footing upper surface flush;After installing, by the requirement construction cushion coat 9 and sole plate 10 of construction drawing and related specifications.

Claims (4)

1. a kind of opening prestressed high strength coagulation pile pile anti-floating system integrated with anti-float anchor rod, it is characterised in that agent structure Including GFRP anti-float anchor rod bodies of rod locator, hold-down support, centering holder, the GFRP anti-float anchor rods body of rod, open prestressed high-strength Spend concrete tubular pile, enlarged footing, inverted L-shaped reinforcing bar, circular steel plate, bed course, sole plate;GFRP anti-float anchor rod body of rod locators One end is bound on the GFRP anti-float anchor rod bodies of rod, and other end binding at the reserving hole of doughnut-shaped steel plate, prevents in hold-down support The GFRP anti-float anchor rod bodies of rod of centering slide downwards, it is ensured that anchorage length meets design requirement;Hold-down support is mounted on smooth Ground on, to ensure its stability;Centering holder be mounted on the GFRP anti-float anchor rod bodies of rod on and with open prestressed high strength Concrete tubular pile connects, it is ensured that the GFRP anti-float anchor rod bodies of rod are in the center line in open PHC piles aperture On;The GFRP anti-float anchor rod bodies of rod are the solid anchor pole of full thread glass fiber reinforced polymer, and anchorage length is with diameter according to anchor Gu power determines;The material of enlarged footing is glass fiber reinforced polymer material, and center reserves circular hole, spiral shell is formed on the inner wall of aperture The size of line, aperture determines that the outer profile diameter of enlarged footing is the 5 of reserved Circularhole diameter according to GFRP anti-float anchor rod shank diameters Times, enlarged footing mounted on the outer surface on GFRP anti-float anchor rod bodies of rod top and is cast in sole plate in a manner of screw thread couple Interior, it is 2 that mass ratio is marked at the screw thread couple of enlarged footing and the GFRP anti-float anchor rod bodies of rod:1 epoxy resin and EP type curing agent On the one hand mixed liquor is used to increase the forced area of anchored end, diffusion-induced stress improves the effect of anchor force, on the other hand can be real The purpose of existing sealing;Inverted L-shaped reinforcing bar is made of the plain bar of diameter 8mm, and length is determined according to anchorage length;Circular steel The thickness of plate is 4mm, and diameter is less than the internal diameter of PHC piles, and circular steel plate is just put into opening and answers in advance Inside power high-strength concrete pipe pile;Inverted L-shaped reinforcing bar is welded with circular steel plate, and is uniformly distributed in circular steel with 120 ° of angle The edge of plate avoids injecting anchorage mortar in the long range of the entire stake of open PHC piles, only by anchor Gu injecting anchorage mortar within the scope of the anchorage depth that power determines, achievees the purpose that save material, reduces cost;Bed course is thin by C15 Stone element mixed mud is made, and on the ground, top surface smoothes out setting cushion, its surfacing is made to be convenient in assembling reinforcement above, Play the role of protecting sole plate;Sole plate is made of armored concrete, according to construction drawing and《Building foundation designs Specification》The requirement of (GB50007-2011) is constructed and is arranged on bed course, and the GFRP anti-float anchor rod bodies of rod anchor into sole plate In length determined by anchor force.
2. open prestressed high strength coagulation pile pile anti-floating system integrated with anti-float anchor rod according to claim 1, special Sign is that the GFRP anti-float anchor rods body of rod locator is made of iron wire, and specification 18#, a diameter of 1.6mm, length is according to anti- The anchorage length of drogue bar determines.
3. open prestressed high strength coagulation pile pile anti-floating system integrated with anti-float anchor rod according to claim 1, special Sign is that the hold-down support is welded by seamless steel pipe and doughnut-shaped steel plate, and the height of seamless steel pipe is by open prestressed high-strength The height that degree concrete tubular pile bassets is adjusted, and is higher by PHC piles stake top upper surface at least 10cm, Its diameter is bigger 10cm than PHC piles stake diameter, and the width of doughnut-shaped steel plate is 8cm, is reserved on doughnut-shaped steel plate pair The size of the hole of title, hole makes GFRP anti-float anchor rod body of rod locators pass through, fixed for fixing the GFRP anti-float anchor rod bodies of rod Position device, to prevent the GFRP anti-float anchor rod bodies of rod from sliding up and down.
4. open prestressed high strength coagulation pile pile anti-floating system integrated with anti-float anchor rod according to claim 1, special Sign is the centering holder by bolt, nut, steel valve, the first steel disc, steel sleeve, the second steel disc, trapezoidal steel disc, silk stick, interior Seamless steel pipe, the ribbed stiffener steel disc composition of mantle fiber, wherein steel valve is made of seamless steel pipe by 90 ° of even partitions, diameter root It is determined according to the diameter of the GFRP anti-float anchor rod bodies of rod, the first steel disc is welded at the both ends of steel valve, and in the position of form center of the first steel disc Reserving hole, hole are sized so that bolt passes through, and adjacent steel valve is of coupled connections together by screw bolt and nut, is passed through Tighten the bond stress that screw bolt and nut improves steel valve and the GFRP anti-float anchor rod bodies of rod;Outside the Axisymmetric Distributed Line upper edge steel valve of each steel valve Surface soldered steel sleeve, steel sleeve are made of seamless steel pipe, thickness 2mm, a diameter of 2.5cm, and length is answered in advance according to opening The internal diameter of power high-strength concrete pipe pile determines, and ensures that length of the stick in steel sleeve is two of the length outside steel sleeve Times, so that it is determined that the length of wire vent stick, silk stick is the solid iron staff of diameter 2cm, and surface is threaded, the length of side of the second steel disc One end for 5cm, thickness 2mm, silk stick is mounted in steel sleeve, and the other end is welded in the centre of form of the second steel disc, for increasing The forced area of big open end PHC piles inner wall, improve overall stability, interior mantle fiber seamless steel pipe it is straight Diameter determines that interior mantle fiber seamless steel pipe is connect with silk stick by way of screw thread couple, the length of 3cm according to the diameter of silk stick, Trapezoidal steel disc height is 5cm, and thickness 2mm, trapezoidal steel disc is welded on the outer wall of interior mantle fiber seamless steel pipe, in interior mantle fiber seamless steel Ribbed stiffener steel disc is welded between pipe and trapezoidal steel disc, ribbed stiffener steel disc shape is triangle, thickness 2mm, the side of two right-angle sides Length is 3cm, the strength and stability for enhancing trapezoidal steel disc and interior mantle fiber seamless steel pipe, and silk is adjusted when installing centering holder Interior mantle fiber seamless steel pipe on stick makes the GFRP anti-float anchor rod bodies of rod be in open PHC piles aperture On heart line, and the second steel disc is set to be tightly attached to the inner walls of PHC piles by mantle fiber seamless steel pipe in adjusting On.
CN201810524694.7A 2018-05-28 2018-05-28 Integrated anti-floating device of open prestressed high-strength concrete pipe pile and anti-floating anchor rod Active CN108677945B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810524694.7A CN108677945B (en) 2018-05-28 2018-05-28 Integrated anti-floating device of open prestressed high-strength concrete pipe pile and anti-floating anchor rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810524694.7A CN108677945B (en) 2018-05-28 2018-05-28 Integrated anti-floating device of open prestressed high-strength concrete pipe pile and anti-floating anchor rod

Publications (2)

Publication Number Publication Date
CN108677945A true CN108677945A (en) 2018-10-19
CN108677945B CN108677945B (en) 2020-05-12

Family

ID=63808707

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810524694.7A Active CN108677945B (en) 2018-05-28 2018-05-28 Integrated anti-floating device of open prestressed high-strength concrete pipe pile and anti-floating anchor rod

Country Status (1)

Country Link
CN (1) CN108677945B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109706901A (en) * 2019-01-24 2019-05-03 中国建筑第八工程局有限公司 The float Structure and its construction method of large diameter steel pipe in sole plate
CN113585361A (en) * 2021-09-06 2021-11-02 青岛理工大学 Horizontal sliding support, anti-floating anchor rod and construction method
CN114032862A (en) * 2021-11-03 2022-02-11 中铁二局集团建筑有限公司 Water surface garbage collecting device for utilizing water flow traction force
CN114991223A (en) * 2022-06-28 2022-09-02 青岛理工大学 Waterproof uplift pile and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100123576A (en) * 2009-05-14 2010-11-24 정석으뜸기술(주) Method for carrying out improved pile
CN105350584A (en) * 2015-11-10 2016-02-24 中建三局第一建设工程有限责任公司 Construction method of anti-floating anchor rod
CN105951826A (en) * 2016-05-04 2016-09-21 太原理工大学 Suction ground anchor device in tubular pile and water pressure injection method thereof
KR101737360B1 (en) * 2015-07-31 2017-05-18 주식회사 파일웍스 Foldable apparatus for head reinforcement of PHC pile
CN206971213U (en) * 2017-06-07 2018-02-06 中国建筑第八工程局有限公司 The high intensity anti-floating anchor rod structure of basement bottom board

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100123576A (en) * 2009-05-14 2010-11-24 정석으뜸기술(주) Method for carrying out improved pile
KR101737360B1 (en) * 2015-07-31 2017-05-18 주식회사 파일웍스 Foldable apparatus for head reinforcement of PHC pile
CN105350584A (en) * 2015-11-10 2016-02-24 中建三局第一建设工程有限责任公司 Construction method of anti-floating anchor rod
CN105951826A (en) * 2016-05-04 2016-09-21 太原理工大学 Suction ground anchor device in tubular pile and water pressure injection method thereof
CN206971213U (en) * 2017-06-07 2018-02-06 中国建筑第八工程局有限公司 The high intensity anti-floating anchor rod structure of basement bottom board

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
柳向东: "某工程抗浮修复实例及经验总结", 《建筑结构》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109706901A (en) * 2019-01-24 2019-05-03 中国建筑第八工程局有限公司 The float Structure and its construction method of large diameter steel pipe in sole plate
CN109706901B (en) * 2019-01-24 2024-01-23 中国建筑第八工程局有限公司 Anti-floating structure of large-diameter steel pipe in foundation slab and construction method thereof
CN113585361A (en) * 2021-09-06 2021-11-02 青岛理工大学 Horizontal sliding support, anti-floating anchor rod and construction method
CN114032862A (en) * 2021-11-03 2022-02-11 中铁二局集团建筑有限公司 Water surface garbage collecting device for utilizing water flow traction force
CN114991223A (en) * 2022-06-28 2022-09-02 青岛理工大学 Waterproof uplift pile and construction method
WO2024001680A1 (en) * 2022-06-28 2024-01-04 青岛理工大学 Waterproof uplift-resistant pile and construction method

Also Published As

Publication number Publication date
CN108677945B (en) 2020-05-12

Similar Documents

Publication Publication Date Title
CN108677945A (en) A kind of opening prestressed high strength coagulation pile pile anti-floating system integrated with anti-float anchor rod
CN108560613A (en) A kind of opening prestressed high strength coagulation pile pile anti-float method integrated with anti-float anchor rod
CN103572755B (en) Prestressed concrete prefabricated pile
CN105604100B (en) A kind of outer anchoring process of nonmetallic anti-float anchor rod
CN105625421B (en) A kind of outer anchor of nonmetallic anti-float anchor rod
CN213173336U (en) Novel prefabricated assembled anticollision wall
CN113550348A (en) Land large-plate foundation anchor rod reinforcing structure, construction method and fan foundation structure
CN110847167A (en) Combined enhanced uplift anchor rod device and construction method
CN208309582U (en) A kind of opening prestressed high strength coagulation tubular pole anti-floating system integrated with anti-float anchor rod
CN109706925A (en) A kind of tencel muscle anti-float anchor rod anchoring process
CN113668576A (en) Assembled type flaky stone slope surface protection structure and construction method
CN211735379U (en) Waterproof structure of anti-floating anchor rod penetrating through basement bottom plate
CN111719580B (en) Basement anti-floating pile foundation
CN211472481U (en) Combined enhanced uplift anchor rod device
RU2317375C2 (en) Pole for overhead system to be erected in heaving ground
CN203559419U (en) Prestressed concrete precast pile
CN211714733U (en) Structure for assembling concrete tower
CN210507433U (en) Novel fiber rib anti-floating anchor rod anchoring device
CN206034482U (en) Circular prefabricated assembled underground granary of interior steel plated
CN206189971U (en) Circular underground granary of prefabricated assembled of outer steel plated
CN220486467U (en) A-type spiral grouting anchor-supporting self-stabilizing steel support foundation pit support structure
CN206189414U (en) Circular underground granary of slot -in type prefabricated bulkhead of outer steel plated
CN106193744B (en) The round prefabricated assembled underground granary of equal steel plated inside and outside one kind
CN109706926A (en) A kind of tencel muscle anti-float anchor rod anchor
CN106088764B (en) A kind of stepped prefabricated assembled circular underground granary of encased steel plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant