CN208305365U - Fang Zhang mechanism, flowing water unit method sleeper puts a device and a device is put in sleeper tensioning - Google Patents
Fang Zhang mechanism, flowing water unit method sleeper puts a device and a device is put in sleeper tensioning Download PDFInfo
- Publication number
- CN208305365U CN208305365U CN201820620302.2U CN201820620302U CN208305365U CN 208305365 U CN208305365 U CN 208305365U CN 201820620302 U CN201820620302 U CN 201820620302U CN 208305365 U CN208305365 U CN 208305365U
- Authority
- CN
- China
- Prior art keywords
- sleeper
- crossbeam
- gearbox
- puts
- fang zhang
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Machines For Laying And Maintaining Railways (AREA)
Abstract
The utility model belongs to sleeper and puts a field, provides that Fang Zhang mechanism, flowing water unit method sleeper puts a device and a device is put in sleeper tensioning.A kind of sleeper Fang Zhang mechanism, including two columns, column inside install vertical line guide rail respectively, are equipped with crossbeam between two vertical line guide rails, crossbeam moves vertically above and below vertical line guide rail between two columns;Crossbeam is equipped with the gearbox moved in the horizontal direction, and gearbox provides power by variable-frequency motor, and the output shaft of gearbox is connected with a multiple connectors of putting.A kind of flowing water unit method sleeper puts a device, puts a device including two sets of above-mentioned sleepers.Fang Zhang mechanism described in the utility model, flowing water unit method sleeper put a device and sleeper tensioning puts a device and solves existing sleeper and puts a device to put a unit efficiency relatively low and the problems such as put in the multiple groups Synchronous Radio to single deformed bar suddenly.
Description
Technical field
The utility model belongs to sleeper and puts a field, puts a device more particularly, to Fang Zhang mechanism, flowing water unit method sleeper
And a device is put in sleeper tensioning.
Background technique
In the production of flowing water unit method sleeper, steel strand prestress must be loosened before sleeper demoulding, it is existing to put a device
Efficiency is relatively low and puts in the multiple groups Synchronous Radio to single deformed bar suddenly, and it is existing that sleeper end is also easy to produce splitting
As the quality of sleeper substantially reduces, and also seriously affects the service life of sleeper.
Summary of the invention
In view of this, the utility model is directed to Fang Zhang mechanism, flowing water unit method sleeper puts a device and sleeper tensioning
A device is put, a device is put to solve existing sleeper to put a unit efficiency relatively low and to the more of single deformed bar
The problems such as opening suddenly is put when group Synchronous Radio.
In order to achieve the above objectives, the technical solution of the utility model is achieved in that
Vertical line guide rail is installed in a kind of sleeper Fang Zhang mechanism, including two columns, the column inside respectively, and two hang down
It is equipped with crossbeam between straight linear guide, the crossbeam moves vertically above and below vertical line guide rail between two columns;The crossbeam
It is equipped with the gearbox moved in the horizontal direction, the gearbox provides power, the output shaft of the gearbox by variable-frequency motor
It is connected with a multiple connectors of putting.
As a kind of further technical solution, the crossbeam is by sagging on vertical hydraulic cylinder drives edge vertical line guide rail
Straight movement.
As a kind of further technical solution, there are two the vertical hydraulic cylinder is set, it is separately positioned on the crossbeam two
End.
As a kind of further technical solution, the vertical hydraulic cylinder is separately positioned below the crossbeam both ends.
As a kind of further technical solution, the gearbox is by horizontal hydraulic cylinder drives edge horizontal motion;Institute
The one end for stating horizontal hydraulic cylinder couples crossbeam, and the other end couples gearbox.
As a kind of further technical solution, the crossbeam suspended on gearbox below by horizontal linear guide rail.
As a kind of further technical solution, the horizontal linear guide rail is located at horizontal hydraulic cylinder there are two setting
Two sides.
As a kind of further technical solution, the horizontal hydraulic cylinder is located at the middle part of the crossbeam.
As a kind of further technical solution, the variable-frequency motor is located at the different of the gearbox with a connector is put
Side.
Compared with the existing technology, sleeper Fang Zhang described in the utility model mechanism has the advantage that
Sleeper Fang Zhang described in the utility model mechanism is exclusively used in sleeper deformed bar and couples Tension Forming using screw thread
Putting afterwards, the present apparatus can be realized the synchronous slow release stress of multiple groups of single deformed bar, avoid when putting suddenly
The generation of sleeper end splitting phenomena, can guarantee sleeper quality, extend sleeper service life.
A kind of flowing water unit method sleeper puts a device, including two sets of above-mentioned sleeper Fang Zhang mechanisms.This flowing water unit as a result,
It includes above-mentioned sleeper Fang Zhang mechanism usefulness that method sleeper, which puts a device, and details are not described herein
A device is put in a kind of sleeper tensioning, puts a device and sleeper pre-stress stretching device including above-mentioned sleeper.As a result,
It includes above-mentioned sleeper Fang Zhang mechanism usefulness that a device is put in the tensioning of this sleeper, and details are not described herein.
Detailed description of the invention
The attached drawing for constituting a part of the utility model is used to provide a further understanding of the present invention, this is practical new
The illustrative embodiments and their description of type are not constituteed improper limits to the present invention for explaining the utility model.?
In attached drawing:
Fig. 1 is the structural schematic diagram of sleeper Fang Zhang mechanism described in the utility model embodiment;
Fig. 2 is the schematic side view of sleeper Fang Zhang mechanism described in the utility model embodiment;
Fig. 3 is the schematic rear view of sleeper Fang Zhang mechanism described in the utility model embodiment;
Fig. 4 is the schematic top plan view of sleeper Fang Zhang mechanism described in the utility model embodiment.
Description of symbols:
1- column;2- vertical line guide rail;3- vertical hydraulic cylinder;4- crossbeam;5- horizontal linear guide rail;6- horizontal hydraulic pressure
Cylinder;7- gearbox;8- variable-frequency motor;9- puts a connector.
Specific embodiment
It should be noted that in the absence of conflict, the feature in the embodiments of the present invention and embodiment can
To be combined with each other.
In the description of the present invention, it should be understood that term " center ", " longitudinal direction ", " transverse direction ", "upper", "lower",
The orientation or positional relationship of the instructions such as "front", "rear", "left", "right", " vertical ", "horizontal", "top", "bottom", "inner", "outside" is
It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of describing the present invention and simplifying the description, rather than indicate
Or imply that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore cannot understand
For limitations of the present invention.In addition, term " first ", " second " etc. are used for description purposes only, and should not be understood as indicating
Or it implies relative importance or implicitly indicates the quantity of indicated technical characteristic." first ", " second " etc. are defined as a result,
Feature can explicitly or implicitly include one or more of the features.It is in the description of the present invention, unless another
It is described, the meaning of " plurality " is two or more.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified
Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally
Connection;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary,
It can be the connection inside two elements.For the ordinary skill in the art, on being understood by concrete condition
State the concrete meaning of term in the present invention.
The utility model will be described in detail below with reference to the accompanying drawings and embodiments.
Embodiment one
A kind of sleeper Fang Zhang mechanism, as Figure 1-Figure 4, including two columns 1, installation is vertical straight respectively for 1 inside of column
Line guide rail 2, crossbeam 4 is equipped between two vertical line guide rails 2, and crossbeam 4 is sagging along vertical line guide rail 2 between two columns 1
Straight movement;Crossbeam 4 is equipped with the gearbox 7 moved in the horizontal direction, and gearbox 7 provides power by variable-frequency motor 8, can pass through change
Frequency modulation section puts a rate, and the output shaft of gearbox 7 is connected with multiple connectors 9 of putting.
In the optional technical solution of the present embodiment, crossbeam 4 is by sagging on 3 drives edge vertical line guide rail 2 of vertical hydraulic cylinder
Straight movement.
In the optional technical solution of the present embodiment, there are two vertical hydraulic cylinder 3 is set, it is separately positioned on 4 both ends of crossbeam.Benefit
With two 3 synchronization liftings of vertical hydraulic cylinder, so that crossbeam 4 is prolonged about 2 vertical line guide rail between two columns 1 and moves vertically,
It is corresponding with the compressor wire opened need to be put to guarantee to put a connector.
In the optional technical solution of the present embodiment, vertical hydraulic cylinder 3 is separately positioned below 4 both ends of crossbeam.
In the optional technical solution of the present embodiment, gearbox 7 is by 6 drives edge horizontal motion of horizontal hydraulic cylinder;It is horizontal
One end of hydraulic cylinder 6 couples crossbeam 4, and the other end couples gearbox 7.The flexible of horizontal hydraulic cylinder 6 can be such that gearbox prolongs
Horizontal linear guide rail direction horizontal movement, to guarantee to put contact and disengaging of the connector with tension rod.
In the optional technical solution of the present embodiment, crossbeam 4 suspended on gearbox 7 below by horizontal linear guide rail 5.
In the optional technical solution of the present embodiment, there are two horizontal linear guide rail 5 is set, it is located at horizontal hydraulic cylinder 6
Two sides.
In the optional technical solution of the present embodiment, horizontal hydraulic cylinder 6 is located at the middle part of crossbeam 4.
In the optional technical solution of the present embodiment, variable-frequency motor 8 and the heteropleural that a connector 9 is located at gearbox 7 is put.
The course of work of this example:
The present apparatus is respectively arranged a set of in the Zhang Gong position two sides of putting of flowing water unit method sleeper production line, variable-frequency motor 8 is located at
Far from put Zhang Gong position side, to gearbox 7 provide power support, when sleeper steel mould go out curing pool run to put Zhang Gong position when, benefit
It is opened with put slow to sleeper implementation of a device of putting of station two sides.Specifically, after sleeper steel mould runs to and puts Zhang Gong position, first
The tension rod of a connector 9 and sleeper steel mould is put on a horizontal line by the lift adjustment of vertical hydraulic cylinder 3, then horizontal liquid
Cylinder pressure 6 extends forward, makes to put a connector 9 and couples with tension rod or ratcheting, finally starts variable-frequency motor 8, put a connector 9
It drives tension rod slowly to rotate 1~3 week, is released sleeper stress, then quickly rotate several weeks, reach tension rod dismantling
Stopping variable-frequency motor 8 after purpose, horizontal hydraulic cylinder 6 bounces back, and makes to put a connector 9 and tension rod is detached from, and sleeper is put to open and be finished,
Sleeper steel mould can enter next process.
Embodiment two
A kind of flowing water unit method sleeper puts a device, including two sets of above-mentioned sleeper Fang Zhang mechanisms, is arranged in sleeper
The two sides of punching block operation.It includes above-mentioned sleeper Fang Zhang mechanism usefulness that this flowing water unit method sleeper, which puts a device, as a result, herein
It repeats no more.
Embodiment three
A device is put in a kind of sleeper tensioning, puts a device and sleeper pre-stress stretching device including above-mentioned sleeper.Sleeper
Pre-stress stretching device does not specifically describe the specific structure of the device using existing herein.This sleeper tensioning as a result, is put
Opening device includes above-mentioned sleeper Fang Zhang mechanism usefulness, and details are not described herein.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this
Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model
Protection scope within.
Claims (10)
1. a kind of sleeper Fang Zhang mechanism, it is characterised in that: including two columns (1), installation is vertical respectively on the inside of the column (1)
Linear guide (2) is equipped with crossbeam (4) between two vertical line guide rails (2), and the crossbeam (4) is between two columns (1) along vertical
Linear guide (2) moves vertically up and down;The crossbeam (4) is equipped with the gearbox (7) moved in the horizontal direction, the gearbox
(7) power is provided by variable-frequency motor (8), the output shaft of the gearbox (7) is connected with a multiple connectors (9) of putting.
2. sleeper Fang Zhang according to claim 1 mechanism, it is characterised in that: the crossbeam (4) is driven by vertical hydraulic cylinder (3)
It is dynamic to move vertically up and down along vertical line guide rail (2).
3. Fang Zhang mechanism according to claim 2, it is characterised in that: the vertical hydraulic cylinder (3) sets respectively there are two setting
It sets below the crossbeam (4) both ends.
4. sleeper Fang Zhang according to claim 1 mechanism, it is characterised in that: the gearbox (7) is by horizontal hydraulic cylinder (6)
Drives edge horizontal motion;One end of the horizontal hydraulic cylinder (6) couples crossbeam (4), and the other end couples gearbox
(7)。
5. sleeper Fang Zhang according to claim 4 mechanism, it is characterised in that: the crossbeam (4) is below by horizontal linear
Guide rail (5) suspended on gearbox (7).
6. sleeper Fang Zhang according to claim 5 mechanism, it is characterised in that: there are two the horizontal linear guide rail (5) sets,
It is located at the two sides of horizontal hydraulic cylinder (6).
7. sleeper Fang Zhang according to claim 6 mechanism, it is characterised in that: the horizontal hydraulic cylinder (6) is located at the cross
The middle part of beam (4).
8. sleeper Fang Zhang according to claim 1 mechanism, it is characterised in that: the variable-frequency motor (8) and put a connector
(9) it is located at the heteropleural of the gearbox (7).
9. a kind of flowing water unit method sleeper puts a device, it is characterised in that: including two sets of described in any item rails of claim 1-8
Zhen Fangzhang mechanism.
10. a device is put in a kind of sleeper tensioning, it is characterised in that: put a device and sleeper including sleeper as claimed in claim 9
Pre-stress stretching device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820620302.2U CN208305365U (en) | 2018-04-27 | 2018-04-27 | Fang Zhang mechanism, flowing water unit method sleeper puts a device and a device is put in sleeper tensioning |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820620302.2U CN208305365U (en) | 2018-04-27 | 2018-04-27 | Fang Zhang mechanism, flowing water unit method sleeper puts a device and a device is put in sleeper tensioning |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208305365U true CN208305365U (en) | 2019-01-01 |
Family
ID=64713532
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820620302.2U Active CN208305365U (en) | 2018-04-27 | 2018-04-27 | Fang Zhang mechanism, flowing water unit method sleeper puts a device and a device is put in sleeper tensioning |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208305365U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108515611A (en) * | 2018-04-27 | 2018-09-11 | 天津银龙预应力材料股份有限公司 | A device is put and a device is put in sleeper tensioning in a kind of sleeper Fang Zhang mechanisms |
-
2018
- 2018-04-27 CN CN201820620302.2U patent/CN208305365U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108515611A (en) * | 2018-04-27 | 2018-09-11 | 天津银龙预应力材料股份有限公司 | A device is put and a device is put in sleeper tensioning in a kind of sleeper Fang Zhang mechanisms |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102556679B (en) | Automatic hanging machine of pullers | |
CN108515611A (en) | A device is put and a device is put in sleeper tensioning in a kind of sleeper Fang Zhang mechanisms | |
CN109108157B (en) | multifunctional adjustable punching and folding integrated special machine for cable bridge | |
CN208305365U (en) | Fang Zhang mechanism, flowing water unit method sleeper puts a device and a device is put in sleeper tensioning | |
CN201380196Y (en) | Steel plate straightening leading heading press | |
CN202667503U (en) | Bending machine for lateral bars of triangular truss | |
CN106424235A (en) | Multi-die-head driven numerical control bending machine | |
CN206383280U (en) | Precast T-Beam wing plate framework of steel reinforcement molding bed rack | |
CN204566337U (en) | A kind of production die for manufacturing fabricated member | |
CN104723459A (en) | Die assembling and disassembling device for concrete prefabricated panel production line | |
CN202037711U (en) | Driving device of lifting frame for demoulding of aerated concrete block green body | |
CN204060722U (en) | A kind of trestle trolley adjusting mechanism | |
CN108526775B (en) | Automatic picture peg device of integrated shaped steel module tip liftable formula | |
CN102206965A (en) | Mechanism for regulating bodies of communication lift tower | |
CN208534063U (en) | A kind of hanger device | |
CN209579949U (en) | A kind of production equipment of precast beam | |
CN106734636A (en) | A kind of refrigerator door panel Bending Mould | |
CN205342461U (en) | Aircraft nose base structure of cantilever type | |
CN107042582B (en) | Mesh cage distribution device for composite wallboard manufacturing | |
CN109967715A (en) | A kind of rotor aluminum die casting equipment based on motor manufacturing production line | |
CN206794522U (en) | A kind of refrigerator door panel Bending Mould | |
CN216911807U (en) | Movable and adjustable punch structure of precision die | |
CN202039637U (en) | Adjusting mechanism between bodies of lifting tower | |
CN204333713U (en) | There is the switch cubicle of movable switch cabinet bracket system | |
CN215544016U (en) | Corrugated steel forming machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |