CN208290177U - Electromagnetic heating boiler processing concrete ring mould - Google Patents
Electromagnetic heating boiler processing concrete ring mould Download PDFInfo
- Publication number
- CN208290177U CN208290177U CN201820938085.1U CN201820938085U CN208290177U CN 208290177 U CN208290177 U CN 208290177U CN 201820938085 U CN201820938085 U CN 201820938085U CN 208290177 U CN208290177 U CN 208290177U
- Authority
- CN
- China
- Prior art keywords
- mounting
- several
- electromagnetic heating
- dowels
- heating boiler
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Moulds, Cores, Or Mandrels (AREA)
Abstract
The utility model has provided a kind of electromagnetic heating boiler processing concrete ring mould, wherein, electromagnetic heating boiler processing concrete ring mould, it include: two the first mounting rings and at least three pieces of support plates, each support board ends are connected by screw to two the first mounting rings respectively, all support plates surround a urniform, and two the first mounting rings are located at urniform both ends;Each support plate includes: several pairs of mounting blocks, several first dowels and several external arc blocks, mounting blocks are for being connected to the first mounting ring, several first dowels are connected between two mounting blocks, it is fixed with several external arc blocks outside all first dowels, it is seamless between adjacent two external arcs block.Electromagnetic heating boiler processing concrete ring mould solve the problems, such as in the prior art under proof strength reverse mould method production concrete ring mould cause concrete ring mould weight it is larger be difficult to it is mobile.
Description
Technical field
The utility model relates to electromagnetic heating furnace production fields, and in particular to concrete is used in a kind of processing of electromagnetic heating boiler
Ring mould.
Background technique
A kind of electromagnetic heating furnace is had developed, which includes shell, coagulation pedosphere, electromagnetic coil and pot body,
Shell is looped around outside coagulation pedosphere, and the electromagnetic coil of Spiral distribution is disposed in coagulation pedosphere, places pot in concrete circle center
Body, in order to cooperate the shape of pot body, concrete circle center hole is urniform as shown in Figure 1, and the urniform is small in ends and broad in the middle.
In order to realize the production of above-mentioned coagulation pedosphere, uses reverse mould method: being exactly that mold is divided at least three pieces synthesis
Plate, hard board reverse mould mode are produced, and are then mounted on three pieces of hard boards on two flanges by screw, and two flanges are urniform
Both ends, this mode makes simply, but there are the following problems:
In the production process due to coagulation pedosphere, it needs to block the concrete of mobility, it is therefore desirable to bear biggish
Pressure, so the intensity requirement to entire mold is high. so that proof strength, needs to make hard board the state of poling thickness,
It is able to satisfy intensity requirement, and causes the mold entirely obtained overweight, it has not been convenient to is mobile, it has not been convenient to make coagulation pedosphere, and cause
Make the waste of material of mold.
Utility model content
The utility model will provide a kind of electromagnetic heating boiler processing concrete ring mould, and solution is being protected in the prior art
Reverse mould method production concrete ring mould causes concrete ring mould weight is larger to be difficult to mobile problem under card intensity.
To achieve the above object, the utility model uses the following technical solution:
The utility model proposes a kind of electromagnetic heating boiler processing concrete ring moulds, comprising: two the first mounting rings
And at least three pieces of support plates, each support board ends are connected by screw to two the first mounting rings respectively, all support plates are enclosed
At a urniform, two the first mounting rings are located at urniform both ends;
Each support plate includes: several pairs of mounting blocks, several first dowels and several external arc blocks, and mounting blocks are used
In being connected to the first mounting ring, several first dowels are connected between two mounting blocks, if being fixed with outside all first dowels
Dry external arc block, it is seamless between adjacent two external arcs block;
After all support plates are connect with two the first mounting rings, all external arc blocks surround the lateral wall of urniform.
Compared with the prior art, the utility model has the following beneficial effects:
By the way that the first dowel is arranged, installation foundation is provided for external arc block, is the by the way that mounting blocks are arranged to realize
One dowel is connected to the first mounting ring and provides installation foundation, and then realizing can not will have block supporting block to disassemble by screw
Come, to facilitate demoulding after facilitating coagulation pedosphere to be made.The setting of first dowel ensure that intensity, while adjacent two first connection
It is had the gap between muscle, reduces the weight of entire concrete ring mould, facilitated the movement and transport of concrete ring mould, be
The production of coagulation pedosphere provides convenience, while reducing the use of more materials, reduces material cost.
The further advantage, target and feature of the utility model will be partially reflected by the following instructions, and part will also pass through
Research and practice to the utility model and be understood by the person skilled in the art.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of urniform;
Fig. 2 is the structural schematic diagram that concrete ring mould is used in electromagnetic heating boiler processing;
Fig. 3 is in Fig. 2 by the structural schematic diagram after the disassembly of external arc block.
Appended drawing reference: the first mounting ring 1, mounting blocks 21, the first dowel 22, external arc block 23, reinforcing ring 3, second connect
Connect muscle 4, second mounting ring 5, outer toroid 6, screw 7.
Specific embodiment
In order to make technological means of the utility model, creation characteristic, reach purpose and effect is more clear and is easy to
Understand, the utility model be further elaborated with reference to the accompanying drawings and detailed description:
As shown in FIG. 2 and 3, the present embodiment first proposed a kind of electromagnetic heating boiler processing coagulation pedosphere mould
Tool, comprising: two the first mounting rings 1 and at least three pieces of support plates, each support board ends pass through with two the first mounting rings 1 respectively
Screw 7 connects, and all support plates surround a urniform, and two the first mounting rings 1 are located at urniform both ends;
Each support plate includes: several pairs of mounting blocks 21, several first dowels 22 and several external arc blocks 23 (will
Urniform lateral wall is divided into several external arc blocks 23 composition, is if being equivalent to mathematics the inside reference area for one piece of surface decomposition
Dry rectangle machine choosing is the same), mounting blocks 21 are connected with several for being connected to the first mounting ring 1 between two mounting blocks 21
One dowel 22, is fixed with several external arc blocks 23 outside all first dowels 22, seamless between adjacent two external arcs block 23;
After all support plates are connect with two the first mounting rings 1, all external arc blocks 23 surround the lateral wall of urniform.When
In use, electromagnetic coil is wrapped on concrete ring mould lateral wall, and keep spiral form;Then, by the coagulation pedosphere
Mold is placed in a cylindrical die, and between have the gap;After again, by concreting in concrete ring mould and cylinder
Between shape mold, concrete dry is waited;Finally, screw 7 is screwed off after concrete setting, so that the first mounting ring 1 and mounting blocks
21 are detached from, and then disassemble from concrete circle center by one piece one piece of support plate, realize the production of coagulation pedosphere.
In order to enable each dowel is encircled together, increase bearing strength, each support plate further include: at least two add
Strong ring 3, each reinforcing ring 3 is connect with all first dowels 22, and reinforcing ring 3 is parallel with the first mounting ring 1.
Bearing strength in order to further increase, each support plate further include: several second dowels 4, the first dowel 22
And second dowel 4 it is parallel with urniform lateral wall, the second dowel 4 is connected to all reinforcing rings 3.
Urniform is kept when in order to facilitate the installation of, each piece of mounting blocks 21 are cut down from complete second mounting ring 5,
Each mounting blocks 21 surround an annular.
Urniform is kept when in order to facilitate the installation of, each piece of external arc block 23 is also to cut down from complete outer toroid 6,
The ring that external arc block 23 surrounds is parallel with the first mounting ring 1.
The present embodiment also proposes a kind of production method such as above-mentioned electromagnetic heating boiler processing concrete ring mould, packet
Include following steps:
S1, following accessory: two the first mounting rings 1, two second mounting rings 5, several first dowels 22, several outer circles is got ready
Ring 6 and at least six screws 7;
S2, every one first dowel, 22 both ends are welded with two second mounting rings 5 respectively;
S3, outer toroid 6 is successively welded on the first dowel 22, it is seamless between adjacent two outer toroid 6, mold is made
First product;
S4, outer toroid 6 and second mounting ring 5 are cut, so that it is external arc block 23, the second installation that outer toroid 6, which is cut,
5 stripping and slicing of ring is mounting blocks 21, and second mounting ring 5 is divided for three 21 or more mounting blocks;
S5, the first screw hole is opened up on each mounting blocks 21, corresponding with the first screw hole is opened up in the first mounting ring 1
Two screw holes;
S6, screw 7 is screwed in the second screw hole and the first screw hole, realizes that mounting blocks 21 are mounted in second mounting ring 5,
Obtain concrete ring mould.In order to realize the production of above-mentioned electromagnetic heating boiler processing concrete ring mould, guarantee pacifying
Urniform is formed after enabling to each piece of support plate to close up when dress, step 4 is exactly to cut each second mounting ring 5 and outer toroid 6
It cuts, and avoids avoiding the first dowel 22 and the second dowel 4 when cutting difficult cutting in cutting process.
In order to realize the installation of reinforcing ring 3, and the first dowel 22 is kept to surround urniform, therefore is connected first by all first
One end of muscle 22 is welded in a second mounting ring 5, so that all first dowels 22 are first laid out, to keep the first connection
Muscle 22 keeps urniform, then installs reinforcing ring 3, will be also prepared for several reinforcing rings 3 when carrying out step S1;Step S2 is specific
Following operation:
S21, one end of all first dowels 22 is welded in a second mounting ring 5;
S22, reinforcing ring 3 is placed between all first dowels 22, then welds all dowels and reinforcing ring 3
It connects;
S23, all first dowel, 22 other ends are welded in another second mounting ring 5.
In order to realize the installation of the second dowel 4, several second dowels 4 have been also prepared for when carrying out step S1;
After having carried out step S2 and before carrying out step S3: every one second dowel 4 is placed in the first dowel 22
Between, and every one second dowel 4 is welded with all reinforcing rings 3;
And it is welded on the second dowel 4 when carrying out step S3, while by outer toroid 6.
Finally, it is stated that above embodiments are only to illustrate the technical solution of the present embodiment rather than limit, although reference
The present embodiment is described in detail in preferred embodiment, those skilled in the art should understand that, it can be to this implementation
The technical solution of example is modified or replaced equivalently, should all without departing from the objective and range of the present embodiment technical solution
Cover in the scope of the claims of the present embodiment.
Claims (5)
1. a kind of electromagnetic heating boiler processing concrete ring mould characterized by comprising two the first mounting rings and at least
Three pieces of support plates, each support board ends are connected by screw to two the first mounting rings respectively, and all support plates surround a urniform,
Two the first mounting rings are located at urniform both ends;
Each support plate includes: several pairs of mounting blocks, several first dowels and several external arc blocks, and mounting blocks are for connecting
It is connected to the first mounting ring, several first dowels are connected between two mounting blocks, is fixed with outside all first dowels several outer
Circular arc block, it is seamless between adjacent two external arcs block;
After all support plates are connect with two the first mounting rings, all external arc blocks surround the lateral wall of urniform.
2. electromagnetic heating boiler processing concrete ring mould according to claim 1, which is characterized in that each support plate
Further include: at least two reinforcing rings, each reinforcing ring are connect with all first dowels, and reinforcing ring and the first mounting ring are flat
Row.
3. electromagnetic heating boiler processing concrete ring mould according to claim 1 or 2, which is characterized in that Mei Yizhi
Fagging further include: several second dowels, the first dowel and the second dowel are parallel with urniform lateral wall, the second connection
Muscle is connected to all reinforcing rings.
4. electromagnetic heating boiler processing concrete ring mould according to claim 1, which is characterized in that each mounting blocks
Surround an annular.
5. electromagnetic heating boiler processing concrete ring mould according to claim 3, which is characterized in that external arc block encloses
At ring it is parallel with the first mounting ring.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820938085.1U CN208290177U (en) | 2018-06-13 | 2018-06-13 | Electromagnetic heating boiler processing concrete ring mould |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820938085.1U CN208290177U (en) | 2018-06-13 | 2018-06-13 | Electromagnetic heating boiler processing concrete ring mould |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208290177U true CN208290177U (en) | 2018-12-28 |
Family
ID=64701895
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820938085.1U Active CN208290177U (en) | 2018-06-13 | 2018-06-13 | Electromagnetic heating boiler processing concrete ring mould |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208290177U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108544654A (en) * | 2018-06-13 | 2018-09-18 | 重庆云彬科技发展有限公司 | Electromagnetic heating boiler processing with concrete ring mould with and preparation method thereof |
-
2018
- 2018-06-13 CN CN201820938085.1U patent/CN208290177U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108544654A (en) * | 2018-06-13 | 2018-09-18 | 重庆云彬科技发展有限公司 | Electromagnetic heating boiler processing with concrete ring mould with and preparation method thereof |
CN108544654B (en) * | 2018-06-13 | 2023-04-28 | 重庆云彬科技发展有限公司 | Concrete ring mold for electromagnetic heating boiler processing and manufacturing method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103358393B (en) | A kind of mould producing reinforced concrete inspection and the preparation technology of production reinforced concrete inspection thereof | |
CN206873930U (en) | A kind of adjustable assembled composite beam die | |
CN208290177U (en) | Electromagnetic heating boiler processing concrete ring mould | |
US9321188B2 (en) | Method for manufacturing of ceramic electro-insulating pipes | |
CN210233399U (en) | Brick making machine for producing perforated cement prefabricated products | |
CN108544654A (en) | Electromagnetic heating boiler processing with concrete ring mould with and preparation method thereof | |
CN212312306U (en) | Novel bench formwork for manufacturing prefabricated laminated slab | |
CN205305974U (en) | Square haw flakes production machine | |
CN207616850U (en) | The detachable molding die of hollow brick | |
CN216031460U (en) | Can overturn from taking maintenance function mould platform | |
CN206812178U (en) | A kind of concrete mold for being easy to vibrate | |
CN206898321U (en) | A kind of stacked box device | |
CN203110124U (en) | Cement pipe manufacturing equipment | |
CN202861190U (en) | Arched curved-surface work piece pressing forming die | |
CN103926126A (en) | Cement raw material tablet test device and cement raw material tabletting method | |
RU2437826C1 (en) | Method of producing magnetic cores | |
EP1261466B8 (en) | Method and plant for manufacturing prestressed concrete products | |
CN202726037U (en) | Tundish lining vibration forming mold | |
CN201900263U (en) | Mould for powder compacting of Al-Ni-Co magnet steel with ultra-high specification | |
CN103085168B (en) | Technology producing cement pipe with cement pipe manufacturing equipment | |
CN206765036U (en) | It is a kind of applied to cement brick production from mold | |
CN106568626B (en) | Quick forming and manufacturing die for upper disc and lower disc of anastomotic rock structural surface | |
CN211662283U (en) | Foaming cement heated board forming die | |
CN203957109U (en) | A kind of cement balancing weight build tool | |
CN203824816U (en) | Cement raw material tabletting test device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |