CN208290177U - Electromagnetic heating boiler processing concrete ring mould - Google Patents

Electromagnetic heating boiler processing concrete ring mould Download PDF

Info

Publication number
CN208290177U
CN208290177U CN201820938085.1U CN201820938085U CN208290177U CN 208290177 U CN208290177 U CN 208290177U CN 201820938085 U CN201820938085 U CN 201820938085U CN 208290177 U CN208290177 U CN 208290177U
Authority
CN
China
Prior art keywords
mounting
several
electromagnetic heating
dowels
heating boiler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820938085.1U
Other languages
Chinese (zh)
Inventor
李伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Cloud Technology Development Co Ltd Bin
Original Assignee
Chongqing Cloud Technology Development Co Ltd Bin
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Cloud Technology Development Co Ltd Bin filed Critical Chongqing Cloud Technology Development Co Ltd Bin
Priority to CN201820938085.1U priority Critical patent/CN208290177U/en
Application granted granted Critical
Publication of CN208290177U publication Critical patent/CN208290177U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Moulds, Cores, Or Mandrels (AREA)

Abstract

The utility model has provided a kind of electromagnetic heating boiler processing concrete ring mould, wherein, electromagnetic heating boiler processing concrete ring mould, it include: two the first mounting rings and at least three pieces of support plates, each support board ends are connected by screw to two the first mounting rings respectively, all support plates surround a urniform, and two the first mounting rings are located at urniform both ends;Each support plate includes: several pairs of mounting blocks, several first dowels and several external arc blocks, mounting blocks are for being connected to the first mounting ring, several first dowels are connected between two mounting blocks, it is fixed with several external arc blocks outside all first dowels, it is seamless between adjacent two external arcs block.Electromagnetic heating boiler processing concrete ring mould solve the problems, such as in the prior art under proof strength reverse mould method production concrete ring mould cause concrete ring mould weight it is larger be difficult to it is mobile.

Description

Electromagnetic heating boiler processing concrete ring mould
Technical field
The utility model relates to electromagnetic heating furnace production fields, and in particular to concrete is used in a kind of processing of electromagnetic heating boiler Ring mould.
Background technique
A kind of electromagnetic heating furnace is had developed, which includes shell, coagulation pedosphere, electromagnetic coil and pot body, Shell is looped around outside coagulation pedosphere, and the electromagnetic coil of Spiral distribution is disposed in coagulation pedosphere, places pot in concrete circle center Body, in order to cooperate the shape of pot body, concrete circle center hole is urniform as shown in Figure 1, and the urniform is small in ends and broad in the middle.
In order to realize the production of above-mentioned coagulation pedosphere, uses reverse mould method: being exactly that mold is divided at least three pieces synthesis Plate, hard board reverse mould mode are produced, and are then mounted on three pieces of hard boards on two flanges by screw, and two flanges are urniform Both ends, this mode makes simply, but there are the following problems:
In the production process due to coagulation pedosphere, it needs to block the concrete of mobility, it is therefore desirable to bear biggish Pressure, so the intensity requirement to entire mold is high. so that proof strength, needs to make hard board the state of poling thickness, It is able to satisfy intensity requirement, and causes the mold entirely obtained overweight, it has not been convenient to is mobile, it has not been convenient to make coagulation pedosphere, and cause Make the waste of material of mold.
Utility model content
The utility model will provide a kind of electromagnetic heating boiler processing concrete ring mould, and solution is being protected in the prior art Reverse mould method production concrete ring mould causes concrete ring mould weight is larger to be difficult to mobile problem under card intensity.
To achieve the above object, the utility model uses the following technical solution:
The utility model proposes a kind of electromagnetic heating boiler processing concrete ring moulds, comprising: two the first mounting rings And at least three pieces of support plates, each support board ends are connected by screw to two the first mounting rings respectively, all support plates are enclosed At a urniform, two the first mounting rings are located at urniform both ends;
Each support plate includes: several pairs of mounting blocks, several first dowels and several external arc blocks, and mounting blocks are used In being connected to the first mounting ring, several first dowels are connected between two mounting blocks, if being fixed with outside all first dowels Dry external arc block, it is seamless between adjacent two external arcs block;
After all support plates are connect with two the first mounting rings, all external arc blocks surround the lateral wall of urniform.
Compared with the prior art, the utility model has the following beneficial effects:
By the way that the first dowel is arranged, installation foundation is provided for external arc block, is the by the way that mounting blocks are arranged to realize One dowel is connected to the first mounting ring and provides installation foundation, and then realizing can not will have block supporting block to disassemble by screw Come, to facilitate demoulding after facilitating coagulation pedosphere to be made.The setting of first dowel ensure that intensity, while adjacent two first connection It is had the gap between muscle, reduces the weight of entire concrete ring mould, facilitated the movement and transport of concrete ring mould, be The production of coagulation pedosphere provides convenience, while reducing the use of more materials, reduces material cost.
The further advantage, target and feature of the utility model will be partially reflected by the following instructions, and part will also pass through Research and practice to the utility model and be understood by the person skilled in the art.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of urniform;
Fig. 2 is the structural schematic diagram that concrete ring mould is used in electromagnetic heating boiler processing;
Fig. 3 is in Fig. 2 by the structural schematic diagram after the disassembly of external arc block.
Appended drawing reference: the first mounting ring 1, mounting blocks 21, the first dowel 22, external arc block 23, reinforcing ring 3, second connect Connect muscle 4, second mounting ring 5, outer toroid 6, screw 7.
Specific embodiment
In order to make technological means of the utility model, creation characteristic, reach purpose and effect is more clear and is easy to Understand, the utility model be further elaborated with reference to the accompanying drawings and detailed description:
As shown in FIG. 2 and 3, the present embodiment first proposed a kind of electromagnetic heating boiler processing coagulation pedosphere mould Tool, comprising: two the first mounting rings 1 and at least three pieces of support plates, each support board ends pass through with two the first mounting rings 1 respectively Screw 7 connects, and all support plates surround a urniform, and two the first mounting rings 1 are located at urniform both ends;
Each support plate includes: several pairs of mounting blocks 21, several first dowels 22 and several external arc blocks 23 (will Urniform lateral wall is divided into several external arc blocks 23 composition, is if being equivalent to mathematics the inside reference area for one piece of surface decomposition Dry rectangle machine choosing is the same), mounting blocks 21 are connected with several for being connected to the first mounting ring 1 between two mounting blocks 21 One dowel 22, is fixed with several external arc blocks 23 outside all first dowels 22, seamless between adjacent two external arcs block 23;
After all support plates are connect with two the first mounting rings 1, all external arc blocks 23 surround the lateral wall of urniform.When In use, electromagnetic coil is wrapped on concrete ring mould lateral wall, and keep spiral form;Then, by the coagulation pedosphere Mold is placed in a cylindrical die, and between have the gap;After again, by concreting in concrete ring mould and cylinder Between shape mold, concrete dry is waited;Finally, screw 7 is screwed off after concrete setting, so that the first mounting ring 1 and mounting blocks 21 are detached from, and then disassemble from concrete circle center by one piece one piece of support plate, realize the production of coagulation pedosphere.
In order to enable each dowel is encircled together, increase bearing strength, each support plate further include: at least two add Strong ring 3, each reinforcing ring 3 is connect with all first dowels 22, and reinforcing ring 3 is parallel with the first mounting ring 1.
Bearing strength in order to further increase, each support plate further include: several second dowels 4, the first dowel 22 And second dowel 4 it is parallel with urniform lateral wall, the second dowel 4 is connected to all reinforcing rings 3.
Urniform is kept when in order to facilitate the installation of, each piece of mounting blocks 21 are cut down from complete second mounting ring 5, Each mounting blocks 21 surround an annular.
Urniform is kept when in order to facilitate the installation of, each piece of external arc block 23 is also to cut down from complete outer toroid 6, The ring that external arc block 23 surrounds is parallel with the first mounting ring 1.
The present embodiment also proposes a kind of production method such as above-mentioned electromagnetic heating boiler processing concrete ring mould, packet Include following steps:
S1, following accessory: two the first mounting rings 1, two second mounting rings 5, several first dowels 22, several outer circles is got ready Ring 6 and at least six screws 7;
S2, every one first dowel, 22 both ends are welded with two second mounting rings 5 respectively;
S3, outer toroid 6 is successively welded on the first dowel 22, it is seamless between adjacent two outer toroid 6, mold is made First product;
S4, outer toroid 6 and second mounting ring 5 are cut, so that it is external arc block 23, the second installation that outer toroid 6, which is cut, 5 stripping and slicing of ring is mounting blocks 21, and second mounting ring 5 is divided for three 21 or more mounting blocks;
S5, the first screw hole is opened up on each mounting blocks 21, corresponding with the first screw hole is opened up in the first mounting ring 1 Two screw holes;
S6, screw 7 is screwed in the second screw hole and the first screw hole, realizes that mounting blocks 21 are mounted in second mounting ring 5, Obtain concrete ring mould.In order to realize the production of above-mentioned electromagnetic heating boiler processing concrete ring mould, guarantee pacifying Urniform is formed after enabling to each piece of support plate to close up when dress, step 4 is exactly to cut each second mounting ring 5 and outer toroid 6 It cuts, and avoids avoiding the first dowel 22 and the second dowel 4 when cutting difficult cutting in cutting process.
In order to realize the installation of reinforcing ring 3, and the first dowel 22 is kept to surround urniform, therefore is connected first by all first One end of muscle 22 is welded in a second mounting ring 5, so that all first dowels 22 are first laid out, to keep the first connection Muscle 22 keeps urniform, then installs reinforcing ring 3, will be also prepared for several reinforcing rings 3 when carrying out step S1;Step S2 is specific Following operation:
S21, one end of all first dowels 22 is welded in a second mounting ring 5;
S22, reinforcing ring 3 is placed between all first dowels 22, then welds all dowels and reinforcing ring 3 It connects;
S23, all first dowel, 22 other ends are welded in another second mounting ring 5.
In order to realize the installation of the second dowel 4, several second dowels 4 have been also prepared for when carrying out step S1;
After having carried out step S2 and before carrying out step S3: every one second dowel 4 is placed in the first dowel 22 Between, and every one second dowel 4 is welded with all reinforcing rings 3;
And it is welded on the second dowel 4 when carrying out step S3, while by outer toroid 6.
Finally, it is stated that above embodiments are only to illustrate the technical solution of the present embodiment rather than limit, although reference The present embodiment is described in detail in preferred embodiment, those skilled in the art should understand that, it can be to this implementation The technical solution of example is modified or replaced equivalently, should all without departing from the objective and range of the present embodiment technical solution Cover in the scope of the claims of the present embodiment.

Claims (5)

1. a kind of electromagnetic heating boiler processing concrete ring mould characterized by comprising two the first mounting rings and at least Three pieces of support plates, each support board ends are connected by screw to two the first mounting rings respectively, and all support plates surround a urniform, Two the first mounting rings are located at urniform both ends;
Each support plate includes: several pairs of mounting blocks, several first dowels and several external arc blocks, and mounting blocks are for connecting It is connected to the first mounting ring, several first dowels are connected between two mounting blocks, is fixed with outside all first dowels several outer Circular arc block, it is seamless between adjacent two external arcs block;
After all support plates are connect with two the first mounting rings, all external arc blocks surround the lateral wall of urniform.
2. electromagnetic heating boiler processing concrete ring mould according to claim 1, which is characterized in that each support plate Further include: at least two reinforcing rings, each reinforcing ring are connect with all first dowels, and reinforcing ring and the first mounting ring are flat Row.
3. electromagnetic heating boiler processing concrete ring mould according to claim 1 or 2, which is characterized in that Mei Yizhi Fagging further include: several second dowels, the first dowel and the second dowel are parallel with urniform lateral wall, the second connection Muscle is connected to all reinforcing rings.
4. electromagnetic heating boiler processing concrete ring mould according to claim 1, which is characterized in that each mounting blocks Surround an annular.
5. electromagnetic heating boiler processing concrete ring mould according to claim 3, which is characterized in that external arc block encloses At ring it is parallel with the first mounting ring.
CN201820938085.1U 2018-06-13 2018-06-13 Electromagnetic heating boiler processing concrete ring mould Active CN208290177U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820938085.1U CN208290177U (en) 2018-06-13 2018-06-13 Electromagnetic heating boiler processing concrete ring mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820938085.1U CN208290177U (en) 2018-06-13 2018-06-13 Electromagnetic heating boiler processing concrete ring mould

Publications (1)

Publication Number Publication Date
CN208290177U true CN208290177U (en) 2018-12-28

Family

ID=64701895

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820938085.1U Active CN208290177U (en) 2018-06-13 2018-06-13 Electromagnetic heating boiler processing concrete ring mould

Country Status (1)

Country Link
CN (1) CN208290177U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108544654A (en) * 2018-06-13 2018-09-18 重庆云彬科技发展有限公司 Electromagnetic heating boiler processing with concrete ring mould with and preparation method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108544654A (en) * 2018-06-13 2018-09-18 重庆云彬科技发展有限公司 Electromagnetic heating boiler processing with concrete ring mould with and preparation method thereof
CN108544654B (en) * 2018-06-13 2023-04-28 重庆云彬科技发展有限公司 Concrete ring mold for electromagnetic heating boiler processing and manufacturing method thereof

Similar Documents

Publication Publication Date Title
CN103358393B (en) A kind of mould producing reinforced concrete inspection and the preparation technology of production reinforced concrete inspection thereof
CN206873930U (en) A kind of adjustable assembled composite beam die
CN208290177U (en) Electromagnetic heating boiler processing concrete ring mould
US9321188B2 (en) Method for manufacturing of ceramic electro-insulating pipes
CN210233399U (en) Brick making machine for producing perforated cement prefabricated products
CN108544654A (en) Electromagnetic heating boiler processing with concrete ring mould with and preparation method thereof
CN212312306U (en) Novel bench formwork for manufacturing prefabricated laminated slab
CN205305974U (en) Square haw flakes production machine
CN207616850U (en) The detachable molding die of hollow brick
CN216031460U (en) Can overturn from taking maintenance function mould platform
CN206812178U (en) A kind of concrete mold for being easy to vibrate
CN206898321U (en) A kind of stacked box device
CN203110124U (en) Cement pipe manufacturing equipment
CN202861190U (en) Arched curved-surface work piece pressing forming die
CN103926126A (en) Cement raw material tablet test device and cement raw material tabletting method
RU2437826C1 (en) Method of producing magnetic cores
EP1261466B8 (en) Method and plant for manufacturing prestressed concrete products
CN202726037U (en) Tundish lining vibration forming mold
CN201900263U (en) Mould for powder compacting of Al-Ni-Co magnet steel with ultra-high specification
CN103085168B (en) Technology producing cement pipe with cement pipe manufacturing equipment
CN206765036U (en) It is a kind of applied to cement brick production from mold
CN106568626B (en) Quick forming and manufacturing die for upper disc and lower disc of anastomotic rock structural surface
CN211662283U (en) Foaming cement heated board forming die
CN203957109U (en) A kind of cement balancing weight build tool
CN203824816U (en) Cement raw material tabletting test device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant