CN108544654A - Electromagnetic heating boiler processing with concrete ring mould with and preparation method thereof - Google Patents
Electromagnetic heating boiler processing with concrete ring mould with and preparation method thereof Download PDFInfo
- Publication number
- CN108544654A CN108544654A CN201810608541.0A CN201810608541A CN108544654A CN 108544654 A CN108544654 A CN 108544654A CN 201810608541 A CN201810608541 A CN 201810608541A CN 108544654 A CN108544654 A CN 108544654A
- Authority
- CN
- China
- Prior art keywords
- mounting
- ring
- several
- dowels
- electromagnetic heating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
- B28B23/022—Means for inserting reinforcing members into the mould or for supporting them in the mould
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Moulds, Cores, Or Mandrels (AREA)
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Abstract
The present invention provides a kind of electromagnetic heating boiler processing with concrete ring mould with and preparation method thereof, wherein electromagnetic heating boiler processing use concrete ring mould, including:Two the first mounting rings and at least three pieces of support plates, each support plate both ends are connected by screw with two the first mounting rings respectively, and all support plates surround a urniform, and two the first mounting rings are located at urniform both ends;Each support plate includes:It is several to mounting blocks, several first dowels and several external arc blocks, mounting blocks are for being connected to the first mounting ring, it is connected with several first dowels between two mounting blocks, is fixed with several external arc blocks outside all first dowels, it is seamless between adjacent two external arcs block.Electromagnetic heating boiler processing concrete ring mould with and preparation method thereof solve the problems, such as in the prior art under proof strength reverse mould method make concrete ring mould cause concrete ring mould weight it is larger be difficult to it is mobile.
Description
Technical field
The present invention relates to electromagnetic heating furnace production fields, and in particular to a kind of electromagnetic heating boiler processing coagulation pedosphere mould
Tool with and preparation method thereof.
Background technology
A kind of electromagnetic heating furnace is had developed, which includes shell, coagulation pedosphere, electromagnetic coil and pot body,
Shell is looped around outside coagulation pedosphere, and the electromagnetic coil of Spiral distribution is disposed in coagulation pedosphere, and pot is placed in concrete circle center
Body is urniform as shown in Figure 1 to coordinate the shape of pot body, concrete circle center hole, and the urniform is small in ends and broad in the middle.
In order to realize the making of above-mentioned coagulation pedosphere, reverse mould method is used:Mold is exactly divided at least three pieces synthesis
Plate, hard board reverse mould mode are produced, and are then mounted on three pieces of hard boards on two flanges by screw, and two flanges are urniform
Both ends, this mode makes simply, but there are the following problems:
In the production process due to coagulation pedosphere, it needs to block the concrete of mobility, it is therefore desirable to bear larger
Pressure, so the intensity requirement to entire mold is high. so that proof strength, needs the state that hard board is made to poling thickness,
Intensity requirement can be met, and cause the mold entirely obtained overweight, it has not been convenient to is mobile, it has not been convenient to make coagulation pedosphere, and cause
Make the waste of material of mold.
Invention content
The present invention to provide a kind of electromagnetic heating boiler processing concrete ring mould with and preparation method thereof, solve existing
In technology under proof strength reverse mould method make concrete ring mould cause concrete ring mould weight it is larger be difficult to it is mobile
Problem.
To achieve the above object, present invention employs the following technical solutions:
Present invention firstly provides a kind of electromagnetic heating boiler processing concrete ring moulds, including:Two the first mounting rings
And at least three pieces of support plates, each support plate both ends are connected by screw with two the first mounting rings respectively, all support plates are enclosed
At a urniform, two the first mounting rings are located at urniform both ends;
Each support plate includes:It is several to mounting blocks, several first dowels and several external arc blocks, mounting blocks use
In being connected to the first mounting ring, several first dowels are connected between two mounting blocks, if being fixed with outside all first dowels
Dry external arc block, it is seamless between adjacent two external arcs block;
After all support plates are connect with two the first mounting rings, all external arc blocks surround the lateral wall of urniform.
The present invention also proposes a kind of production method such as above-mentioned electromagnetic heating boiler processing concrete ring mould, including
Following steps:
S1, following accessory is got ready:Two the first mounting rings, two the second mounting rings, several first dowels, several outer toroids with
And at least six screws;
S2, every 1 first dowel both ends are welded with two the second mounting rings respectively;
S3, outer toroid is welded on successively on the first dowel, it is seamless between adjacent two outer toroid, at the beginning of mold is made
Product;
S4, outer toroid and the second mounting ring are cut so that outer circle loop slit is external arc block, the second mounting ring stripping and slicing
For mounting blocks, the second mounting ring is divided into three mounting blocks or more;
S5, the first screw hole is opened up on each mounting blocks, corresponding with the first screw hole second is opened up in the first mounting ring
Screw hole;
S6, screw is screwed in the second screw hole and the first screw hole, realizes that mounting blocks are mounted in the second mounting ring, obtains
Concrete ring mould.
Compared with the prior art, the present invention has the advantages that:
By the way that the first dowel is arranged, installation foundation is provided for external arc block, is the by the way that mounting blocks are arranged to realize
One dowel is connected to the first mounting ring and provides installation foundation, and then realizing can not will have block supporting block to disassemble by screw
Come, to facilitate form removal after facilitating coagulation pedosphere to be made.The setting of first dowel ensure that intensity, while adjacent two first connection
It is had the gap between muscle, reduces the weight of entire concrete ring mould, facilitated the movement and transport of concrete ring mould, be
The making of coagulation pedosphere provides a convenient, while reducing the use of more materials, reduces material cost.
Part is illustrated to embody by further advantage, target and the feature of the present invention by following, and part will also be by this
The research and practice of invention and be understood by the person skilled in the art.
Description of the drawings
Fig. 1 is the structural schematic diagram of urniform;
Fig. 2 is the structural schematic diagram of electromagnetic heating boiler processing concrete ring mould;
Fig. 3 is the structural schematic diagram after dismantling external arc block in Fig. 2.
Reference numeral:The first mounting ring 1, mounting blocks 21, the first dowel 22, external arc block 23, reinforcing ring 3, second connect
Connect muscle 4, the second mounting ring 5, outer toroid 6, screw 7.
Specific implementation mode
In order to which so that the present invention is realized technological means, creation characteristic, reached purpose more understand and are apparent to effect,
The present invention is further elaborated with reference to the accompanying drawings and detailed description:
As shown in FIG. 2 and 3, the present embodiment first proposed a kind of electromagnetic heating boiler processing coagulation pedosphere mould
Tool, including:Two the first mounting rings 1 and at least three pieces of support plates, each support plate both ends pass through with two the first mounting rings 1 respectively
Screw 7 connects, and all support plates surround a urniform, and two the first mounting rings 1 are located at urniform both ends;
Each support plate includes:It is several that mounting blocks 21, several first dowels 22 and several external arc blocks 23 (are incited somebody to action
Urniform lateral wall is divided into several external arc blocks 23 composition, is by one piece of surface decomposition if being equivalent to reference area inside mathematics
Dry rectangle machine choosing is the same), mounting blocks 21 are connected with several for being connected to the first mounting ring 1 between two mounting blocks 21
One dowel 22, is fixed with several external arc blocks 23 outside all first dowels 22, seamless between adjacent two external arcs block 23;
After all support plates are connect with two the first mounting rings 1, all external arc blocks 23 surround the lateral wall of urniform.When
In use, electromagnetic coil is wrapped on concrete ring mould lateral wall, and keep spiral form;Then, by the coagulation pedosphere
Mold is placed in a cylindrical die, and between have the gap;After again, by concreting in concrete ring mould and cylinder
Between shape mold, concrete dry is waited for;Finally, after concrete setting, screw 7 is screwed off so that the first mounting ring 1 and mounting blocks
21 are detached from, and are then disassembled for one piece one piece from concrete circle center by support plate, realize the making of coagulation pedosphere.
In order to enable each dowel is encircled together, increase bearing strength, each support plate further includes:At least two add
Strong ring 3, each reinforcing ring 3 is connect with all first dowels 22, and reinforcing ring 3 is parallel with the first mounting ring 1.
Bearing strength in order to further increase, each support plate further include:Several second dowels 4, the first dowel 22
And second dowel 4 it is parallel with urniform lateral wall, the second dowel 4 is connected to all reinforcing rings 3.
Urniform, each piece of mounting blocks 21 is kept to be cut down from complete the second mounting ring 5 when in order to facilitate the installation of,
Each mounting blocks 21 surround an annular.
It is also to be cut down from complete outer toroid 6 that urniform, each piece of external arc block 23 are kept when in order to facilitate the installation of,
The ring that external arc block 23 surrounds is parallel with the first mounting ring 1.
The present embodiment also proposes a kind of production method such as above-mentioned electromagnetic heating boiler processing concrete ring mould, packet
Include following steps:
S1, following accessory is got ready:Two the first mounting rings 1, two the second mounting rings 5, several first dowels 22, several outer circles
Ring 6 and at least six screws 7;
S2,22 both ends of every 1 first dowel are welded with two the second mounting rings 5 respectively;
S3, outer toroid 6 is welded on successively on the first dowel 22, it is seamless between adjacent two outer toroid 6, mold is made
First product;
S4, outer toroid 6 and the second mounting ring 5 are cut so that it is external arc block 23, the second installation that outer toroid 6, which is cut,
5 stripping and slicing of ring is mounting blocks 21, and the second mounting ring 5 is divided for three 21 or more mounting blocks;
S5, the first screw hole is opened up on each mounting blocks 21, corresponding with the first screw hole is opened up in the first mounting ring 1
Two screw holes;
S6, screw 7 is screwed in the second screw hole and the first screw hole, realizes that mounting blocks 21 are mounted in the second mounting ring 5,
Obtain concrete ring mould.In order to realize the making of above-mentioned electromagnetic heating boiler processing concrete ring mould, ensure pacifying
Urniform is formed after enabling to each piece of support plate to close up when dress, step 4 is exactly to cut each the second mounting ring 5 and outer toroid 6
It cuts, and avoids avoiding the first dowel 22 and the second dowel 4 when cutting difficult cutting in cutting process.
In order to realize the installation of reinforcing ring 3, and the first dowel 22 is kept to surround urniform, therefore is connected first by all first
One end of muscle 22 is welded in a second mounting ring 5 so that all first dowels 22 are first laid out, to keep the first connection
Muscle 22 keeps urniform, then installs reinforcing ring 3, will be also prepared for several reinforcing rings 3 when carrying out step S1;Step S2 is specific
Following operation:
S21, one end of all first dowels 22 is welded in a second mounting ring 5;
S22, between reinforcing ring 3 is positioned over all first dowels 22, then all dowels and reinforcing ring 3 are welded
It connects;
S23, all first dowel, 22 other ends are welded in another the second mounting ring 5.
In order to realize the installation of the second dowel 4, several second dowels 4 have been also prepared for when carrying out step S1;
After having carried out step S2 and before carrying out step S3:Every 1 second dowel 4 is placed in the first dowel 22
Between, and every 1 second dowel 4 is welded with all reinforcing rings 3;
And it is welded on the second dowel 4 when carrying out step S3, while by outer toroid 6.
Finally illustrate, above example is only to illustrate the technical solution of the present embodiment and unrestricted, although reference
The present embodiment is described in detail in preferred embodiment, it will be understood by those of ordinary skill in the art that, it can be to this implementation
The technical solution of example is modified or replaced equivalently, should all without departing from the objective and range of the present embodiment technical solution
Cover in the right of the present embodiment.
Claims (8)
1. a kind of electromagnetic heating boiler processing concrete ring mould, which is characterized in that including:Two the first mounting rings and at least
Three pieces of support plates, each support plate both ends are connected by screw with two the first mounting rings respectively, and all support plates surround a urniform,
Two the first mounting rings are located at urniform both ends;
Each support plate includes:It is several to mounting blocks, several first dowels and several external arc blocks, mounting blocks are for connecting
It is connected to the first mounting ring, several first dowels are connected between two mounting blocks, is fixed with outside all first dowels several outer
Circular arc block, it is seamless between adjacent two external arcs block;
After all support plates are connect with two the first mounting rings, all external arc blocks surround the lateral wall of urniform.
2. electromagnetic heating boiler processing concrete ring mould according to claim 1, which is characterized in that each support plate
Further include:At least two reinforcing rings, each reinforcing ring are connect with all first dowels, and reinforcing ring and the first mounting ring are flat
Row.
3. electromagnetic heating boiler processing concrete ring mould according to claim 1 or 2, which is characterized in that Mei Yizhi
Fagging further includes:Several second dowels, the first dowel and the second dowel are parallel with urniform lateral wall, the second connection
Muscle is connected to all reinforcing rings.
4. electromagnetic heating boiler processing concrete ring mould according to claim 1, which is characterized in that each mounting blocks
Surround an annular.
5. electromagnetic heating boiler processing concrete ring mould according to claim 3, which is characterized in that external arc block encloses
At ring it is parallel with the first mounting ring.
6. a kind of production method for using concrete ring mould such as electromagnetic heating boiler described in any one of claim 1 to 5 processing,
It is characterised in that it includes following steps:
S1, following accessory is got ready:Two the first mounting rings, two the second mounting rings, several first dowels, several outer toroids and extremely
Few six screws;
S2, every 1 first dowel both ends are welded with two the second mounting rings respectively;
S3, outer toroid is welded on successively on the first dowel, it is seamless between adjacent two outer toroid, mold first product is made;
S4, outer toroid and the second mounting ring are cut so that outer circle loop slit is external arc block, and the second mounting ring stripping and slicing is peace
Block is filled, the second mounting ring is divided into three mounting blocks or more;
S5, the first screw hole is opened up on each mounting blocks, the second screw hole corresponding with the first screw hole is opened up in the first mounting ring;
S6, screw is screwed in the second screw hole and the first screw hole, realizes that mounting blocks are mounted in the second mounting ring, obtains coagulation
Pedosphere mold.
7. the production method of electromagnetic heating boiler processing concrete ring mould according to claim 6, which is characterized in that
It is also prepared for several reinforcing rings when carrying out step S1;Step S2 operations specific as follows:
S21, one end of all first dowels is welded in a second mounting ring;
S22, between reinforcing ring is positioned over all first dowels, then all dowels and reinforcing ring are welded;
S23, all first dowel other ends are welded in another the second mounting ring.
8. the production method of electromagnetic heating boiler processing concrete ring mould according to claim 7, which is characterized in that
It is also prepared for several second dowels when carrying out step S1;
After having carried out step S2 and before carrying out step S3:Between every 1 second dowel is placed in the first dowel, and
Every 1 second dowel and all reinforcing rings are welded;
And when carrying out step S3, while outer toroid being welded on the second dowel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810608541.0A CN108544654B (en) | 2018-06-13 | 2018-06-13 | Concrete ring mold for electromagnetic heating boiler processing and manufacturing method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810608541.0A CN108544654B (en) | 2018-06-13 | 2018-06-13 | Concrete ring mold for electromagnetic heating boiler processing and manufacturing method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108544654A true CN108544654A (en) | 2018-09-18 |
CN108544654B CN108544654B (en) | 2023-04-28 |
Family
ID=63493836
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810608541.0A Active CN108544654B (en) | 2018-06-13 | 2018-06-13 | Concrete ring mold for electromagnetic heating boiler processing and manufacturing method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108544654B (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201395935Y (en) * | 2009-04-03 | 2010-02-03 | 刘纯风 | Round pipe-shaped internal mold |
CN201495765U (en) * | 2009-08-31 | 2010-06-02 | 中建三局第三建设工程有限责任公司 | Sewage well template |
CN101774213A (en) * | 2010-03-05 | 2010-07-14 | 安徽省方大水泥制品有限公司 | Rolling ring assembled with pipe die formed in overhanging roll and forming method |
CN104290178A (en) * | 2014-10-17 | 2015-01-21 | 金川集团股份有限公司 | Casting mold of circular hearth liner and manufacturing method thereof |
CN204566375U (en) * | 2015-02-27 | 2015-08-19 | 北京金风科创风电设备有限公司 | The mould of internal mold and precast concrete tower section |
WO2017093165A1 (en) * | 2015-12-03 | 2017-06-08 | Commissariat A L'energie Atomique Et Aux Energies Alternatives | Cold crucible furnace heated by two electromagnetic inductors having a device forming a magnetic flux concentrator, use of the furnace for melting a mixture of metal(s) and oxide(s) representing a corium |
RU2016148354A (en) * | 2016-12-08 | 2018-06-08 | федеральное государственное бюджетное образовательное учреждение высшего образования "Алтайский государственный технический университет им. И.И. Ползунова" (АлтГТУ) | Induction crucible furnace with wire inductor |
CN208290177U (en) * | 2018-06-13 | 2018-12-28 | 重庆云彬科技发展有限公司 | Electromagnetic heating boiler processing concrete ring mould |
-
2018
- 2018-06-13 CN CN201810608541.0A patent/CN108544654B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201395935Y (en) * | 2009-04-03 | 2010-02-03 | 刘纯风 | Round pipe-shaped internal mold |
CN201495765U (en) * | 2009-08-31 | 2010-06-02 | 中建三局第三建设工程有限责任公司 | Sewage well template |
CN101774213A (en) * | 2010-03-05 | 2010-07-14 | 安徽省方大水泥制品有限公司 | Rolling ring assembled with pipe die formed in overhanging roll and forming method |
CN104290178A (en) * | 2014-10-17 | 2015-01-21 | 金川集团股份有限公司 | Casting mold of circular hearth liner and manufacturing method thereof |
CN204566375U (en) * | 2015-02-27 | 2015-08-19 | 北京金风科创风电设备有限公司 | The mould of internal mold and precast concrete tower section |
WO2017093165A1 (en) * | 2015-12-03 | 2017-06-08 | Commissariat A L'energie Atomique Et Aux Energies Alternatives | Cold crucible furnace heated by two electromagnetic inductors having a device forming a magnetic flux concentrator, use of the furnace for melting a mixture of metal(s) and oxide(s) representing a corium |
RU2016148354A (en) * | 2016-12-08 | 2018-06-08 | федеральное государственное бюджетное образовательное учреждение высшего образования "Алтайский государственный технический университет им. И.И. Ползунова" (АлтГТУ) | Induction crucible furnace with wire inductor |
CN208290177U (en) * | 2018-06-13 | 2018-12-28 | 重庆云彬科技发展有限公司 | Electromagnetic heating boiler processing concrete ring mould |
Also Published As
Publication number | Publication date |
---|---|
CN108544654B (en) | 2023-04-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206873930U (en) | A kind of adjustable assembled composite beam die | |
CN208290177U (en) | Electromagnetic heating boiler processing concrete ring mould | |
US9321188B2 (en) | Method for manufacturing of ceramic electro-insulating pipes | |
CN108544654A (en) | Electromagnetic heating boiler processing with concrete ring mould with and preparation method thereof | |
CN103144189A (en) | Cement pipe manufacturing device | |
CN203110124U (en) | Cement pipe manufacturing equipment | |
CN106891425B (en) | A kind of batch moulding process for building elevation concrete block | |
CN213648365U (en) | Pouring mould of bus type current transformer | |
CN103926126A (en) | Cement raw material tablet test device and cement raw material tabletting method | |
FI20000489A0 (en) | Procedure for the manufacture of prestressed concrete products | |
CN103085168B (en) | Technology producing cement pipe with cement pipe manufacturing equipment | |
CN106863581B (en) | A kind of production technology of the round table-like absolute altitude concrete block for floor | |
CN207616850U (en) | The detachable molding die of hollow brick | |
CN106568626B (en) | Quick forming and manufacturing die for upper disc and lower disc of anastomotic rock structural surface | |
MXPA03008860A (en) | Single mold machine for pressure casting sanitary wares, and a method of changing the mold in such a machine. | |
CN204747430U (en) | Sensor insulating layer forming device | |
SU1187991A2 (en) | Arrangement for forming pressure pipes | |
US3639552A (en) | Method of producing ferro-cement pipes | |
CN211941352U (en) | Prefabricated mould device of fused magnesia stove magnesium bell | |
RU2040399C1 (en) | Mould for making hollow concrete blocks | |
SU1101348A1 (en) | Installation for simultaneous moulding of several concentric articles of concrete mixes | |
CN205614811U (en) | Building block is mould for experiment | |
SU674917A1 (en) | Apparatus for making reinforced-concrete rings | |
JPH07290418A (en) | Manufacture of centrifugally molded concrete liner and device thereof | |
JP2520133Y2 (en) | Formwork device for broken block |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |