CN208266607U - Pipe follows closely fixed Integral geocell - Google Patents
Pipe follows closely fixed Integral geocell Download PDFInfo
- Publication number
- CN208266607U CN208266607U CN201820693054.4U CN201820693054U CN208266607U CN 208266607 U CN208266607 U CN 208266607U CN 201820693054 U CN201820693054 U CN 201820693054U CN 208266607 U CN208266607 U CN 208266607U
- Authority
- CN
- China
- Prior art keywords
- metal tube
- fixed metal
- seam
- fixed
- screw thread
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model discloses a kind of pipes to follow closely fixed Integral geocell, and the band body including several geotechnical grids being placed adjacent, further includes the connector for being fixedly connected with adjacent belts body, the connector is formed by fixing metal tube, capping and bottom cover;The fixed metal tube is the round tube shape structure of both ends perforation, offered on the side wall of the fixed metal tube six be arranged radially connect seam, described connect stitches equidistantly distributed on the side wall of fixed metal tube, described to connect the closing of seam bottom and top through the top for fixing metal tube.Adjacent band body can be securely attached to together by the utility model, and tensile strength is high, to band body fanout free region itself, improves the stability and service life of geotechnical grid integral product.
Description
Technical field
The utility model relates to geotechnical grid technical field of structures, and in particular to pipe follows closely fixed Integral geocell.
Background technique
The purposes of geotechnical grid: 1, for consolidate highway subgrade: it can produce high resiliency power and firm roadbed, and it is traditional
It gravity and the pressure lateral dispersion contacted with ground and is reduced, and can compared to 50% or more base thickness can be reduced on stone basis
For temporary or permanent road construction.2, for consolidating railway bed: rubble and gradation transverse shifting can be prevented,
Keep entirety firmer, prevent from drawing water, collapses even if ground is soft prevented also from entire or part.In the big area of the volume of traffic as handed over
Road, branch road and slalom course are pitched, service life can be dramatically increased.3, for bearing dyke, the barricade of carrying force: it is broken to define reinforcing
The cubic meter of stone forms consistent structural body, can stop transverse pressure, regardless of stratum is slided and is agglomerated, all can voluntarily adjust, can support non-
Structural plane and naturally plant generating layer, can vertical or stepped design.4, administer for shallow water river channel: three face solid grids reinforce embankment
Strength, prevent erosion and increase carrying force, it is possible to reduce the construction cost in shallow river simultaneously allowed the design in river to accord with
Close traffic and the various conditions of soil property.5, pipeline and sewer are used to support: digging and can need not be placed a large amount of using geotechnical grid
Support construction of the stone as pipe bed sewer form a firm durable overall plate structure using conventional material, it is right
Pipeline provides flexible permanent protection, can reduce the micro sinking as caused by long-time, keeps the basis of pipeline harder
Gu and local collapse can be prevented for a long time.This method easy construction is reduced and is excavated, long range bulk transport pipeline is more passed through
It helps practical.6, for preventing landslide and by the hybrid barricade of carrying force: template need not be used, one layer of firm wall can be createed
Face is firmly combined into one with backfill side, even if the situation that traditional various gravity structures are not available, embankment can also be on the spot
Materials significantly reduce engineering cost.7, it is used for independent wall, harbour, flood bank etc.: promptly can play independent wall or obstacle wall by structure,
And permeable granular embankment dyke or weir wall can be used, if temporary facility needs to remove, geotechnical grid also be can be recycled.In code
Head or flood bank and other important seashore purposes are also very extensive.8, it when encountering subgrade in highway, uses
The method of sandstone displacement Soft Soil Layer, investment is big, long in time limit.Construction labor intensity can be mitigated using geotechnical grid significantly, reduce road
Base thickness, speed of application is fast, and performance is good, substantially reduces project cost.Next builds the road simple for process, is available locally, fastly
Fast efficient, this point is particularly important in the deficient area of road-making material.
Geotechnical grid is usually connected by the band body of a plurality of PP or PE material by different modes, to form netted cell compartment knot
Structure, existing connection type include welding, riveting, and welding is that two band bodies is made to bond together by high temperature, and this mode is viscous
The tensile strength for meeting place is low, is easy to be broken in junction, to influence the stability of entire geotechnical grid structure, riveting is
Directly two band bodies are fixed together with rivet, this makes band body drilled and impaired, influences the service life of product.
Summary of the invention
The purpose of the utility model is to overcome the above-mentioned problems in the prior art, provide a kind of consolidating for geotechnical grid
Dingan County's assembling device, adjacent band body can be securely attached to together by it, and tensile strength is high, to band body fanout free region itself, mentions
The high stability and service life of geotechnical grid integral product.
To realize above-mentioned technical purpose and the technique effect, the utility model is achieved through the following technical solutions
:
A kind of fixed Integral geocell of pipe nail, the band body including several geotechnical grids being placed adjacent further include
The connector that adjacent belts body is fixedly connected, the connector are formed by fixing metal tube, capping and bottom cover;
The fixed metal tube is the round tube shape structure of both ends perforation, offers six on the side wall of the fixed metal tube
What is be arranged radially connects seam, and the seam equidistantly distributed that connects is described to connect the closing of seam bottom on the side wall of fixed metal tube
And the top of fixed metal tube is run through at top;
The fixed metal tube top outer wall is equipped with the first external screw thread, is equipped on the inside of the capping and matches with the first external screw thread
The first internal screw thread closed;
The fixed metal tube bottom end outer wall is equipped with the second external screw thread, is equipped on the inside of the bottom cover and matches with the second external screw thread
The second internal screw thread closed, the bottom cover bottom is equipped with socket joint needle vertically;
Two band bodies connect seam from one jointly and penetrate fixed metal tube, then two-way is divided to gradually to connect seam from another two
It is pierced by, penetrates fixed metal tube, finally connect seam from the last item jointly and be pierced by fixed metal tube.
Further, the bottom cover is equipped with the reinforcing rib matched with the socket joint needle.
Further, the socket joint wire surface is equipped with corrosion-resistant coating.
Further, the socket joint needle is an integral structure with bottom cover.
The utility model has the following beneficial effects:
1. gradually interting with body for geotechnical grid is connected seam into being arranged on fixed metal tube, so that fixed effect is more
It is good, improve the intensity with body resisting longitudinal pulling force and lateral pull;
2. setting capping makes band body not skid off fixed metal tube;
3. socket joint needle is designed to that integral structure is connected through a screw thread with fixed metal tube with bottom cover, it is laid with geotechnique at the scene
When cell compartment, socket joint needle directly can be inserted into ground, it is more convenient to use without traditional limit ground nail accessory;
4. band body, fixed metal tube, capping and bottom cover are detachable connection, installation is lossless to its ontology when connecting
It is bad, it is more convenient to recycle and recycle.
Detailed description of the invention
In order to illustrate more clearly of the technical solution of the utility model embodiment, make required for being described below to embodiment
Attached drawing is briefly described, it should be apparent that, the drawings in the following description are merely some embodiments of the present invention,
For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings
Other attached drawings.
Fig. 1 is the dismantling schematic diagram of fixed metal tube, capping and bottom cover;
Fig. 2 is the structural schematic diagram of the utility model;
Fig. 3 is the schematic top plan view that metal tube is fixed in Fig. 1;
Fig. 4 is the schematic top plan view that metal tube is fixed in Fig. 2;
Fig. 5 is another angled arrangement schematic diagram of bottom cover;
Fig. 6 is another angled arrangement schematic diagram of fixed metal tube;
Fig. 7 is the whole use state diagram of the utility model;
In attached drawing, component representated by each label is as follows:
1- fixes metal tube, 2- capping, and 3- bottom cover, 4- connects seam, the first external screw thread of 5-, the first internal screw thread of 6-, 7- second
External screw thread, the second internal screw thread of 8-, 9- socket joint needle, 10- band body, 11- reinforcing rib.
Specific embodiment
In order to be easy to understand the technical means, creative features, achievement of purpose, and effectiveness of the utility model, under
Face will combine the attached drawing in the utility model embodiment, carry out to the technical scheme in the embodiment of the utility model clear, complete
Ground description, it is clear that the described embodiments are only a part of the embodiments of the utility model, instead of all the embodiments.Base
In the embodiments of the present invention, institute obtained by those of ordinary skill in the art without making creative efforts
There are other embodiments, fall within the protection scope of the utility model.
In the description of the utility model, it should be noted that the side of the instructions such as term "vertical", "upper", "lower", "horizontal"
Position or positional relationship be orientation based on the figure or positional relationship, be merely for convenience of description this it is practical and simplification retouch
State, rather than indicate or imply that signified device or element must have a particular orientation, with specific orientation construction and
Operation, therefore should not be understood as limiting the present invention.In addition, " first ", " second ", " third ", " the 4th " are only used for
Purpose is described, and should not be understood as indicating or implying relative importance.
In the description of the utility model, it is also necessary to which explanation " is set unless otherwise specific regulation and limitation, term
Set ", " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection,
Or be integrally connected, it can be mechanical connection, be also possible to be electrically connected, can be and be directly connected to, be also possible to through intermediate matchmaker
It is situated between and is connected, can be the connection inside two elements.It for the ordinary skill in the art, can be as the case may be
Understand the concrete meaning of above-mentioned term in the present invention.
As shown in figs. 1-7, the utility model is that a kind of pipe follows closely fixed Integral geocell, including several are placed adjacent
Geotechnical grid band body 10, further include the connector for being fixedly connected with adjacent belts body 10, the connector is by fixing metal tube
1, capping 2 and bottom cover 3 form;
The fixed metal tube 1 is the round tube shape structure of both ends perforation, offers six on the side wall of the fixed metal tube 1
What item was arranged radially connects seam 4, and 4 equidistantly distributeds of seam that connect are described to connect 4 bottoms of seam on the side wall of fixed metal tube 1
The top of fixed metal tube 1 is run through at portion's closing and top;
The 1 top outer wall of fixed metal tube is equipped with the first external screw thread 5, and 2 inside of capping is equipped with and the first external screw thread 5
The first internal screw thread 6 matched;
The 1 bottom end outer wall of fixed metal tube is equipped with the second external screw thread 7, is equipped with and the second external screw thread 7 on the inside of the bottom cover 3
The second internal screw thread 8 matched, 3 bottom of bottom cover are equipped with socket joint needle 9 vertically;
Two band bodies 10 connect seam 4 from one jointly and penetrate fixed metal tube 1, then two-way is divided to gradually to wear from another two
Draw seam 4 be pierced by, penetrate fixed metal tube 1, finally connects seam 4 from the last item jointly and be pierced by fixed metal tube 1.
Further, the bottom cover 3 is equipped with the reinforcing rib 11 matched with the socket joint needle 9.
Further, 9 surface of socket joint needle is equipped with corrosion-resistant coating.
Further, the socket joint needle 9 is an integral structure with bottom cover 3.
Further, it is equipped with elastic rubber stick in fixed metal tube 1, elastic rubber stick will be compressed with body 10, so that with body
10 is difficult to slide.
The utility model, which gradually interts geotechnical grid with body 10, connects seam 4 into being arranged on fixed metal tube 1, makes
It obtains fixed effect more preferably, improves the intensity with body resisting longitudinal pulling force and lateral pull;Setting capping 2 skid off band body 10 will not
Fixed metal tube 1;Socket joint needle 9 is designed to that integral structure is connected through a screw thread with fixed metal tube 1 with bottom cover 3, spreads at the scene
It is more convenient to use without traditional limit ground nail accessory if when geotechnical grid, socket joint needle 9 directly can be inserted into ground;Band body
10, fixed metal tube 1, capping 2 and bottom cover 3 are detachable connection, are more convenient to its ontology without damage when installation connects
It recycles and recycles.
The preferred embodiment in the utility model disclosed above is only intended to help to illustrate the utility model.Preferred embodiment is simultaneously
There is no the details that detailed descriptionthe is all, also not limiting the utility model is only the specific embodiment.Obviously, according to this theory
The content of bright book can make many modifications and variations.These embodiments are chosen and specifically described to this specification, is in order to preferably
The principles of the present invention and practical application are explained, so that skilled artisan be enable to better understand and utilize this
Utility model.The utility model is limited only by the claims and their full scope and equivalents.
Claims (4)
1. a kind of pipe follows closely fixed Integral geocell, band body (10) including several geotechnical grids being placed adjacent is special
Sign is: further including the connector for being fixedly connected with adjacent belts body (10), the connector is by fixing metal tube (1), capping (2)
It is formed with bottom cover (3);
The fixed metal tube (1) is the round tube shape structure of both ends perforation, offers six on the side wall of the fixed metal tube (1)
What item was arranged radially connects seam (4), and seam (4) equidistantly distributed that connects is described to connect on the side wall of fixed metal tube (1)
It stitches the closing of (4) bottom and the top for fixing metal tube (1) is run through at top;
Fixed metal tube (1) the top outer wall is equipped with the first external screw thread (5), is equipped with and the first outer spiral shell on the inside of the capping (2)
The first internal screw thread (6) that line (5) matches;
Fixed metal tube (1) the bottom end outer wall is equipped with the second external screw thread (7), is equipped with and the second outer spiral shell on the inside of the bottom cover (3)
The second internal screw thread (8) that line (7) matches, bottom cover (3) bottom are equipped with socket joint needle (9) vertically;
The band body (10) of adjacent two connects seam (4) from one jointly and penetrates fixed metal tube (1), then divide two-way gradually from
Another two connect seam (4) and are pierced by, penetrate fixed metal tube (1), finally connect seam (4) from the last item jointly and are pierced by fixed metal
It manages (1).
2. pipe according to claim 1 follows closely fixed Integral geocell, it is characterised in that: the bottom cover (3) is equipped with
The reinforcing rib (11) matched with the socket joint needle (9).
3. pipe according to claim 1 follows closely fixed Integral geocell, it is characterised in that: socket joint needle (9) surface
Equipped with corrosion-resistant coating.
4. pipe according to claim 1 follows closely fixed Integral geocell, it is characterised in that: the socket joint needle (9) and bottom
Lid (3) is an integral structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820693054.4U CN208266607U (en) | 2018-05-10 | 2018-05-10 | Pipe follows closely fixed Integral geocell |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820693054.4U CN208266607U (en) | 2018-05-10 | 2018-05-10 | Pipe follows closely fixed Integral geocell |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208266607U true CN208266607U (en) | 2018-12-21 |
Family
ID=64681556
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820693054.4U Active CN208266607U (en) | 2018-05-10 | 2018-05-10 | Pipe follows closely fixed Integral geocell |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208266607U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108360326A (en) * | 2018-05-10 | 2018-08-03 | 安徽中路工程材料有限公司 | The fixed Integral geocell of pipe nail |
-
2018
- 2018-05-10 CN CN201820693054.4U patent/CN208266607U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108360326A (en) * | 2018-05-10 | 2018-08-03 | 安徽中路工程材料有限公司 | The fixed Integral geocell of pipe nail |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107905089A (en) | A kind of reinforcement platform back of the body for preventing bumping at bridge-head and its construction method | |
CN107142926B (en) | The supratectal steel trestle steel-pipe pile antiscour construction method of shallow water riverbed thickness erratic boulder | |
CN202899165U (en) | T-shaped wallboard type retaining wall structure of highway subgrade | |
CN203049610U (en) | Road cutting pile-plank trough type retaining wall structure for railway rich water area | |
CN208844415U (en) | For changing the aqueduct of the flow direction in the river above piping lane to be onstructed | |
CN110499772A (en) | A kind of rock matter riverbed double-layer plate pile cofferdam construction method | |
CN104594287A (en) | Ecological and economic bank protection structure | |
CN102286955B (en) | Reinforced concrete pile type dyke and construction method thereof | |
CN208266607U (en) | Pipe follows closely fixed Integral geocell | |
CN202170498U (en) | Reinforced concrete pile dike | |
CN107059856A (en) | The ecology stake of pretensioning prestressed concrete porous hollow and its construction method | |
CN202450491U (en) | Open type flood discharge structure at dam crest | |
CN103410155B (en) | A kind of recyclable preposition assembling braced cuts structure and application process thereof | |
CN203808101U (en) | Reinforced earth retaining wall with concrete panel | |
CN110205982A (en) | Improve the channel design and its construction method of existing river levee flood control standard | |
CN113373865B (en) | Frame type embankment structure | |
CN109056804A (en) | A kind of pipe gallery foundation pit supporting construction and its implementation | |
CN108360326A (en) | The fixed Integral geocell of pipe nail | |
CN212801549U (en) | H-shaped double-row steel sheet pile supporting structure | |
CN209308066U (en) | A kind of pipe gallery foundation pit supporting construction | |
CN109355990B (en) | Ultra-fine sand roadbed structure for hydraulic filling in low-lying marsh areas | |
CN208266845U (en) | Clip type geotechnical grid band body attachment device | |
CN114351729A (en) | Assembly type ground firmware slope protection and cushion layer structure and laying method thereof | |
CN208219559U (en) | Works water outlet temporary blocking device | |
CN210421127U (en) | Tunnel engineering back pressure backfill structure for treating shallow buried bias voltage diseases |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |