CN202170498U - Reinforced concrete pile dike - Google Patents

Reinforced concrete pile dike Download PDF

Info

Publication number
CN202170498U
CN202170498U CN2011202302065U CN201120230206U CN202170498U CN 202170498 U CN202170498 U CN 202170498U CN 2011202302065 U CN2011202302065 U CN 2011202302065U CN 201120230206 U CN201120230206 U CN 201120230206U CN 202170498 U CN202170498 U CN 202170498U
Authority
CN
China
Prior art keywords
reinforced concrete
dike
concrete
stake
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202302065U
Other languages
Chinese (zh)
Inventor
俞相成
谢先坤
汪巍巍
张丽芬
何刚强
Original Assignee
Shanghai Water Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Water Engineering Design and Research Institute Co Ltd filed Critical Shanghai Water Engineering Design and Research Institute Co Ltd
Priority to CN2011202302065U priority Critical patent/CN202170498U/en
Application granted granted Critical
Publication of CN202170498U publication Critical patent/CN202170498U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a reinforced concrete pile dike. The reinforced concrete pile dike comprises two rows of reinforced concrete plate piles which are in parallel arranged in a sealing manner and inserted to a foundation bed, a dike top which is arranged between the two rows of the reinforced concrete plate piles and connected with the reinforced concrete plate pile tops, filler which is filled above a mud surface line between the two rows of reinforced concrete plate piles, and a protective beach structure which is arranged outside the two rows of reinforced concrete plate piles. The reinforced concrete pile dike has the advantages that: 1, the size is small, the occupied area is a little, and the investment is saved; 2, the needed cubic meter amount of earth and stone is a little, and the cubic metre of earth near the engineering is used for solving a problem that the dike-building sand and the stone material are in short supply; 3, the reinforced concrete plate piles are industrially manufactured and constructed on the spot, thus the mechanical construction degree is high; 4, the pile dike is applicable to the soft earth base, and the integral stability is good; and 5, reinforced concrete structures are arranged outside the structure, so that the wave impact prevention action is strong; the reinforced concrete pile dike is used for the dike-enclosing of the inning engineering, and particularly suitable for building a dike on a deep-water soft earth base.

Description

Reinforced concrete pile formula dike
Technical field
The utility model relates to deep water project of cultivation soft foundation fill technology, relates in particular to a kind of reinforced concrete pile formula dike that is applicable on the deep water soft foundation.
Background technology
Fill on the deep water soft foundation, traditional native bank of stone structural volume is big, needs to consume a large amount of sandstone material, and digging the mountain quarrying influences natural environment, and for the area of sandstone outsourcing, the expense of sandstone is very high, thereby causes the fill cost high.Soil bank of stone floor space is big, and for the area that the soil lacks, it is unfortunate really that fill takies too much soil.For satisfying native bank of stone stability requirement, generally also need do ground and handle, to stride marine deep water construction in flood season and restricted by natural conditions, construction risk is high, difficulty is big, long construction period.
Summary of the invention
The utility model technical problem to be solved is to traditional existing deficiency of the native bank of stone a kind of reinforced concrete pile formula embankment structure to be provided.
To achieve these goals, the technical scheme of the utility model is following:
Reinforced concrete pile formula dike is characterized in that, comprising:
Reinforced concrete sheet pile in two row's parallel seal settings and the insertion ground;
Be arranged between the two placing of reinforcement concrete sheet-pilings and the levee crown that is connected with said reinforced concrete sheet pile stake top;
Be filled in the above filler of mud upper thread between two placing of reinforcement concrete sheet-pilings;
What be arranged on the two placing of reinforcement concrete sheet-pilings outsides protects the beach structure.
Said levee crown keeps at a certain distance away by the steel concrete nose girder that is arranged on reinforced concrete sheet pile stake top, along the dike axis direction and is provided with and is connected in the steel concrete contact beam between the steel concrete nose girder on the two placing of reinforcement concrete sheet-piling stakes top and be laid on the reinforced concrete sandwich formula panel between the adjacent two steel concrete contact beam; Said reinforced concrete sheet pile, steel concrete nose girder, steel concrete contact beam and reinforced concrete sandwich formula panel are coupled to each other into overall structure.
In preferred embodiment of the utility model; Said reinforced concrete sandwich formula panel is made up of precast rc slab and cast-in-place steel concrete panel of getting in touch on beam, the precast rc slab at said steel concrete, and precast rc slab becomes the superposed type force structure with cast-in-place steel concrete panel-shaped.
Said levee crown also comprises the wave wall that is arranged on the steel concrete nose girder.
Said steel concrete contact beam is inverted T-shaped steel concrete contact beam.
Every placing of reinforcement concrete sheet-piling is made up of the long slab stake and the short slab stake that are provided with at interval, and the stake top of long slab stake is concordant with the stake top of short slab stake, and the part that the long slab stake is squeezed in the ground is squeezed into the part in the ground greater than the short slab stake; Be connected through tongue and groove between said long slab stake and the short slab stake.
Between the tongue and groove of said long slab stake and short slab stake, can also require pre-buried rubber sealing rod according to sealing.
For preventing that filler runs off; The utility model also comprises and is laid between the two placing of reinforcement concrete sheet-pilings on the mud upper thread and the geotextiles on the two placing of reinforcement concrete sheet-piling medial surfaces; Said geotextiles surrounds one in order to fill the space of filler, and said filler is filled in the said space.
Said filler is mud filling tube bag or grating building stones.
In a preferred embodiment of the utility model, the said beach structure of protecting comprises next-door neighbour's two placing of reinforcement concrete sheet-pilings and is laid on beach ground sand rib soft raft and concrete precast block soft raft and throwing and fills out rubble bag, piece stone or gabion on sand rib soft raft; Said concrete precast block soft raft is positioned at the outside of said sand rib soft raft.
In order to improve the stability of whole reinforced concrete pile formula dike, strengthen the ability of structure opposing horizontal loading, reduce displacement and the distortion of structure under horizontal loads; Reduce the internal force of sheet pile; According to the structure needs, steel concrete contact beam is chosen certain-length in the unrestrained side of the back of the body, chooses end and divides into the bearing diagonal stake; Insert in the ground bottom of bearing diagonal stake, has certain included angle between said bearing diagonal stake and the said land side reinforced concrete sheet pile.
The advantage of the utility model is:
1, structural volume is little, takes up an area of to lack reduced investment;
2, reinforced concrete sheet pile is prefabricated in the factory, on-the-spot injection, and the mechanized construction degree is high;
3, be applicable to that soft foundation, resistance to overturning are good;
4, required earthwork is few, and the quality requirement that bankets between the two placing of reinforcement concrete sheet-pilings is low, can make full use of near cubic metre of earth of engineering, and influence basin is little;
5, the structure periphery is reinforced concrete structure, and anti-wave impact ability is strong.
Description of drawings
Specify the utility model below in conjunction with the accompanying drawing and the specific embodiment:
Fig. 1 is the reinforced concrete pile formula embankment structure sectional schematic diagram of the utility model.
Fig. 2 is the A-A generalized section of Fig. 1.
Fig. 3 is the B-B generalized section of Fig. 1.
The specific embodiment
For technological means, creation characteristic that the utility model is realized, reach purpose and be easy to understand understanding with effect, below in conjunction with concrete diagram, further set forth the utility model.
Referring to Fig. 1,2,3; Shown reinforced concrete pile formula dike; Comprise two the row reinforced concrete sheet pile 100, the 100a that laterally arrange, every placing of reinforcement concrete sheet-piling 100,100a constitute (referring to Fig. 2) by the long slab stake 101 and the short slab stake 102 of alternate setting, and long slab stake 101 is preformed pile with short slab stake 102; The stake top of long slab stake 101 is concordant with the stake top of short slab stake 102, and the part that the part in the ground is inserted in the ground greater than short slab stake 102 is inserted in long slab stake 101.Connected mode between long slab stake 101 and the short slab stake 102 is that tongue and groove connects, and between the tongue and groove of long slab stake 101 and short slab stake 102, can also require pre-buried rubber sealing rod (not shown) according to sealing.Two placing of reinforcement concrete sheet-pilings 100,100a establish deformation joint one at a certain distance along dike line direction, to reduce differential settlement and the variations in temperature adverse effect to structure.Lateral arrangement reinforced concrete sheet pile 110 between the reinforced concrete sheet pile 100 of deformation joint both sides, 100a, the transverse integral that strengthens pile dike is stable.
In order to improve the monolithic stability of two placing of reinforcement concrete sheet-pilings 100,100a; Strengthen the ability of structure opposing horizontal loading; Reduce displacement and the distortion of structure at horizontal force; Reduce the internal force of reinforced concrete sheet pile,, in the beach face in the land side reinforced concrete sheet pile 100a outside, squeeze into the bearing diagonal stake 700 that forms an angle with land side armored concrete slab 100a stake according to the structure needs.
As shown in Figure 2, then build steel concrete nose girder 200 and steel concrete contact beam 300 in two placing of reinforcement concrete sheet-pilings 100,100a stake top casting.Steel concrete nose girder 200 works platoon leader's sheet pile 101 and short slab stake 102 effects of connecting, and along steel concrete nose girder 200 directions a steel concrete contact beam 300 is set at a certain distance.In the present embodiment, steel concrete contact beam 300 is inverted T-shaped steel concrete contact beam.When building steel concrete contact beam 300, choose certain-length, choose end and be cast in the top of bearing diagonal stake 700 in the unrestrained side of the back of the body.
In time protect the beach construction then, to prevent wave current washing away to sheet pile both sides beach in reinforced concrete sheet pile 100, the 100a outside.Protect beach construction and at first on the beach face of next-door neighbour's two placing of reinforcement concrete sheet-pilings 100,100a, lay sand rib soft raft 920; On the beach face in sand rib soft raft 920 outsides, lay concrete precast block soft raft 900, fill out rubble bag, piece stone or gabion 910 to design altitude at sand rib soft raft 920 upthrows.Simultaneously laying geotextiles 500 on the mud upper thread between two placing of reinforcement concrete sheet-pilings 100, the 100a and on the two placing of reinforcement concrete sheet-pilings 100,100a medial surface; Make geotextiles 500 surround one, then filler 600 is filled in the space to design altitude in order to fill the space of filler 600; Filler 600 is mud filling tube bag or grating building stones.
Then on adjacent two steel concrete contact beam 300, lay precast rc slab 400; After armored concrete slab 400 lays; Cast in situs steel concrete panel 800 on steel concrete contact beam 300 and precast rc slab 400 is built wave wall 810 again on the steel concrete nose girder 200 of the side of heading sea.
Above content shows and has described the advantage of basic principle, principal character and the utility model of the utility model.The personnel of the industry should understand; The utility model does not receive the restriction of above-mentioned instance; The principle of describing in above-mentioned instance and the explanation that the utility model just is described; The utility model also has various changes and modifications under the prerequisite that does not break away from the utility model spirit and scope, and these variations and improvement all will fall in the utility model scope that requires protection.The utility model requires protection domain to be defined by appending claims and equivalent thereof.

Claims (11)

1. reinforced concrete pile formula dike is characterized in that, comprising:
Reinforced concrete sheet pile in two row's parallel seal settings and the insertion ground;
Be arranged between the two placing of reinforcement concrete sheet-pilings and the levee crown that is connected with said reinforced concrete sheet pile stake top;
Be filled in the above filler of mud upper thread between two placing of reinforcement concrete sheet-pilings;
What be arranged on the two placing of reinforcement concrete sheet-pilings outsides protects the beach structure.
2. reinforced concrete pile formula dike as claimed in claim 1; It is characterized in that said levee crown keeps at a certain distance away by the steel concrete nose girder that is arranged on reinforced concrete sheet pile stake top, along the dike axis direction and is provided with and is connected in the steel concrete contact beam between the steel concrete nose girder on the two placing of reinforcement concrete sheet-piling stakes top and be laid on the reinforced concrete sandwich formula panel between the two adjacent steel reinforced concretes contact beam; Said reinforced concrete sheet pile, steel concrete nose girder, steel concrete contact beam and reinforced concrete sandwich formula panel are coupled to each other into overall structure.
3. reinforced concrete pile formula dike as claimed in claim 2; It is characterized in that; Said reinforced concrete sandwich formula panel is made up of precast rc slab and cast-in-place steel concrete panel of getting in touch on beam, the precast rc slab at said steel concrete, and said precast rc slab becomes the superposed type force structure with the cast-in-situ steel reinforced concrete panel-shaped.
4. reinforced concrete pile formula dike as claimed in claim 2 is characterized in that said levee crown also comprises the wave wall that is arranged on the steel concrete nose girder.
5. reinforced concrete pile formula dike as claimed in claim 2 is characterized in that, said steel concrete contact beam is inverted T-shaped steel concrete contact beam.
6. reinforced concrete pile formula dike as claimed in claim 1; It is characterized in that; Every placing of reinforcement concrete sheet-piling is made up of the long slab stake and the short slab stake that are provided with at interval, and the stake top of long slab stake is concordant with the stake top of short slab stake, and the part that the long slab stake is squeezed in the ground is squeezed into the part in the ground greater than the short slab stake; Be connected through tongue and groove between said long slab stake and the short slab stake.
7. reinforced concrete pile formula dike as claimed in claim 6 is characterized in that, between the tongue and groove of said long slab stake and short slab stake, is embedded with the rubber sealing rod.
8. like the described reinforced concrete pile formula of each claim of claim 1 to 7 dike; It is characterized in that; Also comprise and be laid between the two placing of reinforcement concrete sheet-pilings on the mud upper thread and the geotextiles on the two placing of reinforcement concrete sheet-piling medial surfaces; Said geotextiles surrounds one in order to fill the space of filler, and said filler is filled in the said space.
9. reinforced concrete pile formula dike as claimed in claim 8 is characterized in that, said filler is mud filling tube bag or grating building stones.
10. reinforced concrete pile formula dike as claimed in claim 1; It is characterized in that the said beach structure of protecting comprises next-door neighbour's two placing of reinforcement concrete sheet-pilings and is laid on beach ground sand rib soft raft and concrete precast block soft raft and throwing and fills out rubble bag, piece stone or gabion on sand rib soft raft; Said concrete precast block soft raft is positioned at the outside of said sand rib soft raft.
11. reinforced concrete pile formula dike as claimed in claim 2; It is characterized in that; Said steel concrete contact beam is chosen certain-length in the unrestrained side of the back of the body; Choose end and divide into the bearing diagonal stake, insert in the ground bottom of bearing diagonal stake, has certain included angle between said bearing diagonal stake and the said land side reinforced concrete sheet pile.
CN2011202302065U 2011-07-01 2011-07-01 Reinforced concrete pile dike Expired - Fee Related CN202170498U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202302065U CN202170498U (en) 2011-07-01 2011-07-01 Reinforced concrete pile dike

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202302065U CN202170498U (en) 2011-07-01 2011-07-01 Reinforced concrete pile dike

Publications (1)

Publication Number Publication Date
CN202170498U true CN202170498U (en) 2012-03-21

Family

ID=45828694

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202302065U Expired - Fee Related CN202170498U (en) 2011-07-01 2011-07-01 Reinforced concrete pile dike

Country Status (1)

Country Link
CN (1) CN202170498U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102286955A (en) * 2011-07-01 2011-12-21 上海市水利工程设计研究院 Reinforced concrete pile type dyke and construction method thereof
CN106012960A (en) * 2016-07-14 2016-10-12 中交第三航务工程勘察设计院有限公司 Assembly type long piled wharf upper structure system and construction method thereof
CN106192890A (en) * 2016-08-29 2016-12-07 长江勘测规划设计研究有限责任公司 A kind of dam crest cultural landscape band structure
CN107916647A (en) * 2017-10-27 2018-04-17 深圳市东深工程有限公司 A kind of pile dike
CN108018825A (en) * 2017-10-30 2018-05-11 上海市政工程设计研究总院(集团)有限公司 A kind of shore protection

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102286955A (en) * 2011-07-01 2011-12-21 上海市水利工程设计研究院 Reinforced concrete pile type dyke and construction method thereof
CN102286955B (en) * 2011-07-01 2013-08-07 上海市水利工程设计研究院 Reinforced concrete pile type dyke and construction method thereof
CN106012960A (en) * 2016-07-14 2016-10-12 中交第三航务工程勘察设计院有限公司 Assembly type long piled wharf upper structure system and construction method thereof
CN106012960B (en) * 2016-07-14 2018-07-24 中交第三航务工程勘察设计院有限公司 A kind of assembled long piled wharf superstructure system and its construction method
CN106192890A (en) * 2016-08-29 2016-12-07 长江勘测规划设计研究有限责任公司 A kind of dam crest cultural landscape band structure
CN107916647A (en) * 2017-10-27 2018-04-17 深圳市东深工程有限公司 A kind of pile dike
CN108018825A (en) * 2017-10-30 2018-05-11 上海市政工程设计研究总院(集团)有限公司 A kind of shore protection

Similar Documents

Publication Publication Date Title
CN1837511B (en) Double-rowed cofferdam and method for manufacturing the same
CN102286955B (en) Reinforced concrete pile type dyke and construction method thereof
CN103774675B (en) Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof
CN202170498U (en) Reinforced concrete pile dike
CN203684242U (en) Geobag and slurry combined cofferdam type subaqueous construction platform in mud flat
CN211200426U (en) Anti-sliding supporting and retaining structure for miniature steel pipe pile retaining wall
CN206693140U (en) A kind of protection slope
CN204151796U (en) A kind of reinforcement eco-concrete bank protection
CN210482362U (en) Assembled rigid and flexible combined elastic anti-seismic reinforced earth retaining wall
CN112281911A (en) Novel ecological block retaining wall and construction method thereof
CN203808101U (en) Reinforced earth retaining wall with concrete panel
CN111005389A (en) Construction method of unloading plate type supporting structure
KR102116085B1 (en) A Eco-friendly retain wall structure
CN110295573A (en) Adapt to the channel revetment project post-evaluation structure of construction time severe hydrometeorological condition
CN207452938U (en) Composite foundation reinforced cantilever retaining wall structure
CN213625433U (en) A link up transition structure that is used for gravity type and sheet pile formula combination pier
CN211773854U (en) Soil retaining structure permeates water with soil nail
CN211665773U (en) Unloading plate type supporting structure
CN208251014U (en) A kind of upright embankment structure of composite foundation base empty van
CN103821106B (en) Small-sized fishing port and channel revetment structure
CN210482331U (en) Supporting structure of side slope
CN113047215A (en) Middle plate pile high pile wharf structure
CN208501613U (en) Nearby Structure depth riverbed quaywall supporting construction
CN210086322U (en) Anti-floating underground garage in water-rich area
KR101097055B1 (en) Debris barrier and plastering between rafters constructed by the cast iron panel and method of debris barrier

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI WATER ENGINEERING DESIGN + RESEARCH INSTI

Free format text: FORMER NAME: SHANGHAI WATER ENGINEERING DESIGN + RESEARCH INSTITUTE

CP01 Change in the name or title of a patent holder

Address after: 200000 No. 193, Hankou Road, the Bund street, Shanghai, Huangpu District

Patentee after: Shanghai Water Engineering Design & Research Institute Co., Ltd.

Address before: 200000 No. 193, Hankou Road, the Bund street, Shanghai, Huangpu District

Patentee before: Shanghai Water Engineering Design & Research Institute

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120321

Termination date: 20200701

CF01 Termination of patent right due to non-payment of annual fee