CN108360326A - The fixed Integral geocell of pipe nail - Google Patents
The fixed Integral geocell of pipe nail Download PDFInfo
- Publication number
- CN108360326A CN108360326A CN201810443737.9A CN201810443737A CN108360326A CN 108360326 A CN108360326 A CN 108360326A CN 201810443737 A CN201810443737 A CN 201810443737A CN 108360326 A CN108360326 A CN 108360326A
- Authority
- CN
- China
- Prior art keywords
- metal tube
- fixed metal
- fixed
- seam
- bottom cover
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000002184 metal Substances 0.000 claims abstract description 49
- 230000003014 reinforcing effect Effects 0.000 claims description 5
- 239000011248 coating agent Substances 0.000 claims description 3
- 238000000576 coating method Methods 0.000 claims description 3
- 230000007797 corrosion Effects 0.000 claims description 3
- 238000005260 corrosion Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 5
- 239000000463 material Substances 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 239000002689 soil Substances 0.000 description 4
- 239000004575 stone Substances 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 239000006185 dispersion Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000003628 erosive effect Effects 0.000 description 1
- 230000001771 impaired effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C3/00—Foundations for pavings
- E01C3/04—Foundations produced by soil stabilisation
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Mining & Mineral Resources (AREA)
- Agronomy & Crop Science (AREA)
- Soil Sciences (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The invention discloses a kind of pipes to follow closely fixed Integral geocell, includes the band body of several geotechnical grids being placed adjacent, further includes the connector for being fixedly connected with adjacent belts body, the connector is formed by fixing metal tube, capping and bottom cover;The fixed metal tube is the round tube shape structure of both ends perforation, offered on the side wall of the fixed metal tube six be radially arranged connect seam, the seam equidistantly distributed that connects is described to connect seam bottom lock and the top of fixed metal tube is run through at top on the side wall of fixed metal tube.Adjacent band body can be securely attached to together by the present invention, and tensile strength is high, to band body fanout free region itself, improve the stability and service life of geotechnical grid integral product.
Description
Technical field
The present invention relates to geotechnical grid technical field of structures, and in particular to the fixed Integral geocell of pipe nail.
Background technology
The purposes of geotechnical grid:1, for consolidating highway subgrade:High resiliency power and firm roadbed can be generated, and it is traditional
Compared to that can reduce 50% or more base thickness, the pressure lateral dispersion contacted gravity and with ground is simultaneously reduced, and can on stone basis
For temporary or permanent road construction.2, for consolidating railway bed:Rubble and grading transverse shifting can be prevented,
Keep entirety firmer, prevent from drawing water, collapses prevented also from entire or part even if ground is soft.In the big area of the volume of traffic as handed over
Road, branch road and slalom course are pitched, service life can be dramatically increased.3, dyke, the barricade for bearing carrying force:It is broken to define reinforcing
The cubic meter of stone forms consistent structure, can stop transverse pressure, no matter stratum is slided and agglomerated, all can voluntarily adjust, can support non-
Structural plane and naturally plant generating layer, can vertical or stepped design.4, shallow water river channel is used to administer:Three face solid grids reinforce embankment
Strength, prevent erosion and increase carrying force, it is possible to reduce the construction cost in shallow river simultaneously allowed the design in river to accord with
Close traffic and the various conditions of soil property.5, pipeline and sewer are used to support:It digging and can need not be placed a large amount of using geotechnical grid
Support construction of the stone as pipe bed type sewer form a firm durable overall plate structure using conventional material, it is right
Pipeline provides flexible permanent protection, can reduce due to micro sinking caused by long-time, keeps the basis of pipeline harder
Gu and local collapse can be prevented for a long time.This method easy construction is reduced and is excavated, long range bulk transport pipeline is more passed through
Ji is practical.6, for preventing landslide and by the hybrid barricade of carrying force:Template need not be used, you can create one layer of firm wall
Face is firmly combined into one with backfill side, though traditional various gravity structures can not use situation embankment if can be on the spot
Materials significantly reduce engineering cost.7, independent wall, harbour, flood bank etc. are used for:Promptly independent wall or obstacle wall can be played by structure,
And permeable granular embankment dyke or weir wall can be used, if temporary facility needs to remove, geotechnical grid is also recyclable.In code
Head or flood bank and other important seashore purposes are also very extensive.When 8, encountering subgrade in highway, use
Sandstone replaces the method for Soft Soil Layer, and investment is big, long in time limit.Construction labor intensity can be mitigated using geotechnical grid significantly, reduce road
Base thickness, speed of application is fast, and performance is good, substantially reduces project cost.Next builds the road simple for process, can gather materials on the spot, soon
Fast efficient, this point is particularly important in the deficient area of road-making material.
Geotechnical grid is usually connected by the band body of a plurality of PP or PE materials by different modes, to form netted cell compartment knot
Structure, existing connection type include welding, riveting, and welding is so that two band bodies is bonded together by high temperature, and this mode is viscous
The tensile strength for meeting place is low, is easy to be broken in junction, and to influence the stability of entire geotechnical grid structure, riveting is
Directly two band bodies are fixed together with rivet, this makes band body drilled and impaired, influences the service life of product.
Invention content
It is an object of the invention to overcome the above-mentioned problems in the prior art, a kind of fixed peace of geotechnical grid is provided
Assembling device, adjacent band body can be securely attached to together by it, and tensile strength is high, to band body fanout free region itself, be improved
The stability and service life of geotechnical grid integral product.
To realize above-mentioned technical purpose and the technique effect, the present invention is achieved by the following technical solutions:
A kind of fixed Integral geocell of pipe nail, includes the band body of several geotechnical grids being placed adjacent, further includes
The connector that adjacent belts body is fixedly connected, the connector are formed by fixing metal tube, capping and bottom cover;
The fixed metal tube is the round tube shape structure of both ends perforation, and six are offered on the side wall of the fixed metal tube
What is be radially arranged connects seam, and the seam equidistantly distributed that connects is described to connect seam bottom lock on the side wall of fixed metal tube
And the top of fixed metal tube is run through at top;
The fixed metal tube top outer wall is equipped with the first external screw thread, is equipped on the inside of the capping and matches with the first external screw thread
The first internal thread closed;
The fixed metal tube bottom end outer wall is equipped with the second external screw thread, is equipped on the inside of the bottom cover and matches with the second external screw thread
The second internal thread closed, the bottom cover bottom are equipped with socket joint needle vertically;
Two band bodies connect seam from one jointly and penetrate fixed metal tube, then two-way is divided to gradually to connect seam from another two
It is pierced by, penetrates fixed metal tube, finally connecting seam from the last item jointly is pierced by fixed metal tube.
Further, the bottom cover is equipped with and the matched reinforcing rib of socket joint needle.
Further, the socket joint wire surface is equipped with corrosion-resistant coating.
Further, the socket joint needle is an integral structure with bottom cover.
Beneficial effects of the present invention are:
1. gradually interting with body for geotechnical grid is connected seam into being arranged on fixed metal tube so that fixed effect is more
It is good, improve the intensity with body resisting longitudinal pulling force and lateral pull;
2. setting capping makes band body not skid off fixed metal tube;
3. socket joint needle is designed to that integral structure is connected through a screw thread with fixed metal tube with bottom cover, it is laid with geotechnique at the scene
When cell compartment, can socket joint needle be directly inserted into ground, be not necessarily to traditional limit ground nail accessory, it is more convenient to use;
4. band body, fixed metal tube, capping and bottom cover are detachable connection, installation is lossless to its ontology when connecting
It is bad, it is more convenient to recycle and recycle.
Description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, will be described below to embodiment required
Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for ability
For the those of ordinary skill of domain, without creative efforts, it can also be obtained according to these attached drawings other attached
Figure.
Fig. 1 be fixed metal tube, capping and bottom cover dismantling schematic diagram;
Fig. 2 is the structural schematic diagram of the present invention;
Fig. 3 is the schematic top plan view that metal tube is fixed in Fig. 1;
Fig. 4 is the schematic top plan view that metal tube is fixed in Fig. 2;
Fig. 5 is another angled arrangement schematic diagram of bottom cover;
Fig. 6 is another angled arrangement schematic diagram of fixed metal tube;
Fig. 7 is the whole use state diagram of the present invention;
In attached drawing, the component representated by each label is as follows:
1- fixes metal tube, 2- cappings, and 3- bottom covers, 4- connects seam, the first external screw threads of 5-, the first internal threads of 6-, 7- second
External screw thread, the second internal threads of 8-, 9- socket joint needles, 10- band bodies, 11- reinforcing ribs.
Specific implementation mode
In order to make the technical means, the creative features, the aims and the efficiencies achieved by the present invention be easy to understand, below will
In conjunction with the attached drawing in the embodiment of the present invention, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that
Described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based on the implementation in the present invention
Example, all other embodiment that those of ordinary skill in the art are obtained without creative efforts belong to
The scope of protection of the invention.
In description of the invention, it should be noted that the orientation of the instructions such as term "vertical", "upper", "lower", "horizontal" or
Person's position relationship is orientation based on ... shown in the drawings or position relationship, is merely for convenience of describing this practicality and simplify to describe,
Rather than instruction either implies that signified device or element must have a particular orientation, with specific azimuth configuration and behaviour
Make, therefore is not considered as limiting the invention.In addition, " first ", " second ", " third ", " the 4th " are only used for description mesh
, and should not be understood as indicating or implying relative importance.
In description of the invention, it is also necessary to explanation, unless otherwise specific regulation and limitation, term " setting ", " peace
Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally
Connection can be mechanical connection, can also be electrical connection, can be directly connected to, and can also be to be connected by intermediary, can
To be the connection inside two elements.For the ordinary skill in the art, can understand as the case may be above-mentioned
The concrete meaning of term in the present invention.
As shown in figs. 1-7, the present invention is a kind of fixed Integral geocell of pipe nail, including several soil for being placed adjacent
The band body 10 of work cell compartment further includes the connector for being fixedly connected with adjacent belts body 10, and the connector is by fixing metal tube 1, envelope
Lid 2 and bottom cover 3 form;
The fixed metal tube 1 is the round tube shape structure of both ends perforation, and six are offered on the side wall of the fixed metal tube 1
What item was radially arranged connects seam 4, and 4 equidistantly distributeds of seam that connect are described to connect 4 bottoms of seam on the side wall of fixed metal tube 1
Portion closes and the top for fixing metal tube 1 is run through at top;
1 top outer wall of the fixed metal tube is equipped with the first external screw thread 5, and 2 inside of the capping is equipped with and the first external screw thread 5
Matched first internal thread 6;
1 bottom end outer wall of the fixed metal tube is equipped with the second external screw thread 7, and 3 inside of the bottom cover is equipped with and the second external screw thread 7
Matched second internal thread 8,3 bottom of the bottom cover are equipped with socket joint needle 9 vertically;
Two band bodies 10 connect seam 4 from one and penetrate fixed metal tube 1 jointly, then two-way is divided to gradually to be worn from another two
Draw seam 4 be pierced by, penetrate fixed metal tube 1, finally connecting seam 4 from the last item jointly is pierced by fixed metal tube 1.
Further, the bottom cover 3 is equipped with and 9 matched reinforcing rib 11 of the socket joint needle.
Further, 9 surface of socket joint needle is equipped with corrosion-resistant coating.
Further, the socket joint needle 9 is an integral structure with bottom cover 3.
Further, it is equipped with elastic rubber stick in fixed metal tube 1, elastic rubber stick will be compressed with body 10 so that band body
10 is difficult to slide.
The present invention gradually interts geotechnical grid with body 10 connects seam 4 into being arranged on fixed metal tube 1 so that Gu
It is fixed better, improve the intensity with body resisting longitudinal pulling force and lateral pull;Setting capping 2 makes band body 10 not skid off fixation
Metal tube 1;Socket joint needle 9 is designed to that integral structure is connected through a screw thread with fixed metal tube 1 with bottom cover 3, is laid with soil at the scene
When work cell compartment, can socket joint needle 9 be directly inserted into ground, be not necessarily to traditional limit ground nail accessory, it is more convenient to use;Band body 10,
Fixed metal tube 1, capping 2 and bottom cover 3 are detachable connection, more convenient to follow to its ontology without damage when installation connects
Ring utilizes and recycling.
Present invention disclosed above preferred embodiment is only intended to help to illustrate the present invention.There is no detailed for preferred embodiment
All details are described, are not limited the invention to the specific embodiments described.Obviously, according to the content of this specification,
It can make many modifications and variations.These embodiments are chosen and specifically described to this specification, is in order to preferably explain the present invention
Principle and practical application, to enable skilled artisan to be best understood by and utilize the present invention.The present invention is only
It is limited by claims and its full scope and equivalent.
Claims (4)
1. a kind of fixed Integral geocell of pipe nail, includes the band body (10) of several geotechnical grids being placed adjacent, special
Sign is:Further include the connector for being fixedly connected with adjacent belts body (10), the connector is by fixing metal tube (1), capping (2)
It is formed with bottom cover (3);
The fixed metal tube (1) is the round tube shape structure of both ends perforation, and six are offered on the side wall of the fixed metal tube (1)
What item was radially arranged connects seam (4), and seam (4) equidistantly distributed that connects is described to connect on the side wall of fixed metal tube (1)
It stitches (4) bottom lock and the top of fixed metal tube (1) is run through at top;
Fixed metal tube (1) top outer wall is equipped with the first external screw thread (5), is equipped with and the first outer spiral shell on the inside of the capping (2)
Matched first internal thread (6) of line (5);
Fixed metal tube (1) bottom end outer wall is equipped with the second external screw thread (7), is equipped with and the second outer spiral shell on the inside of the bottom cover (3)
Matched second internal thread (8) of line (7), bottom cover (3) bottom are equipped with socket joint needle (9) vertically;
Two adjacent band bodies (10) connect seam (4) from one and penetrate fixed metal tube (1) jointly, then divide two-way gradually from
Another two connect seam (4) and are pierced by, penetrate fixed metal tube (1), and finally connecting seam (4) from the last item jointly is pierced by fixed metal
It manages (1).
2. the fixed Integral geocell of pipe nail according to claim 1, it is characterised in that:The bottom cover (3) is equipped with
With the matched reinforcing rib of the socket joint needle (9) (11).
3. the fixed Integral geocell of pipe nail according to claim 1, it is characterised in that:Socket joint needle (9) surface
Equipped with corrosion-resistant coating.
4. the fixed Integral geocell of pipe nail according to claim 1, it is characterised in that:The socket joint needle (9) and bottom
Lid (3) is an integral structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810443737.9A CN108360326A (en) | 2018-05-10 | 2018-05-10 | The fixed Integral geocell of pipe nail |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810443737.9A CN108360326A (en) | 2018-05-10 | 2018-05-10 | The fixed Integral geocell of pipe nail |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108360326A true CN108360326A (en) | 2018-08-03 |
Family
ID=63011702
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810443737.9A Pending CN108360326A (en) | 2018-05-10 | 2018-05-10 | The fixed Integral geocell of pipe nail |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108360326A (en) |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2432253Y (en) * | 2000-07-10 | 2001-05-30 | 南京玻璃纤维研究设计院 | Socketed earthwork cellular chamber member |
CN2537737Y (en) * | 2002-06-07 | 2003-02-26 | 高红 | Three dimension earth-work grate |
RU161204U1 (en) * | 2015-07-09 | 2016-04-10 | Андрей Николаевич Путивский | GEOMETRIC CONNECTION NODE |
CN205421226U (en) * | 2015-11-25 | 2016-08-03 | 贵州蓝图新材料股份有限公司 | Geotechnological check room of mounting that excels in |
CN105908694A (en) * | 2016-06-22 | 2016-08-31 | 安徽徽风新型合成材料有限公司 | Split high-strength geocell |
CN106013035A (en) * | 2016-06-22 | 2016-10-12 | 安徽徽风新型合成材料有限公司 | Detachable geocell |
CN205875000U (en) * | 2016-07-27 | 2017-01-11 | 何晓婷 | Graticule mesh frame is fixed sand to solid |
JP2017043961A (en) * | 2015-08-26 | 2017-03-02 | 旭化成アドバンス株式会社 | Construction cell structure body and construction method thereof |
CN206941562U (en) * | 2017-07-21 | 2018-01-30 | 新疆睿智新材料有限公司 | A kind of geotechnical grid for strengthening being fixedly connected |
KR101829418B1 (en) * | 2017-09-25 | 2018-02-14 | 주식회사 지오셀코리아 | geo cell for slope construction |
CN207331663U (en) * | 2017-10-23 | 2018-05-08 | 山东科技大学 | A kind of earth working material bee lattice fixed connection apparatus |
CN208266607U (en) * | 2018-05-10 | 2018-12-21 | 安徽中路工程材料有限公司 | Pipe follows closely fixed Integral geocell |
-
2018
- 2018-05-10 CN CN201810443737.9A patent/CN108360326A/en active Pending
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2432253Y (en) * | 2000-07-10 | 2001-05-30 | 南京玻璃纤维研究设计院 | Socketed earthwork cellular chamber member |
CN2537737Y (en) * | 2002-06-07 | 2003-02-26 | 高红 | Three dimension earth-work grate |
RU161204U1 (en) * | 2015-07-09 | 2016-04-10 | Андрей Николаевич Путивский | GEOMETRIC CONNECTION NODE |
JP2017043961A (en) * | 2015-08-26 | 2017-03-02 | 旭化成アドバンス株式会社 | Construction cell structure body and construction method thereof |
CN205421226U (en) * | 2015-11-25 | 2016-08-03 | 贵州蓝图新材料股份有限公司 | Geotechnological check room of mounting that excels in |
CN105908694A (en) * | 2016-06-22 | 2016-08-31 | 安徽徽风新型合成材料有限公司 | Split high-strength geocell |
CN106013035A (en) * | 2016-06-22 | 2016-10-12 | 安徽徽风新型合成材料有限公司 | Detachable geocell |
CN205875000U (en) * | 2016-07-27 | 2017-01-11 | 何晓婷 | Graticule mesh frame is fixed sand to solid |
CN206941562U (en) * | 2017-07-21 | 2018-01-30 | 新疆睿智新材料有限公司 | A kind of geotechnical grid for strengthening being fixedly connected |
KR101829418B1 (en) * | 2017-09-25 | 2018-02-14 | 주식회사 지오셀코리아 | geo cell for slope construction |
CN207331663U (en) * | 2017-10-23 | 2018-05-08 | 山东科技大学 | A kind of earth working material bee lattice fixed connection apparatus |
CN208266607U (en) * | 2018-05-10 | 2018-12-21 | 安徽中路工程材料有限公司 | Pipe follows closely fixed Integral geocell |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206722878U (en) | A kind of mining light-duty filling counterfort | |
CN106498953A (en) | Cut slope composite supporting construction and its construction method | |
CN105927272A (en) | Floor anchoring constraint tunnel lining structure | |
CN209114482U (en) | A kind of recyclable composite soil nailing wall of assembled flexible surface layer | |
CN109024458A (en) | A kind of coal mine subsidence land landscape revetment and the construction method of water-bed antiseepage | |
CN103643689A (en) | Pipe type underground water drainage blind ditch and construction technology and application thereof | |
CN203602980U (en) | Flake rubble stack reinforced soil composite embankment structure | |
CN208266607U (en) | Pipe follows closely fixed Integral geocell | |
CN219410355U (en) | Flexible side-width structure of high-fill embankment of existing railway | |
CN209194555U (en) | A kind of earth cofferdam for deep-water bare basement rock close pile supporting construction cushion cap | |
CN205444232U (en) | Stock - gravity type infiltration retaining wall | |
CN101956404B (en) | Side slope middle impermeable layer anchoring of steep hard rocky bedrock side slope single-layer impermeable structure | |
CN209669900U (en) | Tunnel construction cofferdam structure in water-bed highly permeable sandy soil layer | |
CN108360326A (en) | The fixed Integral geocell of pipe nail | |
CN103410155B (en) | A kind of recyclable preposition assembling braced cuts structure and application process thereof | |
CN203096697U (en) | Ballast field structure at earth and rockfill dam toe | |
CN202090354U (en) | Side slope ecological protection structure | |
CN213867883U (en) | Sand filling pipe bag cofferdam suitable for coastal area | |
CN208266845U (en) | Clip type geotechnical grid band body attachment device | |
CN212926108U (en) | End wall type guide wall structure | |
CN114351729A (en) | Assembly type ground firmware slope protection and cushion layer structure and laying method thereof | |
CN210421127U (en) | Tunnel engineering back pressure backfill structure for treating shallow buried bias voltage diseases | |
CN212801549U (en) | H-shaped double-row steel sheet pile supporting structure | |
CN209568531U (en) | A kind of water storage system of discarded Rare-earth Mine | |
CN208266895U (en) | Cofferdam is built in returning for seabed tunnel point storehouse construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180803 |
|
RJ01 | Rejection of invention patent application after publication |