CN208220208U - A kind of sleeve pipe pre-embedding module board - Google Patents
A kind of sleeve pipe pre-embedding module board Download PDFInfo
- Publication number
- CN208220208U CN208220208U CN201820509271.3U CN201820509271U CN208220208U CN 208220208 U CN208220208 U CN 208220208U CN 201820509271 U CN201820509271 U CN 201820509271U CN 208220208 U CN208220208 U CN 208220208U
- Authority
- CN
- China
- Prior art keywords
- hole
- circular
- substrate
- sleeve pipe
- module board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Sanitary Device For Flush Toilet (AREA)
Abstract
The utility model discloses a kind of sleeve pipe pre-embedding module boards, including substrate, the inside left of the substrate offers the first circular through hole, the lower right for being internally located at the first circular through hole of the substrate offers the second circular through hole, and the right side for being internally located at the first circular through hole of the substrate offers third circular through hole between two parties.The utility model, when toilet pre-buried operation is carried out, after first standpipe is positioned, it is fixed by the position that the pre-buried module board carries out this layer of each branch pipe direct-burried part, it ensure that the manifold size of identical every layer of house type toilet is consistent, good basis is laid for the processing of later period drainage pipeline producer scale, the installation of construction site assembled, under the premise of improving the control of engineering set aside pre-embedded quality, achieve the effect that identical toilet uniform sizes modularization is pre-buried, it realizes the production of later period drainage pipeline producer's scale, the installation of construction site assembled, is worthy to be popularized and popularizes.
Description
Technical field
The utility model relates to sleeve pipe pre-embedding technical field, specially a kind of sleeve pipe pre-embedding module board.
Background technique
Toilet sleeve pipe pre-embedding is the practices well in the installation of architectural engineering electromechanics, and installation method and relationship between quality arrive
The normal operation of entire engineering, big multiple-project domestic at present is all using finished product UPVC direct-burried pipe fitting in the market, such material
The leakage problems of bathroom floor are prevented from source, but have been difficult to control in beforehand burying phase position dimension, the later period is be easy to cause to manage
When road is installed, dimensional discrepancy is excessive, for this purpose, proposing a kind of sleeve pipe pre-embedding module board.
Utility model content
The purpose of this utility model is to provide a kind of sleeve pipe pre-embedding module boards, when toilet pre-buried operation is carried out, first
After standpipe is positioned, is fixed by the position that the pre-buried module board carries out this layer of each branch pipe direct-burried part, ensure that identical house type
The manifold size of every layer of toilet is consistent, lays for the processing of later period drainage pipeline producer's scale, the installation of construction site assembled excellent
It is pre-buried to reach identical toilet uniform sizes modularization under the premise of improving the control of engineering set aside pre-embedded quality for the basis of matter
Effect, realize later period drainage pipeline producer's scale production, construction site assembled installation, to solve to mention in above-mentioned background technique
Out the problem of.
To achieve the above object, the utility model provides the following technical solutions: a kind of sleeve pipe pre-embedding module board, including base
Plate, the inside left of the substrate offer the first circular through hole, the bottom right for being internally located at the first circular through hole of the substrate
Side offers the second circular through hole, and it is logical that the right side for being internally located at the first circular through hole of the substrate offers third circle between two parties
Hole, the lower right for being internally located at third circular through hole of the substrate offer the 4th circular through hole, the interior position of the substrate
The 5th circular through hole is offered in the upper right side of the 4th circular through hole, the internal diameter of first circular through hole is round less than the 4th logical
The internal diameter in hole, internal diameter of the internal diameter less than the second circular through hole of the 4th circular through hole, the internal diameter of second circular through hole
Equal to the internal diameter of third circular through hole, the internal diameter of the 4th circular through hole is equal to the internal diameter of the 5th circular through hole.
Preferably, the substrate is square substrate, and the quadrangle of substrate is symmetrically welded there are four nut.
Preferably, the inside of four nuts is bolted with bolt.
Preferably, the bolt is interior six point cylindrical head bolt.
Preferably, the quadrangle of the substrate symmetrically opens up that there are four the screw holes that match with bolt.
Preferably, the both upper ends thereof of the substrate is symmetrically arranged with two handles.
Preferably, the upper external of two handles is arranged rubber sleeve.
Preferably, the substrate is ambroin substrate.
Compared with prior art, the utility model has the beneficial effects that
The utility model, toilet pre-buried operation carry out when, after first standpipe is positioned, by the pre-buried module board into
The position of this layer of each branch pipe direct-burried part of row is fixed, and ensure that the manifold size of identical every layer of house type toilet is consistent, is arranged for the later period
Good basis is laid in the processing of waterpipe producer scale, the installation of construction site assembled, is improving the quality control of engineering set aside pre-embedded
Under the premise of system, achieve the effect that identical toilet uniform sizes modularization is pre-buried, realizes later period drainage pipeline producer scale system
Make, the installation of construction site assembled, is worthy to be popularized and popularizes.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the front view of the utility model;
Fig. 3 is the right view of the utility model;
Fig. 4 is the partial top view of the utility model.
In figure: 1 substrate, 2 bolts, 3 nuts, 4 third circular through holes, 5 first circular through holes, 6 handles, 7 second circles are logical
Hole, 8 the 4th circular through holes, 9 the 5th circular through holes, 10 screw holes.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-4 is please referred to, the utility model provides a kind of technical solution: a kind of sleeve pipe pre-embedding module board, including substrate 1,
The inside left of the substrate 1 offers the first circular through hole 5, the bottom right for being internally located at the first circular through hole 5 of the substrate 1
Side offers the second circular through hole 7, and the right side for being internally located at the first circular through hole 5 of the substrate 1 offers third circle between two parties
Shape through-hole 4, the lower right for being internally located at third circular through hole 4 of the substrate 1 offer the 4th circular through hole 8, the substrate 1
The upper right side for being internally located at the 4th circular through hole 8 offer the 5th circular through hole 9, the internal diameter of first circular through hole 5 is small
In the internal diameter of the 4th circular through hole 8, the internal diameter of the 4th circular through hole 8 less than the second circular through hole 7 internal diameter, described second
The internal diameter of circular through hole 7 is equal to the internal diameter of third circular through hole 4, and it is round logical that the internal diameter of the 4th circular through hole 8 is equal to the 5th
The internal diameter in hole 9.
Specifically, the substrate 1 is square substrate, and the quadrangle of substrate 1 is symmetrically welded there are four nut 3, passes through setting
Four nuts 3 are easily installed four bolts 2.
Specifically, the inside of four nuts 3 is bolted with bolt 2, it, can be in the pre-buried module by the way that bolt 2 is arranged
When plate is bonded on concrete, by turning bolt 2, substrate 1 can be jacked up, be removed convenient for the pre-buried module board.
Specifically, the bolt 2 is interior six point cylindrical head bolt, which is convenient for pulling by interior hexagonal
Hand is operated.
Specifically, the quadrangle of the substrate 1 is symmetrically opened up there are four the screw hole 10 to match with bolt 2, by the way that spiral shell is arranged
Hole 10 is protruded into convenient for bolt 2.
Specifically, the both upper ends thereof of the substrate 1 is symmetrically arranged with two handles 6, lifted by two handles 6 of setting
Substrate 1.
Specifically, the upper external of two handles 6 is arranged rubber sleeve, which has preferable anti-skidding work
With.
Specifically, the substrate 1 is ambroin substrate, which can prevent the pre-buried module board conductive,
It avoids causing danger.
Working principle: toilet drainage pipeline is moved towards and sleeve position is drawn and determined by the sleeve pipe pre-embedding module board
Position is arranged by the ratio of 1:1 after the completion, draws position and the trend of each toilet direct-burried part of the first floor on substrate 1, and carry out essence
Quasi- aperture makes sleeve pipe pre-embedding module board, when toilet pre-buried operation is carried out, after first being positioned standpipe, by this module
The position that plate carries out this layer of each branch pipe direct-burried part is fixed, and ensure that the manifold size of identical every layer of house type toilet is consistent, after being
Good basis is laid in the processing of phase drainage pipeline producer scale, the installation of construction site assembled, is improving engineering set aside pre-embedded matter
Under the premise of amount control, achieve the effect that identical toilet uniform sizes modularization is pre-buried, realizes that later period drainage pipeline producer is fixed
Ruler production, the installation of construction site assembled, are worthy to be popularized and popularize
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (8)
1. a kind of sleeve pipe pre-embedding module board, including substrate (1), it is characterised in that: the inside left of the substrate (1) offers
The lower right for being internally located at the first circular through hole (5) of one circular through hole (5), the substrate (1) offers the second circular through hole
(7), the right side for being internally located at the first circular through hole (5) of the substrate (1) offers third circular through hole (4) between two parties, described
The lower right for being internally located at third circular through hole (4) of substrate (1) offers the 4th circular through hole (8), the substrate (1) it is interior
The upper right side that portion is located at the 4th circular through hole (8) offers the 5th circular through hole (9), the internal diameter of first circular through hole (5)
Less than the internal diameter of the 4th circular through hole (8), the internal diameter of the 4th circular through hole (8) less than the second circular through hole (7) internal diameter,
The internal diameter of second circular through hole (7) is equal to the internal diameter of third circular through hole (4), the internal diameter of the 4th circular through hole (8)
Equal to the internal diameter of the 5th circular through hole (9).
2. a kind of sleeve pipe pre-embedding module board according to claim 1, it is characterised in that: the substrate (1) is square substrate,
And the quadrangle of substrate (1) is symmetrically welded there are four nut (3).
3. a kind of sleeve pipe pre-embedding module board according to claim 2, it is characterised in that: the inside of four nuts (3)
It is bolted with bolt (2).
4. a kind of sleeve pipe pre-embedding module board according to claim 3, it is characterised in that: the bolt (2) is interior hexagonal circle
Stud bolt.
5. a kind of sleeve pipe pre-embedding module board according to claim 3, it is characterised in that: the quadrangle of the substrate (1) is symmetrical
The screw hole (10) to match there are four opening up with bolt (2).
6. a kind of sleeve pipe pre-embedding module board according to claim 1, it is characterised in that: the both upper ends thereof of the substrate (1)
It is symmetrically arranged with two handles (6).
7. a kind of sleeve pipe pre-embedding module board according to claim 6, it is characterised in that: the top of two handles (6)
Outside is arranged rubber sleeve.
8. a kind of sleeve pipe pre-embedding module board according to claim 1, it is characterised in that: the substrate (1) is ambroin
Substrate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820509271.3U CN208220208U (en) | 2018-04-11 | 2018-04-11 | A kind of sleeve pipe pre-embedding module board |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820509271.3U CN208220208U (en) | 2018-04-11 | 2018-04-11 | A kind of sleeve pipe pre-embedding module board |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208220208U true CN208220208U (en) | 2018-12-11 |
Family
ID=64514557
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820509271.3U Expired - Fee Related CN208220208U (en) | 2018-04-11 | 2018-04-11 | A kind of sleeve pipe pre-embedding module board |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208220208U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114800901A (en) * | 2022-05-07 | 2022-07-29 | 中建八局第二建设有限公司 | Assembled toilet positioning and hole-opening device and construction method |
-
2018
- 2018-04-11 CN CN201820509271.3U patent/CN208220208U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114800901A (en) * | 2022-05-07 | 2022-07-29 | 中建八局第二建设有限公司 | Assembled toilet positioning and hole-opening device and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205907645U (en) | Watering arm mechanism on watering lorry | |
CN208220208U (en) | A kind of sleeve pipe pre-embedding module board | |
CN103435245A (en) | In-situ chemical conditioning and vacuum preloading reduction method and conditioning device for landfill sludge | |
CN203175032U (en) | On-site pieced-up bamboo formwork assembly connecting piece and formwork assembly system thereof | |
CN112160214B (en) | Curb-based geotextile fixing device and mounting method | |
CN102179869B (en) | Pipe connection hole forming device for precast reinforced concrete inspection well mold | |
CN109822727B (en) | Split-type supported multi-layer platform die | |
CN207760881U (en) | Piping lane internal model lift adjustment support device | |
CN202021674U (en) | Adapter hole molding device for prefabricated reinforced concrete inspection well mold | |
CN2635736Y (en) | Shaping mould for manhole | |
CN204940484U (en) | A kind of easy structure manhole of finished product gutter | |
CN203888023U (en) | Outer mold of vertical vibrating pipe mold | |
CN206542144U (en) | A kind of prefabricated integrated line box building element | |
CN203223646U (en) | Tube well internal tube root blocking construction structure | |
CN208642128U (en) | A kind of construction dust falling device | |
CN205077871U (en) | Vertical template bottom anti -leakage , level -off integrated device | |
CN205024761U (en) | Back flush rainwater module bottom plate and module of catchmenting thereof | |
CN207032185U (en) | A kind of high-efficient irrigation coupling technique device based on full controlling channel system | |
CN218582539U (en) | Connecting device for construction of water supply and drainage pipeline | |
CN214597392U (en) | Civil engineering overflow weir device | |
CN201180309Y (en) | Metal threaded steel pipe inspection shaft | |
CN202416533U (en) | Multi-tube convergence inspection well with butt-jointed pipe top | |
CN220848080U (en) | Seepage-proofing structure of fertilizer production multi-layer workshop | |
CN205347166U (en) | Three manure pits of formatting | |
CN218711879U (en) | High-strength inorganic sand-based permeable stone |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181211 |
|
CF01 | Termination of patent right due to non-payment of annual fee |