CN203223646U - Tube well internal tube root blocking construction structure - Google Patents

Tube well internal tube root blocking construction structure Download PDF

Info

Publication number
CN203223646U
CN203223646U CN 201320242399 CN201320242399U CN203223646U CN 203223646 U CN203223646 U CN 203223646U CN 201320242399 CN201320242399 CN 201320242399 CN 201320242399 U CN201320242399 U CN 201320242399U CN 203223646 U CN203223646 U CN 203223646U
Authority
CN
China
Prior art keywords
rock wool
interlayer
tube
fender pier
pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320242399
Other languages
Chinese (zh)
Inventor
张继嵩
孟坚
史均社
任会民
贠晓明
刘琛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHAANXI CONSTRUCTION ENGINEERING GROUP EQUIPMENT INSTALLATION ENGINEERING Co
Original Assignee
SHAANXI CONSTRUCTION ENGINEERING GROUP EQUIPMENT INSTALLATION ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHAANXI CONSTRUCTION ENGINEERING GROUP EQUIPMENT INSTALLATION ENGINEERING Co filed Critical SHAANXI CONSTRUCTION ENGINEERING GROUP EQUIPMENT INSTALLATION ENGINEERING Co
Priority to CN 201320242399 priority Critical patent/CN203223646U/en
Application granted granted Critical
Publication of CN203223646U publication Critical patent/CN203223646U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a tube well internal tube root blocking construction structure which comprises a rock wool interlayer. The rock wool interlayer is formed by rock wool, the position between a tube to be blocked and a floor slab is densely filled with the rock wool, the floor slab is a cast-in-place slab, a preformed hole is formed in the floor slab, the tube to be blocked penetrates through the preformed hole from bottom to top, the preformed hole is a circular hole, the rock wool interlayer is a cylindrical interlayer, and the cylindrical interlayer is coaxially installed on the tube to be blocked in a sleeved mode. A fireproofing mud coating is arranged on the rock wool interlayer, the fireproofing mud coating is arranged right above the rock wool interlayer, and the transverse width of the fireproofing mud coating is the same as the layer thickness of the rock wool interlayer. A fender pier is arranged on the outer side of the rock wool interlayer, the fender pier is arranged on the floor slab, the upper surface of the fender pier is flush with the upper surface of the fireproofing mud coating, and the fireproofing mud coating is arranged between the tube to be blocked and the fender pier. The tube well internal tube root blocking construction structure is simple in structure, reasonable in design, easy and convenient to construct and operate, high in work efficiency, prone to guaranteeing the construction quality, capable of tightly blocking the root of each tube in a tube well and good in waterproof effect.

Description

Pipe well interior conduit root shutoff constructing structure
Technical field
The utility model belongs to tall building pipe well interior conduit root shutoff technical field of construction, especially relates to a kind of pipe well interior conduit root shutoff constructing structure.
Background technique
The pipe well positioned vertical is in underground water intaking or protect phreatic tubulose structure, and it is a kind of plumbing facility of industrial and agricultural production, city, traffic, national defense construction.In the Installation Work of High-Rise Building, pipe well is often because concentrated, of a great variety, the not of uniform size characteristics such as many of pipeline are the difficult points that Installation Work of High-Rise Building is constructed always.At present, unified, the standard of each pipeline root shutoff construction neither one and concrete method of construction can be followed in the pipe well, thereby have problems such as constructing operation is more random, lack of standardization, shutoff imprecision, waterproofing effect difference during practice of construction inevitably.Thereby, nowadays need a kind of simple in structure, reasonable in design, constructing operation is easy and construction quality is easy to control, construction effect is good pipe well interior conduit root shutoff constructing structure, can carry out tight shutoff, good water-proof effect to each pipeline root in the pipe well.
The model utility content
Technical problem to be solved in the utility model is at above-mentioned deficiency of the prior art, a kind of pipe well interior conduit root shutoff constructing structure is provided, it is simple in structure, reasonable in design and constructing operation is easy, work efficiency is high, construction quality is easy to guarantee, can carry out tight shutoff to each pipeline root in the pipe well, and good water-proof effect.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is: a kind of pipe well interior conduit root shutoff constructing structure, it is characterized in that: comprise by the closely knit rock wool interlayer that needs the rock wool between blocking pipe and the floor to form that is filled in, described floor is cast-in-place plate and has the preformed hole that the supply and demand blocking pipe passes from the bottom to top on it, described preformed hole is that circular hole and rock wool interlayer are cylindric interlayer, and described cylindric interlayer coaxial package is on the need blocking pipe; The upper height of described rock wool interlayer is higher than the upper level of floor, and the bed thickness of described rock wool interlayer is 20mm~30mm; Described rock wool interlayer is provided with the anti-chamotte coating of one deck, described anti-chamotte coated fabric be located at the rock wool interlayer directly over, and the horizontal width of described anti-chamotte coating is identical with the bed thickness of rock wool interlayer; Described rock wool interlayer arranged outside has fender pier, and fender pier is laid on the floor, and the upper surface of described fender pier is mutually concordant with the upper surface of anti-chamotte coating, and anti-chamotte coated fabric is located at and needs between blocking pipe and the fender pier.
Above-mentioned pipe well interior conduit root shutoff constructing structure, it is characterized in that: the shape of cross section of described fender pier is ring.
Above-mentioned pipe well interior conduit root shutoff constructing structure, it is characterized in that: the vertical height of described fender pier is not less than 50mm.
Above-mentioned pipe well interior conduit root shutoff constructing structure, it is characterized in that: described fender pier is concrete pier, evenly is coated with on the upper surface of described concrete pier and the outer side wall and is brushed with one deck cement sand bed.
Above-mentioned pipe well interior conduit root shutoff constructing structure, it is characterized in that: the vertical height of described fender pier is 50mm~100mm.
Above-mentioned pipe well interior conduit root shutoff constructing structure, it is characterized in that: the thickness of described fender pier is 50mm~80mm.
Above-mentioned pipe well interior conduit root shutoff constructing structure, it is characterized in that: ring is equipped with in the bottom of described rock wool interlayer, described ring is sleeved on to be needed on the blocking pipe, and ring is laid in and needs between blocking pipe and the floor, and the bottom level of described ring is not higher than the bottom level of floor.
The utility model compared with prior art has the following advantages:
1, simple in structure and reasonable in design, it is lower to drop into construction cost, and used construction equipment is few.
2, method of construction is simple, operation is simple and easy and it is convenient to realize.
3, work efficiency height, construction quality be easy to guarantee and construction effect good, can carry out tight shutoff to each pipeline root in the pipe well, and waterproofing effect is very good.
In sum, the utility model is simple in structure, reasonable in design and constructing operation is easy, work efficiency is high, construction quality is easy to guarantee, can carry out tight shutoff to each pipeline root in the pipe well.
Below by drawings and Examples, the technical solution of the utility model is described in further detail.
Description of drawings
Fig. 1 is structural representation of the present utility model.
Description of reference numerals:
1-need blocking pipe; 2-floor; 3-rock wool interlayer;
4-anti-chamotte coating; 5-fender pier; 6-ring.
Embodiment
As shown in Figure 1, the utility model comprises by the closely knit rock wool interlayer 3 that needs the rock wool between blocking pipe 1 and the floor 2 to form that is filled in, described floor 2 is for cast-in-place plate and have the preformed hole that supply and demand blocking pipe 1 passes from the bottom to top on it, described preformed hole is that circular hole and rock wool interlayer 3 are cylindric interlayer, and described cylindric interlayer coaxial package is on need blocking pipe 1.The upper height of described rock wool interlayer 3 is higher than the upper level of floor 2, and the bed thickness of described rock wool interlayer 3 is 20mm~30mm; Described rock wool interlayer 3 is provided with the anti-chamotte coating 4 of one deck, described anti-chamotte coating 4 be laid in rock wool interlayer 3 directly over, and the horizontal width of described anti-chamotte coating 4 is identical with the bed thickness of rock wool interlayer 3.Described rock wool interlayer 3 arranged outside have fender pier 5, and fender pier 5 is laid on the floor 2, and the upper surface of described fender pier 5 is mutually concordant with the upper surface of anti-chamotte coating 4, and anti-chamotte coating 4 is laid in and needs between blocking pipe 1 and the fender pier 5.
In the present embodiment, the shape of cross section of described fender pier 5 is ring.
During practice of construction, the vertical height of described fender pier 5 is not less than 50mm.
In the present embodiment, the vertical height of described fender pier 5 is 50mm~100mm.The thickness of described fender pier 5 is 50mm~80mm.In the practice of construction process, can be according to concrete needs, vertical height and the thickness of fender pier 5 is adjusted accordingly.
In the present embodiment, described fender pier 5 is concrete pier, evenly is coated with on the upper surface of described concrete pier and the outer side wall and is brushed with one deck cement sand bed.
In the present embodiment, ring 6 is equipped with in the bottom of described rock wool interlayer 3, and described ring 6 is sleeved on to be needed on the blocking pipe 1, and ring 6 is laid in and needs between blocking pipe 1 and the floor 2, and the bottom level of described ring 6 is not higher than the bottom level of floor 2.
The above; it only is preferred embodiment of the present utility model; be not that the utility model is imposed any restrictions; every any simple modification, change and equivalent structure of above embodiment being done according to the utility model technical spirit changes, and all still belongs in the protection domain of technical solutions of the utility model.

Claims (7)

1. pipe well interior conduit root shutoff constructing structure, it is characterized in that: comprise by the closely knit rock wool interlayer (3) that needs the rock wool between blocking pipe (1) and the floor (2) to form that is filled in, described floor (2) is for cast-in-place plate and have the preformed hole that supply and demand blocking pipe (1) passes from the bottom to top on it, described preformed hole is that circular hole and rock wool interlayer (3) are cylindric interlayer, and described cylindric interlayer coaxial package is on need blocking pipe (1); The upper height of described rock wool interlayer (3) is higher than the upper level of floor (2), and the bed thickness of described rock wool interlayer (3) is 20mm~30mm; Described rock wool interlayer (3) is provided with the anti-chamotte coating (4) of one deck, described anti-chamotte coating (4) be laid in rock wool interlayer (3) directly over, and the horizontal width of described anti-chamotte coating (4) is identical with the bed thickness of rock wool interlayer (3); Described rock wool interlayer (3) arranged outside has fender pier (5), and fender pier (5) is laid on the floor (2), the upper surface of described fender pier (5) is mutually concordant with the upper surface of anti-chamotte coating (4), and anti-chamotte coating (4) is laid between need blocking pipe (1) and the fender pier (5).
2. according to the described pipe well interior conduit of claim 1 root shutoff constructing structure, it is characterized in that: the shape of cross section of described fender pier (5) is ring.
3. according to claim 1 or 2 described pipe well interior conduit root shutoff constructing structures, it is characterized in that: the vertical height of described fender pier (5) is not less than 50mm.
4. according to the described pipe well interior conduit of claim 2 root shutoff constructing structure, it is characterized in that: described fender pier (5) is concrete pier, evenly is coated with on the upper surface of described concrete pier and the outer side wall and is brushed with one deck cement sand bed.
5. according to the described pipe well interior conduit of claim 3 root shutoff constructing structure, it is characterized in that: the vertical height of described fender pier (5) is 50mm~100mm.
6. according to claim 1 or 2 described pipe well interior conduit root shutoff constructing structures, it is characterized in that: the thickness of described fender pier (5) is 50mm~80mm.
7. according to claim 1 or 2 described pipe well interior conduit root shutoff constructing structures, it is characterized in that: ring (6) is equipped with in the bottom of described rock wool interlayer (3), described ring (6) is sleeved on to be needed on the blocking pipe (1), and ring (6) is laid in to be needed between blocking pipe (1) and the floor (2), and the bottom level of described ring (6) is not higher than the bottom level of floor (2).
CN 201320242399 2013-05-07 2013-05-07 Tube well internal tube root blocking construction structure Expired - Fee Related CN203223646U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320242399 CN203223646U (en) 2013-05-07 2013-05-07 Tube well internal tube root blocking construction structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320242399 CN203223646U (en) 2013-05-07 2013-05-07 Tube well internal tube root blocking construction structure

Publications (1)

Publication Number Publication Date
CN203223646U true CN203223646U (en) 2013-10-02

Family

ID=49250650

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320242399 Expired - Fee Related CN203223646U (en) 2013-05-07 2013-05-07 Tube well internal tube root blocking construction structure

Country Status (1)

Country Link
CN (1) CN203223646U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105673933A (en) * 2015-12-31 2016-06-15 中交第二航务工程局有限公司 Waterproof sealing device for post-through-wall pipeline and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105673933A (en) * 2015-12-31 2016-06-15 中交第二航务工程局有限公司 Waterproof sealing device for post-through-wall pipeline and construction method

Similar Documents

Publication Publication Date Title
CN103205979A (en) Method for constructing large raft foundation under high temperature
CN201722797U (en) Bathroom floor drain waterproof node
CN104420480B (en) The method for arranging of Collapsible Loess District comprehensive pipe network and structure
WO2012136012A1 (en) Assembled mud-rock flow debris dam and construction method thereof
CN103242009B (en) A kind of abutment infiltration material non-fine concrete block and manufacture craft thereof
CN203215093U (en) Wearing floor water retaining platform and blockage construction structure of electric shaft bridge
CN204826447U (en) Collapsible loess area underground garage planting roof seeps water to get rid of and uses drainage structures
CN203188225U (en) Novel dewatering-well sealing structure
CN203223646U (en) Tube well internal tube root blocking construction structure
CN204608830U (en) Novel underground pipe gallery
CN103205986A (en) Concrete raft foundation construction-joint grouting device and construction method
CN205205844U (en) Member is used in construction of tubular well precipitation in elevator foundation ditch or sump pit
CN106498981A (en) A kind of brick type municipal administration comprehensive pipeline passage and its construction method
CN203701217U (en) Secondary drainage leak-proof structure of bathroom
CN103374915B (en) Continuous closed hanging-upside-down shotcreting supporting system and construction method thereof
CN203441108U (en) Fulgurite threaded constructing structure in reinforced concrete lintel
CN105696543A (en) Dam front drainage method for sub-dam building in red mud stacking area
CN204940484U (en) A kind of easy structure manhole of finished product gutter
CN203066077U (en) Water burst hole grouting sealing device
CN203307785U (en) Buried pressure pipe exterior drainage structure of hydropower station
CN109235439B (en) Hydropower engineering volute casing large-volume concrete pressure-maintaining pouring method wrapped below waist line
CN202574148U (en) Water mist type automatic car washing platform
CN201420394Y (en) Die for making pipeline reserved holes
CN205314491U (en) Basement bottom plate terrace with rubble drainage layer
CN201915423U (en) Inspection well ring port seat and inspection well with same

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131002

Termination date: 20170507

CF01 Termination of patent right due to non-payment of annual fee