CN203175032U - On-site pieced-up bamboo formwork assembly connecting piece and formwork assembly system thereof - Google Patents
On-site pieced-up bamboo formwork assembly connecting piece and formwork assembly system thereof Download PDFInfo
- Publication number
- CN203175032U CN203175032U CN 201320175671 CN201320175671U CN203175032U CN 203175032 U CN203175032 U CN 203175032U CN 201320175671 CN201320175671 CN 201320175671 CN 201320175671 U CN201320175671 U CN 201320175671U CN 203175032 U CN203175032 U CN 203175032U
- Authority
- CN
- China
- Prior art keywords
- formwork
- screw rod
- template
- pieced
- bamboo
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model discloses an on-site pieced-up bamboo formwork assembly connecting piece and a formwork assembly system thereof. The formwork assembly system applying the on-site pieced-up bamboo formwork assembly connecting piece comprises panels, longitudinal keels and heels, wherein the keels are fixedly arranged on the back faces of the panels; the heels are fixed perpendicular to the keels by connecting pieces. An integral formwork combined by arranging the panels in sequence is provided with a plurality of evenly arranged holes in a horizontal direction and a longitudinal direction; screws of the connecting pieces pass through the holes by the front face of the formwork; and upper and lower sides of each row of screws are abutted with one heel and are buckled by butterfly clasps, and are fixed by nuts fastened at the outer sides of the butterfly clasps. The assembly connecting piece disclosed by the utility model consists of the screws, end steel plates, the butterfly clasps and the nuts. The assembly connecting piece is simple in structure and is convenient to use. The pieced-up bamboo panels are formed into the large-area integral formwork, and hoisting transportation is performed after the assembly system is formed, and therefore, the use ratio, the work efficiency and the formwork turnover rate of a hoisting machine are improved. Moreover, the construction quality is ensured, and the mud leakage risk at seams of the formwork and the slab staggering risk of the formwork are reduced. The on-site pieced-up bamboo formwork assembly connecting piece and the formwork assembly system thereof can be widely applied to on-site pieced-up bamboo formwork assembly.
Description
Technical field
The utility model relates to a kind of template linkage and package system thereof.
Background technology
At present, the on-the-spot assembly bamboo wooden form that looses of concrete structure is to be formed by Screw arbor with nut at both-ends is fastening by panel, vertical lumps of wood keel, horizontal steel tube back cord, with form surfacing and the stickfast of lumps of wood keel, determine the arrangement pitch of the stupefied and Screw arbor with nut at both-ends of steel pipe master according to mechanics parameters such as wall height, wall thickness and concreting speed.But, the on-the-spot assembly bamboo wooden form that looses needs to install and remove repeatedly in engineering construction, cause damaged template, turnover rate to reduce easily, and the small size template is lifted by crane piecewise, reduce the handling efficient of vertical transport equipment, in the template assembly process, phenomenons such as slit, faulting of slab ends appear in edge joint position easily, thereby cause concrete spillage problem.
The utility model content
The purpose of this utility model provides a kind of scene and loose to piece together bamboo wooden form assembling connector and template group assembling system thereof, solve on-the-spot loose piece together bamboo wooden form turnover rate low, lift by crane inefficient technical problem piecewise; And the problem of the easy slit of solution on-site consolidation faulting of slab ends.
For achieving the above object, the utility model adopts following technical scheme:
Bamboo wooden form assembling connector loose is pieced together at a kind of scene, comprises screw rod and securing member, and it is characterized in that: an end of described screw rod is welded with a foursquare termination steel plate, and described securing member comprises that the chevron of passing screw rod buckles and be fastened on the nut outside that the mountain type is buckled.
Described termination surface of steel plate has rustproof paint, has the hole that cooperates with screw diameter on the steel plate of termination, and it is concordant with termination steel plate lateral surface that described screw rod passes hole, is connected and fixed by the full penetration weldering.
A kind of diffusing template group assembling system of piecing together bamboo wooden form assembling connector in described scene of using, comprise panel, be fixed on the keel longitudinally of back side of panel, and the back cord of the level of settling perpendicular to keel, the monoblock template that is combined by some panels, at the horizontal and vertical some holes of evenly arranging that have, the screw rod of described connector passes hole by the front of template, hole on every panel is no less than two, on every row's screw rod, respectively there is a back cord on following both sides, two back cords are buckled buckle by the mountain type, and buckle nut outside and fix by being fastened on the mountain type.
Between the slit of described screw rod and template weather strip is arranged, the inwall of the hole on the described template has edge sealing paint.
Compared with prior art the utlity model has following characteristics and beneficial effect:
The utility model has overcome conventional on-site and has loose assembly bamboo wooden form owing to repeated disassembled and assembled, the easy shortcoming that influences turnover rate of damaging, and has solved the technical problem that improves efficiency of construction, assurance construction quality.
The assembling connector that designs in the utility model is by screw rod, the termination steel plate, chevron button and nut are formed, simple in structure, easy to use, utilize the assembling connector to loose to piece together the bamboo wooden boards and be assembled into whole large-area template, form package system and lift by crane transportation again, reduced the manpower consumption amount in the work progress, improved the utilization rate of lifting appliance, accelerating construction progress, simultaneously, owing to be integral assembling construction, avoided improving form cycling rate owing to be that monolithic panel is constructed and disrepair phenomenon that repeated disassembled and assembled causes piecewise, save cost, and more can guarantee construction quality, reduced template edge joint position spillage, the risk of template faulting of slab ends.
The utility model can be widely used in on-the-spot loosing and piece together the assembling of bamboo wooden form.
Description of drawings
The utility model is described in more detail below in conjunction with accompanying drawing.
Fig. 1 is the structural representation of the utility model connector.
Fig. 2 is that the structure master of the utility model connector looks schematic diagram.
Fig. 3 is the structural representation of the utility model package system.
Fig. 4 is that the structure master of the utility model package system looks schematic diagram.
Reference numeral: 1-termination steel plate, 2-screw rod, 3-chevron button, 4-nut, 5-keel, 6-template, 7-back cord.
The specific embodiment
Embodiment is referring to Fig. 1, shown in Figure 2, loose and piece together bamboo wooden form assembling connector in a kind of scene, comprise screw rod and securing member, one end of described screw rod 2 is welded with a foursquare termination steel plate 1, there is rustproof paint on steel plate 1 surface, described termination, termination steel plate 1 with screw rod welding before have the hole that cooperates with screw diameter, it is concordant with termination steel plate lateral surface that described screw rod 2 passes hole, both are connected and fixed by the full penetration weldering, described securing member comprises that the chevron of passing screw rod buckles 3 and be fastened on the nut outside 4 that the mountain type is buckled, it is supporting that the selecting for use of described chevron button 3 and nut 4 should be considered with the screw rod specification, and can satisfy assembling and finish the back large form and lift by crane required mechanics requirement.
Referring to shown in Figure 3, a kind of diffusing template group assembling system of piecing together bamboo wooden form assembling connector in described scene of using, comprise panel, be fixed on the keel longitudinally 5 of back side of panel, and the back cord 7 of the level of settling perpendicular to keel 5, should shift to an earlier date the processing and fabricating moulding according to the building moulding before the described panel assembly unit, two-sided lumps of wood keel and the stickfast of scraping of the vertical placement of back side of panel, the monoblock template 6 that is combined by some panels, at the horizontal and vertical some holes of evenly arranging that have, the screw rod 2 of described connector passes hole by the front of template, on every row's screw rod, respectively there is a back cord 7 on following both sides, two back cords 7 are buckled 3 buckles by the mountain type, and by being fastened on the mountain type to buckle nut outside 4 fixing, between the slit of described screw rod and template weather strip is arranged, it is tight namely to clog the sponge strip shutoff assembling is finished after, the inwall of the hole on the described template is brushed with the edge sealing paint shutoff, prevents that limit, hole chance water logging bubble from causing mashed limit or damaging eyelet.
Referring to shown in Figure 4, press the machine-shaping of building shape and size row plate, each panel splicing closely forms integral mold plate 6, for guaranteeing that each loose to piece together bamboo wooden boards and closely be assembled into integral mold plate 6, the connector that uses on every panel should not be less than 2, and the termination steel plate 1 of connector is brushed with rustproof paint, be close to template 6 fronts, before template is installed, equal brushing release agent on termination steel plate 1 and the form surfacing 6, and clean out.
Claims (4)
1. loose and piece together bamboo wooden form assembling connector in a scene, comprise screw rod and securing member, it is characterized in that: an end of described screw rod (2) is welded with a foursquare termination steel plate (1), and described securing member comprises that the chevron of passing screw rod buckles (3) and be fastened on the nut outside (4) that the mountain type is buckled.
2. loose and piece together bamboo wooden form assembling connector in scene according to claim 1, it is characterized in that: there is rustproof paint on described termination steel plate (1) surface, the termination steel plate has the hole that cooperates with screw diameter on (1), it is concordant with termination steel plate lateral surface that described screw rod (2) passes hole, is connected and fixed by the full penetration weldering.
3. loose and piece together the template group assembling system of bamboo wooden form assembling connector in the described scene of one of application rights requirement 1 to 2, comprise panel, be fixed on the keel longitudinally (5) of back side of panel, and the back cord (7) of the level of settling perpendicular to keel (5), it is characterized in that: the monoblock template (6) that is combined by some panels, at the horizontal and vertical some holes of evenly arranging that have, hole on every panel is no less than two, the screw rod of described connector (2) passes hole by the front of template, on every row's screw rod, respectively there is a back cord (7) on following both sides, two back cords (7) are buckled (3) buckle by the mountain type, and to buckle nut outside (4) fixing by being fastened on the mountain type.
4. template group assembling system according to claim 3, it is characterized in that: between the slit of described screw rod and template weather strip is arranged, the inwall of the hole on the described template has edge sealing paint.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320175671 CN203175032U (en) | 2013-04-10 | 2013-04-10 | On-site pieced-up bamboo formwork assembly connecting piece and formwork assembly system thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320175671 CN203175032U (en) | 2013-04-10 | 2013-04-10 | On-site pieced-up bamboo formwork assembly connecting piece and formwork assembly system thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203175032U true CN203175032U (en) | 2013-09-04 |
Family
ID=49071756
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320175671 Expired - Fee Related CN203175032U (en) | 2013-04-10 | 2013-04-10 | On-site pieced-up bamboo formwork assembly connecting piece and formwork assembly system thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203175032U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105155842A (en) * | 2015-08-12 | 2015-12-16 | 江苏省苏中建设集团股份有限公司 | Fixture for buildings |
CN107386643A (en) * | 2017-07-24 | 2017-11-24 | 黄金兴 | A kind of template periphery bracing means |
CN107558731A (en) * | 2017-09-29 | 2018-01-09 | 上海宝冶集团有限公司 | Beams of concrete side template it is non-to pull-type screw bolt reinforcing structure and construction method |
CN108060774A (en) * | 2017-11-21 | 2018-05-22 | 上海建工五建集团有限公司 | Exempt from punch template system and its construction method |
CN109826103A (en) * | 2019-03-19 | 2019-05-31 | 中国十七冶集团有限公司 | A kind of cast-in-situ box girder bamboo slab rubber and splicing reinforcement means |
CN109868923A (en) * | 2019-03-11 | 2019-06-11 | 深圳市建工集团股份有限公司 | One kind, which dissipates, spells plank sheathing exposed concrete construction method |
-
2013
- 2013-04-10 CN CN 201320175671 patent/CN203175032U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105155842A (en) * | 2015-08-12 | 2015-12-16 | 江苏省苏中建设集团股份有限公司 | Fixture for buildings |
CN107386643A (en) * | 2017-07-24 | 2017-11-24 | 黄金兴 | A kind of template periphery bracing means |
CN107558731A (en) * | 2017-09-29 | 2018-01-09 | 上海宝冶集团有限公司 | Beams of concrete side template it is non-to pull-type screw bolt reinforcing structure and construction method |
CN108060774A (en) * | 2017-11-21 | 2018-05-22 | 上海建工五建集团有限公司 | Exempt from punch template system and its construction method |
CN109868923A (en) * | 2019-03-11 | 2019-06-11 | 深圳市建工集团股份有限公司 | One kind, which dissipates, spells plank sheathing exposed concrete construction method |
CN109826103A (en) * | 2019-03-19 | 2019-05-31 | 中国十七冶集团有限公司 | A kind of cast-in-situ box girder bamboo slab rubber and splicing reinforcement means |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203175032U (en) | On-site pieced-up bamboo formwork assembly connecting piece and formwork assembly system thereof | |
CN201972286U (en) | Combined wood floor cover | |
CN206784924U (en) | A kind of combined type structure post steel form | |
CN203238548U (en) | Concrete pier template device | |
CN205219364U (en) | Concrete core appearance terminal surface is mended paper -back edition and is put | |
CN201972395U (en) | Steel-frame double-layer-net building template | |
CN202055342U (en) | Connecting component for connecting composite plate wall surface with roof surface | |
CN2367688Y (en) | Formboard of steel-frame plastic plate | |
CN203924694U (en) | Biogas charging and discharging pond die special for concrete | |
CN204112736U (en) | Formwork steel wooden construction back cord linkage | |
CN204850188U (en) | One -way superimposed sheet piece connection structure | |
CN201883534U (en) | Rotatable fixing clamp element | |
CN204491507U (en) | A kind of hydraulic engineering template | |
CN204645643U (en) | A kind of novel without perforation Screw arbor with nut at both-ends structure | |
CN203514776U (en) | L-shaped formwork for combined aluminum alloy formwork | |
CN105332451B (en) | A kind of external wall disassembly-free thermal-insulation form board | |
CN204252329U (en) | Masonry and post steel tie pre-embedded steel slab support | |
CN204940224U (en) | A kind of pre-embedded steel slab being applicable to wooden model | |
CN203411986U (en) | Combined house foundation | |
CN206667744U (en) | A kind of basement roof post-cast strip side template support system | |
CN202899552U (en) | Ground coated stone installation structure | |
CN202380715U (en) | Formed steel frame combined fabricated formwork | |
CN203669357U (en) | High-strength parapet formwork | |
CN204040460U (en) | One is exempted from hacking concrete slab and is built device | |
CN203924708U (en) | The vertical plugging structure in a kind of concrete wall ater-casting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130904 Termination date: 20140410 |