CN208201938U - A kind of prefabricated post-cast strip cover board of bottom plate - Google Patents

A kind of prefabricated post-cast strip cover board of bottom plate Download PDF

Info

Publication number
CN208201938U
CN208201938U CN201820508847.4U CN201820508847U CN208201938U CN 208201938 U CN208201938 U CN 208201938U CN 201820508847 U CN201820508847 U CN 201820508847U CN 208201938 U CN208201938 U CN 208201938U
Authority
CN
China
Prior art keywords
post
steel plate
cover board
cast strip
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820508847.4U
Other languages
Chinese (zh)
Inventor
树文韬
井洪勇
祝超
郁永星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201820508847.4U priority Critical patent/CN208201938U/en
Application granted granted Critical
Publication of CN208201938U publication Critical patent/CN208201938U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of prefabricated post-cast strip cover boards of bottom plate, including raft board post poured band, the lower end of the raft board post poured band is provided with stiffener concrete floor, prefabricated cover board is provided with above the stiffener concrete floor, reserved steel plate is provided on the outside of the prefabricated cover board, steel plate for sealing water is provided on the outside of the reserved steel plate, it is welded between the steel plate for sealing water and reserved steel plate, and microdilatancy water-proof concrete has been poured between steel plate for sealing water and reserved steel plate, the surface of the prefabricated cover board is provided with multiple suspension hooks;The prefabricated post-cast strip cover board of the bottom plate, post-cast strip side form can be simplified and install difficulty, the rubbish in post-cast strip can easily be cleared up, the intermediate steel plate for sealing water that omits installs problem, Groundwater formation penetrating passage is prevented, effectively post-cast strip is prevented to seep water, saves and clears up recruitment in post-cast strip, raft plate infiltration common quality defect is avoided, guarantees that structure sufficiently discharges internal force before closing.

Description

A kind of prefabricated post-cast strip cover board of bottom plate
Technical field
The utility model relates to technical field of buildings, specially a kind of prefabricated post-cast strip cover board of bottom plate.
Background technique
In recent years, with the development of building trade, Super High, super large scale of construction public works are more and more, post-cast strip Using more and more extensive.The especially raft board post poured band of basement, almost all of heavy construction are configured lower raft plate Post-cast strip, and post-cast strip setting length, supporting module difficulty is big, often has spillage running pulp phenomenon, should not clear up after concrete setting, It spends a large amount of artificial effects unobvious, causes infiltration hidden danger.Now in the construction process the construction of post-cast strip as a key Control point, but effect is unobvious, and still there is the phenomenon that seeps water in most engineerings, and it is particularly important to improve late poured band structure construction thus.
Utility model content
The purpose of this utility model is to provide a kind of prefabricated post-cast strip cover boards of bottom plate, to solve to mention in above-mentioned background technique Out the problem of.
To achieve the above object, the utility model provides the following technical solutions: a kind of prefabricated post-cast strip cover board of bottom plate, including Raft board post poured band, the lower end of the raft board post poured band are provided with stiffener concrete floor, the stiffener concrete building It is provided with prefabricated cover board above plate, reserved steel plate is provided on the outside of the prefabricated cover board, is set on the outside of the reserved steel plate It is equipped with steel plate for sealing water, is welded between the steel plate for sealing water and reserved steel plate, and is poured between steel plate for sealing water and reserved steel plate There is microdilatancy water-proof concrete, the surface of the prefabricated cover board is provided with multiple suspension hooks.
Preferably, the both sides of the stiffener concrete floor are 20cm longer than the both sides of raft board post poured band.
Preferably, the steel plate for sealing water segmentation indwelling diameter in the prefabricated cover board is not less than the mouth that vibrates of 5cm.
Preferably, the suspension hook is symmetrically arranged with four groups on prefabricated cover board.
Compared with prior art, the utility model has the beneficial effects that the structure design of the utility model is reasonable, the bottom plate is pre- Post-cast strip cover board processed can simplify post-cast strip side form and install difficulty, can easily clear up the rubbish in post-cast strip, omit centre Steel plate for sealing water installs problem, prevents Groundwater formation penetrating passage, effectively post-cast strip is prevented to seep water, and saves to clear up in post-cast strip and use Work avoids raft plate infiltration common quality defect, guarantees that structure sufficiently discharges internal force before closing.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the prefabricated cover plate schematic diagram of the utility model.
In figure: raft board post poured band 1, reserved steel plate 3, steel plate for sealing water 4, microdilatancy water-proof concrete 5, is reinforced prefabricated cover board 2 Reinforced concrete floor 6, suspension hook 7, vibrate mouth 8.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
The utility model provides a kind of technical solution referring to FIG. 1-2: a kind of prefabricated post-cast strip cover board of bottom plate, including raft Board post poured band 1, the lower end of raft board post poured band 1 are provided with stiffener concrete floor 6, and the two of stiffener concrete floor 6 While 20cm longer than the both sides of raft board post poured band 1, the top of stiffener concrete floor 6 is provided with prefabricated cover board 2, preform lid The outside of plate 2 is provided with reserved steel plate 3, and the outside of reserved steel plate 3 is provided with steel plate for sealing water 4, steel plate for sealing water 4 and reserved steel plate 3 Between be welded, and microdilatancy water-proof concrete 5 has been poured between steel plate for sealing water 4 and reserved steel plate 3, the table of prefabricated cover board 2 Face is provided with multiple suspension hooks 7, and suspension hook 7 is symmetrically arranged with four groups on prefabricated cover board 2, and the steel plate for sealing water 4 in prefabricated cover board 2 is segmented Indwelling diameter is not less than the mouth 8 that vibrates of 5cm;After the completion of the construction of post-cast strip waterproof protective layer, poured after in advance before construction of bottom plates Stiffener concrete slab 6 is poured in band range, then construction waterproof and two sides bottom plate, after bottom plate Equalsettlement, after cleaning The rubbish ponding in band is poured, prefabricated cover board 2 is transported to post-cast strip position, the welding of steel plate for sealing water 4 is carried out, after the completion of welding, pours Microdilatancy water-proof concrete 5 is built, it is ensured that concrete compaction, finally receives face maintenance when pouring microdilatancy water-proof concrete 5;It can It simplifying post-cast strip side form and installs difficulty, can easily clear up the rubbish in post-cast strip, the intermediate steel plate for sealing water that omits installs problem, Groundwater formation penetrating passage is prevented, it is effective that post-cast strip is prevented to seep water, it saves and clears up recruitment in post-cast strip, avoid raft plate infiltration matter Common fault is measured, guarantees that structure sufficiently discharges internal force before closing.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (4)

1. a kind of prefabricated post-cast strip cover board of bottom plate, including raft board post poured band (1), it is characterised in that: the raft board post poured band (1) Lower end is provided with stiffener concrete floor (6), is provided with prefabricated cover board above the stiffener concrete floor (6) (2), it is provided with reserved steel plate (3) on the outside of the prefabricated cover board (2), is provided with water-stopping steel on the outside of the reserved steel plate (3) Plate (4) is welded between the steel plate for sealing water (4) and reserved steel plate (3), and between steel plate for sealing water (4) and reserved steel plate (3) It has poured microdilatancy water-proof concrete (5), the surface of the prefabricated cover board (2) is provided with multiple suspension hooks (7).
2. the prefabricated post-cast strip cover board of a kind of bottom plate according to claim 1, it is characterised in that: the stiffener concrete The both sides of floor (6) are 20cm longer than the both sides of raft board post poured band (1).
3. the prefabricated post-cast strip cover board of a kind of bottom plate according to claim 1, it is characterised in that: in the prefabricated cover board (2) Steel plate for sealing water (4) segmentation indwelling diameter be not less than 5cm the mouth that vibrates (8).
4. the prefabricated post-cast strip cover board of a kind of bottom plate according to claim 1, it is characterised in that: the suspension hook (7) is prefabricated Cover board is symmetrically arranged with four groups on (2).
CN201820508847.4U 2018-04-11 2018-04-11 A kind of prefabricated post-cast strip cover board of bottom plate Expired - Fee Related CN208201938U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820508847.4U CN208201938U (en) 2018-04-11 2018-04-11 A kind of prefabricated post-cast strip cover board of bottom plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820508847.4U CN208201938U (en) 2018-04-11 2018-04-11 A kind of prefabricated post-cast strip cover board of bottom plate

Publications (1)

Publication Number Publication Date
CN208201938U true CN208201938U (en) 2018-12-07

Family

ID=64526195

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820508847.4U Expired - Fee Related CN208201938U (en) 2018-04-11 2018-04-11 A kind of prefabricated post-cast strip cover board of bottom plate

Country Status (1)

Country Link
CN (1) CN208201938U (en)

Similar Documents

Publication Publication Date Title
CN208167956U (en) A kind of basement inwall using reverse construction
CN201738479U (en) Roof expansion joint integrated cover plate waterproof structure
CN201581510U (en) Advanced water-stop post-pouring belt of foundation slab
CN208668596U (en) A kind of reinforced concrete girder slab system and prefabricated post assembly node
CN109930625A (en) A kind of tower crane and its construction method
CN102367735B (en) Back-to-back waterstop installation equipment for tunnel construction joint
CN209538214U (en) A kind of late poured band structure of outer wall of basement
CN210713517U (en) Assembled superposed beam structure
CN2921135Y (en) Special concrete crack induction strip for concrete construction joint
CN209482709U (en) A kind of in-situ concrete wall subsiding crack typified form
CN207633546U (en) Toilet concrete sealing prefabricated components
CN213174773U (en) Support system is exempted from to tear open type post-cast strip structure
CN201473974U (en) Novel steel plate water stopper
CN208201938U (en) A kind of prefabricated post-cast strip cover board of bottom plate
CN204690801U (en) Formwork erecting structure is hung in basement roof ater-casting
CN105019656B (en) Construction method for floor system concrete post-cast strip suspended formwork
CN206346308U (en) A kind of construction for facilitating structure base slab post-cast strip to clear up
CN108385981A (en) A kind of outdoor basement roof post-cast strip anti-seepage construction method
CN207878931U (en) A kind of outer wall opening fill assembly
CN210194691U (en) Protective structure for post-cast strip of settlement of basic raft
CN210342002U (en) Basement raft board seepage processing structure
CN212582925U (en) Water retaining ridge antiseep system between kitchen and bathroom
CN204982972U (en) Post -pouring tape
CN218292046U (en) Leading stagnant water knapsack inflation strengthening band
CN104195949B (en) A kind of baffle plate for gap bottom shutoff guardrail link plate and using method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181207

CF01 Termination of patent right due to non-payment of annual fee