CN208169063U - A kind of flexible frock of big MW class wind turbine group performance test - Google Patents

A kind of flexible frock of big MW class wind turbine group performance test Download PDF

Info

Publication number
CN208169063U
CN208169063U CN201820210559.0U CN201820210559U CN208169063U CN 208169063 U CN208169063 U CN 208169063U CN 201820210559 U CN201820210559 U CN 201820210559U CN 208169063 U CN208169063 U CN 208169063U
Authority
CN
China
Prior art keywords
wind turbine
connecting flange
big
turbine group
class wind
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820210559.0U
Other languages
Chinese (zh)
Inventor
李德水
危志全
黄成彦
刘卫
陈艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MingYang Smart Energy Group Co Ltd
Original Assignee
MingYang Smart Energy Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MingYang Smart Energy Group Co Ltd filed Critical MingYang Smart Energy Group Co Ltd
Priority to CN201820210559.0U priority Critical patent/CN208169063U/en
Application granted granted Critical
Publication of CN208169063U publication Critical patent/CN208169063U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Wind Motors (AREA)

Abstract

The utility model discloses a kind of flexible frocks of big MW class wind turbine group performance test,The first connecting flange including being configured with the first connection studs,It is configured with the second connecting flange of the second connection studs,Rope,First connecting flange is connect by the first connection studs with the main shaft of big MW class wind turbine group,Second connecting flange is connect by the second connection studs with the main shaft of small MW class wind turbine group,First connecting flange,Second connecting flange is opposed in opposite directions,And both opposite one side is arranged with multiple lifting lugs,First connecting flange and the second connecting flange are attached in such a way that rope winds lifting lug,And the main shaft of big MW class wind turbine group,First connecting flange,Second connecting flange,The main shaft of small MW class wind turbine group is same rotation centerline.The utility model can efficiently accomplish the performance test of big MW class wind turbine group.

Description

A kind of flexible frock of big MW class wind turbine group performance test
Technical field
The utility model relates to the technical fields of wind power generating set performance test, refer in particular to a kind of big megawatt wind power The flexible frock of generating set performance test.
Background technique
Known in the industry, the performance for understanding, evaluation and analysis each components of wind power generating set usually carries out various tests Test, the purpose tested are:It was found that wind power generating set design, material and in terms of various defects, through analyzing And improvement, increase the reliability of wind power generating set gradually, be finally reached scheduled reliability level, while can be with It is provided safeguard to improve the war preparedness completeness of generating set, reducing maintenance cost, to determine whether wind power generating set meets symbol Whether reliability quantification requirement as defined in closing, such as power reach target.Currently, wind power generating set is towards ultra-compact, greatly The direction of MW class is developed, and the maintenance and replacement to wind power generating set bring inconvenience, especially offshore wind turbine Etc. big MW class, the performance reliability of each components of wind power generating set is required also higher and higher.
For the reliability for guaranteeing wind power generating set performance, then wind power generating set is tested for the property, in wind turbine It, can not be to being tried after machine assembly such as in the case where no routine complete machine full power trial (FPT) platform in group model machine R&D process It tests, carrying out performance verification to Wind turbines by the method that Partial Power is tested is particularly important, however to wind-driven generator Group performance test is then needed to carry out by certain test bill, therefore is surveyed there is big MW class wind turbine group is probed into The demand of method for testing, to guarantee that wind power generating set test achieves the desired purpose.
Utility model content
The purpose of the utility model is to overcome relatively difficult, the time-consuming bases of big MW class wind turbine group centering On plinth, for big MW class wind turbine group performance test problem, a kind of good economy performance, simple and reliable, user are proposed Just the flexible frock of big MW class wind turbine group performance test.
To achieve the above object, technical solution provided by the utility model is:A kind of big MW class wind turbine group The flexible frock of performance test, the big MW class wind turbine group in the performance test, need to be configured with one small MW class wind turbine group drags it, and the big MW class wind turbine group and small MW class wind turbine It is to be flexibly connected by flexible frock between group;Wherein, the flexible frock includes being configured with the first connection studs The first connecting flange, be configured with the second connecting flange, the rope of the second connection studs, first connecting flange passes through First connection studs is connect with the main shaft of big MW class wind turbine group, and second connecting flange passes through second Connection studs is connect with the main shaft of small MW class wind turbine group, first connecting flange, the second connection method It is blue opposite opposed, and both opposite one side is arranged with multiple lifting lugs, first connecting flange and the second connection Flange is attached in such a way that rope winds lifting lug, and the main shaft of the big MW class wind turbine group, first Connecting flange, the second connecting flange, small MW class wind turbine group main shaft be same rotation centerline, by small by million Watt grade wind driven generator unit drags feature and working method that big MW class wind turbine group carrys out wind-driven generator simulation group, with This reaches the performance test to big MW class wind turbine group.
Whole-root rope only has head and the tail section to connect, and centre is not allow for other connectors.
The rope is nylon rope or hawser.
The utility model compared with prior art, has the following advantages that and beneficial effect:
1, this tooling drags big MW class wind turbine group by small MW class wind turbine group, can be as far as possible The feature and working method of wind-driven generator simulation group reach the test to big MW class wind turbine group with this, and are surveying It can guarantee that tested wind power generating set will not be damaged during examination, for no big megawatt wind power of full power trial (FPT) platform The exploitation of generating set model machine is especially suitable.
2, the test fixture that this tooling uses is to carry out transition connection with rope (specially nylon rope or high-intensitive hawser) (namely flexible connection), has the characteristics that flexible clutch, can not adjust wind when can be effectively avoided in this way using rigid connection Requirement of the position of power generator group without being able to satisfy merging precision.
3, this tooling is connected using flexible structure, it is easier to which installation and implementation, operability is convenient, saves cost, and operate Person can according to the actual situation, active control test process.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model tooling.
Fig. 2 is the structural schematic diagram of the first connecting flange.
Fig. 3 is the structural schematic diagram of the second connecting flange.
Fig. 4 is scheme of installation of the utility model tooling in big MW class wind turbine group performance test.
Specific embodiment
The utility model is described in further detail combined with specific embodiments below.
As shown in Figures 1 to 4, the flexible work of big MW class wind turbine group performance test provided by the present embodiment Dress connects including being configured with the first connecting flange 2 of the first connection studs 1, being configured with the second of the second connection studs 3 Acting flange 4 and a rope 5 (specially nylon rope or high-intensitive hawser), wherein the big MW class wind turbine group 6 exists When being tested for the property, it need to be dragged configured with one small MW class wind turbine group 7, with wind-driven generator simulation The feature and working method of group, and be logical between the big MW class wind turbine group 6 and small MW class wind turbine group 7 Flexible frock is crossed to be flexibly connected;First connecting flange 2 is sent out by the first connection studs 1 and big megawatt wind power The main shaft of motor group 6 connects, and second connecting flange 4 is sent out by the second connection studs 3 and small megawatt wind power The main shaft of motor group 7 connects, and first connecting flange 2, the second connecting flange 4 are opposite opposed, and both is opposite One side be arranged with multiple lifting lugs 8, first connecting flange 2 and the second connecting flange 4 are hung by a winding of rope 5 The mode of ear 8 is attached, and 5 only head and the tail section of whole-root rope connects, and centre is not allow for other connectors, while described big by million Main shaft, the first connecting flange 2, the second connecting flange 4, small MW class wind turbine group 7 of watt grade wind driven generator unit 6 Main shaft be same rotation centerline, so during the test by small MW class wind turbine group 7 be powered, use Small MW class wind turbine group 7 actively drag big MW class wind turbine group 6 come wind-driven generator simulation group feature and Working method (unloaded and full load conditions), reaches the performance test to big MW class wind turbine group 7 with this.
In conclusion the utility model can efficiently accomplish big MW class wind turbine group after using above scheme Performance test, the traditional problem for overcoming big MW class wind turbine group centering relatively difficult, time-consuming.This and original property Energy test fixture technology is compared, and the utility model is the good big MW class wind turbine of ideal of a structurally simple, economical property Group performance test frock, is worthy to be popularized.
Embodiment described above is only the preferred embodiment of the utility model, and the implementation of the utility model is not limited with this Range, therefore all shapes according to the utility model, change made by principle, it should all cover within the protection scope of the present utility model.

Claims (2)

1. a kind of flexible frock of big MW class wind turbine group performance test, it is characterised in that:The big MW class wind Power generator group in the performance test, need to drag it configured with one small MW class wind turbine group, and institute Stating between big MW class wind turbine group and small MW class wind turbine group is flexibly connected by flexible frock;Its In, the flexible frock includes the first connecting flange for being configured with the first connection studs, is configured with the second connection double end spiral shell The second connecting flange, the rope of column, first connecting flange pass through the first connection studs and big megawatt level wind power generation The main shaft of unit connects, and second connecting flange passes through the second connection studs and small MW class wind turbine group Main shaft connection, first connecting flange, the second connecting flange are opposed in opposite directions, and both opposite one side is equal Multiple lifting lugs, first connecting flange and the second connecting flange is disposed with to be attached in such a way that rope winds lifting lug, And main shaft, the first connecting flange, the second connecting flange, the small megawatt wind power hair of the big MW class wind turbine group The main shaft of motor group is same rotation centerline, drags big megawatt level wind power generation by small MW class wind turbine group Unit carrys out the feature and working method of wind-driven generator simulation group, reaches the performance survey to big MW class wind turbine group with this Examination.
2. a kind of flexible frock of big MW class wind turbine group performance test according to claim 1, feature It is:Whole-root rope only has head and the tail section to connect, and centre is not allow for other connectors.
CN201820210559.0U 2018-02-07 2018-02-07 A kind of flexible frock of big MW class wind turbine group performance test Active CN208169063U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820210559.0U CN208169063U (en) 2018-02-07 2018-02-07 A kind of flexible frock of big MW class wind turbine group performance test

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820210559.0U CN208169063U (en) 2018-02-07 2018-02-07 A kind of flexible frock of big MW class wind turbine group performance test

Publications (1)

Publication Number Publication Date
CN208169063U true CN208169063U (en) 2018-11-30

Family

ID=64384292

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820210559.0U Active CN208169063U (en) 2018-02-07 2018-02-07 A kind of flexible frock of big MW class wind turbine group performance test

Country Status (1)

Country Link
CN (1) CN208169063U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108343626A (en) * 2018-02-07 2018-07-31 明阳智慧能源集团股份公司 Big Megawatt fan performance test frock and the test method realized using the tooling

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108343626A (en) * 2018-02-07 2018-07-31 明阳智慧能源集团股份公司 Big Megawatt fan performance test frock and the test method realized using the tooling

Similar Documents

Publication Publication Date Title
CN110410284A (en) Root of fan blade load monitoring method and real time on-line monitoring system
CN208169063U (en) A kind of flexible frock of big MW class wind turbine group performance test
CN102253338A (en) Intelligent failure diagnosis method for frequency converter of wind power unit
CN110109016A (en) New energy automobile motor test platform
CN105863952A (en) Flow guide hood, impeller assembly and wind power generation device
CN110043429A (en) A kind of large-scale wind driven generator single blade mounting process construction method
Lazakis et al. Modeling of vessel and equipment cost for the maintenance activities of an offshore tidal energy array
CN103852255A (en) Typical transmission fault intelligent diagnosis method based on neural network wind generating set
CN205689367U (en) Guide frame for the assembling of wind power equipment cabin
CN107590356A (en) A kind of wind driven generation set main shaft bearing automatic Model Selection method and storage device
CN107179243A (en) Self-balancing type hydraulic pressure axle power combination loading experimental rig
CN108343626A (en) Big Megawatt fan performance test frock and the test method realized using the tooling
CN201827027U (en) Self-positioning flange of wind-driven power generation tower
CN203365137U (en) Large slewing bearing test device
CN202221377U (en) Small power test system of a wind power generation set
CN202075127U (en) Variable pitch bearing test board for high-power wind driven generator set
CN105223004A (en) Air bleed valve tappet hierarchical loading fatigue strength contrast test method
CN201955236U (en) Load loading device for test bed for complete high-power wind generating set
CN105897514A (en) Dynamic loading platform for communication sliding ring of wind generating set
CN102242688B (en) High-power wind-driven generator and implement high-power wind-driven generator wind power generation stepped
CN205779457U (en) Kuppe, impeller assembly and wind power generation plant
CN205544629U (en) Complementary electricity generation of scene patrol and examine robot
CN211425862U (en) Starter load control system based on electric dynamometer
CN104854343B (en) Turbine for flow power generator
CN207964138U (en) A kind of wind-power locking disc experimental rig

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant