CN201827027U - Self-positioning flange of wind-driven power generation tower - Google Patents

Self-positioning flange of wind-driven power generation tower Download PDF

Info

Publication number
CN201827027U
CN201827027U CN2010205643245U CN201020564324U CN201827027U CN 201827027 U CN201827027 U CN 201827027U CN 2010205643245 U CN2010205643245 U CN 2010205643245U CN 201020564324 U CN201020564324 U CN 201020564324U CN 201827027 U CN201827027 U CN 201827027U
Authority
CN
China
Prior art keywords
flange
wind
tower
positioning pin
self
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205643245U
Other languages
Chinese (zh)
Inventor
韩清国
王金源
杨永辉
刘新民
郭斌
边宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG ZHONGKAI MARINE ENGINEERING CO LTD
Original Assignee
SHANDONG ZHONGKAI MARINE ENGINEERING CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG ZHONGKAI MARINE ENGINEERING CO LTD filed Critical SHANDONG ZHONGKAI MARINE ENGINEERING CO LTD
Priority to CN2010205643245U priority Critical patent/CN201827027U/en
Application granted granted Critical
Publication of CN201827027U publication Critical patent/CN201827027U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Wind Motors (AREA)

Abstract

The utility model discloses a self-positioning flange of a wind-driven power generation tower, which aims to facilitate connection of a suspended wind-driven power generation tower. The self-positioning flange of the wind-driven power generation tower comprises a flange body, the flange body is provided with a bolt hole and positioning pin holes, and positioning pins are arranged in the positioning pin holes. The positioning pins on the upper part of the flange can be inserted into the positioning pin holes on the lower part of the flange to realize rapid positioning and connecting. During connection, the longest positioning pin is inserted in the positioning pin hole on the lower part of the flange of the tower at first, the upper part of the tower is slightly adjusted, and then a longer positioning pin is inserted into the positioning pin hole on the lower part of the flange of the tower, thus the connection speed of suspending the tower in the air is increased greatly, and the construction is facilitated.

Description

The self-align flange of a kind of wind-power tower
Technical field
The utility model relates to the connection set of wind-power tower, and the self-align flange of particularly a kind of wind-power tower makes the skyborne wind-power tower of lifting easy to connect.
Background technique
Wind energy resources is a renewable energy sources, and utilizing wind energy power also is the new energy industry of world today's fast development.Wind-powered electricity generation is by the steel design tower generator to be placed in tens meters high aerial, and its wind energy is converted to the cover system that mechanical energy is converted to electric energy again.Land wind-powered electricity generation steel design tower generally is to make cylindrical tower tube or frustoconic shape tower tube with roll of steel plate, generally be divided into three sections, adpting flange is welded on the end at every joint tower tube two ends, by bolt flange is connected, the lower end of wind-powered electricity generation main frame also is to be connected with main barrel with flange, and whole tower tube highly reaches more than 70 meter.Every cover tower tube all wants the centering flange to connect construction 4 times aloft, and first segment connects twice between the tower tube after being connected with ground is basic, and main barrel is connected once with epimerite tower tube, and the wind-powered electricity generation main frame is connected once with main barrel.Each flange connects all bolts up to a hundred, and each joint tower tube and wind-powered electricity generation main frame all will carry out flange centering by bolt aloft and connect.Can imagine that tower tube or wind-powered electricity generation main frame that tons up to a hundred are heavy are suspended in tens meters in the air, the centering flange is worn the construction that bolt is the comparison difficulty.For convenient construction need improve flange arrangement.
Summary of the invention
The purpose of this utility model provides the self-align flange of a kind of wind-power tower, makes things convenient for the connection of wind-power tower, improves operating speed.
Can use the technical program for reaching above-mentioned purpose: the self-align flange of a kind of wind-power tower comprises flange body, is provided with bolt hole on flange body, also is provided with positioning pin hole on flange body, and locating stud is housed in it.Utilize the locating stud of upper flange to insert in the positioning pin hole of lower flange, realize being located by connecting fast.
Use the utlity model has following useful effect: the utility model has utilized the rigidity and the elasticity of unequal length locating stud, and mark or the ratio bolt hole of the diameter of positioning pin hole processing is big slightly is set on positioning pin hole, is convenient to identification.When connecting construction, locating stud that at first will be the longest inserts in the positioning pin hole of bottom tower drum flange.Adjust to go up the position of squarer tube a little, can insert in the positioning pin hole of bottom tower drum flange by the locating stud that the next one is long, accelerated the speed that the tower tube lifts connection aloft greatly, made things convenient for construction.
Description of drawings
Fig. 1 is an application principle schematic representation of the present utility model.
Fig. 2 is the plan view of the utility model structural representation.
Embodiment
Below in conjunction with example the utility model is done further detailed description: referring to Fig. 1 and Fig. 2, the self-align flange of a kind of wind-power tower comprises flange body 1, and flange body 1 is provided with bolt hole, also is provided with positioning pin hole on flange body 1, and locating stud 2 is housed in it.At least be provided with 2 locating studs 2 on the flange body 1,3 of preferred design, the length of locating stud 2 has nothing in common with each other, and is slotting the longest earlier, inserts one by one by the length difference.The diameter of positioning pin hole is convenient to distinguish identification, as shown in Figure 2 greater than bolt hole; Also can make positioning pin hole identical, be provided with mark, the convenient connection, need not special processing in the end of positioning pin hole with the diameter of bolt hole.The staff who stand in down in the squarer tube adjusts slightly to the tower tube that is hung in the top, can be with in the squarer tube under next locating stud 2 insertions, and convenient construction.

Claims (5)

1. the self-align flange of wind-power tower comprises flange body (1), is provided with bolt hole on flange body (1), it is characterized in that also being provided with positioning pin hole on flange body (1), and locating stud (2) is housed in it.
2. the self-align flange of a kind of wind-power tower according to claim 1 is characterized in that being provided with at least on the flange body (1) 2 locating studs (2).
3. the self-align flange of a kind of wind-power tower according to claim 1 and 2 is characterized in that the length of locating stud (2) has nothing in common with each other.
4. the self-align flange of a kind of wind-power tower according to claim 1, the diameter that it is characterized in that described positioning pin hole is greater than bolt hole.
5. the self-align flange of a kind of wind-power tower according to claim 1 is characterized in that the end of described positioning pin hole is provided with mark.
CN2010205643245U 2010-10-10 2010-10-10 Self-positioning flange of wind-driven power generation tower Expired - Fee Related CN201827027U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205643245U CN201827027U (en) 2010-10-10 2010-10-10 Self-positioning flange of wind-driven power generation tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205643245U CN201827027U (en) 2010-10-10 2010-10-10 Self-positioning flange of wind-driven power generation tower

Publications (1)

Publication Number Publication Date
CN201827027U true CN201827027U (en) 2011-05-11

Family

ID=43965567

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205643245U Expired - Fee Related CN201827027U (en) 2010-10-10 2010-10-10 Self-positioning flange of wind-driven power generation tower

Country Status (1)

Country Link
CN (1) CN201827027U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102886680A (en) * 2012-09-24 2013-01-23 黑龙江建龙钢铁有限公司 Method for aligning flange disc hole in process of replacing large-diameter valve
CN106545470A (en) * 2016-10-08 2017-03-29 霍尔果斯新国金新能源科技有限公司 Concrete towers cartridge module and its assemble method
CN111946556A (en) * 2020-07-29 2020-11-17 上海市机电设计研究院有限公司 Construction positioning method for precast concrete shell ring
CN112166249A (en) * 2018-06-14 2021-01-01 维斯塔斯风力系统有限公司 Wind turbine power system connection
CN114060221A (en) * 2021-11-11 2022-02-18 江苏亨通蓝德海洋工程有限公司 Cabin hoisting and butt joint method for offshore wind turbine installation by using floating ship

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102886680A (en) * 2012-09-24 2013-01-23 黑龙江建龙钢铁有限公司 Method for aligning flange disc hole in process of replacing large-diameter valve
CN106545470A (en) * 2016-10-08 2017-03-29 霍尔果斯新国金新能源科技有限公司 Concrete towers cartridge module and its assemble method
CN112166249A (en) * 2018-06-14 2021-01-01 维斯塔斯风力系统有限公司 Wind turbine power system connection
CN112166249B (en) * 2018-06-14 2023-09-05 维斯塔斯风力系统有限公司 Wind turbine power system connection
CN111946556A (en) * 2020-07-29 2020-11-17 上海市机电设计研究院有限公司 Construction positioning method for precast concrete shell ring
CN114060221A (en) * 2021-11-11 2022-02-18 江苏亨通蓝德海洋工程有限公司 Cabin hoisting and butt joint method for offshore wind turbine installation by using floating ship
WO2023082524A1 (en) * 2021-11-11 2023-05-19 江苏亨通蓝德海洋工程有限公司 Compartment hoisting and docking method for mounting offshore wind turbine by means of floating ship
CN114060221B (en) * 2021-11-11 2024-02-06 江苏亨通蓝德海洋工程有限公司 Cabin hoisting and docking method for offshore wind turbine installation by floating ship

Similar Documents

Publication Publication Date Title
CN201827027U (en) Self-positioning flange of wind-driven power generation tower
CN203128000U (en) Hoisting device for direct-driven wind power generator set
CN203824826U (en) Adapter flange for testing strength of wind-driven power generator blade
CN203064997U (en) Wind driven generator and cabin assembly sling
WO2015176611A1 (en) Vertical axis wind machine having controllable output power
CN204299803U (en) A kind of wind power generating set assembling shipping platform
CN203537267U (en) High frequency friction generator based wind power generation apparatus
CN201907919U (en) Lifting appliance for foundation ring of wind power tower cylinder
CN201474874U (en) Detachable lifting wind-driven generator tower frame
CN204921266U (en) Be used for large -scale wind generating set column mouting fixed baseplate in ground
CN207548571U (en) Wind power blade tip lightening arrester positioning tool
CN104359072B (en) Road lamp power supplying device based on blast generating
CN208734496U (en) A kind of location structure of wind power generating set Internal cable assembling
CN208918762U (en) Wind power generating set with lifting adjusting structure assembles positioning device
CN202370961U (en) Connecting bolt at root part of fan blade
CN206608283U (en) A kind of pylon for wind-power electricity generation
CN201914832U (en) Hanger of wind power tower tube connecting flange
CN201193594Y (en) Multi-column type pylon for wind generating set
CN201634308U (en) Hanger lapped inside wind-driven generator hub
CN204387918U (en) Wind and light complementary road lamp
CN208750158U (en) A kind of high stability support construction of the assembling applied to wind power generating set
CN203114517U (en) H-shaped vertical-axis wind generator
CN203439031U (en) Triangular saddle assembly for freight cableway transport
CN202483211U (en) Energy saving integration base station with balance weight
CN203439033U (en) Cross-shaped saddle assembly for freight cableway transport

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110511

Termination date: 20131010