CN208168893U - Tunnel portal expanding reach secondary lining applies trolley - Google Patents

Tunnel portal expanding reach secondary lining applies trolley Download PDF

Info

Publication number
CN208168893U
CN208168893U CN201820553253.5U CN201820553253U CN208168893U CN 208168893 U CN208168893 U CN 208168893U CN 201820553253 U CN201820553253 U CN 201820553253U CN 208168893 U CN208168893 U CN 208168893U
Authority
CN
China
Prior art keywords
lateral
jacking block
trolley
arc
secondary lining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820553253.5U
Other languages
Chinese (zh)
Inventor
赵勇
冯勇
王世琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rail Transit Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
Rail Transit Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rail Transit Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical Rail Transit Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority to CN201820553253.5U priority Critical patent/CN208168893U/en
Application granted granted Critical
Publication of CN208168893U publication Critical patent/CN208168893U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of tunnel portal expanding reach secondary linings to apply trolley, solves the problems, such as that existing secondary lining trolley externally can not carry out secondary lining and apply in the hole of imperial palace toy trumpet shape.In trolley portal frame(3)Two vertical pillars lateral surface on be provided with the vertical angle seat arranged along the vertical direction(13), in vertical angle seat(13)On along the vertical direction arranged for interval have lateral double-end lead-screw(15), lateral double-end lead-screw(15)Inner end be connected to lead screw inner end hinge hole(14)On, in each lateral double-end lead-screw(15)Outboard end on be connected with lateral jacking block and connect logical beam(16), logical beam is connected in every lateral jacking block(16)Lateral surface on be positioned apart from lateral arc jacking block(17), each top curve jacking block on same section(9)And lateral arc jacking block(17)It is sequentially connected in series the arc jacking block chain of composition arcuate shape, the secondary lining for realizing hole applies the high purpose of period short construction quality.

Description

Tunnel portal expanding reach secondary lining applies trolley
Technical field
Apply trolley the present invention relates to a kind of tunnel portal secondary lining, in particular to the two of a kind of tunnel portal expanding reach Secondary lining cutting applies trolley.
Background technique
Mountain tunnel hole(General length is 100 meters or so ranges)It is traditionally arranged to be the small gradual change type toroidal of outer imperial palace Shape structure, to play the role of reducing windage when train enters tunnel.It is usually to adopt in the secondary lining in this section of tunnel of constructing With " all round victory " bracket, to carry out the assembled work of secondary lining fritter template, this construction method, which exists, sets up " all round victory " Process is tedious for bracket, heavy workload, problem long in time limit;And " all round victory " bracket seriously hinder constructing tunnel equipment into Tunnel out, after the completion of secondary lining, it is also necessary to remove " all round victory " bracket, expend a large amount of human and material resources and financial resources.And show Some secondary lining trolleys are only applicable to standard section constructing tunnel, and standard section tunnel is cylinder in longitudinal direction, existing Secondary lining trolley on template be made of top curve template and two pieces of lateral arc formworks, sky composed by three pieces of templates Between be in the form of a column, externally can not carry out secondary lining and apply in the hole of imperial palace toy trumpet shape.
Summary of the invention
The present invention provides a kind of tunnel portal expanding reach secondary linings to apply trolley, solves existing secondary lining platform Vehicle can not the hole of external imperial palace toy trumpet shape carry out the technical issues of secondary lining applies.
The present invention is to solve the above technical problem by the following technical programs:
A kind of tunnel portal expanding reach secondary lining applies trolley, including trolley track, and platform is provided on trolley track Vehicle walking dolly is provided with two parallel trolley portal frame base longerons, in two parallel trolley doors on trolley walking dolly It has been positioned apart from trolley portal frame on shape frame base longerons, two top liquid are provided on the top beam of each trolley portal frame Jack is pressed, is provided with interim crossbeam in two top hydraulic jacks, it is adjustable that top has been positioned apart from interim crossbeam Cushion block is saved, top single head lead screw is provided at the top of every pile on adjustable cushion block, is respectively provided on each top single head lead screw There is top longitudinal beam, top longitudinal beam and trolley portal frame base longerons are arranged along tunnel excavation direction, vertical at each top It has been positioned apart from top curve jacking block on beam, top top is provided on the left and right end face of each top curve jacking block Block connects lifting lug, and each top curve jacking block on the same trolley portal frame connects lifting lug connection composition top by top jacking block Portion's arc jacking block chain;It has been positioned apart from lateral adjustable cushion block on the lateral surface of two vertical pillars of trolley portal frame, It is connected with detachable vertical auxiliary strut on the lateral surface of lateral adjustable cushion block, is arranged on detachable vertical auxiliary strut There is the vertical angle seat arranged along the vertical direction, arranged for interval has lead screw inner end along the vertical direction on vertical angle seat Hinge hole, arranged for interval has lateral double-end lead-screw, the inner end of lateral double-end lead-screw along the vertical direction on vertical angle seat It is connected on the hinge hole of lead screw inner end, lateral jacking block is connected on the outboard end of each lateral double-end lead-screw and connects logical beam, Each lateral jacking block connect logical beam be it is horizontally disposed each other along tunnel excavation direction, lead to the outside of beam in every lateral jacking block connection It has been positioned apart from lateral arc jacking block on face, has been provided with lateral jacking block on the upper and lower end face of every piece of lateral arc jacking block Lifting lug is connected, each top curve jacking block and lateral arc jacking block on same section are sequentially connected in series the arc of composition arcuate shape Jacking block chain, multiple small size templates are sequentially connected in series a group camber gradual change gang form, and arc gradual change gang form is arranged in arc On the lateral surface of the arc jacking block chain of shape;By adjusting the length of each lateral double-end lead-screw on same cross section, can make The cambered surface and hole arcuate flanks of arc jacking block chain are coincide;It is each on each trolley portal frame on different cross sections by adjusting again The length of lateral double-end lead-screw can make the loudspeaker that the lateral surface of each arc jacking block chain on tunnel excavation direction is small in outer imperial palace Shape shape, to reach the arc gradual change gang form for making the small size template on the outside of these arc jacking blocks be sequentially connected in series composition and be in Outer imperial palace toy trumpet shape.
Top hydraulic jack folding and unfolding adjusting screw is provided on the top beam of trolley portal frame, in top hydraulic jack The both ends of folding and unfolding adjusting screw are connected separately with top hydraulic jack, to facilitate the position of top hydraulic jack to adjust.
A kind of tunnel portal expanding reach secondary lining applies method, includes the following steps:
The secondary lining template of the first step, wide 60 centimetres of 30 centimeter length of the small size of production, and by the secondary of each small size Lining shuttering is sequentially connected in series a group camber gradual change gang form;
Second step, the lateral arc jacking block of production connect logical beam with lateral jacking block, on the upper and lower end face of lateral arc jacking block Lateral jacking block connection lifting lug is respectively set;
Third step, on the top beam of trolley portal frame installation at the top of hydraulic jack, installed in the hydraulic jack of top Interim crossbeam, the adjustable cushion block at the top of installation on interim crossbeam, the single head lead screw at the top of installation on the adjustable cushion block of top, Top longitudinal beam is installed on the single head lead screw of top, top curve jacking block is installed in compartment of terrain in top longitudinal beam;By each top curve top Block connects lifting lug by the top jacking block being arranged on left and right end face and connects into top curve jacking block chain;
4th step, lateral adjustable cushion block is installed in compartment of terrain on two column lateral surfaces of trolley portal frame, laterally may be used It adjusts and detachable vertical auxiliary strut is installed on the lateral surface of cushion block, installation is hung down on the lateral surface of detachable vertical auxiliary strut Right angle bridle iron is arranged at intervals with lead screw inner end hinge hole on vertical angle seat;
5th step, the lateral jacking block of production connect logical beam, and side is installed in compartment of terrain on the lateral surface that lateral jacking block connects logical beam To arc jacking block;
6th step connects the lateral jacking block for being equipped with lateral arc jacking block after logical beam sling with crane, with top curve The lateral jacking block for being respectively equipped with lateral arc jacking block together, then, is successively connected logical beam and is sling with crane by jacking block chain link Afterwards, lifting lug is connected by lateral jacking block to be sequentially connected in series, form the arc jacking block chain of arcuate shape;
The outboard end of lateral double-end lead-screw is connected to lateral jacking block and connected and led on beam by the 7th step, by lateral double-end lead-screw Inner end be connected on the hinge hole of lead screw inner end, compartment of terrain is sequentially connected lateral double-end lead-screw from top to bottom;
8th step adjusts each lateral double-end lead-screw respectively, forms each top curve jacking block and each lateral arc jacking block The arc jacking block chain of arcuate shape makes the arc jacking block of each arcuate shape on tunnel excavation direction in u-shaped cross-section shape Chain is in horn-like;
9th step, the arc jacking block that the setting of arc gradual change gang form is bounded on each side to the arcuate shape formed to arc jacking block On the lateral surface of chain, to complete the assembling of tunnel portal expanding reach secondary lining trolley;
The secondary lining trolley being completed is moved at the expansion section construction of hole by the tenth step, secondary according to hole Lining design cross dimensions further adjusts each top single head lead screw and each lateral double-end lead-screw, makes the disconnected of secondary lining trolley Face size and hole secondary lining design section size are coincide;
11st step pours secondary lining concrete;
After 12nd step, the intensity of secondary lining concrete wait pour reach design requirement, adjust that shrink each top single Captacula thick stick and each lateral double-end lead-screw are detached from secondary lining trolley formwork with the concrete poured, mobile secondary lining trolley The step of the tenth step and 11 step are repeated after at next plate Second Lining Construction.
The present invention passes through the trolley suitable for expanding reach hole secondary lining of special designing, realizes to compared with long trumpet mouth The conveniently job execution of the secondary lining at hole, will not influence the export & import of equipment in tunnel excavation in the construction process Mouthful operation, the secondary lining at hole apply that the period is short, and construction quality is high.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
Specific embodiment
The present invention is described in detail with reference to the accompanying drawing:
A kind of tunnel portal expanding reach secondary lining applies trolley, including trolley track 1, is provided on trolley track 1 Trolley walking dolly 2 is provided with trolley portal frame 3 on trolley walking dolly 2, is provided on the top beam of trolley portal frame 3 Top hydraulic jack 4 is provided with interim crossbeam 5 in top hydraulic jack 4, has been positioned apart from interim crossbeam 5 Top adjustable cushion block 6 is provided with top single head lead screw 7 at the top of every pile, in each top single head silk on adjustable cushion block 6 It is provided with top longitudinal beam 8 on thick stick 7, top curve jacking block 9 is provided in each top longitudinal beam 8, in top curve jacking block 9 Left and right end face on be provided with top jacking block connection lifting lug;On the lateral surface of two vertical pillars of trolley portal frame 3 between Ground is provided with lateral adjustable cushion block 11, it is vertical that detachable vertical auxiliary is connected on the lateral surface of lateral adjustable cushion block 11 Column 12 is provided with the vertical angle seat 13 arranged along the vertical direction on detachable vertical auxiliary strut 12, in vertical angle steel Arranged for interval has lead screw inner end hinge hole 14 along the vertical direction on support 13, on vertical angle seat 13 along the vertical direction between Every being disposed with lateral double-end lead-screw 15, the inner end of lateral double-end lead-screw 15 is connected on lead screw inner end hinge hole 14, every It is connected with lateral jacking block on the outboard end of a lateral double-end lead-screw 15 and connects logical beam 16, it is along tunnel that each lateral jacking block, which connects logical beam 16, Road excavation direction is horizontally disposed each other, has been positioned apart from lateral arc on the lateral surface that every lateral jacking block connects logical beam 16 Shape jacking block 17 is provided with lateral jacking block connection lifting lug 18, same disconnected on the upper and lower end face of every piece of lateral arc jacking block 17 Each top curve jacking block 9 and lateral arc jacking block 17 on face are sequentially connected in series the arc jacking block chain of composition arcuate shape, Duo Ge little Size template 10 is sequentially connected in series a group camber gradual change gang form, and the arched top of arcuate shape is arranged in arc gradual change gang form On the lateral surface of block chain.
Top hydraulic jack folding and unfolding adjusting screw 19 is provided on the top beam of trolley portal frame 3, at top hydraulic thousand The both ends of jin top folding and unfolding adjusting screw 19 are connected separately with top hydraulic jack 4.
A kind of tunnel portal expanding reach secondary lining applies method, includes the following steps:
The secondary lining template 10 of the first step, wide 60 centimetres of 30 centimeter length of the small size of production, and by the two of each small size Secondary lining shuttering 10 is sequentially connected in series a group camber gradual change gang form;
Second step, the lateral arc jacking block 17 of production connect logical beam 16 with lateral jacking block, in the upper and lower of lateral arc jacking block 17 Lateral jacking block connection lifting lug 18 is respectively set on end face;
Third step, on the top beam of trolley portal frame 3 installation at the top of hydraulic jack 4, pacify in top hydraulic jack 4 Interim crossbeam 5 is filled, the adjustable cushion block 6 at the top of installation on interim crossbeam 5, the single head at the top of installation on top adjustable cushion block 6 Lead screw 7 installs top longitudinal beam 8 on top single head lead screw 7, and top curve jacking block 9 is installed in compartment of terrain in top longitudinal beam 8;It will Each top curve jacking block 9 connects lifting lug by the top jacking block being arranged on left and right end face and connects into top curve jacking block chain;
4th step, lateral adjustable cushion block 11 is installed in compartment of terrain on two column lateral surfaces of trolley portal frame 3, lateral Detachable vertical auxiliary strut 12 is installed, in the lateral surface of detachable vertical auxiliary strut 12 on the lateral surface of adjustable cushion block 11 It is upper that vertical angle seat 13 is installed, lead screw inner end hinge hole 14 is arranged at intervals on vertical angle seat 13;
5th step, the lateral jacking block of production connect logical beam 16, and compartment of terrain is pacified on the lateral surface that lateral jacking block connects logical beam 16 Fill lateral arc jacking block 17;
6th step connects the lateral jacking block for being equipped with lateral arc jacking block 17 after logical beam 16 sling with crane, with top The lateral jacking block for being respectively equipped with lateral arc jacking block 17 together, then, is successively connected logical beam 16 and used by arc jacking block chain link After crane is sling, lifting lug 18 is connected by lateral jacking block and is sequentially connected in series, the arc jacking block chain of arcuate shape is formed;
The outboard end of lateral double-end lead-screw 15 is connected to lateral jacking block and connected and led on beam 16 by the 7th step, by lateral double end The inner end of lead screw 15 is connected on lead screw inner end hinge hole 14, and compartment of terrain is sequentially connected lateral double-end lead-screw from top to bottom 15;
8th step adjusts each lateral double-end lead-screw 15 respectively, makes each top curve jacking block 9 and each 17 groups of lateral arc jacking block At the arc jacking block chain of arcuate shape make the arc of each arcuate shape on tunnel excavation direction in u-shaped cross-section shape Jacking block chain is in horn-like;
9th step, the arched top that the setting of arc gradual change gang form is bounded on each side to the arcuate shape formed to arc jacking block 17 On the lateral surface of block chain, to complete the assembling of tunnel portal expanding reach secondary lining trolley;
The secondary lining trolley being completed is moved at the expansion section construction of hole by the tenth step, secondary according to hole Lining design cross dimensions further adjusts each top single head lead screw 7 and each lateral double-end lead-screw 15, makes secondary lining trolley Cross dimensions and hole secondary lining design section size are coincide;
11st step pours secondary lining concrete;
After 12nd step, the intensity of secondary lining concrete wait pour reach design requirement, adjust that shrink each top single Captacula thick stick 7 and each lateral double-end lead-screw 15 are detached from secondary lining trolley formwork with the concrete poured, mobile secondary lining platform Vehicle at next plate Second Lining Construction after repeat the tenth step and the step of 11 step.

Claims (2)

1. a kind of tunnel portal expanding reach secondary lining applies trolley, including trolley track(1), in trolley track(1)Upper setting There is trolley walking dolly(2), in trolley walking dolly(2)On be provided with trolley portal frame(3), in trolley portal frame(3)Top Top hydraulic jack is provided on beam(4), in top hydraulic jack(4)On be provided with interim crossbeam(5), in interim crossbeam (5)On be positioned apart from top adjustable cushion block(6), the adjustable cushion block at the top of every pile(6)On be provided with top single head Lead screw(7), in each top single head lead screw(7)On be provided with top longitudinal beam(8), in each top longitudinal beam(8)On be respectively provided with There is top curve jacking block(9), in top curve jacking block(9)Left and right end face on be provided with top jacking block connection lifting lug;It is special Sign is, in trolley portal frame(3)Two vertical pillars lateral surface on be positioned apart from lateral adjustable cushion block(11), In lateral adjustable cushion block(11)Lateral surface on be connected with detachable vertical auxiliary strut(12), vertical in detachable vertical auxiliary Column(12)On be provided with the vertical angle seat arranged along the vertical direction(13), in vertical angle seat(13)On along the vertical direction Arranged for interval has lead screw inner end hinge hole(14), in vertical angle seat(13)On along the vertical direction arranged for interval have it is lateral double Captacula thick stick(15), lateral double-end lead-screw(15)Inner end be connected to lead screw inner end hinge hole(14)On, each lateral double Captacula thick stick(15)Outboard end on be connected with lateral jacking block and connect logical beam(16), each lateral jacking block, which connects, leads to beam(16)It is along tunnel It is horizontally disposed each other to excavate direction, connects logical beam in every lateral jacking block(16)Lateral surface on be positioned apart from lateral arc Shape jacking block(17), in every piece of lateral arc jacking block(17)Upper and lower end face on be provided with lateral jacking block connection lifting lug(18), Each top curve jacking block on same section(9)And lateral arc jacking block(17)It is sequentially connected in series the arc jacking block of composition arcuate shape Chain, multiple small size templates(10)It is sequentially connected in series a group camber gradual change gang form, arc gradual change gang form is arranged in arc On the lateral surface of the arc jacking block chain of shape.
2. a kind of tunnel portal expanding reach secondary lining according to claim 1 applies trolley, which is characterized in that in trolley Portal frame(3)Top beam on be provided with top hydraulic jack folding and unfolding adjusting screw(19), in top hydraulic jack folding and unfolding tune Save lead screw(19)Both ends be connected separately with top hydraulic jack(4).
CN201820553253.5U 2018-04-18 2018-04-18 Tunnel portal expanding reach secondary lining applies trolley Active CN208168893U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820553253.5U CN208168893U (en) 2018-04-18 2018-04-18 Tunnel portal expanding reach secondary lining applies trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820553253.5U CN208168893U (en) 2018-04-18 2018-04-18 Tunnel portal expanding reach secondary lining applies trolley

Publications (1)

Publication Number Publication Date
CN208168893U true CN208168893U (en) 2018-11-30

Family

ID=64369695

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820553253.5U Active CN208168893U (en) 2018-04-18 2018-04-18 Tunnel portal expanding reach secondary lining applies trolley

Country Status (1)

Country Link
CN (1) CN208168893U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108533288A (en) * 2018-04-18 2018-09-14 中铁十九局集团轨道交通工程有限公司 Tunnel portal expanding reach secondary lining applies trolley

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108533288A (en) * 2018-04-18 2018-09-14 中铁十九局集团轨道交通工程有限公司 Tunnel portal expanding reach secondary lining applies trolley

Similar Documents

Publication Publication Date Title
CN106089253B (en) A kind of all-hydraulic template system poured for culvert
CN103195450B (en) Hydraulic pressure tunnel invert operation trolley and inverted arch construction method
CN105155423A (en) Upward moving type movable formwork for continuous box girder construction
CN106088326B (en) Assembling frame rod structure based on 3D printing
CN204899941U (en) Whole movable tunnel ditch cable duct formworking jumbo
CN108425686A (en) Tunnel portal expanding reach secondary lining applies method
CN203321538U (en) Variable-cross-section tunnel lining mold
CN107989620B (en) Construction method of three-hole small-spacing tunnel
CN104763446A (en) Multi-functional trolley for subway station construction
CN103470272A (en) Trolley for concrete construction on multiple sections by employing mining method and construction method thereof
CN205778918U (en) Loess tunnel excavation and just formwork build concrete construction combined type chassis
CN110145341A (en) A kind of gang form system for circular tunnel concreting
CN205936645U (en) A full liquid die plate system for culvert is pour
CN109519197A (en) A kind of sliding formwork just dual-purpose trolley of lining excavation supporting and its application
CN208168893U (en) Tunnel portal expanding reach secondary lining applies trolley
CN206109960U (en) Steel that can be under construction fast concrete integrated configuration bridge
CN202176343U (en) Self-propelled multifunctional template trolley combining device
CN204851287U (en) Big section moving as a whole formula formwork support
CN110173281A (en) A kind of sliding mode system for circular tunnel concreting
CN204475184U (en) Urban light rail viaduct mountain type U beam Construction Supporting System
CN203035204U (en) Large-section tunnel second lining grouping formwork trolley
CN203603928U (en) Rubber-tyred walking full-hydraulic lining trolley
CN108533288A (en) Tunnel portal expanding reach secondary lining applies trolley
CN207122313U (en) Constructing middle partition wall in tunnel template and its constructing device
CN203834370U (en) Arch ring steel formwork trolley for circular arch culvert

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant