CN208163249U - A kind of drilling device for bonded rebar - Google Patents
A kind of drilling device for bonded rebar Download PDFInfo
- Publication number
- CN208163249U CN208163249U CN201820692110.2U CN201820692110U CN208163249U CN 208163249 U CN208163249 U CN 208163249U CN 201820692110 U CN201820692110 U CN 201820692110U CN 208163249 U CN208163249 U CN 208163249U
- Authority
- CN
- China
- Prior art keywords
- shifting sledge
- rod
- mounting
- jacking cylinder
- bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of drilling device for bonded rebar, affiliated drilling equipment technical field provides a kind of accurate, easy to operate drilling device for bonded rebar that drills.Shifting sledge is horizontally set on bracket, the sliding aperture being arranged on No. 1 mounting rod, No. 2 mounting rods passes through shifting sledge and is arranged on shifting sledge, it is fixedly connected with jacking cylinder on No. 1 mounting rod, support rod is fixedly connected on the mandril of jacking cylinder, the top of support rod is fixedly installed with electric drill;Sliding recess is vertically arranged on the side wall of No. 2 mounting rods, locating rod upper side wall side is vertically arranged with slide protrusion, slide protrusion, which is stuck in the sliding recess, and the two is opposite slides, the grinding tooth of continuous vertical arrangement is provided on the side wall other side of locating rod, rotate gear is provided on No. 2 mounting rods, crank is provided in the shaft of rotate gear, rotate gear is connected with grinding tooth.It is mainly used for accurately drilling to bar planting.
Description
Technical field
The utility model belongs to drilling equipment technical field, in particular to a kind of drilling device for bonded rebar.
Background technique
Currently, frame structure engineering major part constructional column top rebars and structural union are planted using bar planting after top plate
Muscle refers in architecture storey beam away from the method for being implanted into reinforcing bar in the constructional column that ground is 3-4.5m clear height, usually carries out to bar planting
When drilling, need to be determined the distance different drilling, traditional bore mode be difficult to between different drillings away from
It is effectively determining from carrying out.
The bar planting electric hammer operating frame device of 203578844 U of Patent No. CN, including electric hammer, support rod, operating stick, company
Extension bar, support bar, the support rod, operating stick, connecting rod, support bar connect and compose four-bar linkage structure by connector, wherein propping up
Strut is parallel with support bar, operating stick is parallel with connecting rod, the lower part of support rod is provided with support, electric hammer is fixed on support bar
Top, the end of the operating stick is arranged in the switch of electric hammer.Although having, structure is simple, is quickly beaten convenient for operating with realizing
The purpose in hole, but in drilling higher to precise requirements, utility model Wang Wang is difficult to meet the requirements.
Utility model content
Technical problem to be solved in the utility model is, according to technical problem described in above-mentioned background technique, to provide
A kind of accurate, easy to operate drilling device for bonded rebar that drills.
The technical solution adopted in the utility model is a kind of drilling device for bonded rebar, including bracket, shifting sledge, No. 1 installation
Bar, No. 2 mounting rods, support rod, electric drill, jacking cylinder, locating rods, the shifting sledge is horizontally disposed on the bracket, institute
Sliding aperture, the sliding profile of aperture and cuing open for the shifting sledge are provided on No. 1 mounting rod stating, No. 2 mounting rods
Facial contour is identical, and the sliding aperture being arranged on No. 1 mounting rod, No. 2 mounting rods passes through the shifting sledge and is arranged in institute
It states on shifting sledge, No. 1 mounting rod, No. 2 mounting rods are separately mounted to two sides of the shifting sledge with respect to bracket;Described No. 1
Be fixedly connected with jacking cylinder on mounting rod, the jacking direction of the jacking cylinder straight up, the mandril of the jacking cylinder
On be fixedly connected with the support rod, the top of the support rod is fixedly installed with electric drill;On the side wall of No. 2 mounting rods
It is vertically arranged with sliding recess, locating rod upper side wall side is vertically arranged with slide protrusion, and the slide protrusion is stuck in institute
In the sliding recess stated, the sliding recess is opposite with the slide protrusion to be slided, on the side wall other side of the locating rod
It is provided with the grinding tooth of continuous vertical arrangement, rotate gear is provided on No. 2 mounting rods, is set in the shaft of the rotate gear
It is equipped with crank, the rotate gear is connected with the grinding tooth;No. 1 mounting rod, No. 2 mounting rods sliding aperture side wall on
It is provided with fixing bolt, the fixing bolt is threadedly attached in No. 1 mounting rod, on No. 2 mounting rods.
Further, the frame bottom is provided with universal rolling wheel, and the fixed lock of idler wheel is provided on the universal rolling wheel.
Further, the center of the shifting sledge is fixedly connected at the carriage center, is set on the shifting sledge
Be equipped with length scale line, " 0 " groove of the graduation mark is arranged at the center of the shifting sledge, to two sides extend numerical value by
Flaring is big.
Further, the electric drill and support rod junction are provided with dust-proof guard, the vertical projection of the dust-proof guard
The jacking cylinder is contained within.
Further, the electric drill, jacking cylinder switch be respectively provided on the bracket, the electric drill, jacking cylinder
Switch be arranged side by side.
The utility model compared with prior art, has beneficial effect below, and the shifting sledge is horizontally set on institute
It states on bracket, is provided with sliding aperture on No. 1 mounting rod, No. 2 mounting rods, on No. 1 mounting rod, No. 2 mounting rods
The sliding aperture of setting passes through the shifting sledge and is arranged on the shifting sledge, No. 1 mounting rod, No. 2 mounting rods
It is separately mounted to two sides of the shifting sledge with respect to bracket, length scale line is provided on the shifting sledge, passes through determination described 1
The distance between number mounting rod and No. 2 mounting rods are determined the distance between bar planting drilling, to improve the standard of bore position
True property;No. 1 mounting rod, No. 2 mounting rods sliding aperture side wall on be provided with fixing bolt, the fixing bolt passes through spiral shell
Line is connected to No. 1 mounting rod, on No. 2 mounting rods, and the fixing bolt can be by No. 1 mounting rod, No. 2 installations
Bar is fixed on the shifting sledge, guarantees the stability of the support rod when drilling to bar planting;The side of the locating rod
It is provided with the grinding tooth of continuous vertical arrangement on the wall other side, is provided with rotate gear, the rotate gear on No. 2 mounting rods
Shaft on be provided with crank, the rotate gear is connected with the grinding tooth, by shake crank can control the positioning
Bar moves up and down, and is the fixation position that locating rod withstands on bar planting, as scale to determine the distance between electric drill and locating rod,
The electric drill and the switch of jacking cylinder are respectively provided on the bracket, and staff only needs to control the electric drill, jacking gas
The drilling to bar planting can be completed in the switch of cylinder, easy to operate.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of drilling device for bonded rebar of the utility model;
Fig. 2 is the connection schematic diagram of No. 1 mounting rod and shifting sledge;
Fig. 3 is the connection schematic diagram of No. 2 mounting rods and locating rod.
In figure:01, bracket 02, shifting sledge 03,1 mounting rod 04,2 mounting rod 05, support rod 06, electric drill
07, jacking cylinder 08, locating rod 09, sliding aperture 10, sliding recess 11, slide protrusion 12, grinding tooth 13, rotate gear
14, crank 15, fixing bolt 16, dust-proof guard.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
The technical solution of the utility model is illustrated in conjunction with Fig. 1, Fig. 2, Fig. 3, a kind of drilling device for bonded rebar, including branch
Frame 01, shifting sledge 02,1 mounting rod 03,2 mounting rod 04, support rod 05, electric drill 06, jacking cylinder 07, locating rod 08,
The shifting sledge 02 is horizontally set on the bracket 01, is provided with cunning on described 03, No. 2 mounting rod 04 of No. 1 mounting rod
The profile of dynamic aperture 09, the sliding aperture 09 is identical as the section profile of the shifting sledge 02, No. 1 mounting rod 03,2
The sliding aperture 09 being arranged on number mounting rod 04 passes through the shifting sledge 02 and is arranged on the shifting sledge 02, and described 1
Number 03, No. 2 mounting rod 04 of mounting rod is separately mounted to two sides of the shifting sledge 02 with respect to bracket 01;On No. 1 mounting rod 03
Be fixedly connected with jacking cylinder 07, the jacking direction of the jacking cylinder 07 straight up, on the mandril of the jacking cylinder 07
It is fixedly connected with the support rod 05, the top of the support rod 05 is fixedly installed with electric drill 06;No. 2 mounting rods 04
Sliding recess 10 is vertically arranged on side wall, the 08 upper side wall side of locating rod is vertically arranged with slide protrusion 11, the cunning
Dynamic protrusion 11 is stuck in the sliding recess 10, and the sliding recess 10 is opposite with the slide protrusion 11 to be slided, described
It is provided with the grinding tooth 12 of continuous vertical arrangement on the side wall other side of locating rod 08, is provided with rotation on No. 2 mounting rods 04
Gear 13 is provided with crank 14 in the shaft of the rotate gear 13, and the rotate gear 13 is connected with the grinding tooth 12;Institute
It states and is provided with fixing bolt 15 on 09 side wall of sliding aperture of 03, No. 2 mounting rod 04 of No. 1 mounting rod, the fixing bolt 15 is logical
It crosses and is threaded on described 03, No. 2 mounting rod 04 of No. 1 mounting rod.
Further, 01 bottom of bracket is provided with universal rolling wheel, and the fixed lock of idler wheel is provided on the universal rolling wheel.
Further, the center of the shifting sledge 02 is fixedly connected at 01 center of bracket, the shifting sledge
Length scale line is provided on 02, " 0 " groove of the graduation mark is arranged at the center of the shifting sledge 02, prolongs to two sides
Numerical value is stretched to be gradually expanded.
Further, the electric drill 06 is provided with dust-proof guard 16 with 05 junction of support rod, the dust-proof guard 16
The jacking cylinder 07 is contained within by vertical projection.
Further, the electric drill 06, jacking cylinder 07 switch be arranged on the bracket 01, the electric drill 06,
The switch of jacking cylinder 07 is arranged side by side.
The beneficial effects of the utility model are illustrated in conjunction with Fig. 1, Fig. 2, Fig. 3, the shifting sledge 02 is horizontally disposed
On the bracket 01, sliding aperture 09, No. 1 mounting rod are provided on described 03, No. 2 mounting rod 04 of No. 1 mounting rod
03, the sliding aperture 09 being arranged on No. 2 mounting rods 04 passes through the shifting sledge 02 and is arranged on the shifting sledge 02, institute
State the two sides that 03, No. 2 mounting rod 04 of No. 1 mounting rod is separately mounted to shifting sledge 02 with respect to bracket 01, the shifting sledge 02
On be provided with length scale line, it is drilled to bar planting by the distance between described No. 1 mounting rod 03 and No. 2 mounting rod 04 of determination
Between distance be determined, to improve the accuracy of bore position;The sliding aperture of 03, No. 2 mounting rod 04 of No. 1 mounting rod
Fixing bolt 15 is provided on 09 side wall, the fixing bolt 15 is threadedly attached in No. 1 mounting rod 03,2 peace
It fills on bar 04, described 03, No. 2 mounting rod 04 of No. 1 mounting rod can be fixed on the shifting sledge by the fixing bolt 15
On 02, guarantee the stability of the support rod 05 when drilling to bar planting;It is arranged on the side wall other side of the locating rod 08
There is the grinding tooth 12 of continuous vertical arrangement, is provided with rotate gear 13, the shaft of the rotate gear 13 on No. 2 mounting rods 04
On be provided with crank 14, the rotate gear 13 is connected with the grinding tooth 12, by shake crank 14 can control it is described fixed
Moving up and down for position bar 08, is the fixation position that locating rod 08 withstands on bar planting, as scale to determine electric drill 06 and locating rod 08
The distance between, the electric drill 06 and the switch of jacking cylinder 07 are arranged on the bracket 01, and staff only needs to control
Make the electric drill 06, drilling to bar planting can be completed in the switch of jacking cylinder 07, easy to operate.
It is illustrated in conjunction with Fig. 1, Fig. 2, Fig. 3 application method and working principle to the utility model, the utility model one
Bracket 01 is moved to specific position, by No. 2 mounting rods 04 in the shifting sledge 02 in drilling by kind drilling device for bonded rebar
Upper movement simultaneously rotates the specific position that the locating rod 08 is withstood on bar planting by crank 14, by No. 1 mounting rod 03 described mobile sliding
On rail 02 mobile specific range guarantee at a distance from No. 1 mounting rod 03 and No. 2 mounting rod 04 so that determine the electric drill 06 with
The distance between locating rod 08 is installed described No. 1 by the fixing bolt 15 with determining the determination position of bar planting drilling
03, No. 2 mounting plate of bar is fixed, and guarantees the stability in drilling, by opening the jacking cylinder 07 for the electricity
06 is bored to jack up and electric drill 06 is made to drill bar planting.
A kind of drilling device for bonded rebar of the utility model, purposes are accurately to be drilled to bar planting.
The above description is only a preferred embodiment of the present invention, therefore all according to described in the utility model patent application range
The equivalent change or modification done of structure, feature and principle, be included in the scope of the utility model patent application.
Claims (5)
1. a kind of drilling device for bonded rebar, it is characterised in that:Including bracket(01), shifting sledge(02), No. 1 mounting rod(03), No. 2
Mounting rod(04), support rod(05), electric drill(06), jacking cylinder(07), locating rod(08), the shifting sledge(02)Level is set
It sets in the bracket(01)On, No. 1 mounting rod(03), No. 2 mounting rods(04)On be provided with sliding aperture(09), described
Slide aperture(09)Profile and the shifting sledge(02)Section profile it is identical, No. 1 mounting rod(03), No. 2 installations
Bar(04)The sliding aperture of upper setting(09)Across the shifting sledge(02)It is arranged in the shifting sledge(02)On, it is described
No. 1 mounting rod(03), No. 2 mounting rods(04)It is separately mounted to shifting sledge(02)Opposite bracket(01)Two sides;No. 1 peace
Fill bar(03)On be fixedly connected with jacking cylinder(07), the jacking cylinder(07)Jacking direction straight up, the jacking
Cylinder(07)Mandril on be fixedly connected with the support rod(05), the support rod(05)Top be fixedly installed with electric drill
(06);No. 2 mounting rods(04)Side wall on be vertically arranged with sliding recess(10), the locating rod(08)Upper side wall side
It is vertically arranged with slide protrusion(11), the slide protrusion(11)It is stuck in the sliding recess(10)It is interior, the sliding recess
(10)With the slide protrusion(11)Opposite sliding, the locating rod(08)The side wall other side on be provided with continuous vertical row
The grinding tooth of column(12), No. 2 mounting rods(04)On be provided with rotate gear(13), the rotate gear(13)Shaft on set
It is equipped with crank(14), the rotate gear(13)With the grinding tooth(12)It is connected;No. 1 mounting rod(03), No. 2 mounting rods
(04)Sliding aperture(09)Fixing bolt is provided on side wall(15), the fixing bolt(15)It is threadedly attached in described
No. 1 mounting rod(03), No. 2 mounting rods(04)On.
2. a kind of drilling device for bonded rebar according to claim 1, it is characterised in that:The bracket(01)Bottom is provided with ten thousand
Way roller is provided with the fixed lock of idler wheel on the universal rolling wheel.
3. a kind of drilling device for bonded rebar according to claim 1, it is characterised in that:The shifting sledge(02)Center it is solid
Surely it is connected to the bracket(01)At center, the shifting sledge(02)On be provided with length scale line, " 0 " of the graduation mark
Groove is arranged in the shifting sledge(02)Center at, to two sides extend numerical value be gradually expanded.
4. a kind of drilling device for bonded rebar according to claim 1, it is characterised in that:The electric drill(06)With support rod(05)
Junction is provided with dust-proof guard(16), the dust-proof guard(16)Vertical projection by the jacking cylinder(07)Included in it
It is interior.
5. a kind of drilling device for bonded rebar according to claim 1, it is characterised in that:The electric drill(06), jacking cylinder
(07)Switch be arranged at the bracket(01)On, the electric drill(06), jacking cylinder(07)Switch be arranged side by side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820692110.2U CN208163249U (en) | 2018-05-10 | 2018-05-10 | A kind of drilling device for bonded rebar |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820692110.2U CN208163249U (en) | 2018-05-10 | 2018-05-10 | A kind of drilling device for bonded rebar |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208163249U true CN208163249U (en) | 2018-11-30 |
Family
ID=64366667
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820692110.2U Expired - Fee Related CN208163249U (en) | 2018-05-10 | 2018-05-10 | A kind of drilling device for bonded rebar |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208163249U (en) |
-
2018
- 2018-05-10 CN CN201820692110.2U patent/CN208163249U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105618812B (en) | A kind of device for rectifying a deviation to building in small space | |
CN105672880A (en) | Improved long spiral drilling machine | |
CN208163249U (en) | A kind of drilling device for bonded rebar | |
CN103670286A (en) | All-dimensional moving base seat for steel pylon composite foundation anchoring drill rig | |
CN203188899U (en) | Full sleeve special-type drilling machine | |
CN205895280U (en) | Multi -angle rotating's multi -functional drill boom device | |
CN111765863B (en) | Measuring device for mine tunnel control point | |
CN115478781A (en) | Remote-control dual deviation rectifying method and device for coal mine drilling | |
CN113295451B (en) | Exploration sampling device suitable for under-consolidated soft land | |
CN211714050U (en) | Foundation pit deformation monitoring device | |
CN210031748U (en) | Highway engineering roadbed compactness field detection device | |
CN106089270A (en) | A kind of multi-functional drill arm assembly of multi-angle rotary | |
CN108303068B (en) | Variable-focus angle-adjustable peeping inclinometer and monitoring method | |
CN202832238U (en) | All-dimensional moving base seat for steel pylon composite foundation anchoring drill rig | |
CN218581655U (en) | Underground excavation engineering pilot tunnel vault top soil pressure meter installation device | |
CN209892109U (en) | Drilling equipment for building engineering | |
CN216386397U (en) | Sampling device for hydraulic engineering quality testing | |
CN219909097U (en) | Quick erection device of building pile foundation detection benchmark stake | |
CN218726247U (en) | Cement board shock resistance testing tool | |
CN211974465U (en) | Supporting structure of assembled precast concrete board | |
CN113752179B (en) | Positioning tool for fixing bolt hole of bottom ring of water turbine | |
CN213087920U (en) | Engineering geology investigation positioner | |
CN219281659U (en) | Online monitor for rotary drilling rig | |
CN220184008U (en) | Anchor rod construction device | |
CN219511848U (en) | Drilling coring device for concrete detection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181130 Termination date: 20210510 |