CN208152071U - A kind of piling strtucture and building - Google Patents
A kind of piling strtucture and building Download PDFInfo
- Publication number
- CN208152071U CN208152071U CN201820406813.4U CN201820406813U CN208152071U CN 208152071 U CN208152071 U CN 208152071U CN 201820406813 U CN201820406813 U CN 201820406813U CN 208152071 U CN208152071 U CN 208152071U
- Authority
- CN
- China
- Prior art keywords
- stake
- king pile
- pile
- grafting set
- support component
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
- Foundations (AREA)
Abstract
A kind of piling strtucture and building provided by the utility model, are related to building foundation technical field, the support component including king pile and including at least one pair stake;The support component is removably attachable to the side wall of the king pile, wherein the secondary stake of the support component is obliquely installed relative to the king pile is angled.In the above-mentioned technical solutions, the pile foundation is removably spliced by king pile and multiple secondary stakes, so can be before construction, process in processing factory prefabricated, then to construction site spliced i.e. can be used, and the structure entirely installed is simple, does not need heavy mechanical equipment and marches into the arena, and installation can be completed with simple device in worker.
Description
Technical field
The utility model relates to building foundation technical fields, more particularly, to a kind of piling strtucture and building.
Background technique
The deep foundation being made of the pile framing (abbreviation cushion cap) of stake and connection stake top or the single pile base being connect by column with pile foundation
Plinth, abbreviation pile foundation.If pile body is all embedded in soil, cushion cap bottom surface is contacted with the soil body, then referred to as embedded footing on piles, low capped pile foundation;If pile body top
It bassets and cushion cap bottom is located at ground or more, then referred to as elevated footing on piles.
Common small building foundation structure has cast-in-situ steel reinforced concrete basis, prefabricated PC tubular pole and bored concrete pile foundation etc..
General cast-in-situ steel reinforced concrete basis needs first to excavate foundation trench, then assembling reinforcement, then carries out formwork supporting plate operation, finally pours
Concrete, after concrete curing reaches intensity requirement, form removal, backfilling of earthwork.
But the entire work progress complex procedures of above-mentioned this foundation construction, so will result in long construction period,
Problem at high cost, and then influence the construction efficiency of whole building foundation structure.
Utility model content
The purpose of this utility model is to provide a kind of piling strtucture and buildings, existing in the prior art to solve
The technical issues of cast-in-situ steel reinforced concrete foundation construction low efficiency that foundation structure of building uses.
A kind of piling strtucture provided by the utility model, the support component including king pile and including at least one pair stake;
The support component is removably attachable to the side wall of the king pile, wherein the secondary stake of the support component is opposite
It is obliquely installed in the king pile is angled.
In the above-mentioned technical solutions, the pile foundation is removably spliced by king pile and multiple secondary stakes, so can
It is prefabricated process in processing factory before construction, it then can be used being spliced to construction site, and entirely fill
The structure of machine is simple, does not need heavy mechanical equipment and marches into the arena, and installation can be completed with simple device in worker.
Also, the intensity of this pile foundation is high, and cost of labor, cost are cheap, and transportation cost is also very low, greatly reduce
Entire construction cost.
It is poured moreover, this foundation pile structure is not required to formwork at the scene in entire work progress, does not also need live maintenance.
Even discarded piling strtucture is also easy to clear up later, simple cleaning can make land restoration as former state after discarded, hardly
Damage to land.
Further, in the embodiments of the present invention, the secondary stake of the support component is relative to the king pile length
Plane where direction is angled to be obliquely installed.
It in the above-mentioned technical solutions, can be using relative to the king pile by the angled inclined set-up mode of the secondary stake
Plane where length direction is angled to be obliquely installed.
Further, in the embodiments of the present invention, the secondary stake of the support component is relative to the king pile length
The vertical plane in direction is angled to be obliquely installed.
It in the above-mentioned technical solutions, can be using relative to the king pile by the angled inclined set-up mode of the secondary stake
The vertical plane of length direction is angled to be obliquely installed.
Further, in the embodiments of the present invention, the support component includes the first secondary stake, the second secondary stake, the
Three secondary stakes and fourth officer stake;
The angle that described first secondary stake, the second secondary stake, the stake of third pair and fourth officer stake are obliquely installed relative to the king pile
It is different.
In the above-mentioned technical solutions, using the first secondary stake, the second secondary stake, the stake of third pair and fourth officer stake four secondary stake cooperations
Using the structure of entire foundation pile can be made more stable, and by the setting of different angle, it will form cross one another structure,
To which the stability of whole foundation pile be greatly improved.
Further, it in the embodiments of the present invention, is provided on the king pile and support component cooperation
Fixation kit;
The fixation kit includes at least one grafting set, and the grafting set is set relative to the angled inclination of the king pile
It sets, the pair stake is plugged in the grafting set.
In the above-mentioned technical solutions, secondary stake is assembled come what can be more easier to secondary stake progress grafting using fixation kit
It is disassembled in king pile or on king pile, improves the construction efficiency in work progress.
Further, in the embodiments of the present invention, the fixation kit includes the first grafting set, the second grafting
Set, third grafting set and the 4th grafting set;
The first grafting set, the second grafting set, third grafting set and the 4th grafting set are set relative to king pile inclination
The angle set is different.
In the above-mentioned technical solutions, using the first grafting set, the second grafting set, third grafting set and the 4th grafting set
Opposite described first secondary stake, the second secondary stake, the stake of third pair and fourth officer stake can be plugged and fixed, utilize four secondary stakes
With the use of the structure of entire foundation pile can be made more stable, and by the setting of different angle, will form cross one another
Structure, so that the stability of whole foundation pile be greatly improved.
Further, in the embodiments of the present invention, the king pile uses steel pipe.
In the above-mentioned technical solutions, whole intensity can be improved using steel pipe in the king pile.
Further, in the embodiments of the present invention, the pair stake uses steel pipe.
In the above-mentioned technical solutions, whole intensity can be improved using steel pipe in the secondary stake.
Further, in the embodiments of the present invention, zinc layers are coated on the steel pipe.
In the above-mentioned technical solutions, being coated with zinc layers on the steel pipe can be improved corrosion resistance.
The utility model additionally provides a kind of building, including piling strtucture described above.
In the above-mentioned technical solutions, the building uses piling strtucture described above, the pile foundation by king pile and
Multiple pair stakes are removably spliced, thus can before construction, process in processing factory it is prefabricated, then to applying
Work scene, which is spliced, can be used, and the structure entirely installed is simple, does not need heavy mechanical equipment and marches into the arena, worker's letter
Installation can be completed in single device.
Also, the intensity of this pile foundation is high, and cost of labor, cost are cheap, and transportation cost is also very low, greatly reduce
Entire construction cost.
It is poured moreover, this foundation pile structure is not required to formwork at the scene in entire work progress, does not also need live maintenance.
Even discarded piling strtucture is also easy to clear up later, simple cleaning can make land restoration as former state after discarded, hardly
Damage to land.
Detailed description of the invention
It, below will be right in order to illustrate more clearly of specific embodiment of the present invention or technical solution in the prior art
Specific embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, it is described below
In attached drawing be that some embodiments of the utility model are not paying creativeness for those of ordinary skill in the art
Under the premise of labour, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the first schematic perspective view of piling strtucture provided by the embodiment of the utility model;
Fig. 2 is the second schematic perspective view of piling strtucture provided by the embodiment of the utility model;
Fig. 3 is the first overlooking structure diagram of piling strtucture provided by the embodiment of the utility model;
Fig. 4 is the second overlooking structure diagram of piling strtucture provided by the embodiment of the utility model.
Appended drawing reference:
1- king pile;
2- the first grafting set;3- the second grafting set;4- third grafting set;
The 4th grafting set of 5-;
The secondary stake of 6- first;The secondary stake of 7- second;8- third pair stake;
9- fourth officer stake.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing, it is clear that described
Embodiment is the utility model a part of the embodiment, instead of all the embodiments.Based on the embodiments of the present invention, originally
Field those of ordinary skill every other embodiment obtained without making creative work belongs to practical
Novel protected range.
It is in the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", " perpendicular
Directly ", the orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only
For ease of description the utility model and simplify description, rather than the device or element of indication or suggestion meaning must have it is specific
Orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.In addition, term " the
One ", " second ", " third " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified
Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally
Connection;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary,
It can be the connection inside two elements.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition
The concrete meaning of language in the present invention.
Fig. 1 is the first schematic perspective view of piling strtucture provided by the embodiment of the utility model;Fig. 2 is that this is practical new
Second schematic perspective view of the piling strtucture that type embodiment provides;Fig. 3 is pile foundation knot provided by the embodiment of the utility model
First overlooking structure diagram of structure;Fig. 4 is that the second plan structure of piling strtucture provided by the embodiment of the utility model is illustrated
Figure;As shown in Figs 1-4, a kind of piling strtucture provided in this embodiment, the support including king pile 1 and including at least one pair stake
Component;
The support component is removably attachable to the side wall of the king pile 1, wherein the secondary stake of the support component is opposite
It is obliquely installed in the king pile 1 is angled.
When specifically used, since the pile foundation is removably spliced by king pile 1 and multiple secondary stakes, so
Before construction, process in processing factory prefabricated, then can be used being spliced to construction site, and entirely install
Structure it is simple, do not need heavy mechanical equipment and march into the arena, installation can be completed with simple device in worker.
Also, the intensity of this pile foundation is high, and cost of labor, cost are cheap, and transportation cost is also very low, greatly reduce
Entire construction cost.
It is poured moreover, this foundation pile structure is not required to formwork at the scene in entire work progress, does not also need live maintenance.
Even discarded piling strtucture is also easy to clear up later, simple cleaning can make land restoration as former state after discarded, hardly
Damage to land.
Further, in the embodiments of the present invention, the secondary stake of the support component is relative to 1 length of king pile
Plane where direction is angled to be obliquely installed.
So can be using relative to the 1 length direction institute of king pile by the angled inclined set-up mode of the secondary stake
Plane angled be obliquely installed.
Further, in the embodiments of the present invention, the secondary stake of the support component is relative to 1 length of king pile
The vertical plane in direction is angled to be obliquely installed.
So the angled inclined set-up mode of the secondary stake can be hung down using relative to 1 length direction of king pile
Straight plane is angled to be obliquely installed.
It is of course also possible to according to actual needs, by the secondary stake both relative to flat where 1 length direction of king pile
Face is angled while be obliquely installed, and also makes the pair stake vertical relative to 1 length direction of king pile plane is angled again to incline
Tiltedly setting.
In this case, pass through being obliquely installed in two-dimensional surface, it will be able to further enhance its inclined diversity, make
Multiple pair stakes staggered setting in overall structure, improve its stability used.
Fig. 2 is the second schematic perspective view of piling strtucture provided by the embodiment of the utility model;Fig. 4 is that this is practical new
Second overlooking structure diagram of the piling strtucture that type embodiment provides.As shown in Figure 2 and Figure 4, in the implementation of the utility model
In example, the support component includes the first secondary stake 6, second secondary stake 7, third pair stake 8 and fourth officer stake 9;
What the described first secondary stake 6, second secondary stake 7, third pair stake 8 and fourth officer stake 9 was obliquely installed relative to the king pile 1
Angle is different.
So being used cooperatively and can make using the first secondary stake 7 of secondary stake 6, second, third pair stake 8 and fourth officer stake 9 four secondary stakes
The structure of entire foundation pile is more stable, and by the setting of different angle, will form cross one another structure, thus by whole
The stability of body foundation pile greatly improves.
Further, it in the embodiments of the present invention, is provided on the king pile 1 and support component cooperation
Fixation kit;
The fixation kit includes at least one grafting set, and the grafting set is set relative to the angled inclination of the king pile 1
It sets, the pair stake is plugged in the grafting set.
So using fixation kit come to secondary stake carry out that grafting can be more easier by secondary stake assembly in king pile 1 or
It is disassembled on king pile 1, improves the construction efficiency in work progress.
Further, in the embodiments of the present invention, the fixation kit includes that the first grafting covers the 2, second grafting
Set 3, third grafting set 4 and the 4th grafting set 5;
First grafting covers the 2, second grafting set 3, third grafting set 4 and the 4th grafting set 5 and inclines relative to the king pile 1
The angle being tiltedly arranged is different.
It can be opposite so covering the 2, second grafting set 3, third grafting set 4 and the 4th grafting set 5 using first grafting
The described first secondary stake 6, second secondary stake 7, third pair stake 8 and fourth officer stake 9 is plugged and fixed, utilize four secondary stakes cooperations
Using the structure of entire foundation pile can be made more stable, and by the setting of different angle, it will form cross one another structure,
To which the stability of whole foundation pile be greatly improved.
Further, in the embodiments of the present invention, the king pile 1 uses steel pipe.So the king pile 1 uses
Whole intensity can be improved in steel pipe.
Further, in the embodiments of the present invention, the pair stake uses steel pipe.So the pair stake uses steel
Whole intensity can be improved in pipe.
Further, in the embodiments of the present invention, zinc layers are coated on the steel pipe.So being plated on the steel pipe
There are zinc layers that corrosion resistance can be improved.
The utility model additionally provides a kind of building, including piling strtucture described above.
Since the specific structure of the piling strtucture, the principle of work and power and technical effect are in detailed hereinbefore, herein just not
It repeats again.
So any technology contents about the piling strtucture, can refer to above for the piling strtucture
Record.
From the foregoing, it will be observed that the building uses piling strtucture described above, which passes through king pile 1 and multiple secondary stakes
Removably be spliced, thus can before construction, process in processing factory it is prefabricated, then to construction site into
Row splicing can be used, and the structure entirely installed is simple, does not need heavy mechanical equipment and marches into the arena, and worker is with simple device
Achievable installation.
Also, the intensity of this pile foundation is high, and cost of labor, cost are cheap, and transportation cost is also very low, greatly reduce
Entire construction cost.
It is poured moreover, this foundation pile structure is not required to formwork at the scene in entire work progress, does not also need live maintenance.
Even discarded piling strtucture is also easy to clear up later, simple cleaning can make land restoration as former state after discarded, hardly
Damage to land.
Finally it should be noted that:The above various embodiments is only to illustrate the technical solution of the utility model, rather than limits it
System;Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should
Understand:It is still possible to modify the technical solutions described in the foregoing embodiments, or to some or all of
Technical characteristic is equivalently replaced;And these are modified or replaceed, it does not separate the essence of the corresponding technical solution, and this is practical new
The range of each embodiment technical solution of type.
Claims (10)
1. a kind of piling strtucture, which is characterized in that the support component including king pile and including at least one pair stake;
The support component is removably attachable to the side wall of the king pile, wherein the secondary stake of the support component is relative to institute
State that king pile is angled to be obliquely installed.
2. piling strtucture according to claim 1, which is characterized in that the secondary stake of the support component is relative to the king pile
Plane where length direction is angled to be obliquely installed.
3. piling strtucture according to claim 1, which is characterized in that the secondary stake of the support component is relative to the king pile
The vertical plane of length direction is angled to be obliquely installed.
4. piling strtucture according to claim 1, which is characterized in that the support component includes the first secondary stake, the second pair
Stake, the stake of third pair and fourth officer stake;
The angle that the first secondary stake, the second secondary stake, the stake of third pair and fourth officer stake are obliquely installed relative to the king pile is not
Together.
5. piling strtucture according to claim 1, which is characterized in that be provided on the king pile and match with the support component
The fixation kit of conjunction;
The fixation kit includes at least one grafting set, and the grafting set is obliquely installed relative to the king pile is angled, institute
Secondary stake is stated to be plugged in the grafting set.
6. piling strtucture according to claim 5, which is characterized in that the fixation kit includes the first grafting set, second
Grafting set, third grafting set and the 4th grafting set;
What the first grafting set, the second grafting set, third grafting set and the 4th grafting set were obliquely installed relative to the king pile
Angle is different.
7. piling strtucture according to claim 1, which is characterized in that the king pile uses steel pipe.
8. piling strtucture according to claim 1, which is characterized in that the pair stake uses steel pipe.
9. piling strtucture according to claim 7 or 8, which is characterized in that be coated with zinc layers on the steel pipe.
10. a kind of building, which is characterized in that including piling strtucture as claimed in any one of claims 1-9 wherein.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820406813.4U CN208152071U (en) | 2018-03-23 | 2018-03-23 | A kind of piling strtucture and building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820406813.4U CN208152071U (en) | 2018-03-23 | 2018-03-23 | A kind of piling strtucture and building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208152071U true CN208152071U (en) | 2018-11-27 |
Family
ID=64392783
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820406813.4U Active CN208152071U (en) | 2018-03-23 | 2018-03-23 | A kind of piling strtucture and building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208152071U (en) |
-
2018
- 2018-03-23 CN CN201820406813.4U patent/CN208152071U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2036832C (en) | Pinned foundation system | |
KR101341679B1 (en) | Device for constructing an underground structure and method thereof | |
CA2420991A1 (en) | Integrated footings | |
CN208395826U (en) | Foundation pit wall surface bracing reinforcement connection structure | |
CN110777802A (en) | Deep foundation pit high-low span supporting structure and construction method thereof | |
CN206396783U (en) | Assembled prefabricated ring main unit basis | |
CN104897143A (en) | Cylinder forced centering observation pillar and embedment method thereof | |
CN208152071U (en) | A kind of piling strtucture and building | |
JP5693778B1 (en) | Temporary mountain retaining structure and temporary mountain retaining method | |
CN205531668U (en) | Bored concrete pile basis assembled enclosure | |
CN109797753B (en) | Upright column pile suitable for high rock surface field foundation pit and construction method of lattice column | |
CN110468721A (en) | A kind of large span trestle Cantilever Construction Method | |
JP3684347B2 (en) | Construction method of precast concrete water tank | |
CN105544559A (en) | Structure and method for foundation pit supporting by adopting prefabricated parts | |
KR102316050B1 (en) | Monorail apparatus for mountainous terrain and its building method | |
CN209293036U (en) | A kind of prefabricated foundation pit enclosure system | |
CN209816838U (en) | A construction platform for pouring bored concrete pile concrete | |
CN109881667B (en) | Construction platform for pouring cast-in-place pile concrete and construction method thereof | |
CN106545018A (en) | Excavation slope excavation construction process and excavation slope | |
CN105951844A (en) | Roof node structure adopting cover-excavation method and construction method of roof node structure | |
CN110751880B (en) | Telegraph pole assembling or centralizing training device and method | |
JP2002227220A (en) | Foundation for dwelling and foundation construction method | |
CN205348192U (en) | Shoring of trench lattice formula stand structure | |
CN216664110U (en) | A reinforced structure for existing stake of existing building | |
JPH06257169A (en) | Small-scale basement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |