CN205348192U - Shoring of trench lattice formula stand structure - Google Patents

Shoring of trench lattice formula stand structure Download PDF

Info

Publication number
CN205348192U
CN205348192U CN201521103431.7U CN201521103431U CN205348192U CN 205348192 U CN205348192 U CN 205348192U CN 201521103431 U CN201521103431 U CN 201521103431U CN 205348192 U CN205348192 U CN 205348192U
Authority
CN
China
Prior art keywords
purlin
vertical rod
pole setting
batten plate
foundation ditch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521103431.7U
Other languages
Chinese (zh)
Inventor
苏培奇
吴健
郭军强
蔡敬义
黎萍
詹俊宇
张钦诚
陈娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foundation Design Group Co Ltd Of Guangdong Province
Original Assignee
Foundation Design Group Co Ltd Of Guangdong Province
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foundation Design Group Co Ltd Of Guangdong Province filed Critical Foundation Design Group Co Ltd Of Guangdong Province
Priority to CN201521103431.7U priority Critical patent/CN205348192U/en
Application granted granted Critical
Publication of CN205348192U publication Critical patent/CN205348192U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a shoring of trench lattice formula stand structure, including being located the pole setting of four right angle positions in the rectangle and being located a plurality of connecting pieces of the first -class distance distribution of each pole setting, be located and link to each other through the batten plate between double -phase adjacent of coplanar connecting piece, be located and be connected with the purlin between upper and lower double -phase adjacent of same side batten plate, still be equipped with be under construction in proper order from last under with each pole setting homogeneous phase a plurality of concrete backup pads even. This shoring of trench lattice formula stand structure forms at batten plate between the pole setting and purlin fixed connection through pole setting and the connection that is located four right angle positions on the rectangle stand, utilize the condition that bottom scar height and intensity are big, can make things convenient for this stand structure in the work progress, again from last to excavating earthwork construction down and carrying out the installation of batten plate and purlin after fixing each pole setting, avoid lattice formula stand assemble in advance accomplish after in the work progress loaded down with trivial details pore -forming process, reach safety, the mesh of quick construction, this utility model is used for the architectural engineering technology field.

Description

A kind of foundation ditch supports lattice pillar construction
Technical field
This utility model relates to construction engineering technical field, particularly relates to a kind of foundation ditch and supports lattice pillar construction.
Background technology
In foundation pit construction, if it is excessive to support span, supports intermediate demand and column is set, and lattice column is one of common column form.
At present, the construction of general lattice column is first to process lattice column, and then while construction stand column pile, entirety hangs onto in column stake holes, constructs together with stand column pile.Traditional stand column pile construction adopts punching, manually digging hole, rotation the method pore-forming such as to dig more, and the scar for some foundation ditches is high, and the construction environment that rock strength is big, and traditional forming hole method difficulty of construction is big, the duration slowly, the added cost caused.
Utility model content
The purpose of this utility model is in that to provide a kind of foundation ditch realizing constructing safely and fast to support lattice pillar construction.
Technical solution adopted in the utility model is:
A kind of foundation ditch supports lattice pillar construction, including being positioned at the vertical rod of four right-angle positions of rectangle and the some connectors being positioned in each vertical rod to equidistantly distribute, it is connected by batten plate between the two adjacent connectors being generally aligned in the same plane, what be positioned at same side is connected to purlin between two adjacent batten plates up and down, is additionally provided with from the some concrete support plates being all connected with each vertical rod constructed successively under upper.
Being further used as the improvement of technical solutions of the utility model, vertical rod is cylindric rod member, and connector is the hooping structure arranged around vertical rod, and connector includes two semicircle anchor ears that both sides are bolted to connection.
It is further used as the improvement of technical solutions of the utility model, is connected to the batten plate between vertical rod and purlin welding procedure all from top to bottom.
Being further used as the improvement of technical solutions of the utility model, four vertical rods are positioned at foursquare four right-angle positions.
Being further used as the improvement of technical solutions of the utility model, each purlin being positioned at same side is welded and fixed in " it " font.
The beneficial effects of the utility model: this foundation ditch is supported lattice pillar construction and is fixedly connected to form by the vertical rod that is positioned at four right-angle positions of rectangle column and the batten plate and the purlin that are connected between vertical rod, utilize the condition that bottom scar is high and intensity is big, can facilitate this pillar construction in work progress, after each vertical rod being fixed, earth excavation is constructed and carries out the installation of batten plate and purlin from top to bottom again, pore forming process loaded down with trivial details in work progress after avoiding the assembly in advance of lattice column to complete, reaches the purpose of safety, rapid construction.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described in further detail:
Fig. 1 is that this utility model embodiment has been constructed rear overall structure schematic diagram;
Fig. 2 is structural representation in this utility model embodiment work progress;
Fig. 3 is this utility model embodiment work progress structure top view.
Detailed description of the invention
With reference to Fig. 1~Fig. 3, this utility model is that a kind of foundation ditch supports lattice pillar construction, including being positioned at the vertical rod 1 of four right-angle positions of rectangle and being positioned in each vertical rod 1 the some connectors 2 equidistantly distributed, it is connected by batten plate 3 between the two adjacent connectors 2 being generally aligned in the same plane, what be positioned at same side is connected to purlin 4 between two adjacent batten plates 3 up and down, is additionally provided with from the some concrete support plates 5 being all connected with each vertical rod 1 constructed successively under upper.
This foundation ditch is supported lattice pillar construction and is fixedly connected to form by the vertical rod 1 that is positioned at four right-angle positions of rectangle column and the batten plate 3 and the purlin 4 that are connected between vertical rod 1, utilize the condition that bottom scar is high and intensity is big, can facilitate this pillar construction in work progress, after each vertical rod 1 being fixed, earth excavation is constructed and carries out batten plate 3 and the installation of purlin 4 from top to bottom again, pore forming process loaded down with trivial details in work progress after avoiding the assembly in advance of lattice column to complete, reaches the purpose of safety, rapid construction.
As this utility model preferred embodiment, vertical rod 1 is cylindric rod member, and connector 2 is the hooping structure arranged around vertical rod 1, and connector 2 includes two semicircle anchor ears that both sides are bolted to connection.
As this utility model preferred embodiment, the batten plate 3 between vertical rod 1 and purlin 4 welding procedure all from top to bottom it are connected to.
As this utility model preferred embodiment, four vertical rods 1 are positioned at foursquare four right-angle positions.
As this utility model preferred embodiment, each purlin 4 being positioned at same side is welded and fixed in " it " font.
This lattice pillar construction, in work progress, according to the length of required lattice column, can make four vertical rods 1 and supporting connector 2, batten plate 3 and purlin 4 that constitute lattice column.
Bore the position, hole for placing four vertical rods 1, the most big 4~10cm of major axis of vertical rod 1 of each hole aperture ratio lattice column, the vertical rod 1 of lattice column is installed, adopt cement mortar grouting fully-jewelled hole, and repeat the installation that above step completes its excess-three vertical rod 1 of lattice column, earth excavation subsequently, connects four vertical rods 1 then first concrete support plate 5 of constructing by connector 2 and batten plate 3, purlin 4.
Excavation is behind the position of lower road concrete support plate 5, connect connector 2, welding batten plate 3 and purlin 4 in time, column is made to be linked to be entirety with connector 2, batten plate 3 and purlin 4, form lattice column, and carry out the construction of lower road concrete support plate 5, and repeat the above steps, until excavation completes to foundation ditch.
Certainly, the invention is not limited to above-mentioned embodiment, those of ordinary skill in the art also can make equivalent variations or replacement under the premise without prejudice to this utility model spirit, and these equivalent modification or replacement are all contained in the application claim limited range.

Claims (5)

1. a foundation ditch supports lattice pillar construction, it is characterized in that: include being positioned at the vertical rod of four right-angle positions of rectangle and be positioned in each described vertical rod the some connectors equidistantly distributed, it is connected by batten plate between the two adjacent described connectors being generally aligned in the same plane, what be positioned at same side is connected to purlin between two adjacent described batten plates up and down, is additionally provided with from the some concrete support plates being all connected with each described vertical rod constructed successively under upper.
2. foundation ditch according to claim 1 supports lattice pillar construction, it is characterized in that: described vertical rod is cylindric rod member, described connector is the hooping structure arranged around vertical rod, and described connector includes two semicircle anchor ears that both sides are bolted to connection.
3. foundation ditch according to claim 1 supports lattice pillar construction, it is characterised in that: it is connected to the batten plate between described vertical rod and purlin welding procedure all from top to bottom.
4. support lattice pillar construction according in claims 1 to 3 any one described foundation ditch, it is characterised in that: four described vertical rods are positioned at foursquare four right-angle positions.
5. foundation ditch according to claim 4 supports lattice pillar construction, it is characterised in that: each described purlin being positioned at same side is welded and fixed in " it " font.
CN201521103431.7U 2015-12-24 2015-12-24 Shoring of trench lattice formula stand structure Active CN205348192U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521103431.7U CN205348192U (en) 2015-12-24 2015-12-24 Shoring of trench lattice formula stand structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521103431.7U CN205348192U (en) 2015-12-24 2015-12-24 Shoring of trench lattice formula stand structure

Publications (1)

Publication Number Publication Date
CN205348192U true CN205348192U (en) 2016-06-29

Family

ID=56170370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521103431.7U Active CN205348192U (en) 2015-12-24 2015-12-24 Shoring of trench lattice formula stand structure

Country Status (1)

Country Link
CN (1) CN205348192U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109797753A (en) * 2019-03-11 2019-05-24 深圳宏业基岩土科技股份有限公司 Suitable for the stand column pile of high scar place foundation pit and the construction method of lattice column

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109797753A (en) * 2019-03-11 2019-05-24 深圳宏业基岩土科技股份有限公司 Suitable for the stand column pile of high scar place foundation pit and the construction method of lattice column

Similar Documents

Publication Publication Date Title
JP3184322U (en) Solar panel mount
CN103469802A (en) Combined lattice steel frame spray anchoring supporting method and combined lattice steel frame spray anchoring supporting structure
CN102561384A (en) Steel hoop truss type elevated pile cap tower crane foundation construction method and structure
CN203583493U (en) Combined lattice steel frame spray anchoring foundation pit supporting structure
CN207700821U (en) A kind of upright bar stringer
CN109322241A (en) Trestle work structure and construction method
CN205348192U (en) Shoring of trench lattice formula stand structure
CN101851923B (en) Support pillar construction and erection method
CN210460706U (en) Underground roadway supporting device for coal mining
CN204282391U (en) A kind of heel foundation formwork erecting structure
CN110777802A (en) Deep foundation pit high-low span supporting structure and construction method thereof
CN103821136A (en) Suspended single row scaffold and construction method thereof
CN107299596B (en) Concrete support trestle plate lower supporting beam template system and construction method thereof
CN111350187A (en) Template system suitable for large-diameter manual hole digging annular foundation pile and construction method
CN102817617B (en) Novel inhaul cable type shield originating backrest substrate system
KR101297679B1 (en) Self-supporting Temporary Structure Using Steel Wire And Method Of The Same
CN213115585U (en) Stable form bearing structure that building engineering used
CN204282371U (en) A kind of pre-loaded support struts for foundation ditch
CN204590038U (en) A kind of permanent foundation pit supporting construction
CN209412681U (en) Trestle work structure
CN209443577U (en) A kind of steel structure member
CN203377226U (en) Counterweight type solar frame
CN209040103U (en) A kind of hollow sheet pile wall of assembled abnormity
CN103205983B (en) Construction method of basement rear support system
CN104452775A (en) Prestress support used for foundation pit and construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant