CN208125873U - A kind of multifunction insulating experimental rig - Google Patents
A kind of multifunction insulating experimental rig Download PDFInfo
- Publication number
- CN208125873U CN208125873U CN201820767370.1U CN201820767370U CN208125873U CN 208125873 U CN208125873 U CN 208125873U CN 201820767370 U CN201820767370 U CN 201820767370U CN 208125873 U CN208125873 U CN 208125873U
- Authority
- CN
- China
- Prior art keywords
- test
- insulating
- insulation column
- flume
- experimental rig
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Testing Relating To Insulation (AREA)
Abstract
Multifunction insulating experimental rig provided by the present application, including the first test platform and the second test platform;First test platform includes bracket, and the bottom of bracket is equipped with universal wheel.Plane Installation has test flume on bracket, and the side wall of test flume is equipped with slot, according to the big minor adjustment midfeather and diaphragm plate of test flume required for insulating glove and insulating boot.Test flume is equipped with the first insulation column;Metal tie rods are connected on first insulation column, metal tie rods are equipped with fixed link and electrode, and fixed link is connect with insulating fixing clamp by insulating cord and insulating boot, insulating glove can be fixed on test groove edge.Test flume is equipped with valve, opens valve after the completion of test and bleeds off water.Second test platform can test insulating bar, thoroughly do away with different voltage class pressure test requirement insulated lengths, and the adjustable length of clamping groove plate is adjusted.Multifunction insulating experimental rig provided by the present application, increases efficiency.
Description
Technical field
This application involves electric power networking testing equipment field more particularly to a kind of multifunction insulating experimental rigs.
Background technique
Insulating boot, insulating glove and insulating bar in power supply enterprise using extensively, it as supplementary insulation managing security tools and instruments,
To prevent the injury of contact voltage, step voltage, leakage current electric arc to electric operation personnel.It is (or new to prevent in
Set) insulating safety tools performance change or there are hidden danger, it is often necessary to ac voltage withstanding examination is carried out to insulating boot and insulating glove
It tests, but insulating boot and each have their own testing equipment of insulating glove at present, the test period needed is long, influences working efficiency.It is different
Voltage class pressure test when require insulated lengths different, after winding one end with bare copper wire every time, require measurement length
In the winding other end after complete.
Existing insulating glove and insulating boot pressure test single test about ten minutes often, if individually detected,
A large amount of manpower and material resources can be expended;Testing stand is mostly to be fixedly mounted simultaneously, and mobile inconvenient, it is low that there is detection efficiencies, is used
Inconvenient problem.Meanwhile when carrying out the different Articles Tests such as felt pad, insulating bar, insulating cord, live line work clothes, need
It is tested using different platforms, needs more man power and materials, test efficiency is not high.
Utility model content
This application provides a kind of multifunction insulating experimental rigs, to solve the problems, such as to existing experimental rig low efficiency.
This application provides a kind of multifunction insulating experimental rigs, including the first test platform and the second test platform;Institute
It states the first test platform and second test platform is connected through a screw thread;
First test platform includes bracket, and the bottom of the bracket is equipped with universal wheel;
Plane Installation has test flume on the bracket;The test flume is equipped at least two the first opposite insulation branch
Column;Metal tie rods are connected on the first opposite insulation column;The metal tie rods are equipped with several fixed links
With several electrodes;Test lead is installed on the metal tie rods;
Insulating fixing clamp is connected on the fixed link;The insulating fixing clamp passes through insulating cord and the fixation
Link connection;
At least one midfeather and at least one diaphragm plate are additionally provided in the test flume;The midfeather and the tabula
Plate intersects vertically;The side wall of the midfeather, the diaphragm plate and the test flume forms several test flumes;
Slot is equipped on four side walls of the test flume;
The insulating fixing clamp, the quantity of the electrode are identical as the quantity of the test flume;
The lower part of the test flume is equipped with valve;
The test flume is equipped with ground terminal;
Four second insulation columns are additionally provided on the bracket;One end of second insulation column and the bracket connect
It connects;The other end is equipped with internal screw thread;
Second test platform includes third insulation column, guide rail, fixing card frid, adjustable clamping groove plate;Described
One end that three insulation columns are connect with second insulation column is equipped with external screw thread, and the other end is connect with the guide rail;
The fixing card frid is fixed on the insulation column;
The adjustable clamping groove plate is connected on the guide rail by sliding block.
Preferably, the guide rail is equipped with scale.
Preferably, the fixing card frid is equipped with the internal thread hole of several 12mm.
Preferably, the adjustable clamping groove plate is equipped with groove corresponding with the internal thread hole.
Preferably, conducting wire is equipped in each internal thread hole on the fixing card frid.
Preferably, second insulation column and the third insulation column are telescopic prop.
Preferably, first insulation column, second insulation column, the third insulation column use epoxy resin
Material is made.
By the above technology it is found that multifunction insulating experimental rig provided by the present application, including the first test platform and second
Test platform;First test platform includes bracket, and the bottom of the bracket is equipped with universal wheel;Pass through universal wheel
Shift platform onto position that test needs.Plane Installation has test flume on the bracket, and the side wall of test flume is equipped with slot, root
According to the big minor adjustment midfeather and diaphragm plate of test flume required for insulating glove and insulating boot.The test flume is equipped with first
Insulation column;Metal tie rods are connected on first insulation column, the metal tie rods are equipped with fixed link and electricity
Pole, the fixed link, which is connect by insulating cord with insulating fixing clamp, can be fixed on test trough rim for insulating boot, insulating glove
Edge.Test flume is equipped with valve, opens valve after the completion of test and bleeds off water.Second test platform can try insulating bar
It tests, requires insulated lengths when thoroughly doing away with different voltage class pressure tests, by the way that the adjustable length of clamping groove plate is adjusted, be not required to
It often to measure.Multifunction insulating experimental rig provided by the present application, the same device can carry out insulating boot, insulating glove and
The test of insulating bar, and the test of multiple insulating gloves or insulating boot can be carried out simultaneously, increase efficiency.
Detailed description of the invention
In order to illustrate more clearly of the technical solution of the application, letter will be made to attached drawing needed in the embodiment below
Singly introduce, it should be apparent that, for those of ordinary skills, without any creative labor,
It is also possible to obtain other drawings based on these drawings.
Fig. 1 is the structural schematic diagram of multifunction insulating experimental rig provided by the present application;
Fig. 2 is the structural schematic diagram of the first test platform;
Fig. 3 is the structural schematic diagram of slot;
Fig. 4 is the structural schematic diagram of metal tie rods;
Fig. 5 is the structural schematic diagram of the second test platform;
Fig. 6 is the structural schematic diagram of adjustable clamping groove plate;
Fig. 7 is the structural schematic diagram of fixing card frid.
It illustrates:
The first test platform of 10-;11- bracket;12- universal wheel;13- test flume;The first insulation column of 14-;15- metal connects
Extension bar;16- fixes link;17- electrode;18- insulating fixing clamp;19- midfeather;20- diaphragm plate;21- slot;22- valve;
23- ground terminal;The second insulation column of 24-;The second test platform of 25-;26- third insulation column;27- guide rail;28- fixing card
Frid;Clamping groove plate is adjusted in 29-;30- scale;31- internal thread hole;32- groove.
Specific embodiment
Below with reference to the attached drawing in the application, the technical scheme in the embodiment of the application is clearly and completely described,
Obviously, described embodiment is only a part of the embodiment of the application, instead of all the embodiments.Based in the application
Embodiment, every other embodiment obtained by those of ordinary skill in the art without making creative efforts,
It shall fall within the protection scope of the present invention.
In the following description, numerous specific details are set forth in order to facilitate a full understanding of the present invention, but the application can be with
It is different from the other modes that describe again using other to implement, those skilled in the art can be without prejudice to the application intension
In the case of do similar popularization, therefore the present invention is not limited by the specific embodiments disclosed below.
The embodiment of the present application discloses a kind of multifunction insulating experimental rig, including the first test platform 10 and the second test
Platform 25;First test platform 10 and second test platform 25 are connected through a screw thread;First test platform 10
Including bracket 11, the bottom of the bracket 11 is equipped with universal wheel 12;Plane Installation has test flume 13 on the bracket 11;It is described
Test flume 13 is equipped at least two the first opposite insulation columns 14;Gold is connected on the first opposite insulation column 14
Belong to connecting rod 15;The metal tie rods 15 are equipped with several fixed links 16 and several electrodes 17;The metal tie rods 15
On test lead is installed;Insulating fixing clamp 18 is connected on the fixed link 16;The insulating fixing clamp 18 passes through insulation
Rope is connect with the fixed link 16;At least one midfeather 19 and at least one tabula are additionally provided in the test flume 13
Plate 20;The midfeather 19 intersects vertically with the diaphragm plate 20;The midfeather 19, the diaphragm plate 20 and the test
The side wall of slot 13 forms several test flumes 13;Slot 21 is equipped on four side walls of the test flume 13;The insulation is solid
Clamp 18, the quantity of the electrode 17 are identical as the quantity of the test flume 13;The lower part of the test flume 13 is equipped with valve 22;
The test flume 13 is equipped with ground terminal 23;Four second insulation columns 24 are additionally provided on the bracket 11;Described second absolutely
One end of edge pillar 24 is connect with the bracket 11;The other end is equipped with internal screw thread;Second test platform 25 includes that third is exhausted
Edge pillar 26, guide rail 27, fixing card frid 28, adjustable clamping groove plate 29;The third insulation column 26 and second insulation
One end that pillar 24 connects is equipped with external screw thread, and the other end is connect with the guide rail 27;The fixing card frid 28 is fixed on described
On insulation column;The adjustable clamping groove plate 29 is connected on the guide rail 27 by sliding block.
Carry out insulating boot insulating glove Insulation Test when, according to progress be insulating boot or insulating glove test
Adjust the distance of midfeather 19 and diaphragm plate 20.Then insulating boot insulating glove is fixed and test flume by insulating fixing clamp 18
Electrode 17 is placed in insulating boot insulating glove by 13 edges.Secondly it is filled the water into test flume 13 and insulating boot insulating glove;Most
The pressurization of electrode 17 is tested afterwards.
When carrying out the Insulation Test of insulating bar, the distance of clamping groove plate 29 is adjusted according to different voltages level adjustment, it will
The both ends of insulating bar are placed in fixing card frid 28 and adjustable clamping groove plate 29, then bare copper wire is grounded by winding bare copper wire,
Then pressurization is tested.
By the above technology it is found that multifunction insulating experimental rig provided by the present application, including the first test platform 10 and
Two test platforms 25;First test platform 10 includes bracket 11, and the bottom of the bracket 11 is equipped with universal wheel 12;Pass through
Platform can be shifted onto the position that test needs by universal wheel 12.Plane Installation has test flume 13, test flume on the bracket 11
13 side wall is equipped with slot 21, according to big 19 He of minor adjustment midfeather of test flume 13 required for insulating glove and insulating boot
Diaphragm plate 20.The test flume 13 is equipped with the first insulation column 14;Metal connection is connected on first insulation column 14
Bar 15, the metal tie rods 15 are equipped with fixed link 16 and electrode 17, and the fixed link 16 passes through insulating cord and insulation
Insulating boot, insulating glove can be fixed on 13 edge of test flume by the connection of fixing clamp 18.Test flume 13 is equipped with valve 22, test
Valve 22 is opened after the completion to bleed off water.Second test platform 25 can test insulating bar, thoroughly do away with different voltage etc.
Insulated lengths are required when grade pressure test, by the way that the adjustable length of clamping groove plate 29 is adjusted, do not need often to measure.The application
The multifunction insulating experimental rig of offer, the same device can carry out the test of insulating boot, insulating glove and insulating bar, and
The test that can carry out multiple insulating gloves or insulating boot simultaneously, increases efficiency.
Preferably, the guide rail 27 is equipped with scale 30.Adjustable card intuitively can be adjusted according to different voltages grade
The position of frid 29.
Preferably, the fixing card frid 28 is equipped with the internal thread hole 31 of several 12mm.The internal thread hole 31 of 12mm
Want to match with the outside threaded holes of attachment device, can quickly fix insulating bar.
Preferably, the adjustable clamping groove plate 29 is equipped with groove 32 corresponding with the internal thread hole 31.By insulating bar
The other end lie in groove 32, the groove 32 of opening can be convenient placement and take out.
Preferably, conducting wire is equipped in each internal thread hole 31 on the fixing card frid 28.Wiring can be saved in this way
Time.
Preferably, second insulation column 24 and the third insulation column 26 are telescopic prop.It can basis
The height for needing to adjust the second insulation column 24 and the second insulation column 24 adapts to various demands.
Preferably, first insulation column 14, second insulation column 24, the third insulation column 26 use ring
Oxygen resin material makes.
By the above technology it is found that multifunction insulating experimental rig provided by the present application, including the first test platform 10 and
Two test platforms 25;First test platform 10 includes bracket 11, and the bottom of the bracket 11 is equipped with universal wheel 12;Pass through
Platform can be shifted onto the position that test needs by universal wheel 12.Plane Installation has test flume 13, test flume on the bracket 11
13 side wall is equipped with slot 21, according to big 19 He of minor adjustment midfeather of test flume 13 required for insulating glove and insulating boot
Diaphragm plate 20.The test flume 13 is equipped with the first insulation column 14;Metal connection is connected on first insulation column 14
Bar 15, the metal tie rods 15 are equipped with fixed link 16 and electrode 17, and the fixed link 16 passes through insulating cord and insulation
Insulating boot, insulating glove can be fixed on 13 edge of test flume by the connection of fixing clamp 18.Test flume 13 is equipped with valve 22, test
Valve 22 is opened after the completion to bleed off water.Second test platform 25 can test insulating bar, thoroughly do away with different voltage etc.
Insulated lengths are required when grade pressure test, by the way that the adjustable length of clamping groove plate 29 is adjusted, do not need often to measure.The application
The multifunction insulating experimental rig of offer, the same device can carry out the test of insulating boot, insulating glove and insulating bar, and
The test that can carry out multiple insulating gloves or insulating boot simultaneously, increases efficiency.
The application above embodiments are only for technical scheme for example, being not intended to limit the present invention.
Therefore, the scope of the present invention, should be as listed in the claims.
Claims (7)
1. a kind of multifunction insulating experimental rig, which is characterized in that including the first test platform (10) and the second test platform
(25);First test platform (10) and second test platform (25) are connected through a screw thread;
First test platform (10) includes bracket (11), and the bottom of the bracket (11) is equipped with universal wheel (12);
Plane Installation has test flume (13) on the bracket (11);The test flume (13) is equipped at least two opposite first
Insulation column (14);Metal tie rods (15) are connected on opposite first insulation column (14);The metal tie rods
(15) several fixed links (16) and several electrodes (17) are equipped with;Test lead is installed on the metal tie rods (15);
Insulating fixing clamp (18) are connected on the fixed link (16);The insulating fixing clamp (18) by insulating cord with it is described
Fixed link (16) connection;
At least one midfeather (19) and at least one diaphragm plate (20) are additionally provided in the test flume (13);The midfeather
(19) it intersects vertically with the diaphragm plate (20);The midfeather (19), the diaphragm plate (20) and the test flume (13)
Side wall form several test flumes;
Slot (21) are equipped on four side walls of the test flume (13);
The insulating fixing clamp (18), the quantity of the electrode (17) are identical as the quantity of the test flume (13);
The lower part of the test flume (13) is equipped with valve (22);
The test flume (13) is equipped with ground terminal (23);
Four second insulation columns (24) are additionally provided on the bracket (11);One end of second insulation column (24) with it is described
Bracket (11) connection;The other end is equipped with internal screw thread;
Second test platform (25) includes third insulation column (26), guide rail (27), fixing card frid (28), adjustable card
Frid (29);One end that the third insulation column (26) connect with second insulation column (24) is equipped with external screw thread, another
End is connect with the guide rail (27);
The fixing card frid (28) is fixed on the third insulation column (26);
The adjustable clamping groove plate (29) is connected on the guide rail (27) by sliding block.
2. multifunction insulating experimental rig according to claim 1, which is characterized in that the guide rail (27) is equipped with scale
(30)。
3. multifunction insulating experimental rig according to claim 1, which is characterized in that set on the fixing card frid (28)
There is the internal thread hole (31) of several 12mm.
4. multifunction insulating experimental rig according to claim 3, which is characterized in that the adjustable clamping groove plate (29)
It is equipped with groove (32) corresponding with the internal thread hole (31).
5. multifunction insulating experimental rig according to claim 3, which is characterized in that every on the fixing card frid (28)
Conducting wire is equipped in a internal thread hole (31).
6. multifunction insulating experimental rig according to claim 1, which is characterized in that second insulation column (24) and
The third insulation column (26) is telescopic prop.
7. multifunction insulating experimental rig according to claim 1, which is characterized in that first insulation column (14),
Second insulation column (24), the third insulation column (26) are made using epoxide resin material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820767370.1U CN208125873U (en) | 2018-05-18 | 2018-05-18 | A kind of multifunction insulating experimental rig |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820767370.1U CN208125873U (en) | 2018-05-18 | 2018-05-18 | A kind of multifunction insulating experimental rig |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208125873U true CN208125873U (en) | 2018-11-20 |
Family
ID=64185449
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820767370.1U Active CN208125873U (en) | 2018-05-18 | 2018-05-18 | A kind of multifunction insulating experimental rig |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208125873U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109298304A (en) * | 2018-11-26 | 2019-02-01 | 广东电网有限责任公司 | Insulating glove and insulating boot pressure test case |
CN112782522A (en) * | 2021-02-03 | 2021-05-11 | 武汉光宇电力新技术有限公司 | Withstand voltage test production line of insulating gloves and insulating boots |
CN114487812A (en) * | 2021-12-20 | 2022-05-13 | 广州广重企业集团有限公司 | Generator test device |
CN118362846A (en) * | 2024-06-20 | 2024-07-19 | 青岛鼎信通讯股份有限公司 | Withstand voltage detection device of transformer material for electric energy meter |
-
2018
- 2018-05-18 CN CN201820767370.1U patent/CN208125873U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109298304A (en) * | 2018-11-26 | 2019-02-01 | 广东电网有限责任公司 | Insulating glove and insulating boot pressure test case |
CN112782522A (en) * | 2021-02-03 | 2021-05-11 | 武汉光宇电力新技术有限公司 | Withstand voltage test production line of insulating gloves and insulating boots |
CN114487812A (en) * | 2021-12-20 | 2022-05-13 | 广州广重企业集团有限公司 | Generator test device |
CN118362846A (en) * | 2024-06-20 | 2024-07-19 | 青岛鼎信通讯股份有限公司 | Withstand voltage detection device of transformer material for electric energy meter |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208125873U (en) | A kind of multifunction insulating experimental rig | |
CN204925164U (en) | Electric power wiring anchor clamps | |
CN112213524A (en) | Experimental termination of multi-functional transformer of 110kV and above transformer suspension type | |
CN105116197A (en) | A fast wiring device for 750kV lightning arrester resistive current tests | |
CN104007354B (en) | The total group test circuit and method of 10kV Zinc-Oxide Arresters and cable | |
CN104007375A (en) | Facility for alternating current voltage withstand tests for 200kV and 330kV insulation tools and instruments | |
CN106814288A (en) | A kind of multi-functional discharging detection device of high-voltage capacitor | |
CN205038258U (en) | 750kV arrester resistive current tests quick termination | |
CN107167698A (en) | A kind of leakage current of an arrester live testing device and method | |
KR200169790Y1 (en) | An instrument for measuring earth resistance of concrete electric-pole | |
CN203658522U (en) | Safety equipment voltage withstand test special device | |
CN102004214A (en) | Test method of insulating cord | |
CN108152786A (en) | Electric energy meter field examines voltage sampling method and device | |
CN205861813U (en) | Transformer on-site test device | |
CN209119682U (en) | A kind of dedicated side's of returning device of cable conductor | |
CN205749582U (en) | Transformer testing clamps | |
RU124978U1 (en) | INSULATING BAR | |
CN208401405U (en) | 220kV conductors on quad bundled V-type replacing insulator string tool | |
CN108344920A (en) | A kind of leakage current of an arrester testing auxiliary device and method | |
CN216117694U (en) | Supporting device for main insulation alternating current voltage withstand test of power cable | |
CN105301295B (en) | House cable inlet wire Transformer Winding short-circuit device | |
CN204832259U (en) | Portablely prevent electric reference test bar of maloperation type | |
CN204189528U (en) | Be exclusively used in the insulation column of batch meter and the batch meter of insulation column is installed | |
CN206281882U (en) | Electrical test range finding fixing device | |
CN207114680U (en) | A kind of leakage current of an arrester live testing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |