CN102004214A - Test method of insulating cord - Google Patents

Test method of insulating cord Download PDF

Info

Publication number
CN102004214A
CN102004214A CN 201010579387 CN201010579387A CN102004214A CN 102004214 A CN102004214 A CN 102004214A CN 201010579387 CN201010579387 CN 201010579387 CN 201010579387 A CN201010579387 A CN 201010579387A CN 102004214 A CN102004214 A CN 102004214A
Authority
CN
China
Prior art keywords
conductor
ply
arc
lower conductor
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010579387
Other languages
Chinese (zh)
Inventor
李明
李昆
高世伟
梁方建
张申
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN ELECTRIC POWER COMPANY SHANGQIU POWER SUPPLY Co
Original Assignee
HUNAN ELECTRIC POWER COMPANY SHANGQIU POWER SUPPLY Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN ELECTRIC POWER COMPANY SHANGQIU POWER SUPPLY Co filed Critical HUNAN ELECTRIC POWER COMPANY SHANGQIU POWER SUPPLY Co
Priority to CN 201010579387 priority Critical patent/CN102004214A/en
Publication of CN102004214A publication Critical patent/CN102004214A/en
Pending legal-status Critical Current

Links

Abstract

The invention relates to a test method of an insulating cord. Firstly, an insulating cord test stand is designed, a lower conductor is welded on a base, and an earthing contact is designed; both sides of the conductor are respectively connected with an insulating strut in the vertical direction; the upper ends of the two insulating struts are connected with each other by an upper conductor, and a junction handle for connecting a test lead is arranged at one end; the upper conductor and the lower conductor are uniformly provided with movable arc ply-yarn drills; and the space between every two corresponding arc ply-yarn drills on the upper conductor and the lower conductor is 0.5m. When the insulating cord is tested, the upper and lower ends of the insulating cord are wound on the upper conductor and the lower conductor which are arranged on the test stand, a high-voltage lead is connected to the junction handle of the upper conductor, an earth lead is connected to the earthing contact of the lower conductor so that a voltage is applied to the upper conductor for carrying out an AC voltage test. The invention has the advantages that the structure of the used equipment is simple, a quite long insulating cord can be tested at one time, thus the efficiency is high; the test is free from influence of ambient environment, the current flowing on each section of the insulating cord is equal to the voltage applied to the insulating cord, and the test result is accurate.

Description

Insulation rope test method
Technical field
The present invention relates to a kind of method of the insulation rope being carried out power frequency withstand test.
Background technology
The insulation rope is an indispensable managing security tools and instruments in the electric system, is used by wide model because its flexibility is good, intensity is high, insulating property are strong.Its effect is: 1, can be used as during hot line job and tie up rope and transmit rope; 2, also can be used as lifting rope under the situation about meeting the demands as intensity; 3, also can be used as during non-hot line job and tie up rope and transmit rope; 4, scale also can be used as in live zone and measures chi and use (" electric power safety working regulation " regulation is forbidden to use steel tape, tape measure in live zone and had the line chi of electric conductivity) on the notes; 5, do isolation strip usefulness, separate charged and power failure equipments, show with indicating.
Because the insulation rope will directly contact with live part sometimes; Non-direct contact also is unlikely to the time because the effect of wind or other external force misses the insulation rope bumps live part and cause security incident.Regulation in " so electric power safety working regulation ": the insulation rope will be done AC voltage withstand test (rules require 105kV/0.5m).Method commonly used now when the insulation rope is done experiment is: the insulation rope is hung get up to carry out AC voltage withstand test.This way: 1, not only original but also be subjected to the influence big (as wind) of surrounding environment; 2, the insulation rope is longer, and one section one section (0.5m) tests consuming time long, relatively more clumsy simultaneously; 3, multiply is brought together when testing together, because the kelvin effect of electric current, the distribution that adds to electric field intensity is irregular, and making the electric current that flows through on every section insulation rope is different with the voltage that is born, do not reach every section purpose of carrying out AC voltage withstand test like this, this method is unavailable.
Summary of the invention
In order to overcome difficulty that above-mentioned reason brings and not enough, the invention provides a kind of method that the insulation rope is tested, this method can be carried out AC voltage withstand test to multistage insulation rope simultaneously.
Solving the technical scheme that problem of the present invention adopted is: at first design an insulation rope test-bed, stand can be designed to random length; It comprises the stand base, goes up lower conductor, insulation strut, and the stand base is made with metal, and lower conductor is welded on the stand base, and designs an earth point, is used for linking to each other with grounding body; Upper conductor is located at the lower conductor top, is connected by insulation strut between the two, and designs a wiring handle, and in order to connect test lead, last lower conductor is parallel to each other; Be provided with mobilizable arc ply-yarn drill on last lower conductor, the arc ply-yarn drill on the last lower conductor is crisscross arranged, and each curved line is fastened on the centre of corresponding top or following two arc ply-yarn drills, and the distance between the arc ply-yarn drill of per up and down two correspondences is 0.5m; Last lower conductor is that xsect is circular straight-bar or annulus or elliptical ring; Concrete test method is: on the upper and lower last lower conductor that is wrapped on the stand of insulation rope, mate each arc ply-yarn drill respectively and compress the insulation rope; High-voltage connection is connected on the wiring handle place of upper conductor, and upper conductor is as high-pressure side; Be connected on earth point place on the lower conductor with a ground wire, base is as earth potential; Upper conductor is applied voltage, can carry out AC voltage withstand test.
Because the thickness of insulation rope does not wait, arc ply-yarn drill next door all has aperture on electric conductor up and down, rotates the arc ply-yarn drill, and the end of arc ply-yarn drill can enter that the insulation rope that diameter is thinner compresses in the aperture.
Good effect of the present invention is: the test-bed that this method is used is simple in structure, makes easily, and is with low cost, handled easily; Once can carry out Insulation Test, high efficiency to very long insulation rope; Be not subjected to the influence of surrounding environment, electric current that flows through and the voltage that is born are impartial on every section insulation rope, and test findings is accurate; By regulating each arc ply-yarn drill, can carry out AC voltage withstand test to the insulation rope of different thicknesses.
Description of drawings
Accompanying drawing is the user mode synoptic diagram of the inventive method.
Embodiment
As shown in drawings, at first design an insulation rope test-bed, this stand can be made any length as required; Stand base 1 usefulness metal is made, and welding one lower conductor 2 at one end designs an earth point 3 on the stand base 1, is used for linking to each other with grounding body; Connect an insulation strut 4,5 respectively at lower conductor 2 both sides vertical directions, the epoxy resin enhancement mode glass fibre solid post that insulation strut 4,5 adopts excellent performance is as the major insulation material, and dielectric strength will be higher than 105kV far away; Two insulation strut 4,5 upper ends are connected by upper conductor 6, at one end design a wiring handle 9, in order to connect test lead, last lower conductor 6,2 is copper cylinder or copper pipe, last lower conductor 6,2 is isometric and be parallel to each other, and the insulation strut 4,5 of last lower conductor 6,2 and both sides is formed a framed structure; On upper conductor 6 and below the lower conductor 2, be equipped with mobilizable arc ply-yarn drill 7, arc ply-yarn drill 7 on the last lower conductor 6,2 is crisscross arranged, each arc ply-yarn drill 7 is located at the centre of corresponding top or following two arc ply-yarn drills 7, distance between the arc ply-yarn drill 7 of per up and down two correspondences is 0.5m, promptly as shown in drawings, from a point to the b point, from the b point to the c point, by that analogy, be 0.5m.Because the thickness of insulation rope 10 does not wait, arc ply-yarn drill 7 next doors all have aperture 8 on last lower conductor 6,2, rotate arc ply-yarn drill 7, and the end of arc ply-yarn drill 7 can be inserted the aperture 8 interior insulation ropes 10 that diameter is thinner and be compressed.
Concrete test method is: be wrapped on the stand on the lower conductor 6,2 below the arc ply-yarn drill 7 insulation rope 10 is upper and lower, mate each arc ply-yarn drill 7 respectively and compress insulation rope 10; High-voltage connection is connected on wiring handle 9 places of upper conductor 6, and upper conductor 6 is as high-pressure side; Be connected on earth point 3 places on the lower conductor 2 with a ground wire, stand base 1 is as earth potential; Upper conductor is applied voltage, can carry out AC voltage withstand test, test is finished, and pulls down the insulation rope and can use.

Claims (2)

1. an insulation rope test method at first designs an insulation rope test-bed, and stand can be designed to random length; It comprises the stand base, goes up lower conductor, insulation strut, and the stand base is made with metal, and lower conductor is welded on the stand base, and designs an earth point, is used for linking to each other with grounding body; Upper conductor is located at the lower conductor top, is connected by insulation strut between the two, and designs a wiring handle, and in order to connect test lead, last lower conductor is parallel to each other; Be provided with mobilizable arc ply-yarn drill on last lower conductor, the arc ply-yarn drill on the last lower conductor is crisscross arranged, and each curved line is fastened on the centre of corresponding top or following two arc ply-yarn drills, and the distance between the arc ply-yarn drill of per up and down two correspondences is 0.5m; Last lower conductor is that xsect is circular straight-bar or annulus or elliptical ring; Concrete test method is: on the upper and lower last lower conductor that is wrapped on the stand of insulation rope, mate each arc ply-yarn drill respectively and compress the insulation rope; High-voltage connection is connected on the wiring handle place of upper conductor, and upper conductor is as high-pressure side; Be connected on earth point place on the lower conductor with a ground wire, base is as earth potential; Upper conductor is applied voltage, can carry out AC voltage withstand test.
2. insulation rope test method according to claim 1, it is characterized in that: because the thickness of insulation rope does not wait, arc ply-yarn drill next door all has aperture on electric conductor up and down, rotates the arc ply-yarn drill, and the end of arc ply-yarn drill can enter that the insulation rope that diameter is thinner compresses in the aperture.
CN 201010579387 2010-12-02 2010-12-02 Test method of insulating cord Pending CN102004214A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010579387 CN102004214A (en) 2010-12-02 2010-12-02 Test method of insulating cord

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010579387 CN102004214A (en) 2010-12-02 2010-12-02 Test method of insulating cord

Publications (1)

Publication Number Publication Date
CN102004214A true CN102004214A (en) 2011-04-06

Family

ID=43811738

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010579387 Pending CN102004214A (en) 2010-12-02 2010-12-02 Test method of insulating cord

Country Status (1)

Country Link
CN (1) CN102004214A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103954805A (en) * 2014-04-15 2014-07-30 国家电网公司 Connecting rack for high-voltage holding test
CN106226668A (en) * 2016-08-31 2016-12-14 云南电网有限责任公司楚雄供电局 A kind of many test apparatus for overpressure resistance of insulator spindles
CN104133160B (en) * 2013-05-17 2017-03-01 国家电网公司 Insulating part pressure test frock
CN113376489A (en) * 2021-06-22 2021-09-10 广州万宝电子材料有限公司 Insulated wire voltage withstand test method and test tool thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201298060Y (en) * 2008-11-24 2009-08-26 重庆市电力公司沙坪坝供电局 Detachable insulating rope testing jig
CN201514457U (en) * 2009-09-30 2010-06-23 咸阳供电局 Voltage withstand testing device for insulating rod-like tools
CN201532424U (en) * 2009-11-16 2010-07-21 湖北省电力公司荆门供电公司 Insulating rope test stand

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201298060Y (en) * 2008-11-24 2009-08-26 重庆市电力公司沙坪坝供电局 Detachable insulating rope testing jig
CN201514457U (en) * 2009-09-30 2010-06-23 咸阳供电局 Voltage withstand testing device for insulating rod-like tools
CN201532424U (en) * 2009-11-16 2010-07-21 湖北省电力公司荆门供电公司 Insulating rope test stand

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104133160B (en) * 2013-05-17 2017-03-01 国家电网公司 Insulating part pressure test frock
CN103954805A (en) * 2014-04-15 2014-07-30 国家电网公司 Connecting rack for high-voltage holding test
CN106226668A (en) * 2016-08-31 2016-12-14 云南电网有限责任公司楚雄供电局 A kind of many test apparatus for overpressure resistance of insulator spindles
CN106226668B (en) * 2016-08-31 2022-12-20 云南电网有限责任公司楚雄供电局 Withstand voltage test device with multiple insulating rods
CN113376489A (en) * 2021-06-22 2021-09-10 广州万宝电子材料有限公司 Insulated wire voltage withstand test method and test tool thereof

Similar Documents

Publication Publication Date Title
CN103259215B (en) A kind of telescopic insulation rod device
CN102004214A (en) Test method of insulating cord
CN202523948U (en) Movable grounding protection device for electric welding equipment
CN201909827U (en) Insulating rope test bench
CN205646216U (en) Insulation is tested denso and is established earth connection auxiliary rod
CN104535804A (en) Portable current transformer test clamp
CN105116197A (en) A fast wiring device for 750kV lightning arrester resistive current tests
CN202720248U (en) Insulating bracket for high voltage test
CN205070328U (en) Fixed cassette of line tied in a bundle
CN208270622U (en) A kind of power distribution network arrester, isolator detecting bracket
CN104316736B (en) Combined insulated lead for switch cabinet power-frequency and alternating-current withstand voltage test
CN206470292U (en) A kind of electrical test thread guide devices for being used to make somebody a mere figurehead electrical equipment
CN205210239U (en) Testing arrangement around super conductor insulation performance of package and experimental apparatus thereof
CN205038258U (en) 750kV arrester resistive current tests quick termination
CN106771386A (en) A kind of electrical test thread guide devices for making somebody a mere figurehead electrical equipment
CN207020217U (en) Cable testing aid containing T-shaped terminal
CN208654276U (en) A kind of insulating rope voltage resistant test frame
CN104020325A (en) High-voltage test shielding cover for 10kV ring main unit
CN205622312U (en) A power structure for surpassing HVDC circuit on -line monitoring
CN205544082U (en) Wall bushing with relay protection
CN205157715U (en) Casing surface leakage current shields instrument
CN103700475A (en) Voltage transformer fuse mounting base
CN205003236U (en) Inspect device of high -pressure energy metering equipment wiring
CN107202912A (en) Cable testing aid containing T-shaped terminal
CN204255997U (en) Switch cubicle industrial frequency AC withstand voltage test combined insulation goes between

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110406