CN208105184U - A kind of geotechnological pavement structure of ecology and application have the dykes and dams of the pavement structure - Google Patents

A kind of geotechnological pavement structure of ecology and application have the dykes and dams of the pavement structure Download PDF

Info

Publication number
CN208105184U
CN208105184U CN201820497407.3U CN201820497407U CN208105184U CN 208105184 U CN208105184 U CN 208105184U CN 201820497407 U CN201820497407 U CN 201820497407U CN 208105184 U CN208105184 U CN 208105184U
Authority
CN
China
Prior art keywords
dykes
dams
mask
laid
matrix
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820497407.3U
Other languages
Chinese (zh)
Inventor
吴松华
周春晖
俞家锐
宋龙财
阳岔
薛佳波
邬登成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Water Conservancy and Hydropower Construction Co., Ltd.
Original Assignee
SDC WATERWAY CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SDC WATERWAY CONSTRUCTION CO Ltd filed Critical SDC WATERWAY CONSTRUCTION CO Ltd
Priority to CN201820497407.3U priority Critical patent/CN208105184U/en
Application granted granted Critical
Publication of CN208105184U publication Critical patent/CN208105184U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of geotechnological pavement structures of ecology, it is laid on the dykes and dams matrix piled up, it is pressed on the upper end of the first mask body including the first mask body being laid on dykes and dams matrix inclined surface and the second mask body for being laid on dykes and dams matrix top surface, the outer end of the second mask body.First mask body includes the mask pad that at least one is laid with along dykes and dams extending direction, and mask pad has multiple longitudinally disposed bag bodies, and the cuff to be formed for filling filler is arranged in the upper end opening of bag body.Ecology geotechnique's pavement structure and application have the dykes and dams of the pavement structure, the the first mask body used is in construction, after the mask pad for constituting the first mask body being laid on the inclined surface of dykes and dams matrix, sand is filled into each bag body by the cuff of each bag body of mask pad again, and then form the mask of the inclined surface of dykes and dams matrix, construction is simple is convenient, reduces construction cost.In addition, filling the mask pad after sand is integral structure, and surface is in undaform, and capacity of anti-storm is stronger, and it is also more obvious to protect sand ability.And overall aesthetic degree and ageing resistance also get a promotion.

Description

A kind of geotechnological pavement structure of ecology and application have the dykes and dams of the pavement structure
Technical field
The utility model relates to marine traffic engineering technical fields, and in particular to a kind of geotechnological pavement structure of ecology further relates to answer With the dykes and dams of the geotechnological pavement structure of the ecology.
Background technique
As shown in Figure 1, being piled up on the outside of the embankment improvement project ecology pipe band of inland sea frequently with small-sized woven bag, to improve sand Guarantor's sand ability on beach.Small-sized woven bag needs to be assembled by carrying after manually filling, and woven bag usage quantity is huge, and holds It is easy to aging, cause cost input higher, is affected to the duration.And on the outside of debris dam under the influence of larger stormy waves, individually Sandbag can cause debris dam effect to decline, and influence beauty because specific gravity is not enough damaged by stormy waves.It is transformed in inland sea embankment In project, more particularly, to the landscapes intermediate item such as artificial beach, pavement structure made of being assembled using small woven bag its wind and wave resistance, Anti-aging and aesthetics is all unable to reach the requirement used steadily in the long term.
Utility model content
First technical problem to be solved in the utility model is that a kind of easy construction is provided for the above-mentioned prior art The geotechnological pavement structure of ecology.
Second technical problem to be solved in the utility model be provided for the above-mentioned prior art it is a kind of anti-aging, anti- The strong dykes and dams of stormy waves ability.
The utility model solves technical solution used by above-mentioned first technical problem:A kind of geotechnological mask knot of ecology Structure is laid on the dykes and dams matrix piled up, it is characterised in that:Including the first mask body for being laid on dykes and dams matrix inclined surface with And it is laid on the second mask body of dykes and dams matrix top surface, the outer end of the second mask body is pressed on the first mask body Upper end on;
The first mask body includes the mask pad that at least one is laid with along dykes and dams extending direction, and the mask pad has more The cuff to be formed for filling filler is arranged in a longitudinally disposed bag body, the upper end opening of the bag body.
The mask pad is sewed by two layers of armour layer, the sewing with the setting of a plurality of longitudinal gap on two layers of armour layer Line, and the lower end of two layers of armour layer is sewed together, and then forms the bag body.
The first mask body includes at least two mask pads, and the side for the mask pad being laid with afterwards is pressed on adjacent protection pad On side.
The first mask body uses and is filled with the geotextile tube bag of filler.
The utility model solves technical solution used by above-mentioned second technical problem:A kind of application has ecological geotechnique The dykes and dams of pavement structure, it is characterised in that:It further include dykes and dams matrix, the dykes and dams matrix includes debris dam and is arranged described The embankment of debris dam side.
The embankment is piled up by least two layers polypropylene woven bag filled with filler, the outside shape of the embankment At the inclined surface of dykes and dams matrix.
Compared with prior art, the utility model has the advantage of:Ecology geotechnique's pavement structure and application have the mask The mask pad for constituting the first mask body can be laid on dykes and dams base in construction by the dykes and dams of structure, the first mask body used After on the inclined surface of body, then sand filled into each bag body by the cuff of each bag body of mask pad, and then forms the inclination of dykes and dams matrix The mask in face, construction is simple is convenient, reduces construction cost.In addition, the mask pad filled after sand is integral structure, and surface In undaform, capacity of anti-storm is stronger, and it is also more obvious to protect sand ability.And overall aesthetic degree and ageing resistance are also mentioned It rises.
Detailed description of the invention
Fig. 1 is the schematic cross-section of dykes and dams in the prior art.
Fig. 2 is the schematic cross-section of dykes and dams in the utility model embodiment.
Fig. 3 is the first mask body structural schematic diagram in the utility model embodiment.
Specific embodiment
The utility model is described in further detail below in conjunction with figure embodiment.
As shown in Figures 2 and 3, the dykes and dams in the present embodiment are disposed around on seashore, prevent seashore soil erosion, the dykes and dams packet The geotechnological pavement structure of ecology for including dykes and dams matrix 1 and being laid on dykes and dams matrix 1, is used for protecting ecology geotechnique pavement structure dike Dam foundation body 1, and then anti-aging, the capacity of anti-storm of dykes and dams matrix 1 can not only be improved, additionally it is possible to improve whole aesthetics.
Wherein dykes and dams matrix 1 includes debris dam 11 and is arranged in the embankment 12 of 11 side of debris dam, and embankment 12 is close to blocking Sand dam 11 is arranged.After embankment 12 is arranged, the top surface of embankment 12 constitutes a plane substantially, and the outside of embankment 12 forms inclined surface, The gradient of inclined surface in the present embodiment is 1:2.The top surface of embankment 12 then constitutes the top surface of dykes and dams matrix 1, and embankment 12 tilts Lateral surface then constitute the inclined surface of dykes and dams matrix 1.
The bottom of debris dam 11 uses I type ecology pipe bag, and top uses II type ecology pipe bag, in each ecological pipe bag respectively It is packed into filler.In the present embodiment, the bottom of embankment 12 is laid with using the anti-aging big woven bag of three-layer polypropylene.Every strata When the anti-aging big woven bag of propylene is constructed, the anti-aging big woven bag of polypropylene is laid in place, is consolidated woven bag with the rope made of hemp It is scheduled on corresponding position, is avoided during irrigation since momentum effect causes to generate displacement.Then by the anti-aging big volume of polypropylene It knits the cuff among bag and starts the irrigation sea sand for arriving surrounding equilibrium again.After the completion of the anti-aging big woven bag construction of three-layer polypropylene, Start to carry out the construction of ecological geotechnological pavement structure.
Ecological geotechnique's pavement structure includes the first mask body 2 being laid on 1 inclined surface of dykes and dams matrix and is laid on dike Second mask body 3 of 1 top surface of dam foundation body, the outer end of the second mask body 3 are pressed on the upper end of the first mask body 2.Therefore it is applying Working hour is laid with the first mask body 2 first, then re-lays the second mask body 3.
In the present embodiment, the first mask body 2 includes at least two mask pads being laid with along dykes and dams extending direction, is laid with afterwards The side of mask pad is pressed on the side of adjacent protection pad.Mask pad in the present embodiment is sewed by two layers of armour layer, and two Sewing line with the setting of a plurality of longitudinal gap on layer armour layer, and the lower end of two layers of armour layer is sewed together, and then shape At multiple longitudinal bag bodies 21.The cuff 211 to be formed for filling filler is arranged in the upper end opening of each bag body 21.
In use, mask made of ecological geotextile tube bag same material is leveled up to the inclined surface for being layered on dykes and dams matrix 1 first, So that cuff 211 is located at upper end position, two adjacent mask pads, the mask that the side for the mask pad being laid with afterwards is laid with before being pressed in On the side of pad.In subsequent filling, preceding laying mask pad is not refilled sea sand in the bag body 21 of pressure lateral location, and is pressed in The lateral location of the preceding rear mask pad being laid on mask pad side then needs to fill sea sand.Before the irrigation sea sand into bag body 21, Each mask pad is fixed, prevents that mask pad is caused to slide downwards under subsequent construction momentum effect.To each bag body 21 of mask pad Interior irrigation sea sand sutures the cuff 211 on mask pad top, it is ensured that entire after two mask pads have integrally all charged sea sand The globality of structure, and guarantee that sea sand is not lost by alluvion in structure.
After the completion of the whole laying of first mask body 2, the second mask body 3 is re-layed, the second mask body 3 uses I type ecology pipe Second mask body 3, is laid in the top of dykes and dams matrix 1 by bag, and when laying guarantees completely will ecology geotechnique in the first mask body 2 The cuff 211 of mask pad is pushed down.Also needed in irrigation worker top trample guarantee its bag body 21 be not uneven The phenomenon that.In the construction process, it needs to measure and follow up at any time, guarantee that its absolute altitude meets design requirement.
In ecology geotechnique's pavement structure, the mask pad after filling sand is integral structure, and surface is in undaform, wind resistance Unrestrained ability is stronger, and it is also more obvious to protect sand ability.And overall aesthetic degree and ageing resistance also get a promotion.
Mechanized construction may be implemented in the integral construction of dykes and dams, and construction efficiency greatly improves, and project progress has been effectively ensured, And reduce construction cost.Meanwhile first mask body 2 and the second mask body 3 be all made of ecological geotextile tube bag, ageing resistance It is stronger while also more beautiful.

Claims (6)

1. a kind of geotechnological pavement structure of ecology, is laid on the dykes and dams matrix piled up, it is characterised in that:Including being laid on dykes and dams base The first mask body on body inclined surface and the second mask body for being laid on dykes and dams matrix top surface, the second mask body Outer end is pressed on the upper end of the first mask body;
The first mask body includes the mask pad that at least one is laid with along dykes and dams extending direction, and the mask pad has multiple vertical To the bag body of setting, the cuff to be formed for filling filler is arranged in the upper end opening of the bag body.
2. the geotechnological pavement structure of ecology according to claim 1, it is characterised in that:The mask pad is stitched by two layers of armour layer It makes, the sewing line with the setting of a plurality of longitudinal gap on two layers of armour layer, and the lower end of two layers of armour layer is sewed one It rises, and then forms the bag body.
3. the geotechnological pavement structure of ecology according to claim 1, it is characterised in that:The first mask body includes at least two A mask pad, the side for the mask pad being laid with afterwards are pressed on the side of adjacent protection pad.
4. the geotechnological pavement structure of ecology according to claim 1, it is characterised in that:The first mask body is used and is filled with The geotextile tube bag of filler.
5. a kind of application is just like the dykes and dams of the geotechnological pavement structure of ecology described in Claims 1-4 any claim, feature It is:It further include dykes and dams matrix, the dykes and dams matrix includes debris dam and the embankment that the debris dam side is arranged in.
6. the dykes and dams of the geotechnological pavement structure of ecology according to claim 5, it is characterised in that:The embankment is by least two layers Polypropylene woven bag filled with filler is piled up, and the outside of the embankment forms the inclined surface of dykes and dams matrix.
CN201820497407.3U 2018-04-09 2018-04-09 A kind of geotechnological pavement structure of ecology and application have the dykes and dams of the pavement structure Active CN208105184U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820497407.3U CN208105184U (en) 2018-04-09 2018-04-09 A kind of geotechnological pavement structure of ecology and application have the dykes and dams of the pavement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820497407.3U CN208105184U (en) 2018-04-09 2018-04-09 A kind of geotechnological pavement structure of ecology and application have the dykes and dams of the pavement structure

Publications (1)

Publication Number Publication Date
CN208105184U true CN208105184U (en) 2018-11-16

Family

ID=64120989

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820497407.3U Active CN208105184U (en) 2018-04-09 2018-04-09 A kind of geotechnological pavement structure of ecology and application have the dykes and dams of the pavement structure

Country Status (1)

Country Link
CN (1) CN208105184U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111962471A (en) * 2020-08-24 2020-11-20 中交水利水电建设有限公司 Construction method of artificial lake reclamation dam

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111962471A (en) * 2020-08-24 2020-11-20 中交水利水电建设有限公司 Construction method of artificial lake reclamation dam
CN111962471B (en) * 2020-08-24 2022-02-01 中交水利水电建设有限公司 Construction method of artificial lake reclamation dam

Similar Documents

Publication Publication Date Title
CN204530729U (en) A kind of ecological protection device for greening side slope
CN213086712U (en) Slope dike protection body of gabion mesh box structure
CN107869152A (en) Reinforced earth bulkhead and its construction method with deformation buffer area
CN208105184U (en) A kind of geotechnological pavement structure of ecology and application have the dykes and dams of the pavement structure
CN210684603U (en) Rapid diking device for flood control and emergency rescue
CN205152888U (en) An anchor bag and a concrete interlocking software volleyball association body structure
CN205134303U (en) Compound reinforced structure of soft base of ecological bamboo raft among road engineering of field
CN104499459A (en) Geotextile tube breakwater
CN104164854A (en) Method for ecologically re-greening hardened slope
CN203420255U (en) Ecological seepage-proofing channel with excellent seepage-proofing performance
CN101929141B (en) Overlength flood control pipe bag dykes and dams of rescuing and protecting are utilized to overflow the method for unrestrained bank dangerous situation and equipment thereof
JP6533907B1 (en) Composite sheet and bag made of the composite sheet
CN203654231U (en) Soft raft with concrete water-pervious components
CN207582412U (en) A kind of ecological revetment
CN207017219U (en) A kind of new embankment
CN202945571U (en) Surface protection structure suitable for soil base underwater foundation bed with ultrahigh flow rate
CN202830870U (en) Double-cuff sandbag for sand soft mattress ballasting
CN104141285A (en) Seepage-proofing seawall
CN111321700B (en) Overflowing energy dissipation type ecological bank protection method for anti-scouring and anti-landslide barrier plugs
CN100593604C (en) Flexible explosion-proof dike and construction method thereof
CN203007959U (en) Net cage pad type revetment structure
CN204343278U (en) A kind of flexible sand control sandbag and sand-protecting barrier
CN2700398Y (en) Multifunctional flood prevention bag
CN208685538U (en) A kind of big sand pocket core dike of new type of deep-water
CN203475388U (en) High-strength non-woven geofabriform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 315 200 No. 221 Yanjiang East Road, Zhenhai District, Ningbo City, Zhejiang Province

Patentee after: China Water Conservancy and Hydropower Construction Co., Ltd.

Address before: 315 200 No. 221 Yanjiang East Road, Zhenhai District, Ningbo City, Zhejiang Province

Patentee before: SDC Waterway Construction Co., Ltd.

CP01 Change in the name or title of a patent holder