CN104141285A - Seepage-proofing seawall - Google Patents

Seepage-proofing seawall Download PDF

Info

Publication number
CN104141285A
CN104141285A CN201410383109.8A CN201410383109A CN104141285A CN 104141285 A CN104141285 A CN 104141285A CN 201410383109 A CN201410383109 A CN 201410383109A CN 104141285 A CN104141285 A CN 104141285A
Authority
CN
China
Prior art keywords
sand
seawall
antiseepage
filling
sea wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410383109.8A
Other languages
Chinese (zh)
Inventor
曾甄
袁文喜
罗昉昕
邵燕华
毛丹红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Design Institute of Water Conservancy and Hydroelectric Power
Original Assignee
Zhejiang Design Institute of Water Conservancy and Hydroelectric Power
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Design Institute of Water Conservancy and Hydroelectric Power filed Critical Zhejiang Design Institute of Water Conservancy and Hydroelectric Power
Priority to CN201410383109.8A priority Critical patent/CN104141285A/en
Publication of CN104141285A publication Critical patent/CN104141285A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Revetment (AREA)

Abstract

Provided is a seepage-proofing seawall. The filling materials of the body of the seawall are mainly riprap, the middle portion of the body of the seawall is filled with filling sand, and concrete diaphragm walls are arranged in the filling sand. A filter bag contained rubble layer is arranged between the filling sand and the riprap, and a sand filled drainage layer is arranged on the bottom of the filling sand. The filling sand is filled through sand filling pipe bags. A double-row high pressure swing jet concrete diaphragm wall is adopted for each concrete diaphragm wall. Using of airtight earthwork is eliminated, the problem that airtight earthwork is difficult to fill is solved, construction duration can be shortened, project amount can be reduced, and therefore overall investment of a project can be saved; the section width of the body of the seawall is reduced, and the area, occupied by the seawall, of an intertidal zone or a sea area is reduced.

Description

A kind of antiseepage sea wall
Technical field
The present invention relates to a kind of water conservancy project water retaining structure, especially a kind of antiseepage sea wall that adopts ramp type jackstone to add concrete cut section configuration in conjunction with back-up sand.
 
Background technology
Land resources is the important foundation that ensures economic development, is accompanied by economic fast development, construction land growing tension, and Tidal Flat Reclamation not only can ensure soil safety, alleviate the contradiction of Land Demand, can also improve flood control and disaster reduction ability; Adjustment, the development of urbanization and the construction of infrastructure that it is the coastal area industrial structure provide good platform; It can promote socioeconomic sustainable development, is the important supplement approach that land resources obtains regeneration.
The embankment project of building at silt coast district Tidal Flat Reclamation at present, its structure be generally off-lying sea side by masonry dam gear tide, enclose district's side and adopt the antiseepage of holding one's breath of tidal land mud.Leakage preventing structure is mainly arranged in and encloses district's side, holds one's breath soil as main taking the mud of hypotonicity.The type sea wall can adapt to the larger sedimentation and deformation on mud soft soil foundation preferably, construction technology maturation, and stability and safety are better.But, along with Tidal Flat Reclamation engineering gradually by high beach enclose and cultivate in low beach enclose and cultivate development, traditional sea wall structure highlights the problem of following several respects: 1, the construction period is long.Two factors of efficiency of construction that what the construction period that tradition rock structure sea wall fills was mainly subject to that sea wall safety and stability controls allow rate of loading and antiseepage are held one's breath cubic metre of earth restrict, and the duration delays or delay manyly not increase because of the antiseepage earthwork construction progress of holding one's breath.2, the antiseepage supply difficulty of holding one's breath cubic metre of earth is large.Traditional structure sea wall cubic meter of stone amount and the antiseepage earth volume demand of holding one's breath is all larger, and the antiseepage earthwork of holding one's breath is mainly derived near tidal land mud sea wall, is coated with after face step-down on the one hand, and the depth of water is deepened, and traditional suction dredger not only efficiency is low, and cost multiplication; On the other hand, after the closure of sea wall Longkou, the earthwork of holding one's breath is all taken from and is enclosed inner side, district, and the increase later stage is made ground cost, has extended the construction period.3, sea wall design section is large, increase of investment.Sea wall section increases along with the reduction of the face of painting elevation, and the approximate relation with height of dam square multiple of sea wall investment increases.4, difficulty of construction is large, because engineering integral construction is long in time limit, need to experience multiple flood seasons, and the breakage that typhoon, sudden and violent tide will certainly be certain to embankment structure generation, washes away jackstone, has not only increased difficulty of construction, also will bring the engineering safety problem such as pass the flood period; After painting face reduces on the other hand, dykes and dams underwater portion section increases, and has increased the difficulty of construction of the levee body protection below the water surface, piece stone reason block and leveling.
 
Summary of the invention
The object of the invention is for the deficiencies in the prior art, a kind of antiseepage sea wall is provided, adopt ramp type jackstone to add concrete cut section configuration in conjunction with back-up sand.This sea wall barrier performance is good, cancelled the use that antiseepage is held one's breath cubic metre of earth, shortened levee body section width, reduced occupation of land (with the sea) area of sea wall, saved duration and engineering quantity, thereby reduced the entirety investment of engineering.
The technical solution used in the present invention is:
A kind of antiseepage sea wall, is characterized in that: the filling material of levee body, taking jackstone as main, fills back-up sand at levee body middle part, and concrete cut is set in back-up sand.
As preferably, between described back-up sand and jackstone, be provided with the packed macadam of anti-filter, back-up sand bottom is provided with sand mat of subgrade.
As preferably, described back-up sand adopts sandstone charging pipe bag to fill.
As preferably, described concrete cut adopts double high pressure swing pneumatically placed concrete impervious wall.
The invention has the beneficial effects as follows:
1, cancelled the use that antiseepage is held one's breath cubic metre of earth, solved antiseepage and held one's breath and cubic metre of earth fill the problem that difficulty is large, and can save duration and engineering quantity, thereby saved the investment of engineering entirety;
2, the filling material of levee body, taking jackstone as main, is arranged the back-up sand of certain width at levee body middle part, and concrete cut is set in back-up sand, and this structural shape has good barrier performance; And the angle of internal friction of jackstone and back-up sand is large, easily fills, section resistance to overturning is good, thereby dwindled sea wall levee body section width, has reduced sea wall and take the area in beach or marine site.
 
Brief description of the drawings
Fig. 1 is the section structure schematic diagram of antiseepage sea wall of the present invention;
Fig. 2 is the levee body middle part section structure schematic diagram of antiseepage sea wall of the present invention.
Label declaration in figure: 1-jackstone; 2-back-up sand; The packed macadam of 3-anti-filter; 4-sand mat of subgrade; 5-concrete cut; 6-spins geotextiles; 7-hardcore bed; 8-plastic draining plate; The outer slope of 9-mask; 10-inner slope mask; 11-wave wall; 12-sandstone charging pipe bag.
 
Detailed description of the invention
Below in conjunction with drawings and Examples, the present invention is described in further detail.
A kind of antiseepage sea wall of the present invention, the filling material of levee body, taking jackstone 1 as main, fills back-up sand 2 at levee body middle part, and concrete cut 5 is set in back-up sand 2; Between back-up sand 2 and jackstone 1, be provided with the packed macadam 3 of anti-filter, back-up sand 2 bottoms are provided with sand mat of subgrade 4; Back-up sand 2 adopts sandstone charging pipe bag 11 to fill; Concrete cut 5 adopts double high pressure swing pneumatically placed concrete impervious wall; Thereby form antiseepage body, reach the object of antiseepage.
The work progress of antiseepage sea wall of the present invention is: first lay subfoundation and spin geotextiles 6, jettisoning again hardcore bed 7 with charge sand mat of subgrade 4, adopt again plastic draining plate 8 to carry out based process, plastic draining plate 8 regular arrangement are inserted the following certain depth of painting face, carrying out afterwards main body levee body fills, layering is followed in filling of levee body jackstone 1, segmentation, subregion loads, ensure sea wall balanced rising within the scope of safe load, the packed macadam 3 of anti-filter fills immediately following jackstone 1 with back-up sand 2, and follow the leading principle of jackstone 1 appropriateness, back-up sand 2 adopts sandstone charging pipe bag 12 to fill, filling bag answers layering to place, stacking neat, arrange in order, tight, the upper and lower fissure of displacement, every layer of bag is advisable so that 0.4~0.8m is thick, fill in process at levee body, in conjunction with settlement Control, synchronously carry out outer slopes at different levels mask 9 and inner slope mask 10, until levee body fill top and sedimentation basicly stable after, with high pressure swing spray machine formation high pressure swing pneumatically placed concrete impervious wall 5, finally build levee crown wave wall 11.

Claims (4)

1. an antiseepage sea wall, is characterized in that: the filling material of levee body, taking jackstone (1) as main, fills back-up sand (2) at levee body middle part, and concrete cut (5) is set in back-up sand (2).
2. according to the antiseepage sea wall described in claim 1, it is characterized in that: between described back-up sand (2) and jackstone (1), be provided with the packed macadam of anti-filter (3), back-up sand (2) bottom is provided with sand mat of subgrade (4).
3. antiseepage sea wall according to claim 1 and 2, is characterized in that: described back-up sand (2) adopts sandstone charging pipe bag (12) to fill.
4. antiseepage sea wall according to claim 1, is characterized in that: described concrete cut (5) adopts double high pressure swing pneumatically placed concrete impervious wall.
CN201410383109.8A 2014-08-06 2014-08-06 Seepage-proofing seawall Pending CN104141285A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410383109.8A CN104141285A (en) 2014-08-06 2014-08-06 Seepage-proofing seawall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410383109.8A CN104141285A (en) 2014-08-06 2014-08-06 Seepage-proofing seawall

Publications (1)

Publication Number Publication Date
CN104141285A true CN104141285A (en) 2014-11-12

Family

ID=51850604

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410383109.8A Pending CN104141285A (en) 2014-08-06 2014-08-06 Seepage-proofing seawall

Country Status (1)

Country Link
CN (1) CN104141285A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049350A (en) * 2016-07-26 2016-10-26 浙江省水利水电勘测设计院 Anti-seepage seawall with pile foundation framework rib plate structures
CN107816010A (en) * 2017-10-31 2018-03-20 中铁四局集团第工程有限公司 A kind of Coastal beach area roadbed dykes and dams cofferdam construction method
CN112030896A (en) * 2020-09-14 2020-12-04 浙江省水利水电勘测设计院 Sluice structure and construction method
CN114718012A (en) * 2022-05-05 2022-07-08 中交第四航务工程勘察设计院有限公司 Composite dyke body ecological sea dike structure on soft soil foundation and construction method thereof
CN114960485A (en) * 2022-07-19 2022-08-30 中交第一航务工程局有限公司 Seepage-proofing embankment adaptable to settlement foundation and construction process

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07216903A (en) * 1994-02-03 1995-08-15 Taisei Corp Bulkhead caisson and construction method of bulkhead
CN2749932Y (en) * 2004-07-28 2006-01-04 河海大学岩土工程科学研究所 Sea wall structure
CN102268863A (en) * 2011-06-16 2011-12-07 上海友为工程设计有限公司 Deposit-promoting dam with prism-shaped steel frame and nylon tuck net and method
CN203066089U (en) * 2013-01-15 2013-07-17 广州市市政工程设计研究院 Cofferdam combined by mold bag sand and steel sheet piles and used for hard strata
CN203383193U (en) * 2013-03-22 2014-01-08 中国水电顾问集团贵阳勘测设计研究院 Core-wall rockfill dam structure without cofferdams
CN204174576U (en) * 2014-08-06 2015-02-25 浙江省水利水电勘测设计院 Antiseepage sea wall

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07216903A (en) * 1994-02-03 1995-08-15 Taisei Corp Bulkhead caisson and construction method of bulkhead
CN2749932Y (en) * 2004-07-28 2006-01-04 河海大学岩土工程科学研究所 Sea wall structure
CN102268863A (en) * 2011-06-16 2011-12-07 上海友为工程设计有限公司 Deposit-promoting dam with prism-shaped steel frame and nylon tuck net and method
CN203066089U (en) * 2013-01-15 2013-07-17 广州市市政工程设计研究院 Cofferdam combined by mold bag sand and steel sheet piles and used for hard strata
CN203383193U (en) * 2013-03-22 2014-01-08 中国水电顾问集团贵阳勘测设计研究院 Core-wall rockfill dam structure without cofferdams
CN204174576U (en) * 2014-08-06 2015-02-25 浙江省水利水电勘测设计院 Antiseepage sea wall

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049350A (en) * 2016-07-26 2016-10-26 浙江省水利水电勘测设计院 Anti-seepage seawall with pile foundation framework rib plate structures
CN107816010A (en) * 2017-10-31 2018-03-20 中铁四局集团第工程有限公司 A kind of Coastal beach area roadbed dykes and dams cofferdam construction method
CN112030896A (en) * 2020-09-14 2020-12-04 浙江省水利水电勘测设计院 Sluice structure and construction method
CN114718012A (en) * 2022-05-05 2022-07-08 中交第四航务工程勘察设计院有限公司 Composite dyke body ecological sea dike structure on soft soil foundation and construction method thereof
CN114960485A (en) * 2022-07-19 2022-08-30 中交第一航务工程局有限公司 Seepage-proofing embankment adaptable to settlement foundation and construction process
CN114960485B (en) * 2022-07-19 2024-05-03 中交第一航务工程局有限公司 Seepage-proofing embankment adaptable to sedimentation foundation and construction process

Similar Documents

Publication Publication Date Title
CN104141285A (en) Seepage-proofing seawall
CN105464056A (en) Anti-seepage structure capable of adapting to settlement of earth and rockfill dam
CN101691755A (en) Method for constructing liquified discarded soil in construction of subaqueous structure
CN103233444B (en) Underwater dumped rockfill bedding and side slope Anti-scouring structure and construction method thereof
CN209816885U (en) Novel cofferdam structure under soft covering layer
CN102767157A (en) Diking method through filling sludge into mold bags and vacuum preloading
CN105350511A (en) Border dike water bag strip, water storing border dike, and method for performing water bag strip pile-loading and prepressing
CN111622179A (en) Fence plate slope protection structure for ecological reconstruction of sea wall and construction method thereof
CN105951667B (en) Using mud filling tube bag in enclosing tideland for cultivation region pre- profit retention river structure
CN111472326A (en) Method and structure for building gravity dam on deep covering layer
CN208949902U (en) A kind of river channel bridge bearing platform foundation pit antiseepage cofferdam
CN107761668B (en) Coastal shore reservoir land-building type revetment structure and construction method thereof
CN113481940A (en) Green ecological hollow square slope protection structure of seawall
CN204174576U (en) Antiseepage sea wall
CN103205951A (en) Sludge-type soil combined secondary dike-back pressure diking method
CN209227482U (en) A kind of geotechnical grid encloses low bank between fields
CN217150063U (en) Novel desktop river lake dyke reinforced structure of viewing
CN109056654A (en) A kind of geotechnical grid encloses low bank between fields and its construction method
CN206385498U (en) The compound sea wall of holding one's breath of Shuangzi dike
CN212248086U (en) Seawall ecological transformation's back cover nut block slope protection structure
CN210459099U (en) Seawall structure on soft soil foundation
CN111321700B (en) Overflowing energy dissipation type ecological bank protection method for anti-scouring and anti-landslide barrier plugs
CN202466518U (en) Back pressure structure of soft soil foundation dam
CN111622177A (en) Bottom sealing nut block slope protection structure for sea wall ecological reconstruction and construction method thereof
CN203188174U (en) Underwater riprap foundation bed and side-slope erosion prevention structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20141112